FACULTY OF ARCHITECTURE, PLANNING & SURVEYING

UNIVERSITI TEKNOLOGI MARA


BACHELOR OF QUANTITY SURVEYING (AP224)
BUILDING SERVICES III (QSM605)

A. Objective
To understand the components required and the design techniques, including
related regulations and building by-laws, for vertical and horizontal
mechanical handling systems, air conditioning, mechanical ventilation and
gas installation systems.

B. Learning Outcomes
At the end of this task, students should be able to achieve (CO1). In the long
run, the task is to assist each student to achieve the outcomes of PO2.

C. Instructions
1. Youre required to conduct a thorough case study on one particular
building that has been equipped with 1 system listed below:
a. Vertical / horizontal mechanical handling system
b. Natural / mechanical ventilation system
c. Gas supply system

2. Therefore, your case study report must provide a detailed description


of the 1 system mentioned above.

3. The content of your case study may include:


a. Introduction (5
marks)
b. Literature Reviews (25
marks)
c. Case Study
i. Description and specification of the system
(10 marks)
ii. Design and selection criteria (10
marks)
iii. Related regulations and by-laws (10
marks)
iv. Sustainability and eco-friendly features (10
marks)
v. Detailed sketches, photos and/or schematics (10
marks)
vi. Other aspects that may be deemed important (5
marks)
d. Group Analysis & Conclusion (10
marks)
e. Any evidence (photos & related documents)
(5 marks)
f. References

4. The tasks are to be taken in a group of 5.


Issued: Week 5.
Submission: Week 11.
Font: Arial 11 with 1.5 spacing, justified.