Documente Academic
Documente Profesional
Documente Cultură
Project Plan
Duration
Task ID Task/Activity Description Start Date
(Days)
system selection.
B.3 Suspension
B.6 Ergonomics
B.7 Analysis
D Frame Production
D.2 Weilding
D.3 Joints
E Electrical Work
E Assembly
F Vehicle Testing
Team ID 16060
Team Name Samarthya 2.0
April Ma
End Date Responsible W14 W15 W16 W17 W18
4 11 18 25 2
4/18/2016 Faisal khan
4/11/2016 Ankit pawar
Gagandeep singh
4/18/2016 Prajwal Thakre
Amit singh
Faisal Khan
Gagandeep singh
Amit Singh
Kalyan singh
Ankit pawar
Vinith Korra
Kalyan Singh
Rahul Sarma
Gagandeep Singh
Rajan Lad
Prajwal Thakre
Ankit Pawar
Kalyan singh
Rahul Sarma
Faisal Khan
Ankit Pawar
Vinith Korra
Gagandeep
Kalyan Singh
Faisal Khan
Ankit Pawar
Rajan Lad
Faisal Khan
Ankit Pawar
Gagandeep
Kalyan Singh
Rajan Lad
Rahul Sarma
Faisal Khan
Vikas Verma
Prajwal Thakre
Gagandeep
Vinith Korra
Gagandeep
Kalyan Singh
Ankit pawar
Faisal khan
Ankit Pawar
Main Task/ Activity
Legends Sub Task/ Activity
Milestone
Text Milestone Details
A Designing 30 4/5/2016
A.1 Hand Sketch Preparation 6 4/5/2016
A.2 CAD/Modeling 9 4/11/2016
A.3 CAE Analysis 5 4/13/2016
A.4 Optimization 15 4/20/2016
B Procurement 46 4/18/2016
B.1 Frame Material 14 4/18/2016
B.2 Motor & Controller Unit 37 4/27/2016
B.3 Tire, Rim etc 17 4/21/2016
April Ma
End Date Responsible W14 W15 W16 W17 W18
4 11 18 25 2
5/4/2016 Deepak
Design Ready
4/10/2016 Nisha
4/19/2016 Prakhar
4/17/2016 Deepak
5/4/2016 Pooja
6/2/2016 Prakash
5/1/2016 Srikant
6/2/2016 Animesh
5/7/2016 Suraj
8/11/2016 Kumar
5/5/2016 Pooja
5/8/2016 Prakhar
5/29/2016 Srikant
5/21/2016 Nisha
8/11/2016 Kumar
Main Task/ Activity
Legends Sub Task/ Activity
Milestone
Text Milestone Details
Design Ready
July August Septem
W28 W29 W30 W31 W32 W33 W34 W35 W36
11 18 25 1 8 15 22 29 5
Vehicle Complete
September October
W37 W38 W39 W40 W41
12 19 26 3 10
Project Plan Guidelines
1. Introduction
1.1 Project Planning is an important document for the effective planning and smooth execution of project.
Many professional applications are used in the industry for making project plans. But for the ease of
1.2
generic MS Excel format has been given.
With the help of this project plan, teams can break the entire project into different activities and make the
1.3 & monitoring perfect. This tool can also be used by the teams for the continuous monitoring of the activiti
of planned vs. actual execution as per their own requirements.
A task which defines the major work areas of the entire project shall be considered as Main Task. E.g. D
Material & Parts Procurement, Testing, Documentation etc. These are denoted with Alphabets. Refer Ex
The breakdown of major tasks into minor activities will give the sub activities. These are denoted by Alph
numeral. E.g. Under Designing following can be considered as sub-activity:- sketching, CAD Modelling,
An alphabet is asigned to a Main Task/Activity. The Sub task/activity is denoted by the alphabet of its m
by a number/numeral. This numeral shows the sequence to that sub task in the project plan sheet.
Sub Task/Activity shall be denoted with the Double Arrow Line (Colour-Black, Type-Continuous Line, W
Milestones, if any, shall be shown with upward triangle (Colour-Orange, Outline-Black). The description
be given in the TEXTBOX provided adjacent to it in your project planning sheet.
Text
However, teams may use any other legends as per their choice for addition information. Use of call out
done for effective display of information.
2.8 Timeline:
The weekwise timeline has been shown along with the week numbers of Calendar Year 2016. Teams m
timeline starting from the week when team has started working for project.
The timeline, activities shown in the format and the example sheets are only representative for the under
Teams must enter their actual data.
3. Format
3.1 The same format must be used by the teams. No other formats shall be accepted.
3.2 Enter the team ID and the team Name at the boxes given at the top of the sheet.
Mention all the activities and sub-activities with maximum details and provide dates, duration, responsibl
3.3
insert the shapes representing your activities accordingly.
3.4 Assign a task ID to each main task and sub-task.
3.5 In case of any problem faced related to format, teams must immediately write to efficycle.technical@saen
Deadline for the project plan submission is Friday 20-May-2016 till 05:00pm. No request for deadli
4.2
be entertained.
Team must send the project plan to efficycle.reports@icat.in only (also mentioned under rule 10.7
4.3
Rulebook). If the project plans are not received at this email ID, it will be considered as non-submis
Mail Subject Line and the File Name of Document should be given as Team ID_Team Name_Efficy
4.4
Plan.
4.5 Teams must strictly adhere to all the deadlines given above.
xecution of project.
s. But for the ease of the participants, a
ficycle.technical@saenis.org