Sunteți pe pagina 1din 12

Water and Wastewater Calculation Spreadsheet Instructions

Spreadsheet Version: 2013.08

1. For use with EMI's Civil & Environmental Preliminary Design Guide for Undeveloped Site

2. Rename and save this file in your project folder. It is read-only.

3. Light blue cells indicate user input.

4. Mouse over cells with red triangles in the corners for tips and information.

5. Add columns and modify this spreadsheet as necessary. It was created to be customized
Water Usage Rates in Liters per Capita per Day (Lpcd)1 Wastewater Production (Lpd)3
Users
Building No. of Domestic Institutional
Full-time
Building User Type (Capita) per
Code Buildings Utensil House Clothes Hospital Day-use Total per Capita Total Usage per
Building
Drinking Cooking Washing Washing Washing Bathing Toilets Other Hospital Usage (Lpcd) Day2 (Lpd) Graywater @ Blackwater @
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
TOTAL GRAYWATER TOTAL BLACKWATER
ADDITIONAL USES - -
Notes
1
Usage determined based on local information or from the EMI Civil Preliminary Design Guide Agriculture -
2
The total usage rate is calculated by multiplying the per capita usage rate by the total number of users (i.e. users for all buildings). Other -
3
Watewater production is equal to total water usage, which assumes that inflow & infiltration replaces any water consumed.
TOTAL WATER USAGE
L/day -
L/month -
m3/month -
WELL PUMP CAPACITY
L/hour
Pump Hours per
Day
L/day -
% Capacity #DIV/0!
WATER STORAGE
Storage Required days = - L
Tank Shape
Tank Battery (Group of Tanks) Single Tank Size
Tank Side m #DIV/0! m
Other Tank Side m m
Water Height m m
Tank Freeboard m m
Total Tank Height 0.00 m 0.00 m
Tank Volume 0 L #DIV/0! L
Number of Tanks #DIV/0!
Tank Spacing m
Number of Tank Rows
Num. of Tank Columns
Required Footprint 0.00 m2
APPROX. HEIGHT OF STORAGE
Pressure Required kPa = 0.00 m height
Date:
Time:
Location:
Time Depth to Water Depth Perc Rate
(min) (cm) (mm) (mm) (mm/min) (min/mm) (min/25 mm)
0.00 0.0 -- -- -- --
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!

Result:

Application Rate (lpd / m2)


#N/A

Soil Characterization
Depth Soil Type Notes
Wastewater Primary Treatment (Septic Tanks)1
Building Total Graywater Total Blackwater Tank Dimensions (m)
Building Total Users
Code (Lpd) (Lpd) Liquid Wastewater A: Liquid Retention B: Scum & Storage Total Volume (m3) Length 1st Length 2nd Resulting Tank Storage
Septic Tank Code Users per Tank per Tank (Lpd) Volume (L) Capacity (L) Required (A+B) Width2 Length3 Compartment Compartment Water Depth4 Height Volume (m3)
- - - - - - - -
0 0 - - -
- - - - - - - -
- - - - - - - -
0 0 - - - - - - - - - - -
- - - - - - - -
0 0 - - - - - - - - - - -

Design Constants
Notes
N = Years between Desludging: 1
Septic tank design based on "A Guide to Development of On-Site Sanition" by the World Health Organization, 1992, using the following criteria
for liquid retention times:
If Q < 6,000 L/day, T = 24 hours
F = Sludge Digestion Rate Factor: If 14,000 L/day > Q > 6,000 L/day, T = 33 - 0.001Q hours
If Q > 14,000 L/day, T = 12 hours
where: Q = tank inflow and T = retention time
Septic Tank Receives: And the following formula for scum & storage capacity: B = P x N x F x S
where: B = the required sludge and scum storage capacity in liters
P = Number of people served
Rate of Sludge and Scum N = Number of years between dislodging
40 L/person/yr
Accumulation: F = Sludge digestion rate factor
S = Rate of sludge and scum accumulation (25 L/person/yr receiving only blackwater; 40 L/person/yr all wastewater)
Required Freeboard: meters 2
Minimum width (W) of 0.6m.
3
Total length = 2W (first compartment) + W (second compartment).
4
Depth of water only, not less than 1.2m (1.5m preferred) or greater than total length; Height must include additional freeboard (open space)
above water surface in tank.

Sludge Digestion Rate Factor (F)

F if ambient temp >20 F if ambient temp >10


Number of years F if ambient temp <10 degrees C
degrees C throughout the degrees C throughout the
between desludging during winter
year year

1 1.3 1.5 2.5


2 1 1.15 1.5
3 1 1 1.27
4 1 1 1.15
5 1 1 1.06
6 or more 1 1 1
Wastewater Secondary Treatment & Disposa
Building Total Graywater Total Blackwater Rectangular Pit Dimensions (m) Circular Pit Dimensions (m) Soak B
Building Total Users
Code (Lpd) (Lpd) Wastewater to Load Infiltrative Bottom Number of Proposed Circular Wall Depth Number of Proposed Field
System (Lpd) Area (m2) System Description Length Width Depth Area Wall Area Pits Diameter Bottom Area Area Depth per Pit Pits Width

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

Design Constants

Wastewater Application Rate:


Lpd/m2
Wastewater Secondary Treatment & Disposal Options
Building Total Graywater Total Blackwater Soak Bed Dimensions (m) Trench Dimensions (m)
Building Total Users
Code (Lpd) (Lpd) Necessary Field Pipe Shoulder Number of Pipe Proposed Trench Total Necessary Number of Length of Each Trench
Infiltrative Depth Length Spacing Width Lengths Width Infiltrative Depth Trench Length Trenches Trench Spacing Total Width Option Selected

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -


VIP LATRINE DESIGN

N (effective life of the pit in years)


P (avg number of people using the pit daily)
R (estimated sludge accumulation rate for a single person in m 3/year)
V (effective volume of the pit (m3) = N x P x R

Diameter of the bottom of the pit (m)


Sludge Depth (m)

Q (water used for flushing in liters per day per person)


A (application rate in lpd/m2)
Infiltration Depth (m)=

Pit Depth (m) = Sludge Depth + Infiltration Depth + 0.5m

Sludge Accumulation Rate


Wastes retained in water where degradable anal cleaning materials are used
Wastes retained in water where non-degradable anal cleaning materials are used
Waste retained in dry conditions where degradable anal cleaning materials are used
Wastes reatained in dry conditions where non-degradable anal cleaning materials are used
0

#DIV/0!

#DIV/0!

#DIV/0!

R
40
60
60
90
Water Usage Rates in Liters per Capita per Day (Lpcd)1
Village Number of Users per Domestic Animals Total per Total Usage
User Group
Name Groups Group Utensil House Clothes Capita Usage Total Usage per per Village
Drinking Cooking Washing Washing Washing Bathing Toilets Other Cow & Buffalo (Lpcd) Day2 (Lpd) per Day (Lpd)
- -
-
- -
- -
-
- -

Notes
1
Usage determined based on local information or from the EMI Civil Preliminary Design Guide (Appendix A, Indian Standards of Water
Usage)
2
The total usage rate is calculated by multiplying the per capita usage rate by the total number of users (i.e. users for all buildings).

S-ar putea să vă placă și