Sunteți pe pagina 1din 16

NEBOSH International General Certificate

in Occupational Health and Safety

UNIT IGC3: HEALTH AND SAFETY PRACTICAL


APPLICATION

Student Name:

Student Number:

Date of Submission:
IGC3 The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print)

Signature _______________________________

Date

For completion by a course provider representative (e.g. internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) _______________________________

Signature _______________________________

Date _______________________________

For completion by the course providers internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out
in the NEBOSH Malpractice policy.

Name (Print) _______________________________

Signature _______________________________

Date _______________________________

NB: This declaration must be completed in full submitted and retained with the
candidates script. If this declaration is not submitted the candidates result may be
declared void.
INTERNATIONAL GENERAL
CERTIFICATE Assessors marking sheet
(2011 specification)

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor

Course provider Course provider


number name

Student number Student name

NEBOSH
Maximum
Assessors moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 15
timescales

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 5
area

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 5
standards

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 15
improve health and safety in the chosen area

TOTAL MARKS 100

Grades:
Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessors signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessors additional comments on the practical application:

ASSESSED BY (name in block letters) ________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderators comments:


INTERNATIONAL GENERAL
CERTIFICATE Candidates observation
(2011 specification) sheet

IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number of

Student name _______________________________________ Student number

Place inspected: Prestige Group, Flyover construction, Surat, India Date of inspection 30 March 2014

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

1. Deep excavator hole size of 2x2x3 Short Term Measure: Provision of 1 day.
meter wide without any shoring warning signage on that area such as
protection and has the high hazard of Deep Excavation
people/material can fall and has the
Long Term Measure: Trenching the
potential for fatality, serious personal excavation area to avoid people/material 1 Month.
injury such as bone fracture &head falling from height.
injury and also property Introducing Permit to work 2 weeks
damage(Physical hazard)
Developing safe system of work 2 weeks.

2.Construction materials were stacked


too high outside area without any Short term action: Reduce the height of 2 days
barricade where workers around stacking using workforce.
working and also public walking close Long Term Action:
by has the serious potential of material 1) Barricading the area to exclude 1 Month.
falling from height and impact the the workers and public reaching
workers &public not limited to fatality, the stacking area.
serious personal injury and also 2) Training on safe stacking for all 1 Month.
material damage.(Physical Hazard) workers.

3. Tipper lorry was reversing without Short Term Action: Appoint a banks 3 hrs.
the help of banks man and observed man from the workforce.
no beepers/reverse alarm were in
place and has the potential to collide Long Term Action: Recruit banks man 1 Month
with pedestrians and lead to fatality and also fix reverse alarm for the tipper
and serious personal injury such as truck.
head injury, bone fracture.(Physical
Hazard)
4. Tower crane at site did not have an
operational/safety certification nor did Short Term Action: Inform the 3 hrs.
the crane operator have his operator driver/crane operator to bring the
license on hand/demand..Lifting necessary paper work.
accessories were not inspected before Long Term Action: Inspection training
videos for crane operation before and 2 weeks
and after the operation. All above
after to the crane operator and banks
could lead to equipment failure and man.
falling of object from height can cause
fatality, crane to collapse and serious
personal injury and damage to
property.(Physical Hazard)

5.Excavator are backing up without the


help of spotter could lead to accident Short Term Measure: Appoint interim 2 hrs
and have the potential to cause banks man to guide operator.
property damage, fatality by striking the
Long Term Action: Recruit, Appoint 1 Month.
pedestrians around(Physical Hazard). and train the banks man.

6. No Segregation for pedestrians and


vehicles at the flyover construction Short Term action: Place warning 3 hrs.
area which has the potential to cause signage such as Beware of Vehicles
collision between vehicle and Long Term Action: Separate pedestrian 1 Month
pedestrians and/or stationary objects and vehicles by constructing dividers
lead to property damage.(Physical
Hazard)

7. Diesel Generator in place for power


Short Term Action: Enforce the 2 hrs.
supply during night time work and
workforce to use hearing protection such
producing lots of noise which can lead as ear defenders or ear plugs.
to ear canal damage, tinnitus and also Long Term Action: Carry out 4 weeks.
noise induces hearing loss(Physical maintenance on diesel generator/Buy a
hazard) and no workers using hearing new diesel generator.
protection.

8. Workers have been exposed to hot


Short Term Action: Instruct the workers
weather and working for long time to intake sufficient amount to prevent 5Hrs.
without adequate breaks provided from dehydration.
leading to faint, dehydration and Long term action: Revise the schedule
hyperthermia.(Physical Hazard) and include break system for staff and 3 Weeks.
provide adequate training on heat stress,
dehydration and hyperthermia.
9. Diesel generator has found to be Short Term Measure: Buy a spill tray 1 Week.
leaking and there are no spill trays to and fix where observed leakage.
collect them hence fumes can lead to Long Term Action: Identify the cause for 1 Month.
possible fire and /or explosion having a the leakage and rectify and impart
potential damage to property and also training on the fire and /or explosion.
loss of many lives (Chemical Hazard). .

10. Workers were manually lifting Short Term Action: Enforce to use 2hrs.
cement bags from the warehouse and PPE& RPE.
also found to be not using PPE while
carrying out subject to ligament Long Term Action: Purchase of wheel 3 Weeks
damage(Ergonomic Hazard) barrow where workers can avoid carrying
manually.
Short Term Measure: Enforce workers
11.Drilling machine used at this
to wear PPE as gloves for vibration, RPE 2 days.
construction where found to be to prevent from dust and hearing
producing lots of noise and worker not protection for the noise.
using PPE such as gloves to reduce to Long Term Action: Maintenance should
exposure of vibration to his hand as it be carried out on the drilling machine to 3 Weeks.
identify the root cause for noise if it
is directly passing through can lead to
cannot be fixed then buying of new
vibration white finger, muscle drilling machine available in current
weakening .(Physical Hazard) market
12.Construction iron rods/sands Short Term Measure: Remove the
unloaded in front of the site and it is materials and store it inside and should 2 days.
not stored properly with any be away from the walk way.
barricading in place leading to trip Long Term Action: Build a secure 1 Month.
storage area where it can have lock to
hazard and can cause head injury as it
prevent from theft and also from tripping
preventing access/egress. hazard.

13.Drilling machine cord has 3 days.


kinks/splints at various places and also Short Term Action: Insulate the kink
has scorch marks has the potential to areas to prevent from electric leakage.
give electric shock to driller and lead to 1 Month.
Long Term Action: Replace the cord
heart fibrillation and cardiac arrest ,
and carry out portable appliance testing
death and secondary effects(Physical to ensure the standard has been
hazard). followed.

14.Oil spillage in the warehouse area 2 hrs.


where it has the potential for slip
Short Term Action: Clean up the oil
hazard and could lead to head injury,
spillage .
bruises etc(Physical Hazard) Long Term Action: Inspection regime
and continuous supervision in the 1 week.
warehouse area to maintain proper
housekeeping at all times.
15.Trailing of cables at the drilling area 2 hrs.
where workers found to be walking Short Term Measure: Warning signage
in place for trailing of cables Trip Hazard
around that area could lead to trip
hazard and have the potential for head
injury, bone fracture.(Physical Hazard)
1 Week
16. Ergonomic Hazard: Administration
department employees have a poor Short Term Action: Frequent breaks
working posture looking at the and job rotation by having tailor made
computer in the remote office area at good working schedule. 1 Month.
construction site due to non- adjustable
chairs and computer monitors can lead Long term measure :Purchasing
to musculoskeletal disorder, eye strain, adjustable chairs and monitors where
fatigue and back pain. workers can adjust to adequate level

17. Biological Hazard: Been observed 3 days.


that there is a pool of water stagnated Short Term Action: Water treatment
located near right side of the with chlorine to kills germs, bacteria and
construction area can cause biological virus.
effect of inhaling and/or absorption of
harmful bacteria and viruses may lead Long term Action: Purchase of biocides 1 Month.
to contagious diseases or to kill germs completely and proper
,Legionellosis, Hepatitis A, B. housekeeping with adequate supervision.

18. First aid provision at each Demonstrates the management Continue.


construction sections. Commitment towards health and safety
for workers.
19. Wholesome drinking water at all Potable drinking water to workers would Continue.
construction areas. help to hydrate themselves and employer
mention with the signage board stating
Safe Condition at each drinking water
facility areas.

1 day.
Short Term Measure: Enforce worker to
20. . Mechanical Hazard: Electric disc wear gloves PPE to minimize the
cutter machine (110V) for cutting abrasion. 3 Weeks.
stones in the construction where it had Long Term Measure: Training for all
no guards and could lead to potentially place workers on using the electric disc
high risk for entanglement as he is machine using hazard without using
wearing loose clothing, and cutting guard and replace the missing guard.
and/or abrasion as he is not using any
PPE .

1 day
21. Employees are at high risk of Short Term Measure: Enforce the
lung diseases from cement dust worker to use PPE/RPE such as hard hat
around the concrete mixer. There is and gloves, RPE is single face piece
no protection measures have been mask respirator to protect from inhalation
taken for employees such as no hazard.
Long Term Measure: High impact 3 weeks.
PPE,RPE and hard hats can lead to
training associated with the use of
asphyxiation, scar lung tissue and cement/concrete mixer.
also irritant to skin, eyes(Chemical
Hazard).

22.One of the workers were yelling at Short Term Measure: Consultation with 1 day.
both the employees to identify the cause.
another in the construction area can
cause stress and have the Long Term Measure: Formulating and
psychological effect as poor self implementing zero tolerance policy 2 Weeks.
esteem and strictly for behavioural issues
depression(Psychological Hazard).

23.Gas cutting work is ongoing Short Term Measure: Interim 3 hrs.


appointment of Fire Watcher.
nearby fuel storage area(Diesel).
There is no fire protection against Long Term Measure: Gas cutting
burn flying objects and fire operation should be done in highly
extinguisher around that area. Risk ventilated area where sufficient fire 1 Month.
of the property damage/fire extinguishers, purchase of DCP fire
incident/loss of lives)(Chemical extinguishers and construction of
&Physical Hazard). separate area to do gas cutting operation.

24. Welding work found to be Short Term Measure: Appoint fire 2 hrs.
happening around fuel storage area, watcher in that area.
hazard of fire/explosion as the spark
from welding operation would do and Long Term Measure: Buy pre-fabricated 2 Weeks.
welding pipes instead carrying out
risk of property damage, loss of lives,
welding operations.
burn injury(Physical Hazard).
25. Workers were carrying bricks on Short Term Measure: Stop the manual 1hr.
their head manual handling risk can handling work.
lead to headache, neck pain, bone Long Term Measure: Purchase of wheel
barrow where workers can use to carry 1 Week.
damage on the neck area(Physical
the bricks.
hazard). .
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student number

Location Prestige Group, Flyover construction, Surat, India Date of review30 /06 /2014

Introduction including overview of area inspected and activities taking place

The report follows a health and safety inspection of the construction, administration office and welfare
facilities at Prestige Group, Flyover construction, Surat, India where company involves construction
projects of apartments and also road projects like flyover and pavements.
The inspection took place on 30 March 2014 between 0900 and 1600. The scope of this inspection is
to highlight areas of concern because there have been serious accidents and near- misses for the
past month. Around 300 workers at site and using hand held tools such as hammer, chisel, axe and
power tools such as drilling machine, portable electric disk cutter, crane and cement mixer etc..
Inspection has been conducted based on the visual observation and also in interviewing workforce
and checking documents such as tool box talk, investigation report of previous accident that has
happened in this workplace for the past months ,Permit to work , safe system of work documents to
overview the general health and safety culture and commitment towards health and safety of the
organisation. Site has ongoing work of stacking construction materials using crane, excavator to dig
up the soil for the foundation ,welding operation ,gas cutting operation and concrete mixing operation.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student number

Location Prestige Group, Flyover construction, Surat, India Date of review 30/06 /2014

Executive Summary

At the completion of this inspection, I have concluded with recommendation which includes the time,
effort, money and control measures to mitigate/eliminate the health and safety issues observed
through are pointed out .Implementing on these control measures not only benefit the company
business image also boost employees morale and avoid any legal implication from the external
authorities, Direct and indirect cost associated for the company following an accident.

Key issues were found in the construction area activities are highlighted below.

Excavation for the foundation of flyover with no shoring/trenching could lead to


people/material may fall.
Materials were stacked too much height and had the potential for falling from height on to the
workers lead to head injury, fatality as some objects observed to be sharp ones.
Tipper Lorries and excavators are reversed without the help of banks man could lead to
accident with fixed objects/pedestrians.
Tower crane operator without any license and certification when spot checked and also no
inspection being done on the lifting materials and only visual contact with operator and spotter
no other communication device had been used for potential of blind spots for crane operation.

A quick analysis of the cost shown in the recommendation can help to identify the cost implication to
overcome the key areas which can in turn help to protect our workers, property and more importantly
our ISO certification renewal and public image on our business.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student number ________________________________

Location:Prestige Group, Flyover construction, Surat, India Date of review 30/06/2014

Main findings of the inspection

The key areas that have been identified are listed below:

*Observation#1:

Deep excavation were found for the foundation of flyover without any protection measures from the
workers/materials to prevent fall and also soil heaped around the excavation area can cave-in and
has the potential for workers can caught in lead to asphyxiation, death and also head injury, cuts,
bruises when workers fall into excavation and it is breaching ILO legislation of Convention C167-
Safety and Health in construction convention, 1988(No.167).

Recommendation:
Trenching the excavation area would completely eliminate the soil from cave in and also warning
signage around would caution the workers to understand the importance of signage and helps to
protect themselves from falling /also falling objects when workers working inside. For trenching would
cost approximately $250 and for purchase of 2 new warning signage cost around $50.

*Observation#2:

Construction materials such as iron rods ,bricks, cement bags were stacked too high where workers
and publics are walking nearby and it has the potential to fall off from height , workers/public may get
crushed and result in serious personal injury not limited to bone fracture,cuts,bruises etc... Which is
against ILO-C155 Occupational Health and safety convention 1981 and Work at height regulation-
2005(WAHR).
Recommendation:
High-Impact aversion therapy training for all workers on safe stacking to completely eliminate this
issue and also barricading the area helps to prevent the pedestrians movement safe which both could
cost approximately USD250.

Observation#3:

Tipping operations being carried without the help of spotter where lot of workers were found to be
moving around and also no announcement being made to clear off the area that could alert the
workers to move away before the tipping operation started has the potential for workers even get
crushed when the load fall on them resulting in serious personal injury,fatality,head injury etc. which
breaches the legislation of ILO -C177- Home work convention ,1966(No.177)

Recommendation:
Interim provision of banks man allocated before tipping operation could start minimize the issue, to
completely eliminate this issue would be announcing before tipping operation starts and recruit a
spotter and train to master on signalling to the operator and ensure no one is around during tipping
operation which would cost approximately USD400.

Observation#4:

Tower crane operator where found to be no paper work of his license and certification that supposed
to be carried in the crane machine. Also no inspection/maintenance record where in place for crane
and its slings where it all could lead to serious property damage and fatality which breaches ILO-
R164-Occupation health and safety recommendation,1981(No.164)

Recommendation:

Enforcing strict rules all necessary paperwork should be in place in the crane such as operators
license and certification for crane and also inspection/maintenance records carried on weight lifting
equipments during operation .

Observation#5:

Excavator were reversed without the help of banks man and there are plenty of other workers working
around the excavation area and also no signage in place can lead to excavator may fall into the
excavation can cause property damage and also when it collide with pedestrians can leads to fatality
by getting crushed which breaches ILO-R175- Safety and health in Construction Recommendation,
1988(No.175)

Recommendation: Appoint interim spotter to minimize the consequence and to completely eliminate
recruit and train spotter which would cost approximately USD450.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Student number ________________________________

Location Prestige Group, Flyover construction, Surat, India Date of review 30/06/2014

Conclusions

At the outset, I would like to thank the management for giving me an opportunity to inspect on the
place where there is heavy mounted traffic and it found to be challenging with one of the biggest
construction of flyover project at Surat, India. Also would like to extend my thanks to each and every
workforce who helped me throughout this inspection, by understanding the importance of why I am
being here as it pertains to their safety instead that the inspector came to point out the issues out
there and hence misbehaving like not providing sufficient information when asked/look at me like a
police.

Workforce seems to be happy with the sufficient welfare facilities and adequate workload on them
with the shift basis, however there found to be still grey areas where management should focus on to
rectify them, such as

Excavation without protection could lead to falling of material/worker has the consequence of
serious personal injury and fatality, constructing a trench with adequate warning signage
would eliminate this hazard.
Construction materials were stacked too high has the potential to fall from height on to
workers can have significant head injury ,bone fracture etc. Reducing the height and training
would help to mitigate this issue.
Tipper and Excavators were reversed/operated without the help the banks man can lead to
striking of pedestrians around that area, to rectify this issue an interim spotter should be
identified to mitigate and to completely eliminate recruit and train the spotter.
Crane operation being carried out without any inspection record and also no paper work on
board such as crane operators licence and certification which could lead to cancelling the
license for that vehicle to operate and any accident may found to be breaching the statutory
law,to rectify ensure inspection carried out on schedule and necessary paper work on board
all the times.

Above issues were spotted as major which highlights the concern of serious moral, legal and
economical problems which in turn could damage the public image and reputation on us. Suitable
recommendation suggested on the spotted issue which Im bringing to your attention through this
report for implementation to rectify it without further delay.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report template

UNIT IGC3 THE HEALTH AND


SAFETY PRACTICALAPPLICATION

Student number ________________________________

Location Prestige Group, Flyover construction, Surat, India Date of review 30/06/2014

Recommendations:

Recommendation Likely resource implications Priority Target date


Observation#1:
Trenching the excavation 2 manpower required to High 30 April 2014(1
area and provision of implement ,trench would cost Month)
warning signage to around USD 250 and 2 warning
minimize the signages would cost $50 , total
people/material falling cost of approximately USD 300
from height.
Observation#2
Training on safe stacking Arrangement of workplace High 1 Month
and reducing the height of training on safe stacking like
the stacked material. purchasing training material (30- April-2014)
would cost approximately
USD50

Observation#3:
Recruit, Appoint and Recruiting cost would be High (30- April-2014)
Train the banks man for approximately USD200 and
reverse operation of training could cost USD50 so (1 Month)
tipper. total of approximately $250.

Observation#4:
Enforcement of rules by Would not cost anything to the Medium 2 Weeks.
supervisor to instruct the organisation however it has the (14-April-2014)
crane operator to carry all potential indirect cost like
necessary paperwork and stopping the crane operation
training videos for crane after an accident or any spot
operator. inspection carried by external
authorities which is
immeasurable.

Observation#5: Recruiting cost would be High 1 Month


Recruit, Appoint and approximately USD200 and (30- April-2014)
Train the banks man for training could cost USD50 so
reverse operation of total of approximately $250.
excavator.

S-ar putea să vă placă și