Sunteți pe pagina 1din 7

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

Quezon City Branch


Don Fabian Ext., Commonwealth Avenue Quezon City

Network Plan
Advanced Networking

Alejandria
Cagulang
Corporal
Gutierrez
Illazar
Magtibay
Resnera
Valencia
Analysis

Considering a distance of approximately 60 meters, between the Rothlener and


Miserior building of Polytechnic University of the Philippines, Quezon City Branch, and
the controlled environment provided by less infrastructures and other destructive
factors, it is wise to use coaxial and UTP cables in constructing a local area network
(LAN) for the said buildings. Not only the transmission of data and signal will be
effective, but the network will also be reliable and budget-wise, since it will require
inexpensive equipments, and the network is not that large.

The network plan is designed to last for a long span of time, and this is possible
by resorting to the use of conduits. The location of the buildings is suitable for
underground wirings, but it is advised to apply this only if proven convenient. The
conduits will serve as protection against destructive elements.

Other necessary technologies, such as hub, router, server etc., will be used in the
establishment of the network plan. Full Mesh network topology is suggested for this type
of network.

Purpose
The purpose on creating this network plan is to analyze and solve the probem
about the connectivity between the Rothlener and Miserior Building of Polytechnic
University of the Philippines, Quezon City Branch. And to formulate a new and better
design for efficient and faster speed of connection. This plan also used new type of
connections that can be suitable the environment/ surroundings. The plan aims to find
and use materials that are low cost but effective, durable and convenient type that will
last for the said period of time.
COST BENEFIT ANALYSIS

COST ANALYSIS
Tangible Costs
BENEFIT ANALYSISProduct Price Quantity Total
Coaxial Cable (per
Product meter) Price
Php 12.00 60 Php 720.00
*60meters
Decreased Anxiety needed Php 4,000.00/yr
Actiontec
(from ECB2500C MOCA Coax to
increased
Ethernet
reliability)Adapter Php 3,014.10 2 Php 6,028.10
Decrease in Manpower Php 360,000/yr
F -Type Coax
Increased Antenna CablePhp
Productivity Jack
25,000.00/yr
Connector Plug Male
Less Training Time 10 Pcs Php 323.08
Php 6,000.00/yr 1 Php 323.08
Increased Connectivity Php 10,000.00/yr
UTP Cable PUPQC
between CAT 5 (perand
meter)
Php 22.00 250 Php 5,500.00
*250meters
PUP Main Offices needed
Microsoft Windows
Ease of Record Server 2008
Keeping Php
Php 25,000.00/yr
1 Php 40,000.00
Increased Security 40,000.00
Php 30,000.00/yr
RJ45
Php 50.00 18 Php 900.00
*5 pieces per pack
Total Php 460,000.00/year
Mikrotik CRS112-8G-4S-IN 8 port
Gigabit Cloud
Intangible Router Switch
Benefits Php 6,062.36 1 Php 6,062.36
Product Price
TP-Link
IncreasedTL-RN940N 5-port 450mbps
Staff Morale Php 15,000.00/yr
Php 1,600.00 4 Php 6,400.00
Router
D-Link
Total DES-1016A 24-ports Desktop Php 1,549.00 Php 115,000.00/year
Php 1,549.00
Router Switch
Ultimate Tool Kit Php
Total Benefit Analysis = 1 Php
Php 10,000.00
10,000.00
475,000.00/year
Labor (Maintaining the System for 6 Php Php
5
months) (40k per month labour) 40,000.00 200,000.00

Subtotal of Tangible Costs Php


220,063.00

Intangible Costs
Product Price Total
Network Down Time Php 1 Php
50,000.00 50,000.00

Subtotal of Intangible Costs Php 50,000.00

Total 6-month Cost Analysis Php


270,063.00
Total Monthly Cost Php 54,012.60
CONCLUSION:
The allotted time for the project to finish is 5 months and it will cost a total of Php
270,063.00. While the project is expected to last for 3 to 6 years, we can say that the
total benefit for the implementation of this project will be Php 475,000 annually.
Network Design
a.) Network Topology
b.)Floor Plan
Maintenance
Network maintenance tasks are those tasks which network administrators perform
on a day-to-day basis, allowing for the stability of the network. Some common network
maintenance tasks include, but are not limited to, these are the following general
activities:
Task Performed Schedule

Installing, replacing or upgrading both When the components are ready to


hardware and software. install.
Replacing new component when
switching old component to new
component or after troubleshooting any
network issues.
Upgrading is performed specified from
the planned network upgrade.
Monitoring, tuning and optimizing the Monitoring is performed every operating
network time of the network.
Tuning and optimizing when performing
troubleshooting operation.

Documenting the network and Every time after monitoring and


maintaining network documentation troubleshooting or other maintenance
activities. Compiled and maintained
chronologically.

Securing the network from both internal Always performed especially when
and external threats operating hours.

Planning for network upgrades, Monthly, to enhance and stabilise the


expansions, or enhancements network.

Scheduling backups and restoring Weekly, after last backup. And when
services or the network from backups performing upgrades, replacements and
installation of components.

Maintaining and updating device Performed weekly.


configurations

S-ar putea să vă placă și