N DON DUE TEC AME O. E H UNIT 9MCD A Check for water cooled electric power cables and gun cooling water connections for their proper fitment and 1. DISTRIBUTIO serviceability conditions of cables. Check for tightness N UNIT of insulator guide. A Clean the nozzle jets with proper size of wire from back end. Do not use oversize wires. Do not rotate the wires. Push the wire straight in and out. B Clean the siphon plug jets with proper size of wire. Do UNIT 6P-II not use oversize wires. Do not rotate the wires. GUN C When nozzle is installed on the gun, ensure that 2. siphon plug bore is clean and nozzle nut is firmly THERMOSPR hand tightened on the siphon plug. AY GUN D Perform leak checks and checks for any obstructions in either the oxygen or fuel gas circuits. If any abnormalities found, fix the problem and do corrective actions. E Check for recommended flow rates and pressure. 3. UNIT 4HL A Operate the system and check for any abnormality by TILTING increasing the speed and decreasing it. TABLE UNIT B Lubricate if required. SL EQUIPMENT INSPECTION ITEMS DATE SIGN N DON DUE TEC AME O. E H 4. UNIT 6HE A Check for proper operation of the unit. ELECTRICAL B Ensure that all incating lights are serviceable CONTROL UNIT 5. UNIT 4HC A Operate the system and check for any abnormality by TRAVERSE increasing the speed and decreasing it. UNIT 6. UNIT 8ME A Operate the system and check for water pressure and HEAT water temperature. It should be within limits during operation of system. EXCHANGER UNIT 7. UNIT 4MP A Ensure that all incating lights are serviceable during DUEL operation. POWDER B Check for gas leaks. Check for positive feeding of powder after loading. FEEDER UNIT SL EQUIPMENT INSPECTION ITEMS DATE SIGN N DON DUE TEC AME O. E H 8. SPRAY A Clean ventilation/exhaust system. BOOTH B Clean water tank. Re-fill with fresh clean water. C Check for serviceability of fans, power sources, and filtration equipments. Check for proper operation of ventilation and exhaust system. D Check for serviceability of fire protection equipments. E Check all pipings and their connections for leakage. F Check for proper earthing and bonding of all equipments before operation. G Check water pumps for leakage during operation. 9. GRIT BLAST A Check foot switch for smooth operation B Check air regulator, pressure gage and exhaust valve M/C for smooth operation. C Check air filter for any blockage. D Check orifice of abrasive mixing tube against wear. E Check rubber linings of cabin walls.