ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO

NACIONAL INTERCONECTADO DE LA REPBLICA DOMINICANA

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO


ENERO_2016 DICIEMBRE_2019

OC-GO-14-POLP1510-151031-V0

Para: Agentes del MEM y la SIE

Preparado por: Organismo Coordinador del SENI

Preparado por: Revisado por: Aprobado por: Fecha


V1 Peter Santana Victor Collado Andrs Manzueta
Analista de Estudios 2015-10-31
Analista de Estudios Encargado rea de Estudios
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

1. BASE LEGAL ................................................................................................................................ 6


2. INTRODUCCIN .......................................................................................................................... 6
3. INSUMOS DE LA PROGRAMACIN DE LARGO PLAZO ................................................................... 7
DATOS DE LA DEMANDA ................................................................................................................................. 7
4. ESCENARIOS CONSIDERADOS PARA LA REALIZACION DEL ANLISIS ENERGTICO ........................15
5. RESULTADOS DE LAS SIMULACIONES .........................................................................................15
5.1 GENERACIN DE ENERGA POR TIPO DE COMBUSTIBLE .............................................................15
5.2 COSTOS MARGINALES RESULTANTES .........................................................................................19
5.3 ANLISIS Y EVALUACIN DEL ESCENARIO OPERATIVO ................................................................28
EVOLUCIN DE LA DEMANDA Y EL DFICIT ESPERADO ......................................................................................... 28
EVOLUCIN DE LA ENERGA PROYECTADA Y EL COSTO OPERATIVO ESPERADO ........................................................ 33
5.4 RESUMEN DE PRODUCCIN ESPERADA ......................................................................................38
GENERACIN ESPERADA POR BLOQUES ........................................................................................................... 38
PRODUCCIN ESPERADA POR CENTRALES DE GENERACIN.................................................................................. 38
PRODUCCIN ESPERADA POR EMPRESAS DE GENERACIN .................................................................................. 39
CAUDALES PROMEDIO TURBINADOS ............................................................................................................... 39
CONSUMO PROMEDIO DE COMBUSTIBLES ....................................................................................................... 39
6. OBSERVACIONES Y COMUNICACIONES PRESENTADAS POR LOS AGENTES DEL MEM...................42
NUEVOS PROYECTOS DE GENERACIN............................................................................................................. 42
NUEVOS PROYECTOS DE TRANSMISIN ........................................................................................................... 44
PROYECTOS EN FASE DE DISEO ..................................................................................................................... 44
PROYECTOS EN PROCESO DE LICITACIN .......................................................................................................... 44
OBRAS EN PROCESO DE ADJUDICACIN ........................................................................................................... 44
7. ESTUDIO ELCTRICO ..................................................................................................................45
8. CONCLUSIONES .........................................................................................................................46
DEL ANLISIS ENERGTICO: ........................................................................................................................... 46
DEL ANLISIS ELCTRICO: .............................................................................................................................. 47
9. RECOMENDACIONES .................................................................................................................48
DEL ANLISIS ENERGTICO: ........................................................................................................................... 48
DEL ANLISIS ELCTRICO: .............................................................................................................................. 48
10. ANEXOS ....................................................................................................................................49
ESTIMACIN DE DEMANDA ESPERADA ..............................................................................................49
DEMANDA ESPERADA POR BLOQUES ................................................................................................50
ENERGA NO SUMINISTRADA POR BLOQUES .....................................................................................52
ENERGA ESPERADA POR TIPO DE COMBUSTIBLE ...............................................................................54
COSTOS MARGINALES ESPERADOS ....................................................................................................56

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 2 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DE LA GENERACIN ESPERADA POR BLOQUE ................................................................58


RESUMEN DE PRODUCCIN ESPERADA............................................................................................ 206
ENERGA ESPERADA POR EMPRESAS DE GENERACIN ..................................................................... 214
CAUDALES PROMEDIO TURBINADOS .............................................................................................. 216
CONSUMO PROMEDIO DE COMBUSTIBLES ..................................................................................... 220
DATOS DE LA GENERACIN ............................................................................................................. 223
CONCESIONES PROVISIONALES OTORGADAS POR LA COMISIN NACIONAL DE ENERGA (CNE) ........ 224
PROGRAMA DE MANTENIMIENTO MAYOR ...................................................................................... 225
COMPARACIN COSTOS VARIABLES DE DESPACHO ......................................................................... 227
PROPUESTAS DE MEJORAS REALIZADAS EN LOS PROGRAMAS DE MEDIANO PLAZO DEL 2015. .......... 228
PROPUESTAS DE MEJORAS REALIZADAS EN LOS PROGRAMAS DE MEDIANO PLAZO DEL 2014. .......... 230

NDICE DE FIGURAS

Figura 1. Demanda proyectada anual para el periodo de estudio. 8


Figura 2. Demanda total proyectada anual para el periodo de estudio. 9
Figura 3.Comparacin de demanda abastecida y demanda total proyectada. 10
Figura 4. Demanda esperada ao 2016. 11
Figura 5. Demanda esperada ao 2017. 11
Figura 6. Demanda esperada ao 2018. 12
Figura 7. Demanda esperada ao 2019. 12
Figura 8. Demanda proyectado ao 2016, escenario de demanda total. 13
Figura 9. Demanda total proyectado ao 2017, escenario de demanda total. 13
Figura 10. Demanda total proyectado ao 2018, escenario de demanda total. 14
Figura 11. Demanda total proyectado ao 2019, escenario de demanda total. 14
Figura 12. Generacin de Energa por tipo de Combustible 2016_2019. 16
Figura 13. Generacin de Energa por tipo de Combustible 2016. 16
Figura 14. Generacin de Energa por tipo de Combustible 2016_2019, escenario demanda total. 18
Figura 15. Generacin de Energa total por tipo de Combustible 2016, escenario demanda total. 18
Figura 16. Costos marginales promedios esperados 2016-2019. 19
Figura 17. Costos marginales promedios mximo 2016-2019. 20
Figura 18.Costos marginales mnimos esperados 2016-2018. 20
Figura 19. Costos marginales promedios esperados 2016-2019, escenario demanda total 21
Figura 20. Costos marginales mximos esperados 2016-2019, escenario demanda total. 22
Figura 21. Costos marginales mnimos esperados 2016-2019, escenario demanda total. 22
Figura 22. Comparacin Costos marginales mximos esperados 2016-2019, ambos escenario de demanda. 23
Figura 23. Comparacin Costos marginales promedio esperados 2016-2019, ambos escenario de demanda. 23
Figura 24. Comparacin Costos marginales mnimos esperados 2016-2019, ambos escenario de demanda. 24
Figura 25. Costos marginales esperados 2016. 24
Figura 26. Costos marginales esperados 2017. 25
Figura 27. Costos marginales esperados 2018. 25
Figura 28. Costos marginales esperados 2019. 26
Figura 29. Costos marginales esperados 2016, escenario demanda total. 26
Figura 30. Costos marginales esperados 2017, escenario demanda total. 27

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 3 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Figura 31. Costos marginales esperados 2018, escenario demanda total. 27


Figura 32. Costos marginales esperados 2019, escenario demanda total. 28
Figura 33. Evolucin de la demanda y el dficit proyectado para el 2016. 29
Figura 34. Evolucin de la demanda y el dficit proyectado para el 2017. 29
Figura 35. Evolucin de la demanda y el dficit proyectado para el 2018. 30
Figura 36. Evolucin de la demanda y el dficit proyectado para el 2016. 30
Figura 37. Evolucin de la demanda y el dficit proyectado para el 2016, escenario demanda total. 31
Figura 38. Evolucin de la demanda y el dficit proyectado para el 2017, escenario demanda total. 32
Figura 39. Evolucin de la demanda y el dficit proyectado para el 2018, escenario demanda total. 32
Figura 40. Evolucin de la demanda y el dficit proyectado para el 2019, escenario demanda total. 33
Figura 41. Evolucin de la energa proyectada y el costo operativo esperado para el 2016. 34
Figura 42. Evolucin de la energa proyectada y el costo operativo esperado para el 2017. 34
Figura 43. Evolucin de la energa proyectada y el costo operativo esperado para el 2018. 35
Figura 44. Evolucin de la energa proyectada y el costo operativo esperado para el 2019. 35
Figura 45. Evolucin energa proyectada y costo operativo esperado ao 2016, escenario demanda total. 36
Figura 46. Evolucin energa proyectada y costo operativo esperado ao 2017, escenario demanda total. 37
Figura 47. Evolucin energa proyectada y costo operativo esperado ao 2018, escenario demanda total. 37
Figura 48. Evolucin energa proyectada y costo operativo esperado ao 2019, escenario demanda total. 38
Figura 49. Generacin de Energa por Empresas, ao 2016. 40
Figura 50. Generacin de Energa por Empresas, ao 2017. 40
Figura 51. Generacin de Energa por Empresas, ao 2018. 41
Figura 52. Generacin de Energa por Empresas, ao 2019. 41
Figura 53. Comparacin Costos variables de Despacho. 227

NDICE DE TABLAS

Tabla 1. Tendencia de la demanda cada cuatro aos. ...................................................................................................8


Tabla 2. Proyectos de nuevas centrales de generacin. ..............................................................................................43
Tabla 3. Estimacin de la Demanda. ............................................................................................................................49
Tabla 4. Estimacin de la Demanda total. ...................................................................................................................49
Tabla 5. Estimacin de la Demanda de las Distribuidoras. ..........................................................................................49
Tabla 6. Demanda proyectada por bloques (escenario demanda abastecida)...........................................................50
Tabla 7. Demanda proyectada por bloques (escenario demanda total). ...................................................................51
Tabla 8. Energa no suministrada esperada por bloques. ...........................................................................................52
Tabla 9. Energa no suministrada esperada por bloques (escenario demanda total). ...............................................53
Tabla 10. Energa por tipo de combustible 2016. .......................................................................................................54
Tabla 11. Energa por tipo de combustible 2017. .......................................................................................................54
Tabla 12. Energa por tipo de combustible 2018. .......................................................................................................54
Tabla 13. Energa por tipo de combustible 2019. .......................................................................................................54
Tabla 14. Energa por tipo de combustible escenario demanda total 2016. ..............................................................55
Tabla 15. Energa por tipo de combustible escenario demanda total 2017. ..............................................................55
Tabla 16. Energa por tipo de combustible escenario demanda total 2018. ..............................................................55
Tabla 17. Energa por tipo de combustible escenario demanda total 2018. ..............................................................55
Tabla 18. Costos marginales por bloques horarios para el ao 2016. ........................................................................56
Tabla 19. Costos marginales por bloques horarios para el ao 2017. ........................................................................56
Tabla 20. Costos marginales por bloques horarios para el ao 2018. ........................................................................56

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 4 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 21. Costos marginales por bloques horarios para el ao 2019. ........................................................................56
Tabla 22. Costos marginales por bloques horarios para el ao 2016, escenario demanda total. ..............................57
Tabla 23. Costos marginales por bloques horarios para el ao 2017, escenario demanda total. ..............................57
Tabla 24. Costos marginales por bloques horarios para el ao 2018, escenario demanda total. ..............................57
Tabla 25. Costos marginales por bloques horarios para el ao 2019, escenario demanda total. ..............................57
Tabla 26. Resultados de la generacin por bloques de demanda ...............................................................................58
Tabla 27. Resultados de la generacin por bloques de demanda escenario demanda total ....................................132
Tabla 28. Produccin esperada por centrales de generacin [GWh], ao 2016. ....................................................207
Tabla 29. Produccin esperada por centrales de generacin [GWh], ao 2017. ....................................................209
Tabla 30. Produccin esperada por centrales de generacin [GWh], ao 2018. ....................................................210
Tabla 31. Produccin esperada por centrales de generacin [GWh], ao 2019. ....................................................212
Tabla 32.Energa esperada por empresas, ao 2016. ................................................................................................214
Tabla 33.Energa esperada por empresas, ao 2017. ................................................................................................214
Tabla 34. Energa esperada por empresas, ao 2018. ..............................................................................................215
Tabla 35. Energa esperada por empresas, ao 2019. ...............................................................................................215
Tabla 36. Caudales promedios mensuales centrales hidroelctricas, ao 2016. ......................................................216
Tabla 37. Caudales promedios mensuales centrales hidroelctricas, ao 2017. ......................................................217
Tabla 38. Caudales promedios mensuales centrales hidroelctricas, ao 2018. ......................................................218
Tabla 39. Caudales promedios mensuales centrales hidroelctricas, ao 2019. ......................................................219
Tabla 40. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2016. ...220
Tabla 41. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2017. ...220
Tabla 42. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2018. ...221
Tabla 43. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2019. ...222
Tabla 44. Rendimientos y costos de combustibles. ...................................................................................................223
Tabla 45. Concesiones provisionales otorgadas por la CNE. .....................................................................................224
Tabla 46. Programa de Mantenimiento Mayor propuesto de centrales de generacin ao 2016. .........................225
Tabla 47. Recomendaciones hechas por el OC en los PMP del 2015 ........................................................................228
Tabla 48. Propuestas hechas por el OC en los PMP del 2014 ....................................................................................230

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 5 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

1. BASE LEGAL
Ley General de Electricidad No 125-01, y el Reglamento para la Aplicacin de la Ley General de
Electricidad, Artculos: 176, 178, 179, 188 ,189 y 191.

2. INTRODUCCIN

En el Artculo 176 (b) del RLGE, indica que la planificacin de la operacin del SENI
comprender la Programacin de Largo Plazo.

La programacin de la operacin de largo plazo se determinar con estudios de planificacin de


la operacin, que garanticen una operacin confiable y de mnimo costo econmico, que lleve a
minimizar los costos de operacin para el conjunto de las instalaciones de generacin y
transmisin, con independencia de la propiedad de sus instalaciones y de los contratos de
suministro, Artculo 178 del RLGE.

Atendiendo a estos requerimientos de Ley, hemos tomado en cuenta para la realizacin de


este Programa de Operacin de Largo Plazo, los siguientes lineamientos:

I. Operacin confiable. Exige para su cumplimiento, una programacin que tome en


cuenta el conjunto de variables de decisin que garanticen la continuidad del
suministro ante la probabilidad de eventos adversos al sistema (aspecto de
seguridad, suficiencia y confiabilidad).

II. Mnimo costo. Exige para su cumplimiento, una programacin que minimice los
costos globales de abastecimiento y racionamiento de energa. Necesitando a su vez
tomar en cuenta el conjunto global de variables cuantitativas involucradas que
determinan los costos de operacin.

III. Del conjunto de instalaciones. Exige para su cumplimiento, una programacin que
tome en cuenta la interaccin de los diferentes componentes del sistema:
generacin, transmisin y demanda.

Para la elaboracin de este programa se han utilizados como insumos, las informaciones
enviadas por los Agentes e instituciones del sector elctrico dominicano y la Base de Datos
de la Programacin de Largo y Mediano Plazo del Organismo Coordinador. Se simula la
operacin del SENI para los prximos 48 meses utilizando el programa MOPERD.

En cuanto al correspondiente anlisis elctrico de este Programa de Largo Plazo se incluyen


de manera independiente dos (2) estudios especiales:

I. Estudio de las restricciones operativas de la red de transmisin del SENI, 2016-2019.


II. Estudio de corrientes de cortocircuito 2016-2019.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 6 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

3. INSUMOS DE LA PROGRAMACIN DE LARGO PLAZO

Datos de la Demanda
La demanda proyectada para los prximos 4 aos, se obtuvo utilizando los datos histricos de
la Base de Datos de Tiempo Real del SENI, desde el ao 2006 hasta septiembre del 2015, para
crear un modelo de proyeccin a travs de las metodologa estadstica de anlisis de regresin
y correlacin conjuntamente con el modelo de pronstico de Box-Jenkins, entre las variables
tiempo (aos) y las inyecciones de energa (GWh).Conjuntamente con dicho mtodo de
pronostico fue utilizado el mtodo de la ecuacin de la reta la proyecciones de demanda que
cubre este programa de largo Plazo. Artculo 179 del RLGE.

Para este Programa de Largo Plazo presentamos dos1 escenarios de demanda:

1. Demanda abastecida.
2. Y la demanda abastecida ms la demanda restringida, en lo adelante se le llamar
Demanda total.

En la Figura 1 se muestra la demanda proyectada anual y el crecimiento para el horizonte de


estudio 2016-2019. Como puede apreciarse, la demanda esperada para el 2016 con respecto a
la demanda del 2015 tendra un crecimiento de 1.3%, y para el resto del periodo de estudio la
tasa de crecimiento promedio esperada sera de 2.8%.

La tendencia natural de demanda de todo sistema elctrico es que la demanda crezca cada
ao, como efectivamente se muestra en la Figura 1. Esta tendencia se mantiene a partir del ao
2009.

Sin embargo, de la misma Figura 1, analizamos que a partir del ao 2007, el crecimiento del
ao posterior a ste la demanda crece a un valor menor al ao anterior. Esta condicin solo se
da cada cuatro (4) aos a partir del 2007. Podemos sugerir que este comportamiento se debe
al evento a nivel Nacional que se presenta cada cuatro aos a partir del 2008.

Donde el caso contrario se presenta en el ao posterior al evento a nivel Nacional mencionado


anteriormente, exceptuando el ao 2009, donde el comportamiento se aparta de la tendencia
de los dems aos.

La Tabla 1 muestra la idea presentada en los dos ltimos prrafos anteriores.

1
No se presenta un posible tercer escenario con la demanda de las Distribuidoras de Electricidad, debido que solo una de ellas
(de tres existente) envi la informacin correspondiente para la elaboracin de este Programa de Largo Plazo.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 7 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GWh Energa (MWh) % De Crecimiento %


18,000 7.3% 8.0%

16,000 5.4% 5.3% 5.6%


6.0%

14,000 3.5%
2.8% 4.0%
2.5% 2.5% 2.8% 2.7%
12,000
1.3% 2.0%
0.3%
10,000
0.0%
8,000
-2.0%
6,000

-4.0%
4,000

2,000 -7.2% -6.0%

0 -8.0%
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Figura 1. Demanda proyectada anual para el periodo de estudio.

Tabla 1. Tendencia de la demanda cada cuatro aos.


2007 2.5%
Evento Nacional 2008 0.3%
2009 -7.2% Excepcin
2011 5.4%
Evento Nacional 2012 5.3%
2013 5.6%
2015 3.5%
Evento Nacional 2016 1.3%
2017 2.8%

Para el escenario de demanda total, se obtienen los mismos resultados anteriores, solo que los
valores de energa son mayores en este escenario y adems el porciento de crecimiento del ao
2016 es mayor que el obtenido en el escenario anterior.

En la Figura 2 presentamos estos resultados.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 8 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

%
GWh Energa (MWh) % De Crecimiento
25,000 5.9% 7.0%

5.4% 20045 6.0%


19560
20,000 18590
18131
17161 17542
16209 19075 5.0%
15780
14973
15,000 3.4% 4.0%
2.7%
2.5%
2.6% 2.5% 2.5% 3.0%
10,000 2.2%
2.0%

5,000
1.0%

0 0.0%
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Figura 2.Demanda total proyectada anual para el periodo de estudio.

La proyeccin de la demanda es ajustada mensualmente utilizando la Base de Datos de Tiempo


Real2 del OC-SENI, tomando los datos de demanda de los meses transcurridos del presente ao
(hasta setiembre del 2015) y los datos de demanda de los meses de los aos anteriores (desde
el 2006).Con dichas informaciones y aplicando el mtodo de pronstico Box-Jenkins, es
proyectada la demanda esperada para los meses que comprende este informe de Largo.

En la Tabla 3 y la Tabla 4 (ver anexo) mostramos los valores utilizados para esta programacin
y la proyeccin esperada para el cuatrienio abarcado por este Programa de Largo Plazo.

En la Tabla 5 (ver anexo), se incluye la declaracin de la demanda por parte de las empresas
de distribucin3 EDENORTE, EDESUR y EDEESTE.

En la Figura 3 se muestran los resultados de demanda resultante de los dos (2) escenarios
presentados. Hay aproximadamente una diferencia del 18% entre los resultados de los dos
escenarios presentados en cuanto a energa se refiere y una diferencia de 15% en la demanda
mxima de los dos escenarios. Esto hace pensar que la energa no suministrada ronda este valor
de 18 %, es decir 18 % de la energa abastecida.

2
Base de Datos en Tiempo Real OC-SENI, desde enero 2006 a septiembre del 2015. En dicha base de datos, la demanda del SENI, incluye la
demanda de las tres (3) distribuidoras de electricidad (EDENORTE, EDEESTE y EDESUR), as como la demanda de los Usuarios No Regulados. En
cada bloque de demanda estn incluidos los bloques por horarios y los das tpicos de cada mes.
3
Solo la distribuidora del Este envi la informacin de la proyeccin de demanda para el periodo que abarca este Programa de Largo Plazo. La
demanda de las otras dos (2) distribuidoras mostrada en la Tabla 4 fue la declarada por las otras dos distribuidoras el ao pasado (2015).

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 9 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Comparacin demanda abastecida y demanda total


Demanda total Demanda Abastecida Diferencia (%)

90,000 19%
18%
80,000 77,270 18%
18% 18%

70,000 18%

60,000 17%

50,000 17%

40,000 16%

65,519
30,000 16%
15%
20,000 15%

10,000 15%
2,963 1,610 1,365 2,734
2,569 2,318
- 14%
Total (GWh): Demanda Mxima (MW): Energa Promedio (GWh): Potencia Mxima Promedio
(MW):

Figura 3.Comparacin de demanda abastecida y demanda total proyectada.

La demanda4 esperada, expresada en cinco (5) bloques horarios, se muestran en las Tabla 6 y
Tabla 7 (ver anexo), para los dos escenarios propuestos. Artculo: 189 (a).

Y la energa no suministrada esperada, expresada en cinco (5) bloques horarios, es mostrada


en las Tabla 8 y Tabla 9 (ver anexo). Artculo: 189 (b) del RLGE.

Grficamente los resultados de demanda obtenidos son mostrados en las: Figura 4, Figura 5,
Figura 6 y Figura 7.

4
La demanda proyectada del SENI, incluye la demanda de las tres (3) distribuidoras de electricidad (EDENORTE, EDEESTE y EDESUR), as como
la demanda de los Usuarios No Regulados. En cada bloque de demanda estn incluidos los bloques por horarios y los das tpicos de cada mes.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 10 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

MW ENERGA (GWh) DEMANDA MXIMA GWH


2,400 1,500
2,367 2,363
2,350 2,323 1,400
2,272
2,300 1,300
2,183
2,249 2,239
2,250 2,153 2,164 1,200
2,189
2,200 1,100

1,351

1,436
2,150 1,000

1,432
1,282

2,115

1,375

1,352
2,067 1,276

1,263
1,255
2,100 900

1,340
1,244

2,050 800

2,000 700
1,105

1,950 600

1,900 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 4. Demanda esperada ao 2016.

MW GWH
ENERGA (GWh) DEMANDA MXIMA
2,500 1,700

2,450 2,434 2,431


2,389
2,400 1,500
2,336
2,350 2,244
2,214 2,313 2,226 2,303
1,300
2,300 2,251

2,250
1,100
2,200 2,175
2,125
1,473
1,389

1,414
1,477

1,390
1,318

2,150
1,312

1,299
1,291

900
2,100
1,378
1,280

2,050 700

2,000
1,136

1,950 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Figura 5. Demanda esperada ao 2017.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 11 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

MW GWH
ENERGA (GWh) DEMANDA MXIMA
2,600 1,700

2,502 2,498
2,500 2,455 1,500
2,401
2,306
2,400 2,275 2,376 2,287 2,366 1,300
2,313

2,300 1,100

1,428

1,513

1,518
2,235

1,453
2,184
1,355

1,429
1,348

1,335
1,327
2,200 900
1,416
1,315

2,100 700
1,168

2,000 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 6. Demanda esperada ao 2018.

MW GWH
ENERGA (GWh) DEMANDA MXIMA
2,600 2,569 2,565 1,700
2,521
2,465
2,500 2,368 1,500
2,336 2,440 2,349 2,430
2,375
2,400 1,300

2,295
2,300 2,243 1,100
1,428

1,518
1,513

1,453
1,355

1,429
1,348

1,335
1,327

2,200 900
1,416
1,315

2,100 700
1,168

2,000 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 7. Demanda esperada ao 2019.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 12 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Para el escenario de demanda total, grficamente los resultados obtenidos son mostrados en
las: Figura 8, Figura 9, Figura 10 y Figura 11.

MW ENERGA (GWh) DEMANDA MXIMA GWH


2,800 1,900
2,748 2,744 2,737
2,750 2,721 2,708
1,700
2,700 2,642
2,650 2,629 2,532 2,548 2,617 1,500
2,516
2,600
1,300
2,550

1,572
2,500

1,673
1,662
2,431

1,668
1,100

1,611
1,499

1,553

1,544
1,480

2,450
900
1,577

2,400
1,454

2,350
1,299

700
2,300

2,250 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 8. Demanda proyectado ao 2016, escenario de demanda total.

MW ENERGA (GWh) DEMANDA MXIMA GWH


2,900 1,900
2,819 2,815 2,808
2,792 2,779
1,700
2,800
2,711

2,697 2,598 2,614 1,500


2,685
2,700 2,582

1,300
2,600
1,613

1,711

1,716
1,705
1,538

1,653

2,494 1,100
1,594

1,584
1,519

2,500
1,618
1,492

900

2,400
1,333

700

2,300 500
ENERO MARZO MAYO JULIO SEPTIEMBRE NOVIEMBRE
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
Figura 9. Demanda total proyectado ao 2017, escenario de demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 13 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

MW ENERGA (GWh) DEMANDA MXIMA GWH


3,000 1,900

2,891 2,887 2,880


2,900 2,863 2,849 1,700
2,780
2,800 2,664 2,681 1,500
2,647 2,766 2,753

2,700 1,300

1,654

1,754
2,557
1,577

1,760
1,749

1,695

1,634
2,600 1,100

1,625
1,557

1,659
1,530

2,500 900
1,367

2,400 700

2,300 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 10. Demanda total proyectado ao 2018, escenario de demanda total.

MW GWH
ENERGA (GWh) DEMANDA MXIMA
3,000 2,963 2,959 1,900
2,934 2,951
2,920

2,849 1,700
2,900

2,835 2,730 2,747 2,821


2,713 1,500
2,800

1,300
1,695

1,798

2,700
1,616

1,804
1,792

2,621
1,737

1,675

1,665

1,100
1,596

1,700
1,568

2,600
900
1,401

2,500
700

2,400 500
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 11. Demanda total proyectado ao 2019, escenario de demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 14 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

4. ESCENARIOS CONSIDERADOS PARA LA REALIZACION DEL ANLISIS ENERGTICO

En este Programa de Largo Plazo, hemos considerados dos escenarios de demanda, como ya se
haba dicho anteriormente. Igualmente estamos considerando el ingreso al SENI de cuatro (4)
nuevas centrales de generacin, aportando un tal de 915 MW al SENI.

I. Para febrero del 2016 se contempla la entrada del parque elico LARIMAR 1, el
cual aportara al SENI 49.5 MW: Dicho parque elico se interconectar al SENI a
travs de la Subestacin Los Cocos 138KV. Ser operada por la empresa de
generacin EGE-HAINA.

II. Para finales de enero del 2017 se contempla la entrada de la conversin a ciclo
combinado DPP (Los Mina), la cual aportara al SENI 114 MW: Como es conocido
por todos, se interconectar al SENI a travs de la Subestacin Los Mina 138KV.
Ser operada por la empresa de generacin DPP.

III. Para abril del 2017 se contempla la entrada en prueba de la central a carbn
Punta Catalina 1, el cual aportara al SENI 376 MW. Y para agosto del 2017
entrara a operar comercialmente (esta ltima fecha fue la considerada en este
Programa de largo Plazo: Como es conocido por todos, se interconectar al SENI
a travs de la subestacin Punta Catalina 345KV. Ser operada por la empresa
CDEEE.

IV. Para junio del 2017 se contempla la entrada en prueba de la central a carbn
Punta Catalina 2, el cual aportara al SENI 376 MW. Y para octubre del 2017
entrara a operar comercialmente (esta ltima fecha fue la considerada en este
Programa de largo Plazo: Como es conocido por todos, se interconectar al SENI
a travs de la subestacin Punta Catalina 345KV. Ser operada por la empresa
CDEEE.

5. RESULTADOS DE LAS SIMULACIONES

5.1 Generacin de Energa por tipo de combustible

A continuacin se presenta la produccin de energa esperada para el horizonte de estudio


2016-2019, por tipo de combustible utilizado (Escenario: demanda abastecida).

Adems, se presenta la energa esperada para el ao 2016, donde se puede observar que se
presentara un cambio en la composicin de los combustibles utilizados.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 15 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GENERACIN DE ENERGA POR TIPO DE COMBUSTIBLE AO 2016_2019


HIDROELCTRICA ELICA
7.33% 1.36% PETRLEO
29.53%

CARBN
35.03%

GAS
26.75%

Figura 12. Generacin de Energa por tipo de Combustible 2016_2019.

GENERACIN DE ENERGA POR TIPO DE COMBUSTIBLE AO 2016

HIDROELCTRICA ELICA
7.75% 1.32%

CARBN
13.64%

PETRLEO
50.29%

GAS
27.00%

Figura 13. Generacin de Energa por tipo de Combustible 2016.

Del anlisis de las Figura 12 y Figura 13, se nota claramente la diferencia en la composicin de
la matriz energtica del SENI en cuanto al tipo de combustible.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 16 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Mientras que para el ao 2016, el tipo de combustible dominante es el petrleo, con una
participacin del 50.3 %, ya para el final del periodo de anlisis de este Programa de Largo Plazo
(comenzando a mediado del 2017), el dominio del petrleo es desplazo casi a la mitad
quedando en solo 29.5%.

El carbn que apenas representaba el 13.4% para el 2016, pasara a representar el 35% de todo
el parque energtico del SENI para mediado del 2017.

La generacin con el tipo de combustible gas y la tecnologa elica se incrementa con relacin
a la del primer ao de estudio de este Programa de Largo Plazo, pero su incremento no es
significativo.

La generacin hidroelctrica es la que se quedar prcticamente igual para todo el periodo de


estudio.

En las Tabla 10, Tabla 11, Tabla 12 y Tabla 13 (ver anexo), tambin se muestra la generacin
de energa por tipo de combustible por meses por cada ao que abarca este Programa de Largo
Plazo 2016_2019.

Con el escenario de demanda total, el cambio en la composicin del tipo de combustible


utilizado es ms conservador que el obtenido en el escenario de demanda anterior.

Para el ao 2016, domina el tipo de combustible petrleo (como en el caso anterior de


demanda) con una participacin de 52.5 % de todo el parque energtico existente.

Para el final del periodo de estudio, el petrleo baja su participacin a 40.3 %, el cual es un
valor mucho mayor al obtenido con el escenario de demanda anterior. La explicacin la
podemos encontrar en que en este escenario considera una demanda mayor al escenario
anterior

La generacin a carbn desde el 2017 en adelante se duplica con relacin a la existente en el


2016, al pasar de una participacin de 12.6% a 27.8 %.

La composicin de los dems tipo de combustible proyectado en este Programa de Largo Plazo
se mantendr prcticamente igual durante todo el periodo de estudio.

Grficamente las Figura 14 y Figura 15 ilustran el anlisis presentado en los prrafos anteriores
para este escenario de demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 17 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GENERACIN DE ENERGA POR TIPO DE COMBUSTIBLE AO 2016_2019


HIDROELCTRICA ELICA
7.09% 1.32%
PETRLEO
40.31%
CARBN
27.82%

GAS
23.46%
Figura 14. Generacin de Energa por tipo de Combustible 2016_2019, escenario demanda total.

GENERACIN DE ENERGA POR TIPO DE COMBUSTIBLE AO 2016

HIDROELCTRICA ELICA
7.19% 1.23%

CARBN
12.64%

PETRLEO
52.48%

GAS
26.46%

Figura 15. Generacin de Energa total por tipo de Combustible 2016, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 18 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

5.2 Costos Marginales resultantes

A continuacin se presentan los costos marginales esperados y su variacin (%), para el


horizonte de estudio 2016-2019 que abarca este Programa de Largo Plazo. (Escenario: demanda
abastecida).

RD$ / MWh Costos Marginales promedios esperados Variacin %


4,500 5%

4,000 2.04%
0% 0%
3,500

3,000 -5%

2,500
-10%
2,000 3,981
3,343
1,500 -15%
-16.02% 2,572 2,625
1,000
-20%
500
-23.06%
0 -25%
2016 2017 2018 2019

Figura 16. Costos marginales promedios esperados 2016-2019.

Del anlisis de la Figura 16, se encuentra que el costo marginal promedio tendr a disminuir a
partir del segundo ao (2017) cubierto por este estudio de Largo Plazo.
Para el ao 2017 se proyecta una disminucin del costo marginal promedio del orden de 16%.,
con respecto al costo marginal promedio del ao 2016.
La tendencia a la baja del costo marginal promedio se mantiene hasta el ao 2018, donde se
espera una disminucin del costo marginal promedio del orden de 23%, con relacin al costo
marginal promedio proyectado para el ao 2017.
Para el ao final (2019) que abarca este Programa de Largo Plazo, la tendencia a la baja del
costo marginal promedio se revierte, y tiende a aumentar, aunque este aumento es
relativamente pequeo, solo aumentara el costo marginal promedio un 2%, con respecto al
costo marginal promedio proyectado para el 2018.
La explicacin la podramos encontrar en que para el ao 2019 no se tiene contemplado
ninguna entrada al SENI de nueva generacin de costo similar a la generacin entrante para el
2017 y al aumento de demanda de dicho ao.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 19 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

En las Figura 17 y Figura 18, se muestran los costos marginales mximos y mnimos esperados
respectivamente para todo el periodo de estudio, los cuales tambin tendrn a disminuir a
partir del segundo ao abarcado por este estudio de Largo Plazo.

RD$ / MWh Costos Marginales mximos esperados Variacin %


4,500 5%
2.42%
4,000 0% 0%
-1.15%
3,500 -5%

3,000 -10%

2,500 -15%

2,000 4,215 4,167 -20%

1,500 -25%
2,742 2,809
1,000 -30%
-34.18%
500 -35%

0 -40%
2016 2017 2018 2019
Figura 17. Costos marginales promedios mximo 2016-2019.

RD$ / MWh Costos Marginales mninos esperados Variacin %


4,500 5%
2.68%
4,000 0% 0%

3,500 -5.20% -5%


3,000
-10%
2,500
-15%
2,000 4,222
-20%
1,500 2,928 2,850
2,776
-25%
1,000

500 -30%
-30.66%
0 -35%
2016 2017 2018 2019

Figura 18.Costos marginales mnimos esperados 2016-2018.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 20 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Con el escenario de demanda total, se encuentra que el costo marginal promedio tambin
tendr a disminuir a partir del segundo ao (2017) cubierto por este Programa de Largo Plazo.
En este escenario de demanda total, la disminucin en el costo marginal promedio es menor
que el que se obtendra con el caso de demanda tratado en el apartado anterior.
En este escenario, se proyecta una disminucin del costo marginal promedio para el ao 2017
de 10.7% con relacin al costo marginal que se proyecta para el ao 2016.
Para el ao 2018 se obtendra una disminucin del costo marginal promedio de 22.7% con
relacin al proyectado para el ao 2017.
Igualmente que en el escenario de demanda anterior para el ao 2019, la tendencia de
disminucin del costo marginal promedio se revierte, y aumenta en 3.9 % con relacin al
proyectado en el ao 2018.
En la Figura 19 presentamos dichos resultados de costo marginales promedios para este escenario
de demanda total.
En las Figura 20 y Figura 21 se presenta los resultados de costo marginales mximos y mnimos
respectivamente.

RD$ / MWh Costos Marginales promedios esperados Variacin %


5,000 10%

4,500
5%
4,000
3.78%

3,500 0% 0%

3,000
-5%
2,500
4,401 -10%
2,000 3,930 -10.70%

1,500 3,038 3,152


-15%

1,000
-20%
500 -22.71%

0 -25%
2016 2017 2018 2019
Figura 19. Costos marginales promedios esperados 2016-2019, escenario demanda total

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 21 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$ / MWh Costos Marginales mximos esperados Variacin %


5,000 10%
4,500 5.50% 5%
4,000
0% 0%
3,500 -0.03%

3,000
-5%

2,500 -10%
4,471 4,470
2,000
-15%
3,244 3,422
1,500
-20%
1,000

500
-25%
-27.42%
0 -30%
2016 2017 2018 2019
Figura 20. Costos marginales mximos esperados 2016-2019, escenario demanda total.

RD$ / MWh Costos Marginales mninos esperados Variacin %


4,500 5%
2.68%
4,000 0% 0%

3,500 -5.20% -5%


3,000
-10%
2,500
-15%
2,000
4,222

-20%
1,500 2,928 2,776 2,850
-25%
1,000

500 -30%
-30.66%
0 -35%
2016 2017 2018 2019
Figura 21. Costos marginales mnimos esperados 2016-2019, escenario demanda total.

A continuacin presentamos una comparacin entre los resultados de los costos marginales
mximo, promedio y mnimo proyectados respectivamente, en este Programa de Largo Plazo

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 22 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

para los dos (2) escenarios de demanda analizados. La idea es presentada en las Figura 22,
Figura 23 y Figura 24.

COSTO MARGINAL MXIMO, ESCENARIO DEMANDA TOTAL 2016-2019 (RD$/MWH)


COSTO MARGINAL MXIMO 2016-2019 (RD$/MWH)
4,800 Variacin 25%
4,471 21.85%
4,600 4,470
4,400 4,215 18.30% 20%
4,200
4,000 4,167
3,800 15%
3,600 3,422
3,400 3,244 10%
7.27%
3,200 6.08%
3,000 2,809
2,742 5%
2,800
2,600
2,400 0%
2016 2017 2018 2019
Figura 22. Comparacin Costos marginales mximos esperados 2016-2019, ambos escenario de demanda.

COSTO MARGINAL PROMEDIO, ESCENARIO DEMANDA TOTAL 2016-2019 (RD$/MWH)


COSTO MARGINAL PROMEDIO 2016-2019 (RD$/MWH)

4,800 Variacin 25%


4,600 4,401
20.11%
4,400
18.10% 20%
4,200 17.56%
3,981
4,000
3,930
3,800 15%

3,600 10.56%
3,400 10%
3,152
3,200 3,343 3,038
3,000
5%
2,800
2,572 2,625
2,600
2,400 0%
2016 2017 2018 2019
Figura 23. Comparacin Costos marginales promedio esperados 2016-2019, ambos escenario de demanda.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 23 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

COSTO MARGINAL MNIMO, ESCENARIO DEMANDA TOTAL 2016-2019 (RD$/MWH)


COSTO MARGINAL MNIMO 2016-2019 (RD$/MWH)
4,800 Variacin 25%
4,600
4,222 19.89%
4,400
20%
4,200
4,000 14.38% 14.84% 15.14%
3,800 15%
3,691
3,600
3,400 10%
3,200
3,000 2,928
2,850
2,776 5%
2,800 2,442
2,600 2,417 2,475
2,400 0%
2016 2017 2018 2019
Figura 24. Comparacin Costos marginales mnimos esperados 2016-2019, ambos escenario de demanda.

En las Figura 25, Figura 26, Figura 27 y Figura 28, se muestran los resultados de los costos
marginales proyectados para los aos 2016 al 2019 en el escenario demanda abastecida.

En las Tabla 18, Tabla 19, Tabla 20 y Tabla 21, (ver anexo), tambin se muestran los costos
marginales proyectados por meses por cada ao que abarca este Programa de Largo Plazo
2016_2019.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


4800
CMG 1 CMG 2 CMG 3
4600
4400
4200
4000 4,185 4,215 4,161 4,157
4,079 4,087
3800 3,959
3,874 3,879
3600 3,741 3,746
3,691
3400
3200
3000
2800
2600
MAR

MAY

OCT
AGO
JUN

JUL

DIC
SEP

NOV
ENE

FEB

ABR

2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
Figura 25. Costos marginales esperados 2016.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 24 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


5000
4800 CMG 1 CMG 2 CMG 3
4600
4400
4200
4000 4,167
3800 4,027 3,950
3,919
3600
3400 3,657
3,524
3200 3,432
3000
2800 3,057 3,007
2600
2400
2200 2,486 2,452 2,442
2000
1800
MAR

MAY

OCT
JUN

AGO
JUL

DIC
SEP

NOV
ENE

FEB

ABR

2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
Figura 26. Costos marginales esperados 2017.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)

3400 CMG 1 CMG 2 CMG 3

3200

3000

2800

2600 2,742
2,649 2,681 2,661
2,617 2,627
2400 2,507 2,530 2,496 2,492
2,417 2,449
2200

2000

1800
MAR

MAY

OCT
AGO
JUN

JUL
ENE

DIC
FEB

SEP

NOV
ABR

2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
Figura 27. Costos marginales esperados 2018.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 25 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


3800
CMG 1 CMG 2 CMG 3
3600

3400

3200

3000

2800
2,809
2600 2,736 2,718
2,697 2,672 2,689
2400 2,550 2,598
2,492 2,539 2,523
2,475
2200

2000

1800
MAR

MAY

OCT
JUN

AGO
JUL

DIC
SEP

NOV
ENE

FEB

ABR

2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
Figura 28. Costos marginales esperados 2019.

En las Figura 29, Figura 30, Figura 31 y Figura 32 , se muestran los resultados de los costos
marginales proyectados para los aos 2016 al 2019 en el escenario demanda total.

En las Tabla 22, Tabla 23, Tabla 24 y Tabla 25 (ver anexo), tambin se muestran los costos
marginales proyectados por meses por cada ao que abarca este Programa de Largo Plazo
2016_2019 en el escenario demanda total.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


5000
CMG 1 CMG 2 CMG 3 CMG 4 CMG 5 CMG PROM
4800
4600
4400
4,471 4,471 4,470 4,471 4,471 4,469 4,471 4,434
4200
4,276 4,283 4,309
4000 4,222
3800
3600
3400
3200
3000
MAR

MAY

OCT
JUN

AGO
ENE

JUL

DIC
FEB

SEP

NOV
ABR

2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
Figura 29. Costos marginales esperados 2016, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 26 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


5000
CMG 1 CMG 2 CMG 3 CMG 4 CMG 5 CMG PROM
4800
4600
4400
4,469 4,442 4,410 4,470
4200
4000 4,217 4,219
4,095
3800 3,919 3,933
3600
3400
3200
3000
3,084
2800 2,980 2,928
2600
2400
MAR

MAY

AGO

OCT
JUN

JUL

SEP

NOV
ENE

FEB

DIC
ABR

2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
Figura 30. Costos marginales esperados 2017, escenario demanda total.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


5000
4800 CMG 1 CMG 2 CMG 3 CMG 4 CMG 5 CMG PROM

4600
4400
4200
4000
3800
3600
3400
3200
3,244 3,215
3000 3,153 3,145
3,015 3,028 3,066 3,075
2800 3,004
2,913
2600 2,776 2,820
2400
2200
MAR

MAY

OCT
JUN

AGO

DIC
ENE

FEB

JUL

SEP

NOV
ABR

2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
Figura 31. Costos marginales esperados 2018, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 27 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$/MWh COSTOS MARGINALES POR BLOQUES DE DEMANDA (RD$/MWh)


5000
CMG 1 CMG 2 CMG 3 CMG 4 CMG 5 CMG PROM
4800
4600
4400
4200
4000
3800
3600
3400
3,422 3,394
3200
3,285 3,271
3000 3,160 3,172 3,198
3,117 3,084
2800 2,981
2,850 2,896
2600
2400
2200
MAR

MAY

OCT
AGO
JUN

JUL

DIC
ENE

FEB

SEP

NOV
ABR

2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 32. Costos marginales esperados 2019, escenario demanda total.

5.3 Anlisis y Evaluacin del Escenario Operativo

Evolucin de la demanda y el dficit esperado

A continuacin se presentan las proyecciones de demanda y dficit resultante para todo el


periodo de estudio abarcado por este Programa de Largo Plazo, para el primer escenario de
demanda (abastecida).

Las Figura 33, Figura 34, Figura 35 y Figura 36 muestran la demanda y el dficit proyectado
para todo el periodo de estudio.

De las mismas se observa que se tendr dficit para el primer ao (2016) y hasta septiembre
del prximo ao (2017) abarcado por estudio.

A partir de octubre del 2017 y hasta el final del periodo de estudio el dficit proyectado
prcticamente desaparece, mantenindose por debajo de un (1) GWH.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 28 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


70.0 1800.0

57.8 1600.0
60.0
1400.0
50.0 46.2
40.7
1200.0
40.0 35.2 1000.0
30.3 31.7
30.0 800.0
24.6

17.8 600.0
20.0 15.0 16.2
11.4 12.7 400.0
1,244.4

1,104.8

1,281.8

1,275.6

1,339.5

1,351.1

1,432.0

1,436.3

1,375.2

1,352.0

1,255.4

1,263.3
10.0
200.0

0.0 0.0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 33. Evolucin de la demanda y el dficit proyectado para el 2016.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


70.0 1800.0

1600.0
60.0
1400.0
1,477.0
1,472.6

1,414.2

1,390.3
1,389.4
1,377.5

50.0
1,318.2

1,311.8

1,299.1
1,291.0

1200.0
1,279.7

43.10
1,136.1

40.0 1000.0
29.00
30.0 800.0

20.50 21.60
600.0
20.0
12.30 400.0
7.7 7.3
10.0
3.10 200.0
2.10
0.10 0.00 0.10
0.0 0.0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Figura 34. Evolucin de la demanda y el dficit proyectado para el 2017.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 29 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


70.0 1800

1600
60.0
1400
50.0
1200
40.0 1000

1,453.2
1,517.8
1,513.2
1,427.7
800
1,415.5
30.0
1,354.6

1,347.9

1,335.0
1,326.6
1,315.0

1,167.5

600

1,428.7
20.0
400
10.0
200

0.0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 35. Evolucin de la demanda y el dficit proyectado para el 2018.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


70.0 1800

1600
60.0
1400
50.0
1200

40.0
1,492.2

1000
1,558.5
1,553.8
1,466.0
1,453.5

800
1,390.9

1,384.1

30.0
1,370.8
1,362.2
1,350.3

1,198.8

600
1,467.0

20.0
400
10.0
200

0.0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 36. Evolucin de la demanda y el dficit proyectado para el 2016.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 30 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

A continuacin se presentan las proyecciones de demanda y dficit resultante para todo el


periodo de estudio abarcado por este Programa de Largo Plazo, para el escenario de demanda
total.

Las Figura 37, Figura 38, Figura 39 y Figura 40 muestran la demanda y el dficit proyectado
para todo el periodo de estudio.

En este escenario de demanda total se observa que se tendr un dficit bastante alto si se
compara con el escenario de demanda anterior. Para el primer ao (2016) y hasta septiembre
del prximo ao (2017) abarcado por estudio.

A partir de octubre del 2017, empieza a bajar se forma considerable y es para los aos 2018 y
2019 es cuando el dficit proyectado prcticamente desaparece, mantenindose por debajo de
un (1) GWH.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW

250 2000

225 234.0 1800


223.8
200 1600
202.3
175 186.6 188.1 1400
182.1
170.9
150 1200
155.9 155.1
125 1000

100 115.4 800


102.4
95.1
75 600

50 400
1,454.4

1,299.3

1,498.5

1,479.9

1,576.7

1,571.6

1,662.1

1,667.5

1,610.6

1,672.7

1,553.2

1,543.9

25 200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 37. Evolucin de la demanda y el dficit proyectado para el 2016, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 31 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


250 2000
225 1800
195.20
200 1600
175 153.20 159.00 1400
150 1200
126.50
125 1000
91.80
100 800
70.1 73.4 6.00 3.60
36.70
75 3.00 600
31.60
50 400
1,492.3

1,333.2

1,537.6

1,518.5

1,617.8

1,612.5

1,705.4

1,711.0

1,652.6

1,716.3

1,593.7

1,584.2
25 200
0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Figura 38. Evolucin de la demanda y el dficit proyectado para el 2017, escenario demanda total.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW


250 2000
225 1800
200 1600
175 1400
150 1200
125 1000
100 800
75 600
50 400
1,530.2

1,367.1

1,576.7

1,557.1

1,659.0

1,653.5

1,748.7

1,754.4

1,694.6

1,759.9

1,634.2

1,624.5

25 200
0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 39. Evolucin de la demanda y el dficit proyectado para el 2018, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 32 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GWH DEMANDA PROYECTADA DEFICIT ESPERADO MW

250 2000

225 1800

200 1600

175 1400

150 1200

125 1000

100 800

75 600

50 400
1,530.2

1,367.1

1,576.7

1,557.1

1,659.0

1,653.5

1,748.7

1,754.4

1,694.6

1,759.9

1,634.2

1,624.5
25 200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 40. Evolucin de la demanda y el dficit proyectado para el 2019, escenario demanda total.

Evolucin de la energa proyectada y el costo operativo esperado

A continuacin se presentan las proyecciones de energa y el costo operativo resultante para


todo el periodo de estudio abarcado por este Programa de Largo Plazo, escenario de demanda
(abastecida).

Las Figura 41, Figura 42, Figura 43 y Figura 44 muestran la energa y el costo operativo
proyectado para todo el periodo de estudio.

De las grficas mencionadas en el prrafo anterior se observa que se el costo operativo tendr
a disminuir a partir de septiembre del ao 2017 y se mantendra esta tendencia hasta el final
del periodo abarcado por este Programa de Largo Plazo.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 33 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


3,500 1800

1600
3,000
1,374 1,390
1,308 1,310 1,340 1,327
1,263 1,245 1,247
1400
1,229 1,243
2,500
1,093 1200
2,000 1000
3,224 3,107 800
1,500 2,901 2,958
2,839 2,845 2,773
2,484 2,628 2,506 2,522
2,173
600
1,000
400
500
200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 41. Evolucin de la energa proyectada y el costo operativo esperado para el 2016.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


3,500 1800

1600
3,000

1,473.90 1400
2,500 1,429.00 1,411.90 1,390.00
1,355.50 1,360.20
1,272.00 1,305.60 1,291.20 1,290.90 1,298.60 1200
2,000 1,128.30 1000

3,182 800
1,500
2,844 2,793 2,808
2,597
2,370 2,347 2,247 600
1,000 2,148
1,703 1,550 1,556 400
500
200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Figura 42. Evolucin de la energa proyectada y el costo operativo esperado para el 2017.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 34 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


3,500 1800

1600
3,000
1,512.40 1,517.30 1400
1,415.10 1,427.30 1,452.50 1,428.20
2,500
1,354.10 1,347.70 1,326.40 1,334.50
1,314.90 1200
2,000 1,167.20
1000

1,500 800

600
1,000 2,044 2,001 1,918
1,863 1,797 1,813 1,798
1,709 1,638 1,646 400
1,556
1,389
500
200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 43. Evolucin de la energa proyectada y el costo operativo esperado para el 2018.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


3,500 1800

1600
3,000
1,552 1,558
1,491 1400
1,453 1,465 1,467
2,500 1,390 1,384 1,362 1,370
1,350 1200
1,199
2,000 1000

1,500 800

600
1,000 2,156 2,110 2,022
1,961 1,899 1,911 1,896
1,800 1,724 1,731
1,642 400
1,465
500
200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 44. Evolucin de la energa proyectada y el costo operativo esperado para el 2019.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 35 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

A continuacin se presentan las proyecciones de energa y el costo operativo resultante para


todo el periodo de estudio abarcado por este Programa de Largo Plazo, escenario de demanda
total.

Las Figura 45, Figura 46, Figura 47 y Figura 48 muestran la energa y el costo operativo
proyectado para todo el periodo de estudio en este escenario de demanda.

De las grficas mencionadas en el prrafo anterior se observa que se el costo operativo tendr
a disminuir a partir de septiembre del ao 2017 y se mantendra esta tendencia hasta el final
del periodo abarcado por este Programa de Largo Plazo.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


5,000 2000
4,500 1800
4,000 1,438 1,465 1,422 1,438 1600
1,352 1,383 1,394 1,385 1,382 1,389
1,324
3,500 1400
1,204
3,000 1200
2,500 1000
4,338 4,239 4,308
2,000 3,941 4,013 3,919 4,099 3,937 800
3,671 3,852
3,452
1,500 3,116 600
1,000 400
500 200
0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016

Figura 45. Evolucin energa proyectada y costo operativo esperado ao 2016, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 36 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


5,000 2000

4,500 1,674 1,710 1800


1,621 1,591 1,580
4,000 1,510 1600
1,445 1,465 1,454
1,422 1,392
3,500 1,259 1400

3,000 1200

2,500 1000
4,308
2,000 3,882 3,967 3,883 800
3,620
3,293 3,237 3,143
1,500 3,063 600
2,605
2,359 2,311
1,000 400

500 200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Figura 46. Evolucin energa proyectada y costo operativo esperado ao 2017, escenario demanda total.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


5,000 2000
1,739 1,747 1,750
4,500 1,654 1,647 1,688 1800
1,629 1,618
1,574 1,554
1,529
4,000 1600
1,365
3,500 1400
3,000 1200
2,500 1000
2,000 800
1,500 600
2,756 2,695 2,618 2,752
2,306 2,451 2,482 2,459 2,487 2,438
1,000 2,106 1,906 400
500 200
0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018

Figura 47. Evolucin energa proyectada y costo operativo esperado ao 2018, escenario demanda total.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 37 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RD$ COSTO OPERATIVO MILLONES DE $RD ENERGA PROYECTADA GWH


5,000 2000
1,777 1,786 1,789
4,500 1,692 1,727 1800
1,685 1,667 1,655
1,611 1,590
1,566
4,000 1600
1,399
3,500 1400

3,000 1200

2,500 1000

2,000 800

1,500 2,909 2,842 2,906 600


2,575 2,617 2,588 2,761 2,617
2,425 2,561
2,215
1,000 2,003 400

500 200

0 0
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019

Figura 48. Evolucin energa proyectada y costo operativo esperado ao 2019, escenario demanda total.

5.4 Resumen de Produccin Esperada

Generacin esperada por bloques

La generacin de cada central de generacin elctrica expresada en cinco (5) bloques horarios,
se muestra en las Tabla 23 , para el escenario de demanda abastecida y en la Tabla 24 para el
escenario de demanda total (ver anexo). Artculo: 189 (c) del RLGE.

Produccin esperada por centrales de generacin

Las Tabla 28, Tabla 29, Tabla 30 y Tabla 31, (ver anexo) resume la produccin esperada, por
centrales de generacin, para el periodo de estudio, enero del_2016 a dicimebre_2019.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 38 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Produccin esperada por empresas de generacin

Las Tabla 32, Tabla 33, Tabla 34 y Tabla 35 (ver anexo) resume la produccin esperada, por
empresas de generacin, para el periodo de estudio abarcado en este Programa de Largo Plazo.

Las Figura 49, Figura 50, Figura 51 y Figura 52, muestran en forma grfica la participacin de las
empresas de generacin en la produccin esperada, expresada en porciento (%) para el
periodo de estudio abarcado por este Programa de Largo Plazo. En la misma se ve como va
cambiando la participacin de las empresas a medida que van entrando nuevas unidades de
generacin.

Caudales promedio turbinados

Los caudales5 promedios aproximados mensuales turbinados de las centrales hidroelctricas


esperados para todo el periodo de estudio abarcado por este Programa de Largo Plazo, son
mostrados en las Tabla 36, Tabla 37, Tabla 38 y Tabla 39 (ver anexo) .Artculo: 189 (d) del
RLGE.

Consumo promedio de combustibles

El consumo promedio de combustible6 aproximado mensual de los centrales de generacin,


segn su tipo de combustibles esperados para todo el periodo de estudio abarcado por este
Programa de Largo Plazo, son mostrados en las Tabla 40, Tabla 41, Tabla 42 y Tabla 43.
Artculo: 189 (e) del RLGE.

5
Las centrales hidroelctricas mostradas en las Tabla 35. Energa esperada por empresas, ao 2019.,Tabla 36, Error! Reference source
not found. y Tabla 38. Caudales promedios mensuales centrales hidroelctricas, ao 2018. estn cero (0), debido que dicha
informacin no est disponible.
Caudales promedios aproximados calculados con base a las informaciones proporcionadas por EGEHIDRO de los rendimientos hidrulicos de
las principales centrales hidroelctricas (promedio de los aos 2010 al 2013) y los resultados de las simulaciones realizadas con el MOPERD para
este Programa de Largo Plazo 2016 _2019.

6
Consumo de combustibles promedios aproximados calculados con base a las informaciones proporcionadas por los Agentes del MEM de su
consumo especfico, calculado para la semana de Programacin del 03 al 09 de octubre del 2015 y los resultados de las simulaciones realizadas
con el MOPERD para este Programa de Largo Plazo 2016_2019.
Unidades de las centrales:
Centrales de carbn expresados en toneladas mtricas.
Centrales de gas expresados en millones de BTU.
Centrales de FUEL expresados en galones.
Para la central Los mina (ciclo combinado) se us el mismo de Los Mina 6.
Para las centrales Catalina se usaron los mismos valores de Barahona Carbn.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 39 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GENERACIN ESPERADA POR EMPRESAS 2016 MONTE RO LOS ORIGENES POWER


0.7% PLANT
SEABOARD METALDOM 0.6%
CEPP 3.3% 1.7%
CDEEE
2.4% 2.1%
PVDC
5.5%

HAINA
LAESA
24.9%
6.0%

GPLV
9.3%

EGEHID AES ANDRES


7.7% 12.8%

ITABO DPP
13.3% 9.6%
Figura 49. Generacin de Energa por Empresas, ao 2016.

GENERACIN ESPERADA POR EMPRESAS 2017 MONTE RO LOS ORIGENES POWER


0.5% PLANT
METALDOM
0.4%
SEABOARD 1.7%
CEPP 2.5%
CDEEE
2.4%
PVDC 1.2%
4.8%

LAESA HAINA
5.8% 24.9%

GPLV
7.7%

EGEHID
7.5%
AES ANDRES
12.5%

ITABO
12.9%
DPP
15.6%
Figura 50. Generacin de Energa por Empresas, ao 2017.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 40 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

GENERACIN ESPERADA POR EMPRESAS 2018 MONTE RO


0.0%
METALDOM LOS ORIGENES POWER
SEABOARD 0.4% PLANT
CEPP 0.0%
PVDC 0.0%
1.5%
0.2%
LAESA
GPLV
EGEHID 2.2%
0.6%
7.2%
CDEEE
ITABO 40.0%
12.4%

DPP
13.2%

AES ANDRES HAINA


12.1% 9.9%

Figura 51. Generacin de Energa por Empresas, ao 2018.

GENERACIN ESPERADA POR EMPRESAS 2019


MONTE RO
SEABOARD METALDOM 0.0%
0.6% LOS ORIGENES POWER
CEPP 0.1%
PVDC 1.7% PLANT
0.3% 0.0%
LAESA
GPLV
EGEHID 0.8%2.5%
7.0%
CDEEE
ITABO 38.9%
12.1%

DPP
13.3%

HAINA
AES ANDRES 10.9%
11.7%
Figura 52. Generacin de Energa por Empresas, ao 2019.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 41 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

6. Observaciones y comunicaciones presentadas por los Agentes del MEM

Las observaciones presentadas por los Agentes del MEM7 y las decisiones adoptadas por la
direccin del OC son exigidas en el Articulo 189 (f) del RLGE.

Al momento de la elaboracin de este Programa de largo Plazo, no se tena informacin de


observaciones presentadas por los Agentes del MEM.

Nuevos Proyectos de generacin

EGE-HAINA

La empresa de generacin EGE-HAINA, mediante la comunicacin del 25 de agosto del2015


informa de la incorporacin del parque elico LARIMAR 1 al SENI.

EL parque elico LARIMAR 1 estar ubicado en la regin sur del pas, especficamente en el
municipio Enriquillo de la provincia de Barahona. La conexin de LARIMAR al SENI se efectuar
en la subestacin Los Cocos 138KV, vinculada con el resto de la regin sur del SENI a travs de
la interconexin Los Cocos - Cruce de Cabral 138KV.

EL parque elico LARIMAR 1 constar de quince (15) aerogeneradores de 3.3MW, para un total
de 49.5MW.

El cronograma de prueba propuesto y puesta en servicio es el siguiente:

Diciembre del 2015: cinco (5) aerogeneradores en pruebas (16.5MW).


Enero del 2016: quince (15) aerogeneradores en pruebas (49.5MW).
Febrero del 2016: Puesta en servicios (49.5MW).

CDEEEE

La Corporacin Dominicana De Empresas Elctricas Estatales (CDEEE), mediante la


comunicacin CDEEEE-IN2015-011568 del 28 de septiembre del 2015 informa de la
incorporacin de la Central termoelctrica Catalina al SENI.

Dicha central constar de dos unidades de generacin termoelctricas de 376 MW c/u,


utilizarn carbn como combustible. Estarn ubicadas en el Distrito Municipal Catalina,
Provincia Peravia. Se interconectaran al SENI a travs de la S/E 345kv Punta Catalina.

7
MEM: Mercado Elctrico Mayorista de la Republica Dominicana.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 42 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

El cronograma de prueba propuesto y puesta en servicio es el siguiente:

Catalina 1: Marzo del 2017 inician pruebas y Agosto del 2017 inician operacin
comercial.
Catalina 2: Junio del 2017 inician pruebas y Octubre del 2017 inician operacin
comercial.

DPP

Dominican Power Partners ((DPP), mediante la comunicacin VPC 165/2015 del 28 de


septiembre del 2015 informa de la incorporacin de la Conversin a Ciclo Combinado DPP al
SENI. Sera una turbina de vapor que aprovechara los gases de escape de las unidades existente
en la actualidad (Los Mina 5 y 6). Aportara al SENI 114MW y se interconectara al mismo a
travs de la S/E Los Mina 138KV.

El cronograma de puesta en servicio es el siguiente:

A finales de Enero del 2017 inician operacin.

En la Tabla 2, se presentan los proyectos de nuevas centrales de generacin que entrara al


SENI dentro el periodo de estudio abarcado por este Programa de Largo Plazo.

Tabla 2. Proyectos de nuevas centrales de generacin.


PUNTO DE FECHA DE POTENCIA
NOMBRE EL TIPO DE TIPO DE
TEM CONEXIN AL ENTRADA EN NOMINAL
PROYECTO CENTRAL COMBUSTIBLE
SENI OPERACIN (MW)
S/E Los Cocos
1 Larimar 1 Febrero_2016 Elica Elica 49.5
138KV
Utilizar gases
Conversin Ciclo S/E Los Mina Turbina
2 Enero_2017 escape (gas 114
Combinado DPP 138KV Vapor
natural)
S/E Punta
Turbina
3 Punta Catalina 1 Catalina Agosto_2017 Carbn 376
Vapor
345KV
S/E Punta
Turbina
4 Punta Catalina 2 Catalina Octubre_2017 Carbn 376
Vapor
345KV

Total 915.5

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 43 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Nuevos Proyectos de Transmisin

A continuacin presentamos los proyectos de transmisin:

Proyectos en fase de diseo:

Subestacin Bonao III (compra de terreno).


Subestacin Higuey II (Seleccin de terreno).
Subestacin La Vega (Seleccin de terreno).
Subestacin Santiago Norte (Seleccin de terreno).
Subestacin Playa Dorada (Diseo 1 baha 69 kV).
Subestacin de maniobras Imbert (Diseo 1 baha 69 kV).
Subestacin de maniobras Rincn (Diseo 1 baha 69 kV)
Lnea 138 kV Guerra - AES interconexin. (Seleccin de ruta y levantamiento
topogrfico).
Lnea 138 kV Guerra - La Luisa - SPM II (Seleccin de ruta y levantamiento topogrfico).
Lnea 138 kV Guerra - Hainamosa (Seleccin de ruta y levantamiento topogrfico).
Lnea 138 kV zona central, Hainamosa - Isabela, Los Mina CNP, Metropolitano
(Seleccin de ruta).
Lnea 138 kV Higuey II - Macao (Seleccin de ruta).

Proyectos en proceso de licitacin:

Subestacin Guerra 345/138 kV.


Lnea 345 kV Pedro Brand Guerra.
Lnea 69 kV Rincn Fantino.
Lnea 69 kV Cruce de Ocoa - Ocoa (aislada a 138 kV).
Lnea 138 kV Hato Mayor - El Seibo.
Lnea 69 kV Puerto Plata II - Playa Dorada (aislada a 138 kV).
Subestacin Dajao.
Lnea 69 kV Duverg - Jiman (aislada a 138 kV).

Obras en proceso de adjudicacin:

Ampliacin S/E KM15 de Azua


Construccin S/E Cruce de Cabral con autotransformador en un terreno diferente al
actual.
LT de KM15 de Azua Pizarrete 138 kV, doble circuito.
LT San Juan - KM15 de Azua 138 kV, doble circuito.
Construccin S/E Hato Mayor 138/69 kV.
LT Hato Mayor El Seibo 138 kV.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 44 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Ampliacin S/E El Seibo.

En la Tabla 45 (ver anexo) se muestran las concesiones provisionales dadas por La CNE8.

7. Estudio Elctrico

Ver los dos (2) estudios especiales anexos a este Programa de Largo Plazo 2016-2019.

Estudio: Restricciones Operativas de la Red de Transmisin del SENI, 2016-2019.


Estudio: Corrientes de Cortocircuito y Capacidad Interruptiva de los Interruptores del
SENI.

8
Comisin Nacional de Energa.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 45 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

8. Conclusiones

Considerando los resultados obtenidos y las evaluaciones realizadas por el anlisis de los
diferentes escenarios simulados para el periodo de estudio 2016-2019, se concluye lo
siguiente:

Del anlisis energtico:

Se estima un crecimiento de demanda promedio del orden 2.4 % para todo el periodo de
estudio 2016-2019.

Se evaluaron dos escenarios de demanda: uno con las proyecciones solo de demanda
abastecida y otro escenario con la demanda abastecida ms la demanda no abastecida,
encontrndose un diferencia de demanda entre ambos escenarios de aproximadamente 18%.

Con la expectativa de la entrada de nuevas centrales de generacin al SENI, se producirn


reducciones considerables en los costos marginales promedios que se han proyectado en
ambos escenarios de demanda.

La reduccin de costo marginal proyectada en el escenario de demanda abastecida ms


demanda no abastecida, son ms conservadoras que las que se proyectan para el primer
escenario de demanda.

Las proyecciones indican que la composicin de combustibles utilizados para la generacin para
los prximos cuatro (4) anos, cambiara totalmente. De tenerse un predominio de petrleo en
la primera mitad del periodo de estudio se pasara a tener una mayor participacin del carbn
en la segunda mitad del periodo de estudio abarcado en este estudio de Largo Plazo.

En ambos escenarios se proyectan cambios en la composicin de combustibles utilizados para


la generacin, siendo en el escenario de demanda abastecida ms demanda no bastecida ms
conservador el cambio de combustible que se utilizara.

En el primer escenario de demanda analizado en este Programa de Largo Plazo se proyecta


prcticamente la desaparicin del dficit de generacin a partir de la entrada a operacin de las
nuevas centrales de generacin. Para el segundo escenario de demanda estudiado, el dficit no
se proyecta que desaparecer, pero se tendra una reduccin considerable del mismo.

El costo operativo igualmente experimentara una reduccin considerable a partir de la entrada


de las nuevas centrales de generacin en ambos escenarios de demanda.

Finalmente, se puede afirmar que a partir de la segunda mitad del periodo abarcado por este
Programa de Largo Plazo, con la entrada al SENI de nuevas plantas generacin, utilizando

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 46 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

combustibles de mejor precio en los mercados internacionales, el SENI en su conjunto se


beneficiara de menor dficit de generacin, menor costo marginal y menor costo operativo.

Del anlisis elctrico:

Las conclusiones se detallan en los dos (2) estudios especiales anexos a este Programa de Largo
Plazo 2016-2019.

Estudio: Restricciones Operativas de la Red de Transmisin del SENI, 2016-2019.


Estudio: Corrientes de Cortocircuito y Capacidad Interruptiva de los Interruptores del
SENI.
.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 47 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

9. Recomendaciones

Del anlisis energtico:

1. Se recomienda a los Agentes del MEM confirmar las fechas de entrada de sus nuevos
proyectos, y las fechas de salidas de sus instalaciones en el SENI para el periodo de
estudio.

2. No obstante, debido a la incertidumbre de los insumos para este periodo de estudio,


recomendamos seguir evaluando y analizando los posibles escenarios de demanda y
generacin que definiran los futuros escenarios operativos del SENI.

3. Tambin recomendamos solicitar a los agentes del MEM, a la SIE y a la CNE,


proporcionar las informaciones necesarias para modelar los nuevos proyectos pautados
para ingresar en el SENI durante dicho periodo 2016-2019.

Del anlisis elctrico:

Las recomendaciones se detallan en los dos (2) estudios especiales anexos a este Programa
de Largo Plazo 2016-2019.

Estudio: Restricciones Operativas de la Red de Transmisin del SENI, 2016-2019.


Estudio: Corrientes de Cortocircuito y Capacidad Interruptiva de los Interruptores del
SENI.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 48 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

10. Anexos

Estimacin de Demanda Esperada

Tabla 3. Estimacin de la Demanda.


Estimacin de la Demanda
Aos Energa (MWh) % De Crecimiento
2006 12196
2007 12499 2.5%
2008 12542 0.3%
2009 11645 -7.2%
2010 12491 7.3%
2011 13161 5.4%
2012 13856 5.3%
2013 14627 5.6%
2014 14990 2.5%
2015 15515 3.5%
2016 15711 1.3%
2017 16157 2.8%
2018 16602 2.8%
2019 17048 2.7%

Tabla 4. Estimacin de la Demanda total.


Estimacin de la Demanda
Aos Energa (MWh) % De Crecimiento
2010 14973
2011 15780 5.4%
2012 16209 2.7%
2013 17161 5.9%
2014 17542 2.2%
2015 18131 3.4%
2016 18590 2.5%
2017 19075 2.6%
2018 19560 2.5%
2019 20045 2.5%

Tabla 5. Estimacin de la Demanda de las Distribuidoras.


Proyeccin de demanda de las Distribuidoras
Aos EDESUR EDEESTE EDENORTE Total % Crecimiento
2015 4712 4321 3967 13001
2016 4853 4533 4117 13504 3.73%
2017 5049 4660 4098 13807 2.19%
2018 5220 4842 4107 14169 2.55%

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 49 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Demanda Esperada por bloques

Tabla 6. Demanda proyectada por bloques (escenario demanda abastecida).


POTENCIA (MW)
ENERGA
AO MES DEMANDA
BLOQUE 1 BLOQUE 2 BLOQUE 3 BLOQUE 4 BLOQUE 5 (GWh)
MXIMA
2016 ENERO 2,153 2,153 1,912 1,774 1,578 1,342 1,244
2016 FEBRERO 2,067 2,067 1,841 1,735 1,592 1,332 1,105
2016 MARZO 2,249 2,249 1,945 1,820 1,656 1,379 1,282
2016 ABRIL 2,183 2,183 1,953 1,834 1,705 1,524 1,276
2016 MAYO 2,164 2,164 1,997 1,873 1,732 1,536 1,340
2016 JUNIO 2,272 2,272 2,087 1,952 1,811 1,585 1,351
2016 JULIO 2,367 2,367 2,130 2,017 1,861 1,613 1,432
2016 AGOSTO 2,363 2,363 2,151 2,011 1,857 1,628 1,436
2016 SEPTIEMBRE 2,323 2,323 2,124 2,015 1,850 1,578 1,375
2016 OCTUBRE 2,189 2,189 2,033 1,923 1,754 1,493 1,352
2016 NOVIEMBRE 2,115 2,115 1,948 1,834 1,693 1,433 1,255
2016 DICIEMBRE 2,239 2,239 1,935 1,780 1,620 1,363 1,263
2017 ENERO 2,214 2,214 1,967 1,824 1,623 1,381 1,280
2017 FEBRERO 2,125 2,125 1,894 1,784 1,637 1,370 1,136
2017 MARZO 2,313 2,313 2,000 1,872 1,703 1,418 1,318
2017 ABRIL 2,244 2,244 2,009 1,886 1,754 1,567 1,312
2017 MAYO 2,226 2,226 2,054 1,926 1,781 1,580 1,378
2017 JUNIO 2,336 2,336 2,147 2,008 1,862 1,630 1,389
2017 JULIO 2,434 2,434 2,191 2,074 1,914 1,659 1,473
2017 AGOSTO 2,431 2,431 2,212 2,068 1,909 1,674 1,477
2017 SEPTIEMBRE 2,389 2,389 2,184 2,073 1,902 1,622 1,414
2017 OCTUBRE 2,251 2,251 2,090 1,978 1,804 1,535 1,390
2017 NOVIEMBRE 2,175 2,175 2,004 1,886 1,741 1,473 1,291
2017 DICIEMBRE 2,303 2,303 1,990 1,831 1,666 1,402 1,299
2018 ENERO 2,275 2,275 2,021 1,874 1,667 1,419 1,315
2018 FEBRERO 2,184 2,184 1,946 1,833 1,682 1,407 1,168
2018 MARZO 2,376 2,376 2,055 1,923 1,750 1,457 1,355
2018 ABRIL 2,306 2,306 2,064 1,938 1,802 1,610 1,348
2018 MAYO 2,287 2,287 2,111 1,979 1,830 1,623 1,416
2018 JUNIO 2,401 2,401 2,206 2,063 1,914 1,675 1,428
2018 JULIO 2,502 2,502 2,251 2,131 1,967 1,704 1,513
2018 AGOSTO 2,498 2,498 2,273 2,125 1,962 1,720 1,518
2018 SEPTIEMBRE 2,455 2,455 2,244 2,130 1,955 1,667 1,453
2018 OCTUBRE 2,313 2,313 2,148 2,033 1,854 1,577 1,429
2018 NOVIEMBRE 2,235 2,235 2,059 1,938 1,789 1,514 1,327
2018 DICIEMBRE 2,366 2,366 2,045 1,881 1,712 1,440 1,335
2019 ENERO 2,336 2,336 2,075 1,925 1,712 1,457 1,350
2019 FEBRERO 2,243 2,243 1,998 1,883 1,727 1,445 1,199
2019 MARZO 2,440 2,440 2,110 1,975 1,797 1,496 1,391
2019 ABRIL 2,368 2,368 2,120 1,990 1,850 1,653 1,384
2019 MAYO 2,349 2,349 2,167 2,032 1,879 1,667 1,454
2019 JUNIO 2,465 2,465 2,265 2,118 1,965 1,720 1,466
2019 JULIO 2,569 2,569 2,312 2,188 2,020 1,750 1,554
2019 AGOSTO 2,565 2,565 2,334 2,182 2,014 1,766 1,559
2019 SEPTIEMBRE 2,521 2,521 2,304 2,187 2,007 1,712 1,492
2019 OCTUBRE 2,375 2,375 2,206 2,087 1,903 1,620 1,467
2019 NOVIEMBRE 2,295 2,295 2,114 1,990 1,837 1,554 1,362
2019 DICIEMBRE 2,430 2,430 2,099 1,931 1,758 1,479 1,371
Total (GWh): 65,519
Demanda Mxima (MW): 2,569
Energa Promedio (GWh): 1,365
Potencia Mxima Promedio (MW): 2,318

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 50 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 7. Demanda proyectada por bloques (escenario demanda total).

POTENCIA (MW)
ENERGA
AO MES DEMANDA
BLOQUE 1 BLOQUE 2 BLOQUE 3 BLOQUE 4 BLOQUE 5 (GWh)
MXIMA
2016 ENERO 2,516 2,516 2,235 2,073 1,844 1,569 1,454
2016 FEBRERO 2,431 2,431 2,165 2,040 1,872 1,566 1,299
2016 MARZO 2,629 2,629 2,274 2,128 1,936 1,612 1,499
2016 ABRIL 2,532 2,532 2,266 2,128 1,978 1,768 1,480
2016 MAYO 2,548 2,548 2,351 2,205 2,038 1,808 1,577
2016 JUNIO 2,642 2,642 2,428 2,271 2,107 1,843 1,572
2016 JULIO 2,748 2,748 2,473 2,341 2,160 1,872 1,662
2016 AGOSTO 2,744 2,744 2,497 2,335 2,155 1,890 1,668
2016 SEPTIEMBRE 2,721 2,721 2,487 2,360 2,166 1,848 1,611
2016 OCTUBRE 2,708 2,708 2,515 2,380 2,170 1,847 1,673
2016 NOVIEMBRE 2,617 2,617 2,411 2,269 2,094 1,772 1,553
2016 DICIEMBRE 2,737 2,737 2,365 2,175 1,980 1,666 1,544
2017 ENERO 2,582 2,582 2,293 2,127 1,892 1,610 1,492
2017 FEBRERO 2,494 2,494 2,222 2,094 1,921 1,607 1,333
2017 MARZO 2,697 2,697 2,333 2,183 1,986 1,654 1,538
2017 ABRIL 2,598 2,598 2,325 2,184 2,030 1,814 1,519
2017 MAYO 2,614 2,614 2,412 2,262 2,091 1,855 1,618
2017 JUNIO 2,711 2,711 2,491 2,330 2,161 1,892 1,613
2017 JULIO 2,819 2,819 2,537 2,402 2,217 1,921 1,705
2017 AGOSTO 2,815 2,815 2,562 2,396 2,212 1,939 1,711
2017 SEPTIEMBRE 2,792 2,792 2,552 2,422 2,223 1,896 1,653
2017 OCTUBRE 2,779 2,779 2,580 2,442 2,227 1,895 1,716
2017 NOVIEMBRE 2,685 2,685 2,473 2,329 2,149 1,819 1,594
2017 DICIEMBRE 2,808 2,808 2,426 2,232 2,031 1,709 1,584
2018 ENERO 2,647 2,647 2,352 2,181 1,940 1,651 1,530
2018 FEBRERO 2,557 2,557 2,278 2,147 1,969 1,648 1,367
2018 MARZO 2,766 2,766 2,392 2,239 2,037 1,696 1,577
2018 ABRIL 2,664 2,664 2,384 2,239 2,082 1,860 1,557
2018 MAYO 2,681 2,681 2,474 2,320 2,144 1,902 1,659
2018 JUNIO 2,780 2,780 2,555 2,389 2,216 1,940 1,654
2018 JULIO 2,891 2,891 2,602 2,463 2,273 1,970 1,749
2018 AGOSTO 2,887 2,887 2,627 2,457 2,268 1,988 1,754
2018 SEPTIEMBRE 2,863 2,863 2,617 2,484 2,279 1,944 1,695
2018 OCTUBRE 2,849 2,849 2,646 2,504 2,283 1,943 1,760
2018 NOVIEMBRE 2,753 2,753 2,536 2,388 2,203 1,865 1,634
2018 DICIEMBRE 2,880 2,880 2,488 2,289 2,083 1,753 1,625
2019 ENERO 2,713 2,713 2,410 2,235 1,988 1,692 1,568
2019 FEBRERO 2,621 2,621 2,335 2,200 2,018 1,689 1,401
2019 MARZO 2,835 2,835 2,451 2,294 2,087 1,738 1,616
2019 ABRIL 2,730 2,730 2,444 2,295 2,133 1,906 1,596
2019 MAYO 2,747 2,747 2,535 2,377 2,198 1,950 1,700
2019 JUNIO 2,849 2,849 2,618 2,449 2,271 1,988 1,695
2019 JULIO 2,963 2,963 2,666 2,524 2,329 2,019 1,792
2019 AGOSTO 2,959 2,959 2,692 2,518 2,324 2,037 1,798
2019 SEPTIEMBRE 2,934 2,934 2,682 2,545 2,336 1,992 1,737
2019 OCTUBRE 2,920 2,920 2,712 2,566 2,340 1,991 1,804
2019 NOVIEMBRE 2,821 2,821 2,599 2,447 2,258 1,911 1,675
2019 DICIEMBRE 2,951 2,951 2,550 2,346 2,134 1,796 1,665
Total (GWh): 77,270
Demanda Mxima (MW): 2,963
Energa Promedio (GWh): 1,610
Potencia Mxima Promedio (MW): 2,734

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 51 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Energa no suministrada por bloques

Tabla 8. Energa no suministrada esperada por bloques.


DFICIT ESCENARIOS DEMANDA ABASTECIDA
TOTAL
AO MES DFICIT BLOQUE 1 BLOQUE 2 BLOQUE 3 BLOQUE 4 BLOQUE 5 ENERGA
DFICIT
MAXIMO (MW) (MW) (MW) (MW) (MW) (GWH)
(MW)
2016 ENERO 206.9 206.9 37.3 10.6 1.1 - 15.0 255.9
2016 FEBRERO 166.3 166.3 27.1 11.1 3.5 0.1 11.4 208.1
2016 MARZO 262.6 262.6 37.7 13.8 3.7 0.1 17.8 317.9
2016 ABRIL 282.6 282.6 79.9 32.4 13.1 2.2 30.3 410.2
2016 MAYO 240.3 240.3 91.4 32.9 11.2 1.4 31.7 377.2
2016 JUNIO 297.8 297.8 123.7 44.6 13.9 1.4 40.7 481.4
2016 JULIO 380.4 380.4 152.3 79.8 25.1 2.0 57.8 639.6
2016 AGOSTO 337.9 337.9 133.5 50.5 16.0 1.7 46.2 539.6
2016 SEPTIEMBRE 276.0 276.0 96.9 45.2 12.9 0.6 35.2 431.6
2016 OCTUBRE 193.9 193.9 68.1 28.3 8.0 0.3 24.6 298.6
2016 NOVIEMBRE 128.5 128.5 34.1 12.5 4.4 0.2 12.7 179.7
2016 DICIEMBRE 252.4 252.4 35.1 10.5 2.6 0.1 16.2 300.7
2017 ENERO 137.0 137.0 15.9 3.7 0.3 - 7.7 156.9
2017 FEBRERO 124.7 124.7 16.1 6.0 1.5 - 7.3 148.3
2017 MARZO 218.2 218.2 23.1 7.7 1.6 - 12.3 250.6
2017 ABRIL 236.3 236.3 52.1 19.1 6.9 0.9 20.5 315.3
2017 MAYO 195.9 195.9 61.3 19.9 6.1 0.6 21.6 283.8
2017 JUNIO 254.4 254.4 87.6 27.8 7.9 0.6 29.0 378.3
2017 JULIO 339.8 339.8 114.5 53.5 14.9 0.8 43.1 523.5
2017 AGOSTO 40.9 40.9 7.7 2.2 0.5 - 3.1 51.3
2017 SEPTIEMBRE 26.1 26.1 5.0 2.0 0.5 - 2.1 33.6
2017 OCTUBRE 1.0 1.0 0.2 0.1 - - 0.1 1.3
2017 NOVIEMBRE 0.6 0.6 0.1 - - - 0.1 0.7
2017 DICIEMBRE 1.9 1.9 0.1 - - - 0.1 2.0
2018 ENERO 1.4 1.4 0.1 - - - 0.1 1.5
2018 FEBRERO 1.4 1.4 0.1 - - - 0.1 1.5
2018 MARZO 3.4 3.4 0.2 - - - 0.1 3.6
2018 ABRIL 3.9 3.9 0.5 0.2 0.1 - 0.2 4.7
2018 MAYO 2.6 2.6 0.5 0.1 - - 0.2 3.2
2018 JUNIO 4.7 4.7 0.8 0.2 - - 0.3 5.7
2018 JULIO 11.1 11.1 1.5 0.6 0.1 - 0.7 13.3
2018 AGOSTO 7.4 7.4 1.1 0.2 - - 0.5 8.7
2018 SEPTIEMBRE 4.4 4.4 0.7 0.2 - - 0.3 5.3
2018 OCTUBRE 1.9 1.9 0.4 0.1 - - 0.2 2.4
2018 NOVIEMBRE 1.2 1.2 0.2 0.1 - - 0.1 1.5
2018 DICIEMBRE 3.5 3.5 0.2 0.1 - - 0.2 3.8
2019 ENERO 2.6 2.6 0.2 0.1 - - 0.1 2.9
2019 FEBRERO 2.3 2.3 0.3 0.1 - - 0.1 2.7
2019 MARZO 6.2 6.2 0.4 0.1 - - 0.3 6.7
2019 ABRIL 6.7 6.7 0.9 0.3 0.1 - 0.4 8.0
2019 MAYO 4.7 4.7 1.0 0.3 0.1 - 0.4 6.1
2019 JUNIO 8.1 8.1 1.4 0.3 0.1 - 0.6 9.9
2019 JULIO 18.0 18.0 2.2 0.9 0.2 - 1.1 21.3
2019 AGOSTO 12.2 12.2 1.9 0.6 0.2 - 0.8 14.9
2019 SEPTIEMBRE 7.5 7.5 1.2 0.4 0.1 - 0.5 9.2
2019 OCTUBRE 3.2 3.2 0.8 0.3 0.1 - 0.3 4.4
2019 NOVIEMBRE 1.8 1.8 0.3 0.1 - - 0.1 2.2
2019 DICIEMBRE 5.8 5.8 0.3 - - - 0.2 6.1
Total (MW): 6,735.70
Dficit Promedio(GWH): 10.30
Dficit Promedio (MW): 140.33

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 52 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 9. Energa no suministrada esperada por bloques (escenario demanda total).


DFICIT ESCENARIO DEMANDA TOTAL
TOTAL
AO MES DFICIT BLOQUE 1 BLOQUE 2 BLOQUE 3 BLOQUE 4 BLOQUE 5 ENERGA
DFICIT
MAXIMO (MW) (MW) (MW) (MW) (MW) (GWH)
(MW)
2016 ENERO 565.0 565.0 285.1 157.5 33.4 1.5 102.4 1,042.5
2016 FEBRERO 523.7 523.7 260.6 165.4 68.2 4.1 95.1 1,022.0
2016 MARZO 642.1 642.1 290.3 176.6 67.2 3.2 115.4 1,179.4
2016 ABRIL 632.1 632.1 366.8 249.4 144.0 35.1 155.9 1,427.4
2016 MAYO 623.3 623.3 426.8 291.1 161.8 33.5 182.1 1,536.5
2016 JUNIO 668.5 668.5 454.4 307.9 173.1 28.4 186.6 1,632.3
2016 JULIO 760.8 760.8 486.5 374.7 225.7 36.3 223.8 1,884.0
2016 AGOSTO 718.3 718.3 472.3 322.8 181.7 33.2 202.3 1,728.3
2016 SEPTIEMBRE 673.6 673.6 441.1 330.3 179.9 20.1 188.1 1,645.0
2016 OCTUBRE 712.1 712.1 519.4 400.4 238.5 30.0 234.0 1,900.4
2016 NOVIEMBRE 620.3 620.3 415.1 288.3 164.0 14.0 170.9 1,501.7
2016 DICIEMBRE 749.7 749.7 390.5 241.5 102.7 6.0 155.1 1,490.4
2017 ENERO 490.7 490.7 207.3 89.0 12.9 0.3 70.1 800.2
2017 FEBRERO 479.6 479.6 211.6 117.8 40.3 1.6 73.4 850.9
2017 MARZO 601.0 601.0 241.0 129.0 40.7 1.3 91.8 1,013.0
2017 ABRIL 589.4 589.4 317.2 197.3 98.7 19.4 126.5 1,222.0
2017 MAYO 582.9 582.9 381.2 242.0 115.8 19.1 153.2 1,341.0
2017 JUNIO 629.3 629.3 409.6 259.4 125.9 16.0 159.0 1,440.2
2017 JULIO 724.6 724.6 443.1 328.0 177.0 21.1 195.2 1,693.8
2017 AGOSTO 328.6 328.6 101.2 35.7 11.7 1.2 36.7 478.4
2017 SEPTIEMBRE 283.6 283.6 83.7 37.5 11.3 0.8 31.6 416.9
2017 OCTUBRE 57.5 57.5 16.5 6.0 1.5 0.1 6.1 81.6
2017 NOVIEMBRE 34.7 34.7 8.0 2.7 0.8 - 3.1 46.2
2017 DICIEMBRE 73.7 73.7 6.1 1.6 0.3 - 3.6 81.7
2018 ENERO 29.2 29.2 2.8 0.7 0.1 - 1.5 32.8
2018 FEBRERO 27.5 27.5 3.3 1.2 0.3 - 1.5 32.3
2018 MARZO 57.7 57.7 4.0 1.3 0.3 - 2.7 63.3
2018 ABRIL 51.5 51.5 7.6 2.6 0.9 0.2 3.4 62.8
2018 MAYO 49.2 49.2 12.7 3.6 1.1 0.1 4.6 66.7
2018 JUNIO 67.6 67.6 17.0 4.7 1.3 0.1 6.0 90.7
2018 JULIO 121.6 121.6 22.7 9.4 2.6 0.2 9.9 156.5
2018 AGOSTO 93.1 93.1 20.0 6.0 1.6 0.1 7.8 120.8
2018 SEPTIEMBRE 71.9 71.9 16.2 6.5 1.6 0.1 6.4 96.3
2018 OCTUBRE 86.8 86.8 26.5 10.5 2.6 0.1 9.7 126.5
2018 NOVIEMBRE 52.6 52.6 13.4 4.7 1.5 0.1 5.0 72.3
2018 DICIEMBRE 111.5 111.5 10.4 2.8 0.7 - 5.8 125.4
2019 ENERO 43.7 43.7 4.9 1.3 0.2 - 2.5 50.1
2019 FEBRERO 39.3 39.3 4.9 1.9 0.6 - 2.3 46.7
2019 MARZO 86.2 86.2 7.0 2.4 0.6 - 4.4 96.2
2019 ABRIL 76.3 76.3 12.4 4.3 1.6 0.3 5.4 94.9
2019 MAYO 73.4 73.4 20.5 6.5 1.9 0.2 7.4 102.5
2019 JUNIO 97.6 97.6 25.2 7.7 2.1 0.1 9.0 132.7
2019 JULIO 175.0 175.0 33.9 14.7 3.7 0.3 14.7 227.6
2019 AGOSTO 137.9 137.9 30.1 9.5 2.6 0.3 11.7 180.4
2019 SEPTIEMBRE 107.5 107.5 24.8 10.4 2.6 0.1 9.8 145.4
2019 OCTUBRE 129.2 129.2 39.7 16.9 4.1 0.3 14.8 190.2
2019 NOVIEMBRE 76.3 76.3 20.2 7.1 2.2 0.1 7.4 105.9
2019 DICIEMBRE 161.4 161.4 16.5 4.3 1.0 - 8.7 183.2
Total (MW): 30,058.00
Dficit Promedio(GWH): 65.09
Dficit Promedio (MW): 626.21

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 53 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Energa esperada por tipo de combustible

Escenario Demanda abastecida.

Tabla 10. Energa por tipo de combustible 2016.


TIPO DE 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 610.80 537.80 634.70 660.30 671.00 641.90 721.20 688.40 673.50 644.30 615.10 629.20
GAS 324.40 321.80 345.30 362.90 321.00 340.00 332.60 374.20 359.20 365.40 349.20 353.80
CARBN 193.80 125.60 180.60 107.60 194.00 187.30 193.90 194.00 187.70 193.70 170.80 166.70
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 5.40 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,229 1,093 1,263 1,245 1,308 1,310 1,374 1,390 1,340 1,327 1,243 1,247

Tabla 11. Energa por tipo de combustible 2017.


TIPO DE 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 560.70 511.40 606.60 635.60 646.30 619.80 701.40 485.30 467.50 183.10 156.40 155.20
GAS 313.60 311.40 335.70 356.50 314.00 334.30 327.60 318.40 305.50 293.00 281.20 288.00
CARBN 273.70 197.70 260.50 184.60 273.70 264.90 273.90 537.00 519.60 527.60 491.80 495.40
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,272 1,128 1,306 1,291 1,356 1,360 1,429 1,474 1,412 1,915 1,799 1,825

Tabla 12. Energa por tipo de combustible 2018.


TIPO DE 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 146.50 136.20 196.10 248.40 243.10 241.70 326.00 282.20 268.30 215.70 186.90 185.90
GAS 265.50 262.40 279.30 290.90 252.40 274.20 261.70 304.50 293.40 295.60 282.10 291.00
CARBN 515.80 423.60 512.80 439.00 535.00 516.10 536.20 534.70 516.70 530.40 496.00 498.30
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,841 1,642 1,880 1,858 1,941 1,936 2,037 2,043 1,962 1,954 1,834 1,859

Tabla 13. Energa por tipo de combustible 2019.


TIPO DE 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 174.00 161.80 226.90 284.00 278.70 274.60 363.20 319.70 303.40 248.70 216.30 214.80
GAS 267.90 263.60 281.00 292.00 253.30 276.10 264.00 305.90 294.80 299.20 285.60 292.70
CARBN 522.00 427.50 516.20 438.90 536.50 518.10 536.20 536.70 519.00 532.70 498.70 502.90
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,875 1,674 1,917 1,893 1,978 1,976 2,077 2,083 2,001 1,991 1,871 1,896

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 54 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Escenario Demanda Total.

Tabla 14. Energa por tipo de combustible escenario demanda total 2016.
TIPO DE 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 707.60 626.90 734.40 728.50 740.10 698.70 772.80 749.00 739.40 732.10 728.70 740.40
GAS 350.00 343.60 364.70 373.40 338.70 357.70 345.00 388.70 375.80 388.90 375.20 384.50
CARBN 193.80 125.60 180.60 107.60 194.00 187.30 193.90 194.00 187.70 193.70 170.80 166.70
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 5.40 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,352 1,204 1,383 1,324 1,394 1,385 1,438 1,465 1,422 1,438 1,382 1,389

Tabla 15. Energa por tipo de combustible escenario demanda total 2017.
TIPO DE 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 678.80 616.20 723.50 718.10 730.60 690.90 764.90 642.60 631.20 466.40 421.40 399.60
GAS 345.70 337.60 358.60 374.80 338.70 356.60 344.70 361.60 350.70 320.70 305.30 311.60
CARBN 273.70 197.70 260.50 184.60 273.70 264.90 273.90 537.00 519.60 536.70 502.40 508.70
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 1,422 1,259 1,445 1,392 1,465 1,454 1,510 1,674 1,621 2,236 2,099 2,106

Tabla 16. Energa por tipo de combustible escenario demanda total 2018.
TIPO DE 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 323.10 306.40 387.70 441.50 465.40 443.00 528.20 490.00 481.60 498.70 456.50 435.50
GAS 284.20 278.60 295.90 303.50 267.30 290.40 285.60 324.90 312.90 328.70 308.80 314.90
CARBN 534.20 435.30 524.30 439.30 537.00 518.70 536.20 535.80 519.30 536.20 502.50 508.30
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 2,055 1,840 2,100 2,064 2,181 2,156 2,263 2,272 2,198 2,276 2,137 2,143

Tabla 17. Energa por tipo de combustible escenario demanda total 2018.
TIPO DE 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
COMBUSTIBLE ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
PETRLEO 356.60 336.90 422.60 474.10 497.40 472.70 558.20 521.60 512.40 529.20 486.60 467.10
GAS 286.60 280.70 298.90 308.00 274.00 297.40 293.70 332.20 320.80 336.50 316.80 319.80
CARBN 536.20 435.20 523.30 438.90 536.70 518.80 536.20 536.70 519.30 536.80 502.20 508.70
HIDROELCTRICA 95.00 88.70 91.50 93.60 104.60 109.00 95.90 107.50 110.10 114.30 99.90 81.00
ELICA 29.00 19.10 11.30 20.90 16.90 32.20 30.20 25.70 9.20 9.30 7.50 15.90
TOTAL 2,090 1,874 2,138 2,099 2,218 2,196 2,302 2,311 2,236 2,313 2,176 2,181

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 55 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Costos Marginales esperados

Escenario Demanda abastecida.

Tabla 18. Costos marginales por bloques horarios para el ao 2016.


CMG 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 4,473 4,473 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,472 4,474
CMG 2 4,355 4,354 4,404 4,469 4,471 4,472 4,472 4,473 4,471 4,468 4,459 4,407
CMG 3 4,003 3,945 4,260 4,459 4,460 4,398 4,469 4,464 4,462 4,362 4,237 3,967
CMG 4 3,130 3,388 3,526 4,241 3,949 4,090 4,370 4,224 4,321 3,693 3,539 3,314
CMG 5 2,773 2,843 2,859 3,357 3,147 3,093 3,304 3,215 3,066 2,923 2,874 2,820
CMG PROM 3,691 3,741 3,874 4,185 4,079 4,087 4,215 4,161 4,157 3,959 3,879 3,746

Tabla 19. Costos marginales por bloques horarios para el ao 2017.


CMG 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 4,471 4,471 4,473 4,474 4,474 4,474 4,474 4,397 4,212 2,819 2,785 2,914
CMG 2 4,126 4,173 4,328 4,465 4,467 4,470 4,471 3,322 3,198 2,658 2,614 2,603
CMG 3 3,454 3,569 3,822 4,404 4,294 4,370 4,465 3,011 3,006 2,569 2,550 2,538
CMG 4 2,918 3,133 3,222 3,836 3,584 3,636 4,357 2,848 2,835 2,511 2,480 2,432
CMG 5 2,730 2,769 2,779 3,113 2,987 2,969 3,084 2,671 2,644 2,028 1,985 1,965
CMG PROM 3,432 3,524 3,657 4,027 3,919 3,950 4,167 3,057 3,007 2,486 2,452 2,442

Tabla 20. Costos marginales por bloques horarios para el ao 2018.


CMG 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 2,854 2,833 3,038 3,068 2,981 3,045 3,326 3,189 3,074 2,885 2,837 3,011
CMG 2 2,609 2,588 2,670 2,764 2,752 2,796 2,879 2,835 2,802 2,710 2,676 2,657
CMG 3 2,530 2,543 2,575 2,658 2,635 2,660 2,771 2,698 2,710 2,603 2,575 2,559
CMG 4 2,340 2,485 2,528 2,563 2,547 2,558 2,637 2,572 2,583 2,538 2,525 2,523
CMG 5 1,963 1,980 2,009 2,486 2,411 2,337 2,502 2,456 2,392 2,090 2,024 1,984
CMG PROM 2,417 2,449 2,507 2,649 2,617 2,627 2,742 2,681 2,661 2,530 2,496 2,492

Tabla 21. Costos marginales por bloques horarios para el ao 2019.


CMG 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 2,959 2,927 3,160 3,183 3,052 3,156 3,532 3,300 3,203 2,990 2,924 3,106
CMG 2 2,668 2,650 2,715 2,810 2,816 2,847 2,962 2,901 2,859 2,772 2,725 2,708
CMG 3 2,560 2,565 2,618 2,710 2,689 2,709 2,829 2,750 2,758 2,674 2,614 2,591
CMG 4 2,455 2,528 2,539 2,605 2,576 2,585 2,697 2,614 2,624 2,559 2,547 2,532
CMG 5 1,978 2,013 2,069 2,520 2,480 2,459 2,530 2,500 2,462 2,207 2,079 1,993
CMG PROM 2,475 2,492 2,550 2,697 2,672 2,689 2,809 2,736 2,718 2,598 2,539 2,523

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 56 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Escenario Demanda Total.

Tabla 22. Costos marginales por bloques horarios para el ao 2016, escenario demanda total.
CMG 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474
CMG 2 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474
CMG 3 4,473 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474
CMG 4 4,460 4,470 4,468 4,473 4,473 4,473 4,473 4,474 4,473 4,474 4,473 4,472
CMG 5 3,173 3,455 3,481 4,460 4,460 4,458 4,460 4,459 4,453 4,458 4,270 3,614
CMG PROM 4,222 4,276 4,283 4,471 4,471 4,470 4,471 4,471 4,469 4,471 4,434 4,309

Tabla 23. Costos marginales por bloques horarios para el ao 2017, escenario demanda total.
CMG 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,474 4,347 4,066 4,420
CMG 2 4,473 4,473 4,473 4,474 4,474 4,474 4,474 4,470 4,467 3,399 3,204 3,132
CMG 3 4,470 4,473 4,473 4,474 4,474 4,474 4,474 4,381 4,381 3,112 3,008 2,874
CMG 4 4,100 4,463 4,462 4,471 4,472 4,473 4,473 3,515 3,600 2,857 2,818 2,730
CMG 5 2,939 3,156 3,154 4,453 4,317 4,160 4,454 2,935 2,885 2,568 2,550 2,528
CMG PROM 4,095 4,217 4,219 4,469 4,442 4,410 4,470 3,919 3,933 3,084 2,980 2,928

Tabla 24. Costos marginales por bloques horarios para el ao 2018, escenario demanda total.
CMG 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 3,711 3,658 4,386 4,387 4,272 4,348 4,469 4,466 4,461 4,465 4,351 4,468
CMG 2 2,979 2,982 3,076 3,196 3,285 3,385 3,660 3,562 3,486 3,654 3,376 3,253
CMG 3 2,795 2,831 2,889 3,013 3,026 3,052 3,236 3,121 3,169 3,227 3,072 2,987
CMG 4 2,588 2,700 2,733 2,837 2,833 2,845 2,999 2,889 2,898 2,943 2,876 2,773
CMG 5 2,425 2,495 2,524 2,654 2,618 2,593 2,680 2,628 2,605 2,608 2,574 2,537
CMG PROM 2,776 2,820 2,913 3,015 3,028 3,066 3,244 3,153 3,145 3,215 3,075 3,004

Tabla 25. Costos marginales por bloques horarios para el ao 2019, escenario demanda total.
CMG 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
BLOQUES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
CMG 1 4,167 4,142 4,464 4,462 4,422 4,426 4,472 4,471 4,467 4,471 4,462 4,472
CMG 2 3,051 3,057 3,179 3,393 3,552 3,602 4,055 3,816 3,715 4,026 3,604 3,432
CMG 3 2,843 2,893 2,981 3,093 3,133 3,140 3,440 3,252 3,281 3,419 3,196 3,046
CMG 4 2,641 2,737 2,779 2,904 2,901 2,900 3,055 2,970 3,002 3,029 2,957 2,831
CMG 5 2,460 2,528 2,533 2,703 2,672 2,641 2,723 2,687 2,665 2,657 2,604 2,551
CMG PROM 2,850 2,896 2,981 3,117 3,160 3,172 3,422 3,285 3,271 3,394 3,198 3,084

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 57 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Resultados de la generacin esperada por bloque


La generacin de cada planta generadora esperada, expresada en cinco (5) bloques horarios, se
muestra en el Tabla 25. Costos marginales por bloques horarios para el ao 2019, escenario demanda total.,
escenario demanda abastecida.

Tabla 26. Resultados de la generacin por bloques de demanda


RESULTADOS DESPACHO POR BLOQUE (MW)
bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2016
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 58 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
Centrales Trmicas
G3ITABO2 111.20 111.20 111.20 111.20 111.20 82.71
G3AANDRE 212.20 212.20 212.20 212.20 212.20 157.88
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.69
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.84
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.67
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.35
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.90 200.90 200.90 200.90 200.90 149.50
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 69.80 62.12
G3QUISQ1 109.90 109.90 109.90 109.90 30.30 67.65
G3PALAMA 95.10 95.10 94.60 78.00 10.20 52.57
G3EM2CGN 96.20 91.90 86.70 28.40 2.80 40.43
G3IKM22 9.40 8.80 8.10 1.70 0.10 3.63
G3BERSAL 14.00 13.10 11.40 2.20 0.10 5.21
G3LOPPLA 21.90 20.30 15.40 3.10 0.20 7.62
G3CESPM1 37.30 31.70 15.00 3.20 0.10 10.06
G3CESPM2 15.00 12.20 6.00 1.30 0.10 3.94
G3CESPM3 54.30 37.00 14.60 2.80 0.10 11.38
G3RSJUAN 1.10 0.70 0.30 - - 0.21
G3HAINAG 48.50 25.60 9.30 1.60 - 8.01
G3HAINA4 23.90 9.50 3.20 0.40 - 3.08
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Febrero 2016
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 20.70 18.70 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.00 9.70 3.90 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.40 10.30 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 59 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 74.80
G3AANDRE 244.20 244.20 244.20 244.20 244.20 164.09
G3ITABO1 34.90 34.90 34.90 34.90 34.90 23.42
G3LMINA5 79.00 79.00 79.00 79.00 79.00 53.08
G3LMINA6 80.10 80.10 80.10 80.10 80.10 53.86
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 20.73
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 30.55
G3QUISQ2 193.60 193.60 193.60 193.60 193.60 130.09
G3METALD 28.40 28.40 28.40 28.40 28.40 19.07
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 16.83
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 18.74
G3SESTE 56.80 56.80 56.80 56.80 56.80 38.15
G3LVEGA 71.00 71.00 71.00 71.00 71.00 47.71
G3MRIO 87.50 87.50 87.50 87.50 86.70 58.68
G3QUISQ1 109.10 109.10 109.10 109.10 47.20 63.38
G3PALAMA 86.10 86.10 86.10 85.80 11.90 45.95
G3EM2CGN 96.60 93.20 92.10 59.50 6.90 43.30
G3IKM22 9.40 8.80 8.20 3.40 0.40 3.61

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 60 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BERSAL 14.00 13.10 12.00 4.20 0.40 5.19
G3LOPPLA 21.90 20.20 15.90 5.40 0.50 7.41
G3CESPM1 37.50 31.00 15.80 5.60 0.50 9.59
G3CESPM2 18.30 13.90 7.00 2.60 0.20 4.34
G3CESPM3 54.30 32.00 13.90 5.40 0.40 9.87
G3RSJUAN 1.00 0.60 0.20 0.10 - 0.18
G3HAINAG 47.90 20.10 8.90 3.60 0.20 6.63
G3HAINA4 23.40 7.30 3.10 1.20 - 2.53
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Marzo 2016
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 61 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.60 93.60 93.60 93.60 93.60 69.62
G3AANDRE 244.00 244.00 244.00 244.00 244.00 181.52
G3ITABO1 108.30 108.30 108.30 108.30 108.30 80.60
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.80
G3LMINA6 59.30 59.30 59.30 59.30 59.30 44.15
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.41
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.80 200.80 200.80 200.80 200.80 149.40
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 57.50 57.50 57.50 57.50 57.50 42.75
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 55.10 72.07
G3PALAMA 95.10 95.10 95.10 95.10 15.30 56.61
G3EM2CGN 96.60 96.60 96.60 72.40 7.30 51.74
G3IKM22 9.40 9.40 9.20 4.30 0.40 4.43
G3BERSAL 14.10 14.10 13.10 5.70 0.50 6.39
G3LOPPLA 21.90 20.70 18.80 7.40 0.60 9.17
G3CESPM1 37.00 33.70 22.90 7.30 0.50 12.64
G3CESPM2 51.90 42.60 23.90 7.80 0.50 14.93
G3CESPM3 55.40 35.80 16.90 5.60 0.30 12.16
G3RSJUAN 1.10 0.60 0.30 0.10 - 0.22
G3HAINAG 50.30 24.80 11.00 3.60 0.10 8.60
G3HAINA4 25.40 9.00 3.80 1.30 - 3.28
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.02

Abril 2016
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 62 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3AANDRE 244.20 244.20 244.20 244.20 244.20 175.82
G3ITABO1 108.60 108.60 108.60 108.60 108.60 78.21
G3LMINA5 78.90 78.90 78.90 78.90 78.90 56.79
G3LMINA6 77.50 77.50 77.50 77.50 77.50 55.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.37
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.00 187.00 187.00 187.00 187.00 134.65
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.70 63.70 63.70 63.70 63.70 45.87
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 63 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3QUISQ1 109.50 109.50 109.50 109.50 109.50 78.82
G3PALAMA 95.10 95.10 95.10 95.10 93.30 68.17
G3EM2CGN 96.30 96.30 96.30 96.30 54.00 62.05
G3IKM22 9.40 9.40 9.40 9.40 2.90 5.64
G3BERSAL 14.10 14.10 14.10 14.10 3.90 8.40
G3LOPPLA 21.80 21.80 21.80 20.10 5.10 12.54
G3CESPM1 36.90 36.90 35.70 22.90 5.10 18.48
G3CESPM2 51.80 50.80 42.90 23.10 5.50 22.66
G3CESPM3 55.80 50.80 34.50 16.40 4.10 19.93
G3RSJUAN 1.10 0.90 0.60 0.30 0.10 0.36
G3HAINAG 50.40 39.80 22.90 10.00 2.50 14.48
G3HAINA4 25.60 16.50 8.20 3.70 0.90 5.80
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.03

Mayo 2016
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 64 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.80
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.81
G3LMINA5 68.90 68.90 68.90 68.90 68.90 51.23
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.35
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.60 200.60 200.60 200.60 200.60 149.27
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.43
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.70 109.70 109.70 109.70 109.70 81.64
G3PALAMA 87.10 87.10 87.10 87.10 68.60 61.55
G3EM2CGN 96.90 96.90 96.90 92.50 28.10 59.11
G3IKM22 9.40 9.40 9.40 7.70 1.80 5.34
G3BERSAL 14.00 14.00 14.00 10.70 2.30 7.77
G3LOPPLA 21.90 21.90 21.90 14.30 3.00 11.59
G3CESPM1 37.10 37.10 32.80 16.00 3.50 17.10
G3CESPM2 23.50 23.40 19.40 9.30 1.90 10.36
G3CESPM3 56.30 53.20 36.20 14.30 2.90 20.78
G3RSJUAN 1.10 1.00 0.60 0.30 0.10 0.38
G3HAINAG 50.50 42.50 23.20 9.00 1.80 15.20
G3HAINA4 25.10 18.50 8.40 3.20 0.50 6.23
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.03

Junio 2016
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 65 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 80.00
G3AANDRE 245.00 245.00 245.00 245.00 245.00 176.43
G3ITABO1 108.20 108.20 108.20 108.20 108.20 77.94
G3LMINA5 52.80 52.80 52.80 52.80 52.80 38.02
G3LMINA6 80.40 80.40 80.40 80.40 80.40 57.89
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.38
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.20
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.60 193.60 193.60 193.60 193.60 139.40
G3METALD 28.40 28.40 28.40 28.40 28.40 20.45

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 66 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.19
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.60 109.60 109.60 109.60 109.60 78.92
G3PALAMA 95.10 95.10 95.10 95.10 69.40 64.05
G3EM2CGN 96.60 96.60 96.60 92.30 23.70 56.30
G3IKM22 9.40 9.40 9.40 8.80 1.50 5.29
G3BERSAL 14.10 14.10 13.60 13.10 1.90 7.79
G3LOPPLA 21.90 21.90 20.70 16.80 2.60 11.37
G3CESPM1 37.10 37.10 34.20 16.90 2.90 16.87
G3CESPM2 11.90 11.90 10.80 5.40 0.90 5.38
G3CESPM3 55.80 54.20 42.10 16.90 2.90 21.75
G3RSJUAN 1.10 1.00 0.80 0.30 - 0.40
G3HAINAG 50.40 46.40 29.00 10.70 1.60 16.68
G3HAINA4 25.40 21.10 11.10 3.90 0.50 7.09
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.03

Julio 2016
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 67 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.89
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.85
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.63
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.20
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.76
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.42
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.62
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.74
G3PALAMA 95.10 95.10 95.10 95.10 93.40 70.49
G3EM2CGN 96.50 96.50 96.50 96.40 45.20 62.70
G3IKM22 9.40 9.40 9.40 8.80 2.70 5.71
G3BERSAL 14.00 14.00 14.00 13.20 3.70 8.47
G3LOPPLA 21.90 21.90 21.90 20.50 4.70 13.00
G3CESPM1 37.00 37.00 36.50 33.90 4.60 21.17
G3CESPM2 51.80 51.50 49.90 37.60 4.90 27.30
G3CESPM3 55.40 54.10 49.30 27.60 3.60 25.76
G3RSJUAN 1.10 1.00 0.90 0.50 0.10 0.49
G3HAINAG 50.30 47.00 39.30 18.20 2.20 20.59
G3HAINA4 25.50 22.40 16.10 6.70 0.70 8.97
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.05

Agosto 2016
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 68 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.84
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.79
G3LMINA5 79.30 79.30 79.30 79.30 79.30 59.02
G3LMINA6 80.40 80.40 80.40 80.40 80.40 59.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.90
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 69 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.59
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.42
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.70 109.70 109.70 109.70 109.70 81.63
G3PALAMA 87.10 87.10 87.10 87.10 74.00 62.49
G3EM2CGN 96.60 96.60 96.60 96.60 35.90 61.13
G3IKM22 9.40 9.40 9.40 9.40 2.10 5.70
G3BERSAL 14.00 14.00 14.00 13.80 2.90 8.43
G3LOPPLA 21.80 21.80 21.80 18.80 3.80 12.51
G3CESPM1 37.70 37.70 36.70 23.40 4.20 19.38
G3CESPM2 51.50 51.50 45.80 23.80 4.20 23.97
G3CESPM3 43.00 42.30 32.50 14.50 2.40 17.70
G3RSJUAN 1.10 1.10 0.80 0.30 0.10 0.43
G3HAINAG 50.70 47.50 30.70 11.90 1.90 17.99
G3HAINA4 25.80 22.30 11.90 4.40 0.60 7.80
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.04

Septiembre 2016
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 4.90 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 70 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.21
G3AANDRE 244.30 244.30 244.30 244.30 244.30 175.92
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.08
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.91
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.78
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.37
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.56
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.80 63.80 63.80 63.80 63.80 45.95
G3LVEGA 83.20 83.20 83.20 83.20 83.20 59.87
G3MRIO 87.70 87.70 87.70 87.70 87.70 63.17
G3QUISQ1 118.50 118.50 118.50 118.50 118.50 85.32
G3PALAMA 95.10 95.10 95.10 95.10 58.80 62.21
G3EM2CGN 96.60 96.60 96.60 96.00 21.30 56.48
G3IKM22 9.40 9.40 9.40 8.90 1.30 5.27
G3BERSAL 14.00 14.00 14.00 13.20 1.70 7.84
G3LOPPLA 21.80 21.80 21.80 20.30 2.40 12.12
G3CESPM1 37.10 37.10 35.90 21.50 2.80 17.92
G3CESPM2 51.80 51.30 46.30 22.40 2.70 22.76
G3CESPM3 56.00 52.70 40.60 16.10 1.70 20.89
G3RSJUAN 1.10 1.00 0.70 0.30 - 0.38
G3HAINAG 50.70 42.60 28.20 10.30 1.00 15.72
G3HAINA4 25.60 18.40 10.70 3.70 0.30 6.49
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 71 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)

Octubre 2016
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.50 0.50 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.87
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.03
G3ITABO1 108.20 108.20 108.20 108.20 108.20 80.49

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 72 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LMINA5 79.30 79.30 79.30 79.30 79.30 59.00
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.70
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.70 40.70 40.70 40.70 40.70 30.29
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 194.20 194.20 194.20 194.20 194.20 144.50
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.40
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 81.20 76.67
G3PALAMA 87.10 87.10 87.10 87.10 23.70 53.60
G3EM2CGN 96.60 96.60 96.60 83.30 11.00 54.34
G3IKM22 9.40 9.40 9.40 6.30 0.70 4.90
G3BERSAL 14.00 14.00 14.00 8.50 0.90 7.14
G3LOPPLA 21.90 21.90 21.40 10.20 1.20 10.45
G3CESPM1 2.40 2.40 2.20 0.90 0.10 1.09
G3CESPM2 51.80 51.20 42.80 14.30 1.40 21.19
G3CESPM3 55.80 49.80 31.20 10.60 1.00 18.23
G3RSJUAN 1.10 0.90 0.50 0.20 - 0.33
G3HAINAG 50.20 36.70 19.30 6.60 0.50 12.80
G3HAINA4 24.70 15.10 7.30 2.40 0.20 5.22
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.02

Noviembre 2016
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.50 0.50 0.40 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 73 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.28
G3AANDRE 243.90 243.90 243.90 243.90 243.90 175.60
G3ITABO1 108.10 108.10 108.10 108.10 108.10 77.81
G3LMINA5 79.10 79.10 79.10 79.10 79.10 56.94
G3LMINA6 80.10 80.10 80.10 80.10 80.10 57.70
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 17.70 17.70 17.70 17.70 17.70 12.74
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.56
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.20
G3LVEGA 83.20 83.20 83.20 83.20 83.20 59.87
G3MRIO 87.70 87.70 87.70 87.70 85.70 62.81
G3QUISQ1 118.50 118.50 118.50 118.50 73.30 77.56
G3PALAMA 95.00 95.00 95.00 93.10 19.50 55.11
G3EM2CGN 96.80 96.80 93.70 72.70 8.50 49.81
G3IKM22 9.40 9.40 8.30 4.50 0.50 4.20
G3BERSAL 14.00 14.00 12.40 6.40 0.60 6.20
G3LOPPLA 21.90 21.90 18.80 7.70 0.80 9.16
G3CESPM1 37.50 34.90 21.10 8.60 0.80 12.43
G3CESPM2 51.20 40.70 21.30 8.70 0.60 13.88
G3CESPM3 54.70 33.70 15.70 6.30 0.40 11.34
G3RSJUAN 1.00 0.60 0.30 0.10 - 0.20
G3HAINAG 46.30 22.70 9.90 3.90 0.20 7.73

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 74 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3HAINA4 21.30 8.40 3.40 1.30 0.10 2.91
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Diciembre 2016
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 75 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Trmicas
G3ITABO2 111.70 111.70 111.70 111.70 111.70 83.11
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.90
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.68
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.88
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.66
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 4.00 4.00 4.00 4.00 4.00 2.94
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.20 201.20 201.20 201.20 201.20 149.66
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.39
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 87.00 66.66
G3QUISQ1 118.50 118.50 118.50 118.50 39.50 74.20
G3PALAMA 95.10 95.10 95.10 94.10 11.10 55.72
G3EM2CGN 96.70 96.70 91.00 44.00 5.00 45.26
G3IKM22 9.40 9.40 7.70 2.80 0.30 3.89
G3BERSAL 14.10 14.10 11.50 3.60 0.30 5.71
G3LOPPLA 21.90 21.20 15.00 4.50 0.40 8.01
G3CESPM1 24.00 21.90 10.90 3.40 0.20 7.23
G3CESPM2 40.00 32.90 14.20 4.80 0.30 10.55
G3CESPM3 55.90 35.70 13.30 4.50 0.20 11.28
G3RSJUAN 1.10 0.60 0.20 0.10 - 0.20
G3HAINAG 50.60 23.80 8.30 2.60 0.10 7.75
G3HAINA4 25.50 8.70 2.90 0.90 - 3.00
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.02

RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2017
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 76 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.83
G3AANDRE 213.30 213.30 213.30 213.30 213.30 158.71
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.83
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.83
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.68
G3LMINA6 80.10 80.10 80.10 80.10 80.10 59.57
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.40
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.90 200.90 200.90 200.90 200.90 149.45
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 83.20 83.20 83.20 83.20 54.70 56.83
G3MRIO 87.80 87.80 87.80 87.80 25.10 54.20
G3QUISQ1 109.90 109.90 109.40 90.60 11.70 60.82
G3PALAMA 95.10 91.40 86.50 30.60 2.70 40.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 77 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3EM2CGN 96.20 86.90 59.40 11.60 0.60 31.26
G3IKM22 9.40 8.10 3.50 0.70 - 2.49
G3BERSAL 14.10 11.80 5.00 0.80 - 3.57
G3LOPPLA 21.90 17.60 6.90 1.00 - 5.22
G3CESPM3 53.40 29.20 9.60 1.40 - 8.81
G3CESPM2 14.40 6.90 2.30 0.30 - 2.14
G3CESPM1 34.80 11.70 3.60 0.50 - 3.88
G3RSJUAN 1.00 0.40 0.10 - - 0.12
G3HAINAG 45.90 12.90 3.80 0.50 - 4.46
G3HAINA4 21.30 4.40 1.20 0.10 - 1.66
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Febrero 2017
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 20.70 18.70 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.20 9.90 3.50 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.50 10.10 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 78 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 74.80
G3AANDRE 244.70 244.70 244.70 244.70 244.70 164.44
G3ITABO1 35.00 35.00 35.00 35.00 35.00 23.49
G3LMINA5 79.10 79.10 79.10 79.10 79.10 53.15
G3LMINAC 107.10 107.10 107.10 107.10 107.10 71.97
G3LMINA6 80.00 80.00 80.00 80.00 80.00 53.79
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 20.73
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 30.55
G3QUISQ2 193.40 193.40 193.40 193.40 193.40 130.00
G3METALD 28.40 28.40 28.40 28.40 28.40 19.08
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 16.83
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 18.74
G3SESTE 56.80 56.80 56.80 56.80 56.80 38.14
G3LVEGA 71.00 71.00 71.00 71.00 71.00 47.71
G3MRIO 87.50 87.50 87.50 87.50 52.10 53.14
G3QUISQ1 109.10 109.10 109.10 109.10 22.00 59.40
G3PALAMA 86.00 85.00 85.00 69.20 7.70 42.22
G3EM2CGN 96.60 89.40 76.10 29.40 2.90 34.62
G3IKM22 9.40 8.10 4.80 1.60 0.10 2.62
G3BERSAL 14.00 11.80 6.20 2.30 0.20 3.69
G3LOPPLA 21.90 17.60 8.60 3.10 0.20 5.38
G3CESPM3 55.00 32.30 13.50 5.30 0.20 9.84
G3CESPM2 17.70 8.60 3.60 1.30 0.10 2.69
G3CESPM1 34.40 11.40 4.70 1.70 - 3.84
G3RSJUAN 1.00 0.40 0.20 0.10 - 0.12
G3HAINAG 45.90 12.80 5.40 1.90 - 4.54
G3HAINA4 21.00 4.40 1.90 0.60 - 1.70
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Marzo 2017
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 79 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.40 93.40 93.40 93.40 93.40 69.50
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.72
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.91
G3LMINA5 79.40 79.40 79.40 79.40 79.40 59.11
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.66
G3LMINA6 59.50 59.50 59.50 59.50 59.50 44.30
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.42
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.50 201.50 201.50 201.50 201.50 149.92
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 80 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SESTE 57.30 57.30 57.30 57.30 57.30 42.66
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 59.20 60.25
G3QUISQ1 109.80 109.80 109.80 109.80 26.10 66.88
G3PALAMA 95.10 95.10 95.10 88.20 9.40 54.37
G3EM2CGN 96.60 94.90 89.80 38.40 3.10 43.38
G3IKM22 9.40 8.90 7.20 2.20 0.20 3.57
G3BERSAL 14.10 13.20 9.80 2.90 0.20 5.10
G3LOPPLA 21.90 20.40 11.90 3.90 0.20 7.17
G3CESPM3 55.90 45.30 20.10 6.70 0.20 14.63
G3CESPM2 51.80 28.70 11.80 4.00 0.10 9.53
G3CESPM1 37.30 14.30 5.90 1.80 - 5.07
G3RSJUAN 1.10 0.50 0.20 0.10 - 0.16
G3HAINAG 49.80 16.10 6.50 1.90 - 5.88
G3HAINA4 24.50 6.10 2.30 0.60 - 2.35
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Abril 2017
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 81 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3AANDRE 245.40 245.40 245.40 245.40 245.40 176.72
G3ITABO1 108.50 108.50 108.50 108.50 108.50 78.14
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.00
G3LMINAC 107.30 107.30 107.30 107.30 107.30 77.24
G3LMINA6 77.60 77.60 77.60 77.60 77.60 55.86
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.70 40.70 40.70 40.70 40.70 29.33
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.22
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.10 187.10 187.10 187.10 187.10 134.73
G3METALD 28.40 28.40 28.40 28.40 28.40 20.45
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.70 63.70 63.70 63.70 63.70 45.86
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.50 109.50 109.50 109.50 109.50 78.87
G3PALAMA 95.10 95.10 95.10 95.10 71.80 64.45
G3EM2CGN 96.60 96.60 96.60 90.70 25.10 56.22
G3IKM22 9.40 9.40 9.40 7.00 1.50 4.99
G3BERSAL 14.00 14.00 14.00 8.30 2.00 7.04
G3LOPPLA 21.80 21.80 21.30 12.30 2.70 10.69
G3CESPM3 55.90 54.70 43.40 19.00 4.70 22.70
G3CESPM2 51.30 45.90 25.70 10.80 2.50 16.17
G3CESPM1 37.10 26.10 12.70 5.50 1.10 8.92
G3RSJUAN 1.10 0.80 0.40 0.20 - 0.27
G3HAINAG 50.10 30.00 14.10 6.10 1.20 10.36
G3HAINA4 25.20 12.40 5.10 2.10 0.40 4.20
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.02

Mayo 2017
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 82 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.88
G3AANDRE 245.00 245.00 245.00 245.00 245.00 182.26
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.84
G3LMINA5 68.80 68.80 68.80 68.80 68.80 51.19
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.65
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.34
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 83 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.60 200.60 200.60 200.60 200.60 149.23
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.90 109.90 109.90 109.90 99.00 79.84
G3PALAMA 87.20 87.20 87.20 86.00 36.50 55.68
G3EM2CGN 96.50 96.50 95.50 73.90 15.60 53.26
G3IKM22 9.40 9.40 8.40 5.10 1.00 4.56
G3BERSAL 14.10 14.10 12.50 6.90 1.40 6.67
G3LOPPLA 21.90 21.90 19.30 8.70 1.90 9.93
G3CESPM3 55.50 53.80 38.30 13.30 2.70 21.00
G3CESPM2 23.40 21.50 12.40 4.40 0.90 7.71
G3CESPM1 36.90 29.60 13.50 4.90 0.80 9.84
G3RSJUAN 1.10 0.80 0.40 0.20 - 0.29
G3HAINAG 50.30 35.40 15.40 5.50 0.80 11.70
G3HAINA4 24.60 13.80 5.20 1.90 0.20 4.51
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.02

Junio 2017
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 84 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.29
G3AANDRE 244.80 244.80 244.80 244.80 244.80 176.29
G3ITABO1 108.60 108.60 108.60 108.60 108.60 78.19
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.95
G3LMINAC 107.00 107.00 107.00 107.00 107.00 77.02
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.80
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.36
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.51
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.22
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.60 109.60 109.60 109.60 98.00 76.92
G3PALAMA 95.20 95.20 95.20 93.40 35.60 57.96
G3EM2CGN 96.50 96.50 94.30 81.30 14.10 52.33
G3IKM22 9.40 9.40 8.90 5.00 0.90 4.47
G3BERSAL 14.00 14.00 13.20 7.20 1.30 6.58
G3LOPPLA 21.80 21.80 20.40 9.40 1.70 9.87
G3CESPM3 55.70 54.40 43.10 15.70 2.30 21.63
G3CESPM2 12.10 11.70 7.60 2.80 0.40 4.24
G3CESPM1 37.50 33.80 18.20 6.20 0.70 11.31
G3RSJUAN 1.10 1.00 0.50 0.20 - 0.33
G3HAINAG 50.40 41.00 19.80 6.60 0.70 13.29
G3HAINA4 25.40 18.00 7.10 2.30 0.20 5.54
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 85 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
Julio 2017
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.73
G3ITABO1 108.80 108.80 108.80 108.80 108.80 80.94
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.19
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.76

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 86 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.75
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.20 201.20 201.20 201.20 201.20 149.71
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.43
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.80 109.80 109.80 109.80 109.80 81.71
G3PALAMA 95.10 95.10 95.10 95.10 65.90 65.58
G3EM2CGN 96.40 96.40 96.40 92.90 24.00 58.26
G3IKM22 9.40 9.40 9.40 8.80 1.30 5.46
G3BERSAL 14.00 14.00 14.00 13.10 1.90 8.11
G3LOPPLA 21.90 21.90 21.90 20.40 2.70 12.61
G3CESPM3 56.10 56.10 53.20 35.90 4.70 28.51
G3CESPM2 51.40 49.70 45.80 21.40 2.40 22.89
G3CESPM1 37.10 34.00 26.00 10.30 1.10 13.90
G3RSJUAN 1.10 1.00 0.80 0.30 - 0.41
G3HAINAG 50.60 43.80 30.30 11.80 1.10 17.10
G3HAINA4 25.50 19.60 12.40 4.10 0.30 7.29
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.03

Agosto 2017
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 87 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.60 111.60 111.60 111.60 111.60 83.06
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.06
G3AANDRE 245.10 245.10 245.10 245.10 245.10 182.33
G3ITABO1 108.10 108.10 108.10 108.10 108.10 80.45
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.84
G3LMINAC 107.40 107.40 107.40 107.40 107.40 79.89
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.36
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.00 201.00 201.00 201.00 201.00 149.57
G3METALD 28.40 28.40 28.40 28.40 26.10 20.72
G3PIMEN2 25.00 25.00 25.00 25.00 19.10 17.59
G3PIMEN1 27.90 27.90 27.90 27.90 18.00 19.01
G3SESTE 63.70 63.70 63.70 63.70 26.90 40.89
G3LVEGA 76.00 76.00 76.00 73.00 19.00 45.92
G3MRIO 87.80 87.80 85.50 54.20 13.10 45.68
G3QUISQ1 109.90 109.20 81.20 30.20 9.80 44.52
G3PALAMA 87.10 76.90 29.20 12.90 3.40 24.51
G3EM2CGN 96.70 43.20 17.10 8.70 1.30 15.49
G3IKM22 9.40 2.90 1.20 0.60 0.10 1.14
G3BERSAL 13.40 4.00 1.80 0.80 0.10 1.58
G3LOPPLA 20.70 5.20 2.40 1.10 0.10 2.19
G3CESPM3 37.90 7.90 3.90 1.30 0.20 3.51
G3CESPM1 23.50 5.20 2.30 0.70 0.10 2.20
G3CESPM2 25.50 6.00 2.40 0.60 0.10 2.40
G3RSJUAN 0.50 0.10 - - - 0.05
G3HAINAG 19.50 4.70 1.70 0.50 - 1.82

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 88 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3HAINA4 7.40 1.80 0.60 0.20 - 0.68
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Septiembre 2017
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.17

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 89 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CATAL1 353.70 353.70 353.70 353.70 353.70 254.67
G3AANDRE 244.70 244.70 244.70 244.70 244.70 176.19
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.07
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.03
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.13
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.69
G3BARAHC 40.90 40.90 40.90 40.90 40.90 29.48
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.53
G3METALD 28.40 28.40 28.40 28.40 22.70 19.46
G3PIMEN2 25.00 25.00 25.00 25.00 15.20 16.34
G3PIMEN1 27.90 27.90 27.90 27.90 13.60 17.63
G3SESTE 63.70 63.70 63.70 63.70 21.80 38.65
G3LVEGA 83.20 83.20 83.20 80.90 16.40 48.00
G3MRIO 87.70 87.70 86.00 58.60 11.10 44.68
G3QUISQ1 118.50 115.90 93.30 34.10 8.00 46.99
G3PALAMA 95.10 71.40 32.80 13.90 2.20 23.64
G3EM2CGN 94.30 31.90 16.30 7.90 0.80 12.66
G3IKM22 8.90 2.20 1.30 0.50 0.10 0.96
G3BERSAL 12.40 2.80 1.80 0.70 0.10 1.29
G3LOPPLA 18.50 4.00 2.30 0.80 0.10 1.82
G3CESPM3 33.20 8.20 4.60 1.40 0.10 3.48
G3CESPM1 15.90 4.20 2.20 0.60 - 1.68
G3CESPM2 17.00 4.20 1.90 0.50 - 1.68
G3RSJUAN 0.30 0.10 - - - 0.03
G3HAINAG 13.10 3.30 1.50 0.40 - 1.30
G3HAINA4 5.00 1.20 0.50 0.10 - 0.47
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Octubre 2017
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 90 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.50 0.50 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.85
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.09
G3CATAL2 353.10 353.10 353.10 353.10 353.10 262.74
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.07
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.74
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.78
G3LMINAC 107.00 107.00 107.00 107.00 86.80 76.03
G3LMINA6 80.40 80.40 80.40 80.40 31.70 51.17
G3CEPP1 9.30 9.30 9.30 9.30 2.70 5.74
G3BARAHC 40.90 40.90 40.90 40.10 10.40 24.89
G3CEPP2 30.80 30.80 30.80 28.80 6.50 18.27
G3PIMEN3 45.50 45.50 45.50 36.20 8.60 25.64
G3QUISQ2 194.00 188.10 149.30 70.10 22.40 82.71
G3METALD 28.40 21.80 10.60 5.60 1.20 7.88
G3PIMEN2 25.00 16.20 8.10 4.50 0.80 6.05
G3PIMEN1 27.90 13.20 7.00 4.60 0.70 5.40
G3SESTE 59.80 22.80 13.40 8.60 1.10 10.02
G3LVEGA 58.70 19.70 14.10 7.00 0.90 9.22
G3MRIO 31.80 15.40 10.20 3.10 0.50 6.18
G3QUISQ1 23.70 12.20 4.90 1.70 0.20 4.12
G3PALAMA 13.10 3.90 1.60 0.60 0.10 1.50
G3EM2CGN 8.40 1.90 0.90 0.30 - 0.81
G3IKM22 0.50 0.10 0.10 - - 0.05
G3BERSAL 0.70 0.20 0.10 - - 0.07
G3LOPPLA 0.90 0.20 0.10 - - 0.10
G3CESPM1 0.10 - - - - 0.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 91 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CESPM2 1.30 0.30 0.10 - - 0.12
G3CESPM3 1.00 0.30 0.10 - - 0.10
G3RSJUAN - - - - - -
G3HAINAG 0.60 0.20 0.10 - - 0.06
G3HAINA4 0.20 0.10 - - - 0.02
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Noviembre 2017
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.40 0.50 0.50 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 92 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.70 111.70 111.70 111.70 111.70 80.43
G3CATAL1 352.50 352.50 352.50 352.50 352.50 253.81
G3CATAL2 352.90 352.90 352.90 352.90 352.90 254.08
G3AANDRE 244.90 244.90 244.90 244.90 244.90 176.33
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.28
G3LMINA5 79.10 79.10 79.10 79.10 76.20 56.47
G3LMINAC 107.10 107.10 107.10 107.10 60.60 69.13
G3LMINA6 80.40 80.40 80.40 79.20 22.50 47.70
G3CEPP1 9.30 9.30 9.30 8.80 2.10 5.35
G3BARAHC 17.70 17.70 17.70 16.70 3.70 10.18
G3CEPP2 30.80 30.80 30.80 27.50 6.00 17.36
G3PIMEN3 45.50 45.50 44.00 31.50 8.00 23.63
G3QUISQ2 193.60 174.80 117.80 60.50 18.90 70.08
G3METALD 28.40 15.90 7.80 5.30 1.00 6.02
G3PIMEN2 25.00 11.00 5.70 4.20 0.60 4.49
G3PIMEN1 26.70 10.10 5.80 4.00 0.60 4.33
G3SESTE 49.10 16.70 10.70 7.30 0.90 7.64
G3LVEGA 48.30 17.20 11.60 6.00 0.90 7.61
G3MRIO 27.80 13.40 7.50 2.70 0.50 5.01
G3QUISQ1 23.10 9.90 3.70 1.80 0.20 3.39
G3PALAMA 12.10 2.90 1.40 0.70 - 1.23
G3EM2CGN 5.80 1.50 0.70 0.20 - 0.58
G3IKM22 0.40 0.10 - - - 0.04
G3BERSAL 0.50 0.10 0.10 - - 0.05
G3LOPPLA 0.70 0.20 0.10 - - 0.06
G3CESPM1 0.70 0.20 0.10 - - 0.07
G3CESPM2 0.80 0.20 - - - 0.06
G3CESPM3 0.60 0.10 - - - 0.06
G3RSJUAN - - - - - -
G3HAINAG 0.40 0.10 - - - 0.04
G3HAINA4 0.10 - - - - 0.01
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Diciembre 2017
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 93 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.83
G3CATAL1 353.30 353.30 353.30 353.30 353.30 262.83
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 244.10 244.10 244.10 244.10 244.10 181.62
G3ITABO1 108.30 108.30 108.30 108.30 108.30 80.59
G3LMINA5 79.00 79.00 79.00 79.00 69.80 57.15
G3LMINAC 107.00 107.00 107.00 107.00 35.80 67.03
G3LMINA6 80.30 80.30 80.30 80.20 16.50 48.42
G3CEPP1 9.30 9.30 9.30 8.40 1.80 5.42
G3BARAHC 4.00 4.00 4.00 3.10 0.80 2.22
G3CEPP2 30.90 30.90 30.90 21.20 5.60 16.76
G3PIMEN3 45.50 45.50 43.70 21.60 6.80 22.39
G3QUISQ2 200.80 178.90 109.10 50.10 15.20 69.24
G3METALD 28.40 14.80 6.80 4.50 0.50 5.63
G3PIMEN2 25.00 10.50 5.30 3.60 0.40 4.30
G3PIMEN1 27.90 9.80 5.50 3.90 0.40 4.36
G3SESTE 63.70 18.10 11.00 5.60 0.80 8.26
G3LVEGA 78.00 16.70 10.30 3.40 0.50 7.88
G3MRIO 66.00 13.00 5.50 1.70 0.20 5.64
G3QUISQ1 40.50 8.90 2.80 1.10 0.10 3.53
G3PALAMA 19.20 2.70 1.00 0.40 - 1.29
G3EM2CGN 13.20 1.20 0.40 0.10 - 0.71

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 94 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3IKM22 1.00 0.10 - - - 0.05
G3BERSAL 1.40 0.10 - - - 0.07
G3LOPPLA 1.90 0.10 - - - 0.09
G3CESPM1 1.30 0.10 - - - 0.07
G3CESPM2 1.70 0.10 - - - 0.08
G3CESPM3 1.80 0.20 - - - 0.09
G3RSJUAN - - - - - -
G3HAINAG 1.20 0.10 - - - 0.05
G3HAINA4 0.40 - - - - 0.02
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2018
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 95 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.00 111.00 111.00 111.00 111.00 82.59
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.08
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 213.20 213.20 213.20 213.20 213.20 158.63
G3ITABO1 108.20 108.20 108.20 108.20 108.20 80.54
G3LMINA5 78.90 78.90 78.90 78.90 74.60 57.94
G3LMINAC 107.10 107.10 107.10 107.10 40.20 67.82
G3LMINA6 80.10 80.10 80.10 78.90 17.40 48.28
G3CEPP1 9.30 9.30 9.30 7.70 1.80 5.30
G3BARAHC 40.80 40.80 40.80 26.70 6.80 21.82
G3CEPP2 30.80 30.80 29.20 14.00 4.50 14.95
G3PIMEN3 45.50 43.70 41.80 17.20 6.10 20.84
G3QUISQ2 201.10 176.10 114.10 39.20 11.70 67.07
G3METALD 27.80 16.20 6.70 3.80 0.50 5.71
G3PIMEN2 23.70 10.90 5.30 2.80 0.40 4.18
G3PIMEN1 26.30 10.50 5.60 2.50 0.30 4.16
G3SESTE 59.70 18.60 9.90 3.20 0.50 7.55
G3LVEGA 70.90 16.00 9.90 2.30 0.30 7.23
G3MRIO 49.30 11.70 5.50 1.20 0.10 4.79
G3QUISQ1 31.40 8.80 2.80 0.60 0.10 3.13
G3PALAMA 16.00 2.90 1.00 0.20 - 1.22
G3EM2CGN 10.70 1.30 0.40 0.10 - 0.64
G3IKM22 0.70 0.10 - - - 0.04
G3BERSAL 1.00 0.10 - - - 0.06
G3LOPPLA 1.30 0.10 - - - 0.07
G3CESPM1 1.50 0.20 - - - 0.09
G3CESPM2 0.60 0.10 - - - 0.03
G3CESPM3 1.50 0.10 - - - 0.07
G3RSJUAN - - - - - -
G3HAINAG 0.90 0.10 - - - 0.05
G3HAINA4 0.30 - - - - 0.02
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Febrero 2018
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 20.70 18.70 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 96 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 74.90
G3CATAL1 353.50 353.50 353.50 353.50 353.50 237.55
G3CATAL2 352.90 352.90 352.90 352.90 352.90 237.16
G3AANDRE 244.10 244.10 244.10 244.10 244.10 164.00
G3ITABO1 34.90 34.90 34.90 34.90 34.90 23.43
G3LMINA5 79.00 79.00 79.00 79.00 79.00 53.08
G3LMINAC 107.20 107.20 107.20 107.20 67.30 65.68
G3LMINA6 80.20 80.20 80.20 80.20 21.50 44.51
G3CEPP1 9.30 9.30 9.30 9.30 2.00 5.07
G3BARAHC 40.80 40.80 40.80 40.10 8.10 22.08
G3CEPP2 30.90 30.90 30.90 27.10 5.90 16.13
G3PIMEN3 45.50 43.90 43.90 25.80 7.60 20.81
G3QUISQ2 193.60 162.90 109.40 51.70 17.40 60.55

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 97 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3METALD 27.30 12.10 6.70 5.00 0.80 4.73
G3PIMEN2 23.70 8.60 5.40 3.80 0.50 3.62
G3PIMEN1 26.20 8.50 5.50 4.00 0.50 3.73
G3SESTE 52.20 13.30 10.10 6.80 0.80 6.48
G3LVEGA 58.10 12.90 9.60 4.30 0.70 6.06
G3MRIO 39.70 12.30 7.30 2.40 0.40 4.73
G3QUISQ1 25.80 8.60 3.40 1.60 0.20 2.95
G3PALAMA 14.10 2.50 1.30 0.60 - 1.11
G3EM2CGN 10.50 1.40 0.80 0.30 - 0.69
G3IKM22 0.70 0.10 - - - 0.05
G3BERSAL 0.80 0.10 0.10 - - 0.06
G3LOPPLA 1.10 0.20 0.10 - - 0.08
G3CESPM1 1.30 0.20 0.10 - - 0.09
G3CESPM2 0.60 0.10 - - - 0.04
G3CESPM3 1.20 0.20 - - - 0.08
G3RSJUAN - - - - - -
G3HAINAG 0.90 0.10 - - - 0.05
G3HAINA4 0.40 - - - - 0.02
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Marzo 2018
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 98 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.60 93.60 93.60 93.60 93.60 69.67
G3CATAL1 353.80 353.80 353.80 353.80 353.80 263.26
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.08
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.91
G3ITABO1 109.00 109.00 109.00 109.00 109.00 81.09
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.76
G3LMINAC 107.20 107.20 107.20 107.20 74.70 74.00
G3LMINA6 59.60 59.60 59.60 59.60 20.00 37.31
G3CEPP1 9.30 9.30 9.30 9.30 2.40 5.68
G3BARAHC 40.80 40.80 40.80 40.80 9.00 24.74
G3CEPP2 30.80 30.80 30.80 30.80 6.20 18.58
G3PIMEN3 45.50 45.50 45.50 43.70 8.50 26.97
G3QUISQ2 200.90 192.30 160.60 76.70 21.40 86.70
G3METALD 28.40 23.20 10.60 5.70 1.00 8.10
G3PIMEN2 25.00 19.90 7.90 4.70 0.60 6.69
G3PIMEN1 27.90 16.70 7.30 4.60 0.50 6.05
G3SESTE 57.40 22.50 12.60 8.30 0.90 9.64
G3LVEGA 82.70 22.10 14.40 7.80 0.80 10.55
G3MRIO 81.50 16.00 10.60 3.30 0.50 7.88
G3QUISQ1 74.70 13.40 5.50 1.80 0.20 5.97
G3PALAMA 30.50 5.10 1.80 0.80 0.10 2.30
G3EM2CGN 18.70 2.00 0.90 0.30 - 1.15
G3IKM22 1.60 0.10 0.10 - - 0.09
G3BERSAL 2.20 0.20 0.10 - - 0.12
G3LOPPLA 3.10 0.30 0.10 - - 0.17
G3CESPM1 4.30 0.30 0.10 - - 0.20
G3CESPM2 4.40 0.30 0.10 - - 0.22
G3CESPM3 3.40 0.30 0.10 - - 0.17
G3RSJUAN 0.10 - - - - -
G3HAINAG 2.10 0.20 - - - 0.10
G3HAINA4 0.80 0.10 - - - 0.04
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Abril 2018
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 99 de 232


ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3CATAL1 353.60 353.60 353.60 353.60 353.60 254.60
G3CATAL2 354.00 354.00 354.00 354.00 354.00 254.86
G3AANDRE 244.60 244.60 244.60 244.60 244.60 176.12
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.25
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.85
G3LMINAC 107.00 107.00 107.00 107.00 107.00 77.06
G3LMINA6 77.60 77.60 77.60 77.60 77.60 55.88
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 100 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BARAHC 40.80 40.80 40.80 40.80 39.40 29.14
G3CEPP2 30.80 30.80 30.80 30.80 26.50 21.46
G3PIMEN3 45.50 45.50 45.50 45.50 27.70 29.68
G3QUISQ2 187.30 187.30 183.10 143.10 49.10 102.71
G3METALD 28.40 28.10 22.70 9.10 4.90 12.04
G3PIMEN2 25.00 23.60 15.00 6.90 3.90 9.27
G3PIMEN1 27.90 26.20 12.80 6.80 4.00 9.42
G3SESTE 63.80 52.20 21.20 13.00 7.30 18.05
G3LVEGA 71.80 31.60 16.30 11.80 4.10 13.11
G3MRIO 88.00 23.90 15.70 10.60 2.30 11.63
G3QUISQ1 82.50 19.40 12.40 5.10 1.30 9.01
G3PALAMA 31.70 11.00 4.10 1.70 0.50 3.92
G3EM2CGN 19.10 4.60 1.70 0.90 0.20 1.83
G3IKM22 1.70 0.30 0.10 0.10 - 0.13
G3BERSAL 2.40 0.40 0.20 0.10 - 0.18
G3LOPPLA 3.30 0.50 0.20 0.10 - 0.24
G3CESPM1 4.40 0.60 0.20 0.10 - 0.29
G3CESPM2 4.90 0.60 0.20 0.10 - 0.30
G3CESPM3 3.80 0.50 0.20 0.10 - 0.25
G3RSJUAN 0.10 - - - - -
G3HAINAG 2.40 0.30 0.10 - - 0.15
G3HAINA4 0.90 0.10 - - - 0.05
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Mayo 2018
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 101 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 82.99
G3CATAL1 353.80 353.80 353.80 353.80 353.80 263.23
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.09
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.75
G3LMINA5 68.70 68.70 68.70 68.70 68.70 51.13
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.67
G3LMINA6 23.30 23.30 23.30 23.30 23.20 17.33
G3CEPP1 9.30 9.30 9.30 9.30 8.60 6.78
G3BARAHC 40.80 40.80 40.80 40.80 30.00 28.45
G3CEPP2 30.90 30.90 30.90 30.90 18.00 20.68
G3PIMEN3 45.50 45.50 45.50 45.10 17.80 28.86
G3QUISQ2 200.40 200.40 188.70 126.10 42.50 105.78
G3METALD 28.40 28.20 19.70 7.70 4.00 11.49
G3PIMEN2 25.00 22.60 11.00 6.10 3.20 8.43
G3PIMEN1 27.90 24.70 10.40 5.90 2.80 8.67
G3SESTE 63.80 50.20 19.70 11.60 4.20 17.25
G3LVEGA 74.20 30.70 15.60 10.60 2.50 12.85
G3MRIO 75.90 23.10 14.40 7.40 1.60 10.59
G3QUISQ1 44.70 18.80 10.60 3.50 0.90 7.38
G3PALAMA 19.90 9.70 3.10 1.30 0.20 3.16
G3EM2CGN 15.50 4.60 1.60 0.60 0.10 1.69
G3IKM22 1.20 0.30 0.10 - - 0.12
G3BERSAL 1.80 0.40 0.20 0.10 - 0.17
G3LOPPLA 2.50 0.50 0.20 0.10 - 0.21
G3CESPM1 2.80 0.60 0.20 0.10 - 0.24
G3CESPM2 1.70 0.30 0.10 - - 0.14
G3CESPM3 2.60 0.60 0.20 0.10 - 0.23
G3RSJUAN - - - - - -
G3HAINAG 1.70 0.30 0.10 - - 0.13
G3HAINA4 0.60 0.10 - - - 0.05
G3SPEDRV - - - - - -

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 102 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SLORE1 - - - - - -
Junio 2018
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.20 111.20 111.20 111.20 111.20 80.08
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.11
G3CATAL2 352.90 352.90 352.90 352.90 352.90 254.12
G3AANDRE 245.00 245.00 245.00 245.00 245.00 176.37

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 103 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO1 108.30 108.30 108.30 108.30 108.30 78.00
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.97
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.08
G3LMINA6 80.20 80.20 80.20 80.20 77.40 57.24
G3CEPP1 9.30 9.30 9.30 9.30 7.40 6.36
G3BARAHC 40.80 40.80 40.80 40.80 26.10 26.85
G3CEPP2 30.80 30.80 30.80 30.80 13.50 19.23
G3PIMEN3 45.50 45.50 45.50 44.10 16.00 27.43
G3QUISQ2 193.70 193.70 184.50 129.80 38.60 100.22
G3METALD 28.40 27.70 22.40 8.20 3.80 11.61
G3PIMEN2 25.00 23.70 14.10 6.30 3.00 8.89
G3PIMEN1 27.90 26.30 13.20 6.20 2.70 9.20
G3SESTE 57.20 48.80 20.50 11.20 3.30 16.19
G3LVEGA 71.80 44.50 17.40 10.90 2.40 15.15
G3MRIO 84.00 30.10 16.30 9.50 1.50 12.43
G3QUISQ1 73.00 22.00 13.20 4.50 0.90 9.22
G3PALAMA 30.60 12.90 4.80 1.60 0.30 4.32
G3EM2CGN 18.90 7.10 2.00 0.80 0.10 2.29
G3IKM22 1.60 0.40 0.10 0.10 - 0.15
G3BERSAL 2.20 0.60 0.20 0.10 - 0.22
G3LOPPLA 3.20 0.80 0.30 0.10 - 0.29
G3CESPM1 4.30 0.80 0.30 0.10 - 0.34
G3CESPM2 1.30 0.30 0.10 - - 0.11
G3CESPM3 4.80 0.90 0.30 0.10 - 0.37
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 3.00 0.60 0.20 - - 0.22
G3HAINA4 1.10 0.20 0.10 - - 0.08
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Julio 2018
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 104 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3CATAL1 352.90 352.90 352.90 352.90 352.90 262.57
G3CATAL2 352.70 352.70 352.70 352.70 352.70 262.43
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.77
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.66
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.16
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.66
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.36
G3CEPP2 30.80 30.80 30.80 30.80 29.60 22.73
G3PIMEN3 45.50 45.50 45.50 45.50 33.50 31.70
G3QUISQ2 201.10 201.10 200.60 192.30 58.40 122.72
G3METALD 28.40 28.40 26.80 20.80 5.20 15.37
G3PIMEN2 25.00 25.00 23.50 11.70 4.20 12.27
G3PIMEN1 27.90 27.90 26.20 10.90 4.00 13.17
G3SESTE 63.80 60.20 55.50 21.00 8.10 27.80
G3LVEGA 83.20 74.40 41.20 17.80 5.00 27.26
G3MRIO 90.40 52.60 25.50 14.60 2.50 19.76
G3QUISQ1 104.00 31.50 20.20 11.10 1.60 14.63
G3PALAMA 73.70 17.20 11.70 3.60 0.60 8.12
G3EM2CGN 37.50 11.60 5.10 1.60 0.20 4.45
G3IKM22 2.90 0.90 0.40 0.10 - 0.33
G3BERSAL 3.90 1.20 0.50 0.20 - 0.45
G3LOPPLA 5.40 1.50 0.60 0.20 - 0.58
G3CESPM1 7.50 1.60 0.70 0.30 - 0.69
G3CESPM2 9.00 1.70 0.70 0.30 - 0.76
G3CESPM3 7.80 1.20 0.50 0.20 - 0.57

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 105 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 5.60 0.80 0.40 0.10 - 0.41
G3HAINA4 2.10 0.30 0.10 - - 0.16
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Agosto 2018
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 106 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.87
G3CATAL1 352.50 352.50 352.50 352.50 352.50 262.28
G3CATAL2 353.10 353.10 353.10 353.10 353.10 262.72
G3AANDRE 244.80 244.80 244.80 244.80 244.80 182.12
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.61
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.94
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.74
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.75
G3CEPP1 9.30 9.30 9.30 9.30 9.10 6.87
G3BARAHC 40.80 40.80 40.80 40.80 34.40 29.22
G3CEPP2 30.80 30.80 30.80 30.80 20.60 21.13
G3PIMEN3 45.50 45.50 45.50 45.50 22.30 29.72
G3QUISQ2 201.10 201.10 198.40 158.60 49.20 114.64
G3METALD 28.40 28.40 26.80 10.20 4.50 13.34
G3PIMEN2 25.00 25.00 18.80 7.90 3.60 10.65
G3PIMEN1 27.90 27.90 18.00 7.70 3.40 11.04
G3SESTE 63.70 60.70 29.50 14.10 5.40 21.56
G3LVEGA 76.00 58.20 22.40 13.20 3.10 19.63
G3MRIO 87.80 35.30 17.90 10.70 1.90 14.42
G3QUISQ1 98.60 25.50 15.40 5.90 1.20 11.54
G3PALAMA 42.40 14.20 6.20 2.00 0.40 5.35
G3EM2CGN 26.20 9.70 2.80 1.10 0.10 3.26
G3IKM22 2.10 0.60 0.20 0.10 - 0.21
G3BERSAL 3.00 0.70 0.30 0.10 - 0.29
G3LOPPLA 4.40 1.10 0.40 0.10 - 0.42
G3CESPM1 6.00 1.20 0.40 0.10 - 0.49
G3CESPM2 7.00 1.30 0.50 0.20 - 0.56
G3CESPM3 4.70 0.80 0.30 0.10 - 0.35
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 4.20 0.70 0.20 0.10 - 0.30
G3HAINA4 1.60 0.20 0.10 - - 0.11
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Septiembre 2018
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 107 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.19
G3CATAL1 353.10 353.10 353.10 353.10 353.10 254.23
G3CATAL2 353.90 353.90 353.90 353.90 353.90 254.77
G3AANDRE 244.40 244.40 244.40 244.40 244.40 175.95
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.25
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.00
G3LMINAC 107.30 107.30 107.30 107.30 107.30 77.27
G3LMINA6 80.30 80.30 80.30 80.30 79.90 57.74
G3CEPP1 9.30 9.30 9.30 9.30 7.60 6.40
G3BARAHC 40.80 40.80 40.80 40.80 25.90 26.83
G3CEPP2 30.80 30.80 30.80 30.80 14.90 19.45
G3PIMEN3 45.50 45.50 45.50 45.50 17.00 27.84
G3QUISQ2 193.90 193.90 192.10 160.10 39.60 106.96
G3METALD 28.40 28.40 26.80 11.50 4.00 13.05
G3PIMEN2 25.00 25.00 22.60 8.80 3.30 11.08
G3PIMEN1 27.90 27.50 22.70 7.90 2.60 11.34
G3SESTE 63.80 58.80 33.40 14.30 4.00 21.01
G3LVEGA 83.20 56.10 27.20 14.80 2.70 19.92
G3MRIO 86.00 30.90 18.30 11.30 1.50 13.29
G3QUISQ1 89.30 24.50 17.10 6.50 1.00 11.16
G3PALAMA 33.70 13.10 6.90 2.00 0.30 4.87
G3EM2CGN 20.20 7.00 2.80 1.10 0.10 2.51
G3IKM22 1.70 0.40 0.20 0.10 - 0.17
G3BERSAL 2.40 0.60 0.30 0.10 - 0.24

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 108 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LOPPLA 3.40 0.80 0.40 0.10 - 0.33
G3CESPM1 4.70 0.90 0.50 0.10 - 0.41
G3CESPM2 5.10 0.90 0.50 0.10 - 0.41
G3CESPM3 4.10 0.80 0.40 0.10 - 0.34
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 2.60 0.50 0.20 - - 0.20
G3HAINA4 0.90 0.20 0.10 - - 0.07
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Octubre 2018
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.50 0.50 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 109 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.91
G3CATAL1 352.60 352.60 352.60 352.60 352.60 262.35
G3CATAL2 353.40 353.40 353.40 353.40 353.40 262.91
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.79
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.85
G3LMINA5 79.30 79.30 79.30 79.30 79.30 58.98
G3LMINAC 107.10 107.10 107.10 107.10 102.70 78.90
G3LMINA6 80.30 80.30 80.30 80.30 43.80 53.31
G3CEPP1 9.30 9.30 9.30 9.30 3.50 5.89
G3BARAHC 40.80 40.80 40.80 40.80 12.90 25.43
G3CEPP2 30.90 30.90 30.90 30.90 8.20 18.94
G3PIMEN3 45.50 45.50 45.50 43.10 10.00 27.11
G3QUISQ2 194.10 193.50 179.70 99.40 27.90 95.38
G3METALD 28.40 26.40 13.50 6.60 2.00 9.54
G3PIMEN2 25.00 22.30 10.10 5.20 1.20 7.71
G3PIMEN1 27.90 22.00 10.60 5.50 1.10 7.84
G3SESTE 63.70 35.10 17.80 10.70 1.70 13.61
G3LVEGA 76.20 27.80 16.90 9.90 1.30 12.28
G3MRIO 51.10 18.80 13.00 5.20 0.70 8.26
G3QUISQ1 32.80 16.30 8.90 2.70 0.30 6.03
G3PALAMA 16.80 7.10 2.80 1.00 0.10 2.47
G3EM2CGN 12.40 3.20 1.40 0.50 - 1.29
G3IKM22 0.90 0.20 0.10 - - 0.09
G3BERSAL 1.20 0.30 0.10 - - 0.12
G3LOPPLA 1.60 0.40 0.20 - - 0.15
G3CESPM1 0.10 - - - - 0.02
G3CESPM2 2.20 0.60 0.20 0.10 - 0.22
G3CESPM3 1.80 0.50 0.20 - - 0.18
G3RSJUAN - - - - - -
G3HAINAG 1.10 0.30 0.10 - - 0.11
G3HAINA4 0.40 0.10 - - - 0.04
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Noviembre 2018
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.40 0.40 0.50 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 110 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 80.13
G3CATAL1 353.50 353.50 353.50 353.50 353.50 254.53
G3CATAL2 352.80 352.80 352.80 352.80 352.80 254.03
G3AANDRE 243.40 243.40 243.40 243.40 243.40 175.27
G3ITABO1 108.30 108.30 108.30 108.30 108.30 77.99
G3LMINA5 79.00 79.00 79.00 79.00 78.70 56.85
G3LMINAC 107.20 107.20 107.20 107.20 82.30 72.88
G3LMINA6 80.20 80.20 80.20 80.20 29.10 48.98
G3CEPP1 9.30 9.30 9.30 9.30 2.60 5.53
G3BARAHC 17.70 17.70 17.70 17.60 4.60 10.47
G3CEPP2 30.80 30.80 30.80 29.20 7.00 17.82
G3PIMEN3 45.50 45.50 45.50 41.50 9.00 25.79
G3QUISQ2 193.80 188.80 150.30 85.20 24.40 83.35
G3METALD 28.40 23.20 10.90 6.10 1.40 8.05
G3PIMEN2 25.00 17.20 8.30 5.00 1.00 6.19
G3PIMEN1 27.90 16.10 7.70 5.20 0.90 6.00
G3SESTE 56.30 23.00 12.60 8.70 1.20 9.55
G3LVEGA 68.50 22.80 14.90 9.20 1.20 10.36
G3MRIO 42.20 16.70 10.50 4.50 0.70 6.86
G3QUISQ1 30.40 14.30 6.10 2.50 0.40 4.94

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 111 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALAMA 16.00 4.90 2.00 1.00 0.10 1.86
G3EM2CGN 9.60 2.20 1.10 0.50 - 0.94
G3IKM22 0.60 0.20 0.10 - - 0.06
G3BERSAL 0.80 0.20 0.10 - - 0.09
G3LOPPLA 1.10 0.30 0.10 - - 0.11
G3CESPM1 1.20 0.30 0.10 - - 0.13
G3CESPM2 1.40 0.40 0.10 - - 0.13
G3CESPM3 1.00 0.30 0.10 - - 0.11
G3RSJUAN - - - - - -
G3HAINAG 0.70 0.20 0.10 - - 0.06
G3HAINA4 0.30 0.10 - - - 0.02
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Diciembre 2018
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 112 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.00 111.00 111.00 111.00 111.00 82.58
G3CATAL1 352.60 352.60 352.60 352.60 352.60 262.33
G3CATAL2 352.60 352.60 352.60 352.60 352.60 262.35
G3AANDRE 243.90 243.90 243.90 243.90 243.90 181.46
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.77
G3LMINA5 79.30 79.30 79.30 79.30 79.30 58.96
G3LMINAC 107.20 107.20 107.20 107.20 53.60 70.24
G3LMINA6 80.30 80.30 80.30 80.30 20.70 49.22
G3CEPP1 9.30 9.30 9.30 9.30 2.00 5.62
G3BARAHC 4.00 4.00 4.00 4.00 0.80 2.39
G3CEPP2 30.80 30.80 30.80 30.80 6.40 18.61
G3PIMEN3 45.50 45.50 45.50 34.20 8.40 25.25
G3QUISQ2 201.00 192.90 142.60 64.10 20.20 81.11
G3METALD 28.40 21.80 9.60 5.50 1.00 7.63
G3PIMEN2 25.00 18.50 6.80 4.30 0.60 6.14
G3PIMEN1 27.90 14.70 6.70 4.40 0.50 5.54
G3SESTE 63.80 24.30 13.00 8.60 1.00 10.30
G3LVEGA 83.20 21.70 13.30 5.60 0.80 9.89
G3MRIO 81.00 16.60 9.10 2.70 0.40 7.61
G3QUISQ1 65.10 13.40 4.40 1.70 0.20 5.47
G3PALAMA 26.10 4.30 1.50 0.60 0.10 1.95
G3EM2CGN 17.70 1.90 0.80 0.20 - 1.06
G3IKM22 1.30 0.10 0.10 - - 0.08
G3BERSAL 2.00 0.20 0.10 - - 0.11
G3LOPPLA 2.80 0.30 0.10 - - 0.15
G3CESPM1 2.60 0.20 0.10 - - 0.13
G3CESPM2 3.40 0.30 0.10 - - 0.17
G3CESPM3 3.20 0.30 0.10 - - 0.17
G3RSJUAN 0.10 - - - - -
G3HAINAG 2.00 0.20 0.10 - - 0.10
G3HAINA4 0.80 0.10 - - - 0.04
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2019
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 113 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.10 353.10 353.10 353.10 353.10 262.73
G3CATAL2 352.40 352.40 352.40 352.40 352.40 262.20
G3AANDRE 213.00 213.00 213.00 213.00 213.00 158.47
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.82
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.95
G3LMINAC 107.00 107.00 107.00 107.00 61.10 71.50
G3LMINA6 80.20 80.20 80.20 80.20 22.50 49.47
G3CEPP1 9.30 9.30 9.30 9.30 2.00 5.62
G3BARAHC 40.70 40.70 40.70 38.30 8.40 24.15
G3CEPP2 30.80 30.80 30.80 22.90 5.30 17.01
G3PIMEN3 45.50 45.50 44.00 21.60 6.80 22.44

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 114 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3QUISQ2 201.00 186.70 144.50 50.10 16.20 77.17
G3METALD 28.40 23.30 9.90 4.20 0.60 7.65
G3PIMEN2 25.00 18.30 7.20 3.60 0.50 6.05
G3PIMEN1 27.80 16.20 6.50 3.70 0.50 5.64
G3SESTE 60.40 25.20 12.80 5.50 0.70 9.71
G3LVEGA 76.60 21.50 12.00 3.40 0.50 8.99
G3MRIO 71.20 15.10 9.00 1.70 0.20 6.80
G3QUISQ1 46.60 12.60 4.30 0.90 0.10 4.59
G3PALAMA 21.30 4.80 1.50 0.40 - 1.83
G3EM2CGN 14.00 2.00 0.60 0.10 - 0.91
G3IKM22 1.20 0.10 - - - 0.07
G3BERSAL 1.60 0.20 0.10 - - 0.10
G3LOPPLA 2.40 0.20 0.10 - - 0.13
G3CESPM1 2.50 0.20 0.10 - - 0.14
G3CESPM2 1.00 0.10 - - - 0.06
G3CESPM3 2.50 0.20 0.10 - - 0.13
G3RSJUAN - - - - - -
G3HAINAG 1.60 0.20 - - - 0.09
G3HAINA4 0.60 0.10 - - - 0.03
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Febrero 2019
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 20.80 18.50 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 115 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 74.68
G3CATAL1 353.70 353.70 353.70 353.70 353.70 237.69
G3CATAL2 354.00 354.00 354.00 354.00 354.00 237.89
G3AANDRE 244.20 244.20 244.20 244.20 244.20 164.08
G3ITABO1 34.70 34.70 34.70 34.70 34.70 23.35
G3LMINA5 78.90 78.90 78.90 78.90 78.90 53.04
G3LMINAC 107.20 107.20 107.20 107.20 89.90 69.27
G3LMINA6 80.20 80.20 80.20 80.20 27.80 45.52
G3CEPP1 9.30 9.30 9.30 9.30 2.40 5.14
G3BARAHC 40.80 40.80 40.80 40.80 9.10 22.35
G3CEPP2 30.80 30.80 30.80 30.80 6.10 16.78
G3PIMEN3 45.50 45.50 45.50 40.90 8.50 23.89
G3QUISQ2 193.20 177.10 141.90 68.50 21.60 71.43
G3METALD 28.40 21.90 9.20 5.60 1.10 6.89
G3PIMEN2 25.00 14.40 6.80 4.60 0.70 4.99
G3PIMEN1 27.10 11.80 6.60 4.60 0.60 4.58
G3SESTE 53.50 18.10 11.40 7.90 0.90 7.70
G3LVEGA 64.70 15.90 11.80 7.00 0.90 7.55
G3MRIO 64.30 14.60 10.30 3.70 0.60 6.53
G3QUISQ1 36.50 12.30 5.30 1.90 0.30 4.23
G3PALAMA 16.80 4.00 1.70 0.80 0.10 1.54
G3EM2CGN 13.60 1.90 1.00 0.50 - 0.93
G3IKM22 1.00 0.10 0.10 - - 0.07
G3BERSAL 1.50 0.20 0.10 - - 0.09
G3LOPPLA 2.20 0.30 0.10 - - 0.13
G3CESPM1 2.20 0.30 0.10 - - 0.14
G3CESPM2 1.00 0.10 0.10 - - 0.07
G3CESPM3 2.00 0.30 0.10 - - 0.13
G3RSJUAN - - - - - -
G3HAINAG 1.30 0.20 0.10 - - 0.09
G3HAINA4 0.50 0.10 - - - 0.03
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Marzo 2019
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 116 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.40 93.40 93.40 93.40 93.40 69.46
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.14
G3CATAL2 353.90 353.90 353.90 353.90 353.90 263.29
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.09
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.70
G3LMINA5 78.90 78.90 78.90 78.90 78.90 58.71
G3LMINAC 107.10 107.10 107.10 107.10 96.20 77.74

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 117 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LMINA6 59.60 59.60 59.60 59.60 25.30 38.27
G3CEPP1 9.30 9.30 9.30 9.30 3.40 5.87
G3BARAHC 40.80 40.80 40.80 40.80 11.80 25.20
G3CEPP2 30.80 30.80 30.80 30.80 7.00 18.73
G3PIMEN3 45.50 45.50 45.50 45.50 9.10 27.39
G3QUISQ2 201.10 198.30 187.20 112.00 26.80 99.83
G3METALD 28.40 26.60 14.90 6.50 1.40 9.71
G3PIMEN2 25.00 21.40 11.40 5.30 1.00 7.74
G3PIMEN1 27.90 22.90 10.30 5.50 0.80 7.90
G3SESTE 57.50 39.40 16.10 9.80 1.10 13.60
G3LVEGA 83.20 30.50 17.10 11.10 1.10 13.18
G3MRIO 86.00 19.50 13.50 5.40 0.70 9.58
G3QUISQ1 96.60 16.90 9.20 2.60 0.30 8.10
G3PALAMA 48.70 8.80 2.90 1.20 0.10 3.79
G3EM2CGN 25.10 3.40 1.40 0.60 - 1.72
G3IKM22 2.00 0.20 0.10 - - 0.12
G3BERSAL 2.80 0.20 0.10 - - 0.16
G3LOPPLA 4.00 0.40 0.20 0.10 - 0.24
G3CESPM1 5.70 0.50 0.30 0.10 - 0.33
G3CESPM2 6.70 0.50 0.20 0.10 - 0.35
G3CESPM3 5.30 0.40 0.10 - - 0.26
G3RSJUAN 0.10 - - - - -
G3HAINAG 3.60 0.20 0.10 - - 0.17
G3HAINA4 1.30 0.10 - - - 0.06
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Abril 2019
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 118 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3CATAL1 353.30 353.30 353.30 353.30 353.30 254.37
G3CATAL2 353.70 353.70 353.70 353.70 353.70 254.63
G3AANDRE 244.00 244.00 244.00 244.00 244.00 175.68
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.08
G3LMINA5 79.30 79.30 79.30 79.30 79.30 57.06
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.12
G3LMINA6 77.70 77.70 77.70 77.70 77.70 55.92
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.70 40.70 40.70 40.70 40.70 29.33
G3CEPP2 30.80 30.80 30.80 30.80 30.60 22.17
G3PIMEN3 45.50 45.50 45.50 45.50 39.50 31.71
G3QUISQ2 187.00 187.00 187.00 168.50 67.20 110.86
G3METALD 28.40 28.40 27.00 15.20 5.70 14.00
G3PIMEN2 25.00 25.00 22.20 9.60 4.60 11.36
G3PIMEN1 27.90 27.80 22.10 8.80 4.80 11.77
G3SESTE 63.80 59.40 31.90 16.20 9.10 22.01
G3LVEGA 71.80 54.30 21.90 14.10 6.80 18.87
G3MRIO 90.40 33.70 18.80 13.60 3.50 14.66
G3QUISQ1 100.90 23.70 16.30 8.30 1.80 11.59
G3PALAMA 54.10 14.60 7.30 2.50 0.80 5.93
G3EM2CGN 26.40 8.30 2.60 1.20 0.40 2.92
G3IKM22 2.00 0.40 0.20 0.10 - 0.18
G3BERSAL 3.00 0.60 0.20 0.10 - 0.26
G3LOPPLA 4.30 0.80 0.30 0.20 - 0.36
G3CESPM1 6.10 0.90 0.40 0.20 - 0.44
G3CESPM2 7.10 0.90 0.40 0.20 - 0.48
G3CESPM3 5.80 0.80 0.30 0.10 - 0.39
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 3.80 0.50 0.20 0.10 - 0.25
G3HAINA4 1.50 0.20 0.10 - - 0.09

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 119 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Mayo 2019
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.13

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 120 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CATAL2 353.30 353.30 353.30 353.30 353.30 262.85
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.67
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.70
G3LMINA5 68.90 68.90 68.90 68.90 68.90 51.29
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.68
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.34
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.90
G3BARAHC 40.80 40.80 40.80 40.80 40.10 30.25
G3CEPP2 30.80 30.80 30.80 30.80 24.10 21.75
G3PIMEN3 45.50 45.50 45.50 45.50 27.40 30.62
G3QUISQ2 200.60 200.60 196.40 158.20 53.20 114.82
G3METALD 28.40 28.40 25.00 10.10 4.70 13.05
G3PIMEN2 25.00 25.00 20.80 7.70 3.80 11.02
G3PIMEN1 27.90 27.90 19.30 7.50 3.90 11.31
G3SESTE 63.70 57.00 25.20 14.10 6.50 20.29
G3LVEGA 76.00 53.30 21.40 13.10 3.90 18.68
G3MRIO 85.40 31.70 17.40 10.80 2.10 13.67
G3QUISQ1 73.70 23.10 14.40 5.70 1.30 10.17
G3PALAMA 28.30 12.80 5.60 1.80 0.50 4.55
G3EM2CGN 19.30 8.40 2.50 1.00 0.20 2.73
G3IKM22 1.60 0.50 0.20 0.10 - 0.17
G3BERSAL 2.40 0.60 0.20 0.10 - 0.25
G3LOPPLA 3.10 0.90 0.30 0.10 - 0.34
G3CESPM1 4.70 1.00 0.40 0.20 - 0.43
G3CESPM2 2.50 0.60 0.20 0.10 - 0.24
G3CESPM3 4.50 0.90 0.40 0.10 - 0.39
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 2.80 0.60 0.20 0.10 - 0.25
G3HAINA4 1.00 0.30 0.10 - - 0.10
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Junio 2019
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 121 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.20
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.06
G3CATAL2 354.60 354.60 354.60 354.60 354.60 255.33
G3AANDRE 245.20 245.20 245.20 245.20 245.20 176.55
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.05
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.96
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.12
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.82
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.90 40.90 40.90 40.90 36.80 28.73
G3CEPP2 30.90 30.90 30.90 30.90 21.50 20.61
G3PIMEN3 45.50 45.50 45.50 45.50 21.50 28.60
G3QUISQ2 193.80 193.80 189.90 159.80 46.50 107.68
G3METALD 28.40 28.40 26.30 11.30 4.40 13.02
G3PIMEN2 25.00 25.00 22.10 8.90 3.50 11.03
G3PIMEN1 27.90 27.60 22.60 7.80 3.60 11.47
G3SESTE 57.20 54.10 29.50 12.90 5.30 19.29
G3LVEGA 71.80 60.90 23.90 13.10 3.30 19.66
G3MRIO 89.00 45.80 19.10 12.00 2.10 16.33
G3QUISQ1 96.50 28.60 15.90 6.90 1.30 12.01
G3PALAMA 47.00 15.90 8.00 2.40 0.50 6.05
G3EM2CGN 25.00 10.40 3.00 1.20 0.10 3.30
G3IKM22 1.90 0.70 0.20 0.10 - 0.23
G3BERSAL 2.80 0.90 0.30 0.10 - 0.30
G3LOPPLA 4.00 1.10 0.40 0.20 - 0.41
G3CESPM1 5.60 1.30 0.50 0.20 - 0.52

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 122 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CESPM2 1.80 0.40 0.10 - - 0.16
G3CESPM3 6.50 1.40 0.50 0.10 - 0.55
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 4.60 1.00 0.30 0.10 - 0.37
G3HAINA4 1.70 0.30 0.10 - - 0.13
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Julio 2019
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 123 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.50 353.50 353.50 353.50 353.50 263.00
G3CATAL2 352.80 352.80 352.80 352.80 352.80 262.50
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.68
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.65
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.20
G3LMINAC 106.90 106.90 106.90 106.90 106.90 79.54
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.70 40.70 40.70 40.70 40.70 30.28
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 44.20 33.60
G3QUISQ2 201.10 201.10 201.10 196.70 83.10 127.94
G3METALD 28.40 28.40 28.40 26.60 5.90 16.83
G3PIMEN2 25.00 25.00 24.70 22.30 4.90 14.52
G3PIMEN1 27.90 27.90 26.40 20.30 5.00 15.06
G3SESTE 63.60 63.40 59.80 26.50 9.40 30.37
G3LVEGA 83.20 78.40 66.60 23.90 8.40 34.22
G3MRIO 90.40 73.90 35.10 17.60 3.60 26.02
G3QUISQ1 108.10 47.70 24.90 14.80 1.90 19.23
G3PALAMA 88.60 22.40 14.70 5.80 0.80 10.50
G3EM2CGN 61.20 15.10 8.90 2.30 0.30 6.61
G3IKM22 3.90 1.20 0.50 0.20 - 0.46
G3BERSAL 5.50 1.70 0.70 0.20 - 0.64
G3LOPPLA 7.70 2.30 1.00 0.30 - 0.87
G3CESPM1 10.40 2.90 1.10 0.30 - 1.09
G3CESPM2 12.00 2.90 1.10 0.30 - 1.15
G3CESPM3 10.60 2.20 0.80 0.20 - 0.90
G3RSJUAN 0.20 - - - - 0.02
G3HAINAG 8.10 1.40 0.60 0.20 - 0.63
G3HAINA4 3.30 0.50 0.20 - - 0.23
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Agosto 2019
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 124 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.08
G3CATAL2 352.80 352.80 352.80 352.80 352.80 262.46
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.02
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.76
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.92
G3LMINAC 106.90 106.90 106.90 106.90 106.90 79.55
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.69
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.37
G3CEPP2 30.80 30.80 30.80 30.80 27.80 22.41
G3PIMEN3 45.50 45.50 45.50 45.50 32.20 31.46
G3QUISQ2 201.00 201.00 201.00 184.10 63.60 122.18
G3METALD 28.40 28.40 27.30 16.50 5.20 14.69
G3PIMEN2 25.00 25.00 23.70 11.20 4.10 12.21
G3PIMEN1 27.90 27.90 26.40 10.00 4.30 13.09
G3SESTE 63.70 63.70 44.50 18.10 7.60 25.87
G3LVEGA 76.00 71.40 32.30 15.80 5.10 24.59
G3MRIO 87.80 57.60 22.80 13.80 2.70 19.98
G3QUISQ1 108.10 35.50 19.20 9.40 1.50 14.98
G3PALAMA 70.70 17.70 9.80 2.90 0.60 7.66
G3EM2CGN 38.70 13.60 4.70 1.50 0.20 4.73

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 125 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3IKM22 2.80 1.00 0.30 0.10 - 0.34
G3BERSAL 3.80 1.40 0.40 0.10 - 0.46
G3LOPPLA 5.50 1.80 0.50 0.20 - 0.61
G3CESPM1 7.80 1.90 0.70 0.20 - 0.74
G3CESPM2 9.40 2.00 0.60 0.20 - 0.80
G3CESPM3 6.70 1.20 0.40 0.10 - 0.52
G3RSJUAN 0.20 - - - - 0.01
G3HAINAG 6.20 1.10 0.40 0.10 - 0.46
G3HAINA4 2.50 0.40 0.10 - - 0.17
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Septiembre 2019
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 126 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.20
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.06
G3CATAL2 353.80 353.80 353.80 353.80 353.80 254.77
G3AANDRE 244.40 244.40 244.40 244.40 244.40 176.00
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.29
G3LMINA5 78.90 78.90 78.90 78.90 78.90 56.78
G3LMINAC 107.40 107.40 107.40 107.40 107.40 77.31
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.72
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 39.20 29.10
G3CEPP2 30.90 30.90 30.90 30.90 21.50 20.62
G3PIMEN3 45.50 45.50 45.50 45.50 23.30 28.92
G3QUISQ2 193.90 193.90 193.90 184.90 49.80 113.28
G3METALD 28.40 28.40 28.20 16.40 4.50 14.24
G3PIMEN2 25.00 25.00 23.70 12.20 3.70 11.92
G3PIMEN1 27.90 27.90 26.40 11.40 3.90 12.84
G3SESTE 63.70 63.10 53.70 19.30 6.30 26.53
G3LVEGA 83.20 74.70 39.50 17.80 4.00 26.02
G3MRIO 87.70 48.40 24.40 13.80 1.90 17.92
G3QUISQ1 110.80 33.10 21.20 10.60 1.30 14.77
G3PALAMA 55.00 17.00 10.90 3.00 0.40 7.06
G3EM2CGN 28.40 10.90 4.50 1.40 0.10 3.79
G3IKM22 2.20 0.70 0.30 0.10 - 0.26
G3BERSAL 3.10 0.90 0.40 0.10 - 0.34
G3LOPPLA 4.60 1.20 0.50 0.20 - 0.46
G3CESPM1 6.40 1.50 0.60 0.20 - 0.58
G3CESPM2 7.50 1.50 0.60 0.20 - 0.63
G3CESPM3 6.00 1.10 0.50 0.10 - 0.49
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 4.20 0.70 0.30 0.10 - 0.33
G3HAINA4 1.60 0.30 0.10 - - 0.12
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Octubre 2019
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 127 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.50 0.50 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 82.67
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.16
G3CATAL2 352.70 352.70 352.70 352.70 352.70 262.38
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.71
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.67
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.91
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.78
G3LMINA6 80.30 80.30 80.30 80.30 61.00 56.33
G3CEPP1 9.30 9.30 9.30 9.30 5.40 6.23
G3BARAHC 40.80 40.80 40.80 40.80 18.00 26.32
G3CEPP2 30.80 30.80 30.80 30.80 10.40 19.32
G3PIMEN3 45.50 45.50 45.50 45.50 12.40 27.97
G3QUISQ2 194.20 194.20 190.10 132.20 33.40 104.19
G3METALD 28.40 28.40 24.40 9.00 2.70 12.40
G3PIMEN2 25.00 24.70 19.10 6.80 1.90 10.15
G3PIMEN1 27.90 26.10 13.60 6.40 1.70 9.39
G3SESTE 63.70 52.70 24.60 12.50 2.40 18.43
G3LVEGA 82.50 40.90 21.00 12.60 1.70 16.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 128 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MRIO 74.90 25.00 16.30 8.20 1.00 11.29
G3QUISQ1 48.90 20.40 13.30 4.00 0.60 8.33
G3PALAMA 21.20 10.70 4.20 1.40 0.20 3.58
G3EM2CGN 16.50 5.50 2.10 0.80 0.10 2.02
G3IKM22 1.30 0.40 0.20 0.10 - 0.14
G3BERSAL 1.80 0.50 0.20 0.10 - 0.19
G3LOPPLA 2.70 0.60 0.30 0.10 - 0.26
G3CESPM1 0.30 0.10 - - - 0.03
G3CESPM2 4.10 0.90 0.40 0.10 - 0.38
G3CESPM3 3.00 0.80 0.30 0.10 - 0.31
G3RSJUAN 0.10 - - - - 0.01
G3HAINAG 1.90 0.50 0.20 0.10 - 0.19
G3HAINA4 0.70 0.20 0.10 - - 0.07
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Noviembre 2019
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.40 0.50 0.50 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 129 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.26
G3CATAL1 352.60 352.60 352.60 352.60 352.60 253.90
G3CATAL2 353.00 353.00 353.00 353.00 353.00 254.16
G3AANDRE 244.90 244.90 244.90 244.90 244.90 176.35
G3ITABO1 108.50 108.50 108.50 108.50 108.50 78.09
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.85
G3LMINAC 107.20 107.20 107.20 107.20 98.70 75.71
G3LMINA6 80.40 80.40 80.40 80.40 39.40 50.81
G3CEPP1 9.30 9.30 9.30 9.30 3.30 5.66
G3BARAHC 17.70 17.70 17.70 17.70 5.90 10.71
G3CEPP2 30.80 30.80 30.80 30.80 8.60 18.39
G3PIMEN3 45.50 45.50 45.50 43.90 10.30 26.41
G3QUISQ2 193.70 193.70 178.00 116.40 29.40 95.17
G3METALD 28.40 26.40 14.20 7.50 2.10 9.54
G3PIMEN2 25.00 22.30 10.60 5.90 1.40 7.69
G3PIMEN1 27.90 23.00 10.60 5.80 1.20 7.86
G3SESTE 57.20 35.90 16.60 10.60 1.70 12.92
G3LVEGA 79.70 30.70 17.20 11.60 1.40 12.92
G3MRIO 64.80 20.30 13.30 7.20 0.90 9.14
G3QUISQ1 42.00 18.60 10.10 3.60 0.50 6.94
G3PALAMA 19.50 8.20 3.00 1.30 0.10 2.77
G3EM2CGN 13.60 3.30 1.50 0.70 - 1.36
G3IKM22 1.00 0.20 0.10 - - 0.09
G3BERSAL 1.40 0.30 0.10 - - 0.12
G3LOPPLA 1.90 0.40 0.20 0.10 - 0.17
G3CESPM1 2.00 0.50 0.20 0.10 - 0.20
G3CESPM2 2.20 0.50 0.20 0.10 - 0.19
G3CESPM3 1.60 0.40 0.10 - - 0.15
G3RSJUAN - - - - - -
G3HAINAG 1.10 0.20 0.10 - - 0.09
G3HAINA4 0.40 0.10 - - - 0.03
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Diciembre 2019
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 130 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 82.62
G3CATAL1 353.30 353.30 353.30 353.30 353.30 262.83
G3CATAL2 353.40 353.40 353.40 353.40 353.40 262.92
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.92
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.75
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.80
G3LMINAC 107.20 107.20 107.20 107.20 77.30 74.44
G3LMINA6 80.40 80.40 80.40 80.40 27.00 50.36
G3CEPP1 9.30 9.30 9.30 9.30 2.10 5.63
G3BARAHC 4.00 4.00 4.00 4.00 0.90 2.39
G3CEPP2 30.90 30.90 30.90 30.90 6.50 18.66
G3PIMEN3 45.50 45.50 45.50 45.50 9.20 27.39
G3QUISQ2 201.10 199.60 172.70 88.60 24.40 92.85
G3METALD 28.40 26.30 11.90 6.10 1.30 9.02

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 131 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PIMEN2 25.00 20.70 9.20 5.10 1.00 7.19
G3PIMEN1 27.90 21.40 9.30 5.10 0.70 7.36
G3SESTE 63.70 38.70 15.40 9.50 1.20 13.51
G3LVEGA 83.20 28.60 15.50 8.80 1.00 12.16
G3MRIO 89.30 19.50 11.60 3.90 0.60 9.06
G3QUISQ1 93.70 17.00 7.10 2.20 0.20 7.56
G3PALAMA 36.60 7.30 2.20 0.80 - 2.96
G3EM2CGN 21.80 2.90 1.10 0.40 - 1.44
G3IKM22 1.80 0.20 0.10 - - 0.10
G3BERSAL 2.60 0.30 0.10 - - 0.15
G3LOPPLA 3.60 0.40 0.10 - - 0.20
G3CESPM1 3.30 0.30 0.10 - - 0.18
G3CESPM2 5.00 0.40 0.10 - - 0.26
G3CESPM3 4.90 0.40 0.10 - - 0.25
G3RSJUAN 0.10 - - - - -
G3HAINAG 3.30 0.30 0.10 - - 0.16
G3HAINA4 1.20 0.10 - - - 0.06
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

La generacin de cada planta generadora esperada, expresada en cinco (5) bloques horarios, se
muestra en el Tabla 26, escenario demanda total.

Tabla 27. Resultados de la generacin por bloques de demanda escenario demanda total
RESULTADOS DESPACHO POR BLOQUE (MW)
bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2016
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 132 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
Centrales Trmicas
G3ITABO2 111.20 111.20 111.20 111.20 111.20 82.71
G3AANDRE 212.20 212.20 212.20 212.20 212.20 157.88
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.69
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.84
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.67
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.35
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.90 200.90 200.90 200.90 200.90 149.50
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.73
G3PALAMA 95.10 95.10 95.10 95.10 87.40 69.41
G3EM2CGN 96.20 96.20 96.20 96.20 34.00 60.58
G3IKM22 9.40 9.40 9.40 9.40 2.00 5.69
G3BERSAL 14.00 14.00 14.00 14.00 2.50 8.40
G3LOPPLA 21.90 21.90 21.90 21.90 3.50 13.05
G3CESPM1 37.30 37.30 37.30 35.40 3.90 21.50
G3CESPM2 15.00 15.00 15.00 12.80 1.50 8.37
G3CESPM3 55.50 55.50 54.70 37.60 3.50 28.73
G3RSJUAN 1.10 1.10 1.10 0.60 0.10 0.54
G3HAINAG 50.80 50.10 48.50 24.40 2.10 23.92
G3HAINA4 25.60 25.00 23.40 9.00 0.60 11.14
G3SPEDRV - - - - - -

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 133 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SLORE1 0.10 0.10 0.10 - - 0.05

Febrero 2016
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 21.20 18.20 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 134 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 74.80
G3AANDRE 244.20 244.20 244.20 244.20 244.20 164.09
G3ITABO1 34.90 34.90 34.90 34.90 34.90 23.42
G3LMINA5 79.00 79.00 79.00 79.00 79.00 53.08
G3LMINA6 80.10 80.10 80.10 80.10 80.10 53.86
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 20.73
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 30.55
G3QUISQ2 193.60 193.60 193.60 193.60 193.60 130.09
G3METALD 28.40 28.40 28.40 28.40 28.40 19.07
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 16.83
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 18.74
G3SESTE 56.80 56.80 56.80 56.80 56.80 38.15
G3LVEGA 71.00 71.00 71.00 71.00 71.00 47.71
G3MRIO 87.50 87.50 87.50 87.50 87.50 58.80
G3QUISQ1 109.10 109.10 109.10 109.10 109.10 73.29
G3PALAMA 86.10 86.10 86.10 86.10 86.10 57.85
G3EM2CGN 96.60 96.60 96.60 96.60 68.10 60.35
G3IKM22 9.40 9.40 9.40 9.40 3.40 5.36
G3BERSAL 14.00 14.00 14.00 14.00 4.70 7.94
G3LOPPLA 21.90 21.90 21.90 21.90 6.20 12.19
G3CESPM1 37.50 37.50 37.50 37.50 6.30 20.21
G3CESPM2 18.40 18.40 18.40 18.40 2.90 9.87
G3CESPM3 55.70 55.70 55.70 52.00 6.00 28.89
G3RSJUAN 1.10 1.10 1.10 0.90 0.10 0.55
G3HAINAG 50.70 50.10 49.90 40.10 4.00 24.67
G3HAINA4 25.60 25.00 24.30 15.60 1.30 11.43
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.06

Marzo 2016
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 135 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.60 93.60 93.60 93.60 93.60 69.62
G3AANDRE 244.00 244.00 244.00 244.00 244.00 181.52
G3ITABO1 108.30 108.30 108.30 108.30 108.30 80.60
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.80
G3LMINA6 59.30 59.30 59.30 59.30 59.30 44.15
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.41
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.80 200.80 200.80 200.80 200.80 149.40
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 57.50 57.50 57.50 57.50 57.50 42.75
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.77
G3PALAMA 95.10 95.10 95.10 95.10 95.10 70.73
G3EM2CGN 96.60 96.60 96.60 96.60 67.20 66.67
G3IKM22 9.40 9.40 9.40 9.40 3.60 5.97
G3BERSAL 14.10 14.10 14.10 14.10 5.10 8.87
G3LOPPLA 21.90 21.90 21.90 21.90 6.70 13.59
G3CESPM1 37.00 37.00 37.00 37.00 6.50 22.15

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 136 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CESPM2 51.90 51.90 51.90 51.70 7.00 30.64
G3CESPM3 55.40 55.40 55.40 48.80 5.10 31.13
G3RSJUAN 1.10 1.10 1.10 0.90 0.10 0.60
G3HAINAG 50.60 50.50 49.60 36.20 3.20 26.48
G3HAINA4 25.70 25.50 24.20 15.00 1.10 12.55
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.06

Abril 2016
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 137 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3AANDRE 244.20 244.20 244.20 244.20 244.20 175.82
G3ITABO1 108.60 108.60 108.60 108.60 108.60 78.21
G3LMINA5 78.90 78.90 78.90 78.90 78.90 56.79
G3LMINA6 77.50 77.50 77.50 77.50 77.50 55.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.37
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.00 187.00 187.00 187.00 187.00 134.65
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.70 63.70 63.70 63.70 63.70 45.87
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.50 109.50 109.50 109.50 109.50 78.82
G3PALAMA 95.10 95.10 95.10 95.10 95.10 68.48
G3EM2CGN 96.30 96.30 96.30 96.30 96.30 69.32
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.76
G3BERSAL 14.10 14.10 14.10 14.10 14.10 10.14
G3LOPPLA 21.80 21.80 21.80 21.80 21.80 15.71
G3CESPM1 36.90 36.90 36.90 36.90 36.60 26.52
G3CESPM2 51.80 51.80 51.80 51.80 44.80 36.09
G3CESPM3 55.80 55.80 55.80 55.80 36.50 36.88
G3RSJUAN 1.10 1.10 1.10 1.10 0.60 0.70
G3HAINAG 50.40 50.40 50.40 48.20 24.30 31.41
G3HAINA4 25.70 25.70 25.60 23.10 8.80 15.14
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Mayo 2016
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.40 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 138 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.40 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.80
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.81
G3LMINA5 68.90 68.90 68.90 68.90 68.90 51.23
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.35
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.60 200.60 200.60 200.60 200.60 149.27
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.43
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.70 109.70 109.70 109.70 109.70 81.64
G3PALAMA 87.10 87.10 87.10 87.10 87.10 64.83

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 139 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3EM2CGN 96.90 96.90 96.90 96.90 96.90 72.06
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.99
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.45
G3LOPPLA 21.90 21.90 21.90 21.90 21.90 16.29
G3CESPM1 37.10 37.10 37.10 37.10 35.20 27.28
G3CESPM2 23.50 23.50 23.50 23.50 20.00 16.88
G3CESPM3 56.30 56.30 56.30 56.20 37.10 38.49
G3RSJUAN 1.10 1.10 1.10 1.10 0.60 0.72
G3HAINAG 50.50 50.50 50.50 49.50 23.70 32.63
G3HAINA4 25.40 25.40 25.40 23.50 8.50 15.56
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.08

Junio 2016
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.28
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 140 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 80.00
G3AANDRE 245.00 245.00 245.00 245.00 245.00 176.43
G3ITABO1 108.20 108.20 108.20 108.20 108.20 77.94
G3LMINA5 52.80 52.80 52.80 52.80 52.80 38.02
G3LMINA6 80.40 80.40 80.40 80.40 80.40 57.89
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.38
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.20
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.60 193.60 193.60 193.60 193.60 139.40
G3METALD 28.40 28.40 28.40 28.40 28.40 20.45
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.19
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.60 109.60 109.60 109.60 109.60 78.92
G3PALAMA 95.10 95.10 95.10 95.10 95.10 68.47
G3EM2CGN 96.60 96.60 96.60 96.60 96.60 69.58
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.76
G3BERSAL 14.10 14.10 14.10 14.10 14.10 10.12
G3LOPPLA 21.90 21.90 21.90 21.90 21.90 15.76
G3CESPM1 37.10 37.10 37.10 37.10 31.70 25.79
G3CESPM2 11.90 11.90 11.90 11.90 9.40 8.14
G3CESPM3 55.80 55.80 55.80 55.60 32.90 36.20
G3RSJUAN 1.10 1.10 1.10 1.10 0.60 0.69
G3HAINAG 50.40 50.40 50.40 49.60 20.70 31.04
G3HAINA4 25.40 25.40 25.40 24.20 7.40 14.99
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Julio 2016
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 141 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.89
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.85
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.63
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.20
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.76
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.42
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.62
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 142 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.74
G3PALAMA 95.10 95.10 95.10 95.10 95.10 70.79
G3EM2CGN 96.50 96.50 96.50 96.50 96.50 71.78
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.98
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.45
G3LOPPLA 21.90 21.90 21.90 21.90 21.90 16.27
G3CESPM1 37.00 37.00 37.00 37.00 37.00 27.54
G3CESPM2 51.80 51.80 51.80 51.80 45.40 37.42
G3CESPM3 55.40 55.40 55.40 55.40 36.70 37.92
G3RSJUAN 1.10 1.10 1.10 1.10 0.70 0.73
G3HAINAG 50.30 50.30 50.30 49.80 25.10 32.89
G3HAINA4 25.50 25.50 25.50 24.90 8.90 15.92
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.08

Agosto 2016
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 143 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3AANDRE 244.40 244.40 244.40 244.40 244.40 181.84
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.79
G3LMINA5 79.30 79.30 79.30 79.30 79.30 59.02
G3LMINA6 80.40 80.40 80.40 80.40 80.40 59.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.90
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.59
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.42
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.70 109.70 109.70 109.70 109.70 81.63
G3PALAMA 87.10 87.10 87.10 87.10 87.10 64.81
G3EM2CGN 96.60 96.60 96.60 96.60 96.60 71.87
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.99
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.43
G3LOPPLA 21.80 21.80 21.80 21.80 21.80 16.24
G3CESPM1 37.70 37.70 37.70 37.70 36.00 27.75
G3CESPM2 51.50 51.50 51.50 51.50 40.10 36.31
G3CESPM3 43.00 43.00 43.00 43.00 26.00 28.98
G3RSJUAN 1.10 1.10 1.10 1.10 0.60 0.72
G3HAINAG 50.70 50.70 50.70 50.20 22.60 32.64
G3HAINA4 25.80 25.80 25.80 24.60 8.40 15.88
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.08

Septiembre 2016
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 144 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.21
G3AANDRE 244.30 244.30 244.30 244.30 244.30 175.92
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.08
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.91
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.78
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.37
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.56

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 145 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.80 63.80 63.80 63.80 63.80 45.95
G3LVEGA 83.20 83.20 83.20 83.20 83.20 59.87
G3MRIO 87.70 87.70 87.70 87.70 87.70 63.17
G3QUISQ1 118.50 118.50 118.50 118.50 118.50 85.32
G3PALAMA 95.10 95.10 95.10 95.10 95.10 68.45
G3EM2CGN 96.60 96.60 96.60 96.60 96.60 69.52
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.76
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.09
G3LOPPLA 21.80 21.80 21.80 21.80 21.80 15.73
G3CESPM1 37.10 37.10 37.10 37.10 30.80 25.65
G3CESPM2 51.80 51.80 51.80 51.80 32.40 33.96
G3CESPM3 56.00 56.00 56.00 56.00 23.60 34.74
G3RSJUAN 1.10 1.10 1.10 1.10 0.40 0.66
G3HAINAG 50.70 50.70 50.70 50.20 15.10 30.29
G3HAINA4 25.70 25.70 25.70 24.20 5.30 14.73
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Octubre 2016
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.60 0.60 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 146 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.87
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.03
G3ITABO1 108.20 108.20 108.20 108.20 108.20 80.49
G3LMINA5 79.30 79.30 79.30 79.30 79.30 59.00
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.70
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.70 40.70 40.70 40.70 40.70 30.29
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 194.20 194.20 194.20 194.20 194.20 144.50
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.40
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.74
G3PALAMA 87.10 87.10 87.10 87.10 87.10 64.82
G3EM2CGN 96.60 96.60 96.60 96.60 96.60 71.88
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.99
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.44
G3LOPPLA 21.90 21.90 21.90 21.90 21.90 16.29
G3CESPM1 2.40 2.40 2.40 2.40 2.40 1.80
G3CESPM2 51.80 51.80 51.80 51.80 42.80 36.92
G3CESPM3 55.80 55.80 55.80 55.80 32.60 37.43
G3RSJUAN 1.10 1.10 1.10 1.10 0.60 0.71
G3HAINAG 50.40 50.40 50.40 50.40 21.40 32.34
G3HAINA4 25.50 25.50 25.50 25.40 7.70 15.80
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.08

Noviembre 2016

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 147 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.50 0.50 0.50 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.28
G3AANDRE 243.90 243.90 243.90 243.90 243.90 175.60
G3ITABO1 108.10 108.10 108.10 108.10 108.10 77.81
G3LMINA5 79.10 79.10 79.10 79.10 79.10 56.94
G3LMINA6 80.10 80.10 80.10 80.10 80.10 57.70
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 148 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BARAHC 17.70 17.70 17.70 17.70 17.70 12.74
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.56
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.20
G3LVEGA 83.20 83.20 83.20 83.20 83.20 59.87
G3MRIO 87.70 87.70 87.70 87.70 87.70 63.17
G3QUISQ1 118.50 118.50 118.50 118.50 118.50 85.35
G3PALAMA 95.00 95.00 95.00 95.00 95.00 68.42
G3EM2CGN 96.80 96.80 96.80 96.80 96.10 69.58
G3IKM22 9.40 9.40 9.40 9.40 8.80 6.67
G3BERSAL 14.00 14.00 14.00 14.00 13.20 9.97
G3LOPPLA 21.90 21.90 21.90 21.90 19.80 15.40
G3CESPM1 37.50 37.50 37.50 37.50 22.90 24.51
G3CESPM2 51.20 51.20 51.20 51.20 23.00 32.01
G3CESPM3 56.00 56.00 56.00 55.70 17.00 33.55
G3RSJUAN 1.10 1.10 1.10 1.10 0.30 0.64
G3HAINAG 50.60 50.60 50.60 49.20 10.70 29.35
G3HAINA4 25.50 25.50 25.40 23.40 3.80 14.24
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Diciembre 2016
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 149 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.70 111.70 111.70 111.70 111.70 83.11
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.90
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.68
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.88
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.66
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 4.00 4.00 4.00 4.00 4.00 2.94
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.20 201.20 201.20 201.20 201.20 149.66
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.39
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 118.50 118.50 118.50 118.50 118.50 88.18
G3PALAMA 95.10 95.10 95.10 95.10 95.10 70.77
G3EM2CGN 96.70 96.70 96.70 96.70 86.50 70.15
G3IKM22 9.40 9.40 9.40 9.40 4.30 6.09
G3BERSAL 14.10 14.10 14.10 14.10 5.60 8.99
G3LOPPLA 21.90 21.90 21.90 21.90 8.50 13.94
G3CESPM1 24.00 24.00 24.00 24.00 7.60 14.97
G3CESPM2 40.00 40.00 40.00 40.00 9.20 24.29
G3CESPM3 55.90 55.90 55.90 55.70 8.40 33.13
G3RSJUAN 1.10 1.10 1.10 1.00 0.10 0.63
G3HAINAG 50.60 50.60 50.60 46.50 5.20 28.87
G3HAINA4 25.70 25.70 25.50 20.50 1.80 13.91
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 150 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)

RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2017
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 151 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.83
G3AANDRE 213.30 213.30 213.30 213.30 213.30 158.71
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.83
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.83
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.68
G3LMINA6 80.10 80.10 80.10 80.10 80.10 59.57
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.40
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.90 200.90 200.90 200.90 200.90 149.45
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.90 109.90 109.90 109.90 98.10 79.66
G3PALAMA 95.10 95.10 95.10 95.10 35.10 60.14
G3EM2CGN 96.20 96.20 96.20 96.20 13.40 56.94
G3IKM22 9.40 9.40 9.40 8.90 0.80 5.38
G3BERSAL 14.10 14.10 14.10 12.00 0.90 7.78
G3LOPPLA 21.90 21.90 21.90 16.80 1.20 11.71
G3CESPM3 55.20 55.20 53.90 25.10 1.70 25.99
G3CESPM2 15.00 14.90 14.30 5.90 0.30 6.79
G3CESPM1 37.40 36.20 33.80 10.10 0.60 15.57
G3RSJUAN 1.10 1.00 1.00 0.30 - 0.45
G3HAINAG 50.70 48.50 41.50 10.90 0.60 19.67
G3HAINA4 25.60 23.90 18.00 3.80 0.10 8.96
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.04

Febrero 2017
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 21.20 18.20 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 152 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 74.80
G3AANDRE 244.70 244.70 244.70 244.70 244.70 164.44
G3ITABO1 35.00 35.00 35.00 35.00 35.00 23.49
G3LMINA5 79.10 79.10 79.10 79.10 79.10 53.15
G3LMINAC 107.10 107.10 107.10 107.10 107.10 71.97
G3LMINA6 80.00 80.00 80.00 80.00 80.00 53.79
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.43
G3CEPP2 30.80 30.80 30.80 30.80 30.80 20.73
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 30.55
G3QUISQ2 193.40 193.40 193.40 193.40 193.40 130.00
G3METALD 28.40 28.40 28.40 28.40 28.40 19.08
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 16.83
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 18.74
G3SESTE 56.80 56.80 56.80 56.80 56.80 38.14
G3LVEGA 71.00 71.00 71.00 71.00 71.00 47.71
G3MRIO 87.50 87.50 87.50 87.50 87.50 58.80
G3QUISQ1 109.10 109.10 109.10 109.10 109.10 73.34
G3PALAMA 86.00 86.00 86.00 86.00 74.10 55.91
G3EM2CGN 96.60 96.60 96.60 96.60 31.60 54.53
G3IKM22 9.40 9.40 9.40 9.40 1.80 5.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 153 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BERSAL 14.00 14.00 14.00 14.00 2.40 7.57
G3LOPPLA 21.90 21.90 21.90 21.90 3.20 11.72
G3CESPM3 56.10 56.10 56.10 55.10 5.70 29.46
G3CESPM2 18.50 18.50 18.50 15.70 1.40 9.24
G3CESPM1 36.70 36.10 35.90 24.20 1.90 16.85
G3RSJUAN 1.10 1.10 1.00 0.70 0.10 0.50
G3HAINAG 50.80 49.50 47.20 27.60 2.10 21.81
G3HAINA4 25.70 24.40 21.30 10.30 0.70 9.86
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.05

Marzo 2017
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 154 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.40 93.40 93.40 93.40 93.40 69.50
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.72
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.91
G3LMINA5 79.40 79.40 79.40 79.40 79.40 59.11
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.66
G3LMINA6 59.50 59.50 59.50 59.50 59.50 44.30
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.42
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.50 201.50 201.50 201.50 201.50 149.92
G3METALD 28.40 28.40 28.40 28.40 28.40 21.13
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 57.30 57.30 57.30 57.30 57.30 42.66
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 87.80 87.80 87.80 87.80 87.80 65.30
G3QUISQ1 109.80 109.80 109.80 109.80 109.80 81.71
G3PALAMA 95.10 95.10 95.10 95.10 82.90 68.62
G3EM2CGN 96.60 96.60 96.60 96.60 32.40 60.52
G3IKM22 9.40 9.40 9.40 9.40 1.80 5.64
G3BERSAL 14.10 14.10 14.10 14.10 2.40 8.41
G3LOPPLA 21.90 21.90 21.90 21.90 3.40 13.00
G3CESPM3 55.90 55.90 55.90 55.90 6.00 32.77
G3CESPM2 51.80 51.80 51.80 42.30 3.40 28.26
G3CESPM1 37.50 37.50 36.60 23.00 1.50 18.78
G3RSJUAN 1.10 1.10 1.10 0.70 - 0.55
G3HAINAG 50.50 50.00 46.60 26.20 1.60 23.77
G3HAINA4 25.60 24.80 21.50 9.80 0.50 10.90
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 - - 0.05

Abril 2017
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 155 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.40 0.40 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3AANDRE 245.40 245.40 245.40 245.40 245.40 176.72
G3ITABO1 108.50 108.50 108.50 108.50 108.50 78.14
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.00
G3LMINAC 107.30 107.30 107.30 107.30 107.30 77.24
G3LMINA6 77.60 77.60 77.60 77.60 77.60 55.86
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.70 40.70 40.70 40.70 40.70 29.33
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.22
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.10 187.10 187.10 187.10 187.10 134.73
G3METALD 28.40 28.40 28.40 28.40 28.40 20.45
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.70 63.70 63.70 63.70 63.70 45.86
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 156 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3QUISQ1 109.50 109.50 109.50 109.50 109.50 78.87
G3PALAMA 95.10 95.10 95.10 95.10 95.10 68.46
G3EM2CGN 96.60 96.60 96.60 96.60 96.60 69.53
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.76
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.11
G3LOPPLA 21.80 21.80 21.80 21.80 21.80 15.71
G3CESPM3 55.90 55.90 55.90 55.90 45.00 38.35
G3CESPM2 51.30 51.30 51.30 51.30 26.30 32.62
G3CESPM1 37.10 37.10 37.10 34.50 13.00 22.12
G3RSJUAN 1.10 1.10 1.10 1.00 0.40 0.65
G3HAINAG 50.40 50.40 50.00 43.20 14.40 28.78
G3HAINA4 25.60 25.60 24.80 18.90 5.30 13.65
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Mayo 2017
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.40 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.40 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 157 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.88
G3AANDRE 245.00 245.00 245.00 245.00 245.00 182.26
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.84
G3LMINA5 68.80 68.80 68.80 68.80 68.80 51.19
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.65
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.34
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.60 200.60 200.60 200.60 200.60 149.23
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.44
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.90 109.90 109.90 109.90 109.90 81.77
G3PALAMA 87.20 87.20 87.20 87.20 87.20 64.85
G3EM2CGN 96.50 96.50 96.50 96.50 96.50 71.83
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.99
G3BERSAL 14.10 14.10 14.10 14.10 14.10 10.47
G3LOPPLA 21.90 21.90 21.90 21.90 20.70 16.06
G3CESPM3 55.50 55.50 55.50 55.50 35.70 37.79
G3CESPM2 23.40 23.40 23.40 23.40 11.60 15.32
G3CESPM1 36.90 36.90 36.90 35.70 12.80 22.98
G3RSJUAN 1.10 1.10 1.10 1.00 0.40 0.68
G3HAINAG 50.90 50.90 50.90 46.30 14.60 30.62
G3HAINA4 25.40 25.40 25.10 20.60 5.00 14.38
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Junio 2017
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 158 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.29
G3AANDRE 244.80 244.80 244.80 244.80 244.80 176.29
G3ITABO1 108.60 108.60 108.60 108.60 108.60 78.19
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.95
G3LMINAC 107.00 107.00 107.00 107.00 107.00 77.02
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.80
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.36
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.51
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 159 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 57.20 57.20 57.20 57.20 57.20 41.22
G3LVEGA 71.80 71.80 71.80 71.80 71.80 51.68
G3MRIO 90.40 90.40 90.40 90.40 90.40 65.09
G3QUISQ1 109.60 109.60 109.60 109.60 109.60 78.92
G3PALAMA 95.20 95.20 95.20 95.20 95.20 68.51
G3EM2CGN 96.50 96.50 96.50 96.50 96.40 69.49
G3IKM22 9.40 9.40 9.40 9.40 8.90 6.67
G3BERSAL 14.00 14.00 14.00 14.00 12.90 9.89
G3LOPPLA 21.80 21.80 21.80 21.80 17.60 14.97
G3CESPM3 55.70 55.70 55.70 55.70 28.10 35.36
G3CESPM2 12.10 12.10 12.10 12.10 5.40 7.56
G3CESPM1 37.50 37.50 37.50 36.50 11.30 22.33
G3RSJUAN 1.10 1.10 1.10 1.10 0.40 0.65
G3HAINAG 50.50 50.50 50.40 47.10 12.30 29.18
G3HAINA4 25.70 25.70 25.30 21.90 4.40 14.11
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Julio 2017
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 160 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.73
G3ITABO1 108.80 108.80 108.80 108.80 108.80 80.94
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.19
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.76
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.75
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.20 201.20 201.20 201.20 201.20 149.71
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.80 63.80 63.80 63.80 63.80 47.43
G3LVEGA 83.20 83.20 83.20 83.20 83.20 61.86
G3MRIO 90.40 90.40 90.40 90.40 90.40 67.26
G3QUISQ1 109.80 109.80 109.80 109.80 109.80 81.71
G3PALAMA 95.10 95.10 95.10 95.10 95.10 70.75
G3EM2CGN 96.40 96.40 96.40 96.40 96.40 71.70
G3IKM22 9.40 9.40 9.40 9.40 9.40 6.99
G3BERSAL 14.00 14.00 14.00 14.00 14.00 10.41
G3LOPPLA 21.90 21.90 21.90 21.90 21.90 16.26
G3CESPM3 56.10 56.10 56.10 56.10 47.60 40.24
G3CESPM2 51.40 51.40 51.40 51.40 28.00 34.10
G3CESPM1 37.10 37.10 37.10 36.50 13.60 23.34
G3RSJUAN 1.10 1.10 1.10 1.10 0.40 0.68
G3HAINAG 50.60 50.60 50.60 49.10 15.40 31.13
G3HAINA4 25.70 25.70 25.50 23.80 5.70 15.20
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 0.10 0.10 - 0.07

Agosto 2017
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 161 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.60 111.60 111.60 111.60 111.60 83.06
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.06
G3AANDRE 245.10 245.10 245.10 245.10 245.10 182.33
G3ITABO1 108.10 108.10 108.10 108.10 108.10 80.45
G3LMINA5 79.10 79.10 79.10 79.10 79.10 58.84
G3LMINAC 107.40 107.40 107.40 107.40 107.40 79.89
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 162 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.36
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.00 201.00 201.00 201.00 201.00 149.57
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.63
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.75
G3SESTE 63.70 63.70 63.70 63.70 63.70 47.42
G3LVEGA 76.00 76.00 76.00 76.00 76.00 56.55
G3MRIO 87.80 87.80 87.80 87.80 82.40 64.35
G3QUISQ1 109.90 109.90 109.90 109.90 54.20 71.91
G3PALAMA 87.10 87.10 87.10 86.40 19.80 52.77
G3EM2CGN 96.70 96.70 95.80 63.40 12.80 50.98
G3IKM22 9.40 9.40 8.90 4.10 1.00 4.47
G3BERSAL 14.00 14.00 13.30 5.40 1.30 6.50
G3LOPPLA 21.80 21.80 20.70 7.40 1.90 9.92
G3CESPM3 43.30 43.30 33.10 11.20 2.70 17.46
G3CESPM1 37.30 36.50 20.60 7.10 1.50 12.87
G3CESPM2 51.60 46.70 22.20 8.10 1.50 15.59
G3RSJUAN 1.10 0.90 0.50 0.20 - 0.32
G3HAINAG 50.80 40.40 17.10 6.40 1.00 13.12
G3HAINA4 25.60 16.90 6.50 2.50 0.40 5.45
G3SPEDRV - - - - - -
G3SLORE1 0.10 0.10 - - - 0.03

Septiembre 2017
Cen. Hidroelectrica as
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 163 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.17
G3CATAL1 353.70 353.70 353.70 353.70 353.70 254.67
G3AANDRE 244.70 244.70 244.70 244.70 244.70 176.19
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.07
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.03
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.13
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.69
G3BARAHC 40.90 40.90 40.90 40.90 40.90 29.48
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 193.80 139.54
G3METALD 28.40 28.40 28.40 28.40 28.40 20.44
G3PIMEN2 25.00 25.00 25.00 25.00 25.00 18.03
G3PIMEN1 27.90 27.90 27.90 27.90 27.90 20.08
G3SESTE 63.70 63.70 63.70 63.70 63.70 45.87
G3LVEGA 83.20 83.20 83.20 83.20 83.20 59.87
G3MRIO 87.70 87.70 87.70 87.70 76.80 61.29
G3QUISQ1 118.50 118.50 118.50 118.50 45.50 72.77
G3PALAMA 95.10 95.10 95.10 93.80 16.80 54.79
G3EM2CGN 96.50 96.50 96.50 69.10 10.00 49.89
G3IKM22 9.40 9.40 8.90 4.70 0.80 4.39
G3BERSAL 14.10 14.10 13.30 6.10 1.10 6.39
G3LOPPLA 21.90 21.90 20.70 8.70 1.30 9.76
G3CESPM3 55.70 55.30 46.10 14.30 2.10 22.01
G3CESPM1 37.60 35.30 22.20 7.50 0.90 12.49
G3CESPM2 51.60 42.30 23.80 8.00 0.80 14.50
G3RSJUAN 1.10 0.90 0.50 0.20 - 0.30
G3HAINAG 50.70 35.00 18.20 6.20 0.70 11.92
G3HAINA4 25.30 14.60 7.00 2.50 0.20 4.95
G3SPEDRV - - - - - -

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 164 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SLORE1 0.10 0.10 - - - 0.02
Octubre 2017
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.60 0.60 0.50 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.85
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.09
G3CATAL2 353.10 353.10 353.10 353.10 353.10 262.74
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.07

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 165 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.74
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.78
G3LMINAC 107.00 107.00 107.00 107.00 107.00 79.61
G3LMINA6 80.40 80.40 80.40 80.40 80.40 59.79
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.90 40.90 40.90 40.90 40.90 30.44
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 194.00 194.00 194.00 194.00 149.90 136.51
G3METALD 28.40 28.40 28.40 28.40 9.90 17.86
G3PIMEN2 25.00 25.00 25.00 25.00 7.50 15.53
G3PIMEN1 27.90 27.90 27.90 27.90 7.40 17.12
G3SESTE 63.80 63.80 63.80 63.20 13.70 38.47
G3LVEGA 83.20 83.20 83.20 71.10 13.90 47.44
G3MRIO 87.80 87.80 87.70 43.10 9.90 43.52
G3QUISQ1 109.80 109.50 86.80 28.70 5.20 44.50
G3PALAMA 87.10 76.10 33.50 15.40 1.70 25.30
G3EM2CGN 96.60 46.80 21.80 11.10 0.90 17.32
G3IKM22 9.00 3.40 1.80 0.80 0.10 1.35
G3BERSAL 13.40 4.70 2.60 1.00 0.10 1.89
G3LOPPLA 20.10 6.40 3.80 1.20 0.10 2.66
G3CESPM1 2.20 0.60 0.40 0.10 - 0.28
G3CESPM2 38.50 11.60 7.10 1.80 0.10 4.84
G3CESPM3 30.40 10.20 5.40 1.50 0.10 4.00
G3RSJUAN 0.50 0.20 0.10 - - 0.07
G3HAINAG 21.20 7.80 3.70 0.90 0.10 2.88
G3HAINA4 8.50 3.20 1.40 0.30 - 1.14
G3SPEDRV - - - - - -
G3SLORE1 - - - - - 0.01
Noviembre 2017
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.50 0.40 0.40 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 166 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.70 111.70 111.70 111.70 111.70 80.43
G3CATAL1 352.50 352.50 352.50 352.50 352.50 253.81
G3CATAL2 352.90 352.90 352.90 352.90 352.90 254.08
G3AANDRE 244.90 244.90 244.90 244.90 244.90 176.33
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.28
G3LMINA5 79.10 79.10 79.10 79.10 79.10 56.98
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.13
G3LMINA6 80.40 80.40 80.40 80.40 80.40 57.87
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 17.70 17.70 17.70 17.70 17.70 12.77
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.20
G3PIMEN3 45.50 45.50 45.50 45.50 45.20 32.68
G3QUISQ2 193.60 193.60 193.60 193.60 121.50 127.01
G3METALD 28.40 28.40 28.40 28.40 7.80 16.90
G3PIMEN2 25.00 25.00 25.00 25.00 6.00 14.75
G3PIMEN1 27.90 27.90 27.90 27.90 6.00 16.32
G3SESTE 57.20 57.20 57.20 54.30 10.90 32.71
G3LVEGA 83.20 83.20 83.20 61.50 12.20 43.93
G3MRIO 87.70 87.70 78.40 35.00 7.60 38.70
G3QUISQ1 118.60 111.30 59.90 26.60 3.80 38.39
G3PALAMA 95.10 56.50 23.90 14.30 1.40 19.47
G3EM2CGN 91.50 29.30 16.60 8.00 0.70 12.20
G3IKM22 7.80 2.20 1.30 0.50 - 0.92
G3BERSAL 11.10 3.00 1.80 0.60 0.10 1.29
G3LOPPLA 15.60 4.50 2.80 0.90 0.10 1.89
G3CESPM1 19.10 6.40 3.10 0.90 0.10 2.38
G3CESPM2 21.40 7.50 3.30 1.00 - 2.69
G3CESPM3 17.90 6.30 2.50 0.80 - 2.20

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 167 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RSJUAN 0.30 0.10 - - - 0.04
G3HAINAG 13.00 4.40 1.60 0.50 - 1.52
G3HAINA4 5.50 1.70 0.60 0.20 - 0.60
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Diciembre 2017
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 168 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.83
G3CATAL1 353.30 353.30 353.30 353.30 353.30 262.83
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 244.10 244.10 244.10 244.10 244.10 181.62
G3ITABO1 108.30 108.30 108.30 108.30 108.30 80.59
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.78
G3LMINAC 107.00 107.00 107.00 107.00 107.00 79.65
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.72
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 4.00 4.00 4.00 4.00 4.00 2.94
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 43.20 33.43
G3QUISQ2 200.80 200.80 200.80 200.80 72.10 126.65
G3METALD 28.40 28.40 28.40 28.40 5.80 17.12
G3PIMEN2 25.00 25.00 25.00 25.00 4.70 15.03
G3PIMEN1 27.90 27.90 27.90 26.90 4.60 16.45
G3SESTE 63.70 63.70 63.70 39.00 9.10 33.33
G3LVEGA 83.20 83.20 77.50 30.80 6.90 37.98
G3MRIO 90.40 89.30 57.60 20.60 3.20 33.28
G3QUISQ1 118.60 96.90 36.10 19.10 1.80 31.11
G3PALAMA 95.10 39.70 18.20 8.00 0.60 14.76
G3EM2CGN 96.50 23.20 12.30 3.10 0.20 9.85
G3IKM22 9.40 1.90 0.80 0.20 - 0.79
G3BERSAL 14.00 2.70 1.10 0.30 - 1.15
G3LOPPLA 21.40 3.90 1.40 0.40 - 1.68
G3CESPM1 21.90 3.60 1.20 0.40 - 1.58
G3CESPM2 33.90 5.10 1.50 0.40 - 2.26
G3CESPM3 38.10 5.40 1.50 0.40 - 2.45
G3RSJUAN 0.70 0.10 - - - 0.04
G3HAINAG 27.30 3.70 1.00 0.30 - 1.70
G3HAINA4 10.90 1.40 0.30 0.10 - 0.65
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - -
RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2018
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 169 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.00 111.00 111.00 111.00 111.00 82.59
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.08
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 213.20 213.20 213.20 213.20 213.20 158.63
G3ITABO1 108.20 108.20 108.20 108.20 108.20 80.54
G3LMINA5 78.90 78.90 78.90 78.90 78.90 58.71
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.66
G3LMINA6 80.10 80.10 80.10 80.10 80.10 59.62
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 29.00 28.30
G3CEPP2 30.80 30.80 30.80 30.80 15.20 20.18
G3PIMEN3 45.50 45.50 45.50 45.50 18.50 29.04
G3QUISQ2 201.10 201.10 201.10 180.60 41.10 117.61
G3METALD 28.40 28.40 28.20 12.60 3.90 13.92
G3PIMEN2 25.00 25.00 23.70 10.10 3.20 11.85
G3PIMEN1 27.90 27.90 26.40 9.40 2.70 12.71
G3SESTE 63.70 61.00 56.40 15.70 3.60 26.37
G3LVEGA 83.20 77.60 52.20 15.20 2.60 28.90
G3MRIO 87.80 73.80 29.80 11.80 1.30 23.53
G3QUISQ1 107.90 52.30 21.50 7.10 0.70 17.84

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 170 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALAMA 89.00 23.20 12.10 2.40 0.20 9.45
G3EM2CGN 79.00 14.60 6.50 1.10 0.10 6.36
G3IKM22 5.90 1.20 0.40 0.10 - 0.48
G3BERSAL 8.20 1.70 0.60 0.10 - 0.68
G3LOPPLA 10.80 2.50 0.70 0.10 - 0.92
G3CESPM1 14.00 2.90 0.80 0.10 - 1.11
G3CESPM2 5.40 1.20 0.30 - - 0.44
G3CESPM3 15.80 2.90 0.80 0.10 - 1.15
G3RSJUAN 0.30 0.10 - - - 0.02
G3HAINAG 11.30 1.90 0.50 0.10 - 0.77
G3HAINA4 4.70 0.70 0.20 - - 0.29
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Febrero 2018
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 21.20 18.20 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 171 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 74.90
G3CATAL1 353.50 353.50 353.50 353.50 353.50 237.55
G3CATAL2 352.90 352.90 352.90 352.90 352.90 237.16
G3AANDRE 244.10 244.10 244.10 244.10 244.10 164.00
G3ITABO1 34.90 34.90 34.90 34.90 34.90 23.43
G3LMINA5 79.00 79.00 79.00 79.00 79.00 53.08
G3LMINAC 107.20 107.20 107.20 107.20 107.20 72.06
G3LMINA6 80.20 80.20 80.20 80.20 80.20 53.90
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.43
G3CEPP2 30.90 30.90 30.90 30.90 28.30 20.33
G3PIMEN3 45.50 45.50 45.50 45.50 27.10 27.60
G3QUISQ2 193.60 193.60 193.60 193.60 51.90 107.44
G3METALD 28.40 28.40 28.40 27.00 5.00 15.11
G3PIMEN2 25.00 25.00 25.00 20.00 3.90 12.62
G3PIMEN1 27.90 27.90 27.90 15.80 4.00 12.98
G3SESTE 56.80 54.80 53.70 23.80 7.10 24.07
G3LVEGA 71.00 66.50 54.00 19.10 4.40 25.23
G3MRIO 87.50 74.30 34.50 17.60 2.50 23.28
G3QUISQ1 107.60 49.50 24.20 15.90 1.60 17.75
G3PALAMA 80.80 19.90 13.90 6.10 0.60 8.80
G3EM2CGN 78.20 15.70 9.60 2.70 0.30 6.75
G3IKM22 5.10 1.20 0.60 0.20 - 0.47
G3BERSAL 7.10 1.80 0.80 0.30 - 0.66
G3LOPPLA 9.60 2.60 1.00 0.40 - 0.91
G3CESPM1 12.30 3.30 1.10 0.40 - 1.13
G3CESPM2 5.80 1.50 0.50 0.20 - 0.52
G3CESPM3 13.90 2.90 1.10 0.40 - 1.11
G3RSJUAN 0.30 0.10 - - - 0.02
G3HAINAG 10.20 1.90 0.80 0.30 - 0.77
G3HAINA4 4.30 0.70 0.30 0.10 - 0.31
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Marzo 2018
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 172 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.60 93.60 93.60 93.60 93.60 69.67
G3CATAL1 353.80 353.80 353.80 353.80 353.80 263.26
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.08
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.91
G3ITABO1 109.00 109.00 109.00 109.00 109.00 81.09
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.76
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.77
G3LMINA6 59.60 59.60 59.60 59.60 59.60 44.31
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.38
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 39.00 32.68
G3QUISQ2 200.90 200.90 200.90 200.90 65.30 125.46
G3METALD 28.40 28.40 28.40 28.40 5.40 17.06
G3PIMEN2 25.00 25.00 25.00 25.00 4.40 14.97

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 173 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PIMEN1 27.90 27.90 27.90 26.50 4.20 16.32
G3SESTE 57.40 57.40 57.40 35.00 7.90 29.92
G3LVEGA 83.20 83.20 78.90 30.80 6.20 38.10
G3MRIO 87.80 83.20 54.90 19.80 2.70 31.37
G3QUISQ1 110.00 83.10 33.60 17.90 1.50 27.69
G3PALAMA 95.10 34.30 18.20 8.90 0.70 13.96
G3EM2CGN 95.40 20.00 12.50 3.30 0.20 9.29
G3IKM22 8.90 1.60 0.90 0.20 - 0.76
G3BERSAL 13.40 2.40 1.10 0.30 - 1.09
G3LOPPLA 20.80 3.50 1.50 0.40 - 1.58
G3CESPM1 31.90 4.60 1.70 0.40 - 2.17
G3CESPM2 36.70 5.00 1.70 0.50 - 2.39
G3CESPM3 30.70 3.90 1.30 0.40 - 1.94
G3RSJUAN 0.60 0.10 - - - 0.04
G3HAINAG 21.70 2.50 0.80 0.20 - 1.30
G3HAINA4 8.90 0.90 0.30 0.10 - 0.51
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Abril 2018
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 174 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3CATAL1 353.60 353.60 353.60 353.60 353.60 254.60
G3CATAL2 354.00 354.00 354.00 354.00 354.00 254.86
G3AANDRE 244.60 244.60 244.60 244.60 244.60 176.12
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.25
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.85
G3LMINAC 107.00 107.00 107.00 107.00 107.00 77.06
G3LMINA6 77.60 77.60 77.60 77.60 77.60 55.88
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.39
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.20
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.30 187.30 187.30 187.30 183.90 134.25
G3METALD 28.40 28.40 28.40 28.40 21.90 19.32
G3PIMEN2 25.00 25.00 25.00 25.00 14.90 16.29
G3PIMEN1 27.90 27.90 27.90 27.90 12.10 17.37
G3SESTE 63.80 63.80 63.80 63.80 20.50 38.50
G3LVEGA 71.80 71.80 71.80 58.90 15.90 39.83
G3MRIO 90.40 90.40 85.50 40.30 15.70 42.72
G3QUISQ1 109.60 103.70 57.00 25.60 12.40 37.52
G3PALAMA 95.10 61.60 24.00 15.50 3.80 20.89
G3EM2CGN 96.50 28.50 16.60 9.50 1.60 12.52
G3IKM22 9.10 2.10 1.40 0.60 0.10 0.99
G3BERSAL 13.30 3.00 2.00 0.80 0.20 1.42
G3LOPPLA 20.80 4.50 2.70 1.00 0.20 2.06
G3CESPM1 31.30 6.30 3.20 1.10 0.30 2.79
G3CESPM2 34.40 7.50 3.40 1.10 0.20 3.11
G3CESPM3 27.50 6.40 2.60 0.90 0.20 2.54
G3RSJUAN 0.50 0.10 - - - 0.05
G3HAINAG 19.10 4.40 1.60 0.60 0.10 1.71
G3HAINA4 7.90 1.70 0.60 0.20 - 0.67
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Mayo 2018
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 175 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 82.99
G3CATAL1 353.80 353.80 353.80 353.80 353.80 263.23
G3CATAL2 353.60 353.60 353.60 353.60 353.60 263.10
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.09
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.75
G3LMINA5 68.70 68.70 68.70 68.70 68.70 51.13
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.67
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.35
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.90
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.36

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 176 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.40 200.40 200.40 200.40 188.80 147.07
G3METALD 28.40 28.40 28.40 28.40 16.80 19.07
G3PIMEN2 25.00 25.00 25.00 25.00 10.90 16.13
G3PIMEN1 27.90 27.90 27.90 27.90 10.20 17.62
G3SESTE 63.80 63.80 63.80 61.60 17.90 38.92
G3LVEGA 76.00 76.00 76.00 57.70 15.50 42.57
G3MRIO 90.40 90.40 83.30 38.40 14.10 43.18
G3QUISQ1 109.80 106.50 64.90 25.50 9.50 40.20
G3PALAMA 87.10 70.40 25.30 13.90 2.80 22.73
G3EM2CGN 94.80 36.70 18.10 9.40 1.50 14.60
G3IKM22 8.50 2.90 1.50 0.60 0.10 1.17
G3BERSAL 12.60 3.70 2.00 0.80 0.10 1.56
G3LOPPLA 19.30 5.10 2.80 1.00 0.20 2.21
G3CESPM1 25.70 7.40 4.00 1.10 0.20 3.04
G3CESPM2 14.90 4.40 2.20 0.60 0.10 1.76
G3CESPM3 26.20 8.80 3.80 1.10 0.20 3.28
G3RSJUAN 0.50 0.20 0.10 - - 0.06
G3HAINAG 18.50 6.60 2.50 0.70 0.10 2.31
G3HAINA4 7.40 2.60 0.80 0.20 - 0.89
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Junio 2018
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.50 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 177 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.20 111.20 111.20 111.20 111.20 80.08
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.11
G3CATAL2 352.90 352.90 352.90 352.90 352.90 254.12
G3AANDRE 245.00 245.00 245.00 245.00 245.00 176.37
G3ITABO1 108.30 108.30 108.30 108.30 108.30 78.00
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.97
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.08
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.72
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.38
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.70 193.70 193.70 193.70 170.50 135.48
G3METALD 28.40 28.40 28.40 28.40 12.00 17.62
G3PIMEN2 25.00 25.00 25.00 25.00 9.40 15.33
G3PIMEN1 27.90 27.90 27.90 27.80 8.90 16.80
G3SESTE 57.20 57.20 57.20 54.10 13.90 33.22
G3LVEGA 71.80 71.80 71.30 60.40 14.00 39.70
G3MRIO 90.40 90.40 84.70 40.90 13.40 42.35
G3QUISQ1 109.60 107.10 73.00 26.60 8.30 40.46
G3PALAMA 95.20 81.60 30.10 15.80 2.70 25.36
G3EM2CGN 95.70 45.00 19.00 10.10 1.30 15.91
G3IKM22 8.90 3.40 1.50 0.60 0.10 1.24
G3BERSAL 13.40 4.50 2.20 0.80 0.10 1.71
G3LOPPLA 20.60 6.00 3.20 1.10 0.20 2.43
G3CESPM1 30.80 8.00 4.30 1.20 0.20 3.31
G3CESPM2 9.30 2.60 1.30 0.40 0.10 1.04
G3CESPM3 35.60 10.20 4.80 1.30 0.20 3.92
G3RSJUAN 0.60 0.20 0.10 - - 0.07
G3HAINAG 24.50 7.80 3.00 0.80 0.10 2.76
G3HAINA4 10.00 3.20 1.00 0.30 - 1.10
G3SPEDRV - - - - - -
G3SLORE1 - - - - - 0.01
Julio 2018

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 178 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.78
G3CATAL1 352.90 352.90 352.90 352.90 352.90 262.57
G3CATAL2 352.70 352.70 352.70 352.70 352.70 262.43
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.77
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.66
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.16

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 179 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.66
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.36
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.65
G3METALD 28.40 28.40 28.40 28.40 25.10 20.54
G3PIMEN2 25.00 25.00 25.00 25.00 18.90 17.54
G3PIMEN1 27.90 27.90 27.90 27.90 13.30 18.18
G3SESTE 63.80 63.80 63.80 63.80 23.90 40.38
G3LVEGA 83.20 83.20 83.20 80.20 20.70 50.28
G3MRIO 90.40 90.40 90.40 82.00 16.90 52.76
G3QUISQ1 109.90 109.90 103.50 47.50 13.80 52.44
G3PALAMA 95.10 89.80 67.80 22.30 4.40 35.83
G3EM2CGN 96.30 74.70 32.00 15.80 2.00 25.18
G3IKM22 9.40 5.30 2.30 1.30 0.20 1.90
G3BERSAL 14.10 7.00 3.30 1.90 0.20 2.64
G3LOPPLA 21.90 9.70 4.90 2.80 0.30 3.81
G3CESPM1 36.20 12.40 7.10 2.90 0.30 5.16
G3CESPM2 50.00 14.20 8.40 3.10 0.30 6.16
G3CESPM3 49.20 12.40 7.10 2.20 0.20 5.38
G3RSJUAN 0.90 0.20 0.10 - - 0.10
G3HAINAG 38.80 9.20 4.90 1.50 0.20 3.99
G3HAINA4 16.70 3.80 1.90 0.50 0.10 1.63
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Agosto 2018
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 180 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.87
G3CATAL1 352.50 352.50 352.50 352.50 352.50 262.28
G3CATAL2 353.10 353.10 353.10 353.10 353.10 262.72
G3AANDRE 244.80 244.80 244.80 244.80 244.80 182.12
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.61
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.94
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.74
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.75
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.34
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 190.80 147.78
G3METALD 28.40 28.40 28.40 28.40 18.40 19.36
G3PIMEN2 25.00 25.00 25.00 25.00 12.20 16.37
G3PIMEN1 27.90 27.90 27.90 27.90 11.10 17.78
G3SESTE 63.70 63.70 63.70 63.70 19.80 39.64
G3LVEGA 76.00 76.00 76.00 69.40 16.70 44.87
G3MRIO 87.80 87.80 86.30 49.90 14.70 45.33
G3QUISQ1 109.70 109.70 87.80 32.10 10.80 46.30
G3PALAMA 87.10 83.20 36.00 16.60 3.30 27.52
G3EM2CGN 96.60 62.90 23.20 12.60 1.80 20.88
G3IKM22 9.40 4.20 1.90 0.90 0.10 1.56
G3BERSAL 14.00 6.00 2.70 1.20 0.20 2.22
G3LOPPLA 21.90 8.40 3.90 1.70 0.20 3.21
G3CESPM1 36.10 10.20 5.40 1.70 0.30 4.23
G3CESPM2 46.90 12.40 6.10 1.90 0.30 5.10
G3CESPM3 34.40 8.70 3.90 1.10 0.20 3.52
G3RSJUAN 0.80 0.20 0.10 - - 0.09
G3HAINAG 33.40 8.50 3.50 1.00 0.10 3.35

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 181 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3HAINA4 13.70 3.60 1.30 0.30 - 1.36
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Septiembre 2018
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.19
G3CATAL1 353.10 353.10 353.10 353.10 353.10 254.23

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 182 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CATAL2 353.90 353.90 353.90 353.90 353.90 254.77
G3AANDRE 244.40 244.40 244.40 244.40 244.40 175.95
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.25
G3LMINA5 79.20 79.20 79.20 79.20 79.20 57.00
G3LMINAC 107.30 107.30 107.30 107.30 107.30 77.27
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.80
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.40
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.20
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.90 193.90 193.90 193.90 179.00 137.04
G3METALD 28.40 28.40 28.40 28.40 14.50 18.05
G3PIMEN2 25.00 25.00 25.00 25.00 10.40 15.52
G3PIMEN1 27.90 27.90 27.90 27.90 10.10 17.02
G3SESTE 63.80 63.80 63.80 63.80 16.90 37.85
G3LVEGA 83.20 83.20 83.20 81.00 16.60 48.06
G3MRIO 87.70 87.70 87.70 60.50 13.10 45.65
G3QUISQ1 118.50 118.50 107.10 39.10 8.90 50.84
G3PALAMA 95.10 87.60 45.80 18.90 2.70 29.62
G3EM2CGN 96.60 54.70 25.00 13.30 1.40 19.21
G3IKM22 9.40 3.80 2.00 0.90 0.10 1.47
G3BERSAL 14.00 5.40 2.90 1.20 0.10 2.09
G3LOPPLA 21.90 7.50 4.20 1.60 0.20 2.97
G3CESPM1 35.00 9.10 5.70 2.00 0.20 3.98
G3CESPM2 42.30 10.90 6.60 2.00 0.20 4.66
G3CESPM3 36.30 10.00 5.60 1.50 0.10 4.07
G3RSJUAN 0.70 0.20 0.10 - - 0.07
G3HAINAG 26.50 7.20 3.70 1.00 0.10 2.86
G3HAINA4 10.30 2.90 1.30 0.30 - 1.11
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Octubre 2018
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 183 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.60 0.60 0.60 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 82.91
G3CATAL1 352.60 352.60 352.60 352.60 352.60 262.35
G3CATAL2 353.40 353.40 353.40 353.40 353.40 262.91
G3AANDRE 244.30 244.30 244.30 244.30 244.30 181.79
G3ITABO1 108.70 108.70 108.70 108.70 108.70 80.85
G3LMINA5 79.30 79.30 79.30 79.30 79.30 58.98
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.67
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.78
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.37
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 194.10 194.10 194.10 194.10 175.00 141.01
G3METALD 28.40 28.40 28.40 28.40 15.00 18.76
G3PIMEN2 25.00 25.00 25.00 25.00 10.20 16.00
G3PIMEN1 27.90 27.90 27.90 27.90 9.50 17.50
G3SESTE 63.70 63.70 63.70 63.70 17.10 39.17
G3LVEGA 83.20 83.20 83.20 81.20 16.50 49.72
G3MRIO 87.80 87.80 87.80 65.50 13.00 48.09
G3QUISQ1 110.00 110.00 104.90 39.80 8.10 50.32
G3PALAMA 87.10 85.70 54.60 18.80 2.50 31.54
G3EM2CGN 96.60 73.80 31.00 14.80 1.40 24.55
G3IKM22 9.40 4.70 2.30 1.10 0.10 1.74
G3BERSAL 14.00 6.40 3.30 1.50 0.10 2.46
G3LOPPLA 21.90 9.50 4.80 2.20 0.20 3.65
G3CESPM1 2.40 1.00 0.50 0.20 - 0.38

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 184 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3CESPM2 48.50 16.10 9.10 3.00 0.20 6.53
G3CESPM3 43.60 14.10 8.20 2.40 0.20 5.76
G3RSJUAN 0.80 0.30 0.10 - - 0.10
G3HAINAG 32.20 10.60 5.60 1.50 0.10 4.16
G3HAINA4 12.80 4.60 2.30 0.60 - 1.71
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Noviembre 2018
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.50 0.50 0.40 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 185 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 80.13
G3CATAL1 353.50 353.50 353.50 353.50 353.50 254.53
G3CATAL2 352.80 352.80 352.80 352.80 352.80 254.03
G3AANDRE 243.40 243.40 243.40 243.40 243.40 175.27
G3ITABO1 108.30 108.30 108.30 108.30 108.30 77.99
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.91
G3LMINAC 107.20 107.20 107.20 107.20 107.20 77.16
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.78
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.69
G3BARAHC 17.70 17.70 17.70 17.70 17.70 12.74
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 151.50 132.25
G3METALD 28.40 28.40 28.40 28.40 10.70 17.39
G3PIMEN2 25.00 25.00 25.00 25.00 8.00 15.09
G3PIMEN1 27.90 27.90 27.90 27.90 7.60 16.59
G3SESTE 57.20 57.20 57.20 57.20 12.70 33.54
G3LVEGA 83.20 83.20 83.20 77.20 14.70 47.07
G3MRIO 87.70 87.70 85.70 52.20 10.80 43.47
G3QUISQ1 118.40 118.10 88.70 35.20 6.10 46.44
G3PALAMA 95.10 79.70 34.30 17.80 2.00 25.98
G3EM2CGN 96.40 44.20 20.50 11.90 1.10 16.30
G3IKM22 9.40 3.20 1.80 0.70 0.10 1.28
G3BERSAL 13.40 4.50 2.50 1.00 0.10 1.81
G3LOPPLA 19.80 6.20 3.40 1.50 0.10 2.53
G3CESPM1 29.30 8.30 4.60 1.50 0.10 3.39
G3CESPM2 32.70 10.00 5.10 1.80 0.10 3.92
G3CESPM3 26.90 8.80 4.00 1.30 0.10 3.27
G3RSJUAN 0.50 0.20 0.10 - - 0.06
G3HAINAG 19.20 6.40 2.50 0.90 - 2.29
G3HAINA4 7.70 2.60 1.00 0.40 - 0.91
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Diciembre 2018
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 186 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.00 111.00 111.00 111.00 111.00 82.58
G3CATAL1 352.60 352.60 352.60 352.60 352.60 262.33
G3CATAL2 352.60 352.60 352.60 352.60 352.60 262.35
G3AANDRE 243.90 243.90 243.90 243.90 243.90 181.46
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.77
G3LMINA5 79.30 79.30 79.30 79.30 79.30 58.96
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.72
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.77
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 4.00 4.00 4.00 4.00 4.00 2.94
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.00 201.00 201.00 201.00 103.90 132.34
G3METALD 28.40 28.40 28.40 28.40 6.50 17.24
G3PIMEN2 25.00 25.00 25.00 25.00 5.50 15.17
G3PIMEN1 27.90 27.90 27.90 27.90 5.70 16.82
G3SESTE 63.80 63.80 63.80 59.70 10.60 37.32
G3LVEGA 83.20 83.20 82.90 43.40 10.90 41.90
G3MRIO 90.40 90.40 79.10 27.00 4.70 38.72
G3QUISQ1 118.50 111.50 52.00 23.20 2.60 37.42
G3PALAMA 95.10 63.40 22.40 12.40 1.00 20.60
G3EM2CGN 96.50 31.70 16.10 5.10 0.50 12.46

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 187 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3IKM22 9.40 2.40 1.20 0.30 - 1.00
G3BERSAL 14.10 3.30 1.80 0.40 - 1.43
G3LOPPLA 21.80 4.90 2.60 0.60 0.10 2.10
G3CESPM1 24.10 4.80 2.00 0.50 - 2.05
G3CESPM2 38.60 7.10 2.60 0.70 - 3.03
G3CESPM3 49.40 8.10 2.50 0.70 0.10 3.53
G3RSJUAN 0.90 0.10 - - - 0.06
G3HAINAG 38.10 5.60 1.60 0.40 - 2.51
G3HAINA4 16.10 2.30 0.60 0.20 - 1.03
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - -
RESULTADOS DESPACHO POR BLOQUE (MW)

bloq1 bloq2 bloq3 bloq4 bloq5 energia


(MW) (MW) (MW) (MW) (MW) (GWh)
Centrales Hidroelctricas Enero 2019
G3TAVER2 27.60 27.60 14.80 6.20 2.10 9.90
G3JIGUE1 9.60 9.60 9.50 6.20 4.00 5.52
G3JIGUE2 14.10 14.10 10.20 4.10 2.40 5.94
G3TAVER1 13.30 13.30 11.90 8.40 7.60 7.76
G3PALOM1 2.90 2.90 1.00 0.20 0.20 0.87
G3PALOM2 2.80 2.80 2.40 1.30 0.50 1.34
G3AGUAC1 8.90 8.90 8.90 4.10 2.90 4.69
G3AGUAC2 6.10 6.10 4.90 2.80 0.80 2.80
G3PINAL1 7.40 7.40 6.10 1.20 0.10 2.88
G3PINAL2 3.90 3.90 2.10 0.90 - 1.36
G3VALDE2 2.30 2.30 1.00 1.00 0.90 0.98
G3MONCI2 10.50 10.50 9.10 8.10 5.20 6.19
G3MONCI1 11.20 11.20 10.60 8.00 3.80 6.34
G3VALDE1 1.90 1.90 0.60 0.50 0.50 0.70
G3LCOCO2 3.60 3.60 3.60 3.60 3.60 2.66
G3RBLAN2 2.80 2.80 2.80 2.50 1.50 1.82
G3RBLAN1 7.10 7.10 6.90 6.40 5.70 4.87
G3LANGOS 5.70 5.70 5.10 5.10 4.80 3.87
G3RINCON 4.50 4.50 4.50 0.80 - 1.90
G3HATILL 6.00 6.00 5.70 5.40 5.40 4.20
G3LDAMAS 6.00 6.00 6.00 6.00 5.60 4.39
G3SYEGUA 4.40 4.40 4.40 4.40 4.40 3.29
G3JIMENO 3.70 3.70 3.70 3.70 3.20 2.68
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 3.90 3.90 3.90 3.90 2.50 2.67
G3LTORO2 3.20 3.20 3.20 3.20 3.10 2.36
G3LTORO1 3.10 3.10 3.10 3.10 2.90 2.26
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.69
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.21
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.20

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 188 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.13
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.06
G3LARIM1 31.70 31.70 31.70 31.70 31.70 23.61
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.10 353.10 353.10 353.10 353.10 262.73
G3CATAL2 352.40 352.40 352.40 352.40 352.40 262.20
G3AANDRE 213.00 213.00 213.00 213.00 213.00 158.47
G3ITABO1 108.60 108.60 108.60 108.60 108.60 80.82
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.95
G3LMINAC 107.00 107.00 107.00 107.00 107.00 79.64
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.68
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.70 40.70 40.70 40.70 40.70 30.29
G3CEPP2 30.80 30.80 30.80 30.80 23.50 21.64
G3PIMEN3 45.50 45.50 45.50 45.50 23.00 29.84
G3QUISQ2 201.00 201.00 201.00 197.90 52.00 122.61
G3METALD 28.40 28.40 28.40 20.50 4.30 15.44
G3PIMEN2 25.00 25.00 25.00 12.70 3.60 12.63
G3PIMEN1 27.90 27.90 27.80 12.20 3.80 13.66
G3SESTE 63.80 63.80 60.00 21.90 6.00 29.04
G3LVEGA 83.20 79.10 71.10 18.70 3.70 33.38
G3MRIO 87.80 80.00 42.30 14.00 1.70 27.35
G3QUISQ1 109.80 78.20 28.70 11.30 1.00 24.63
G3PALAMA 91.60 33.10 15.40 3.60 0.40 12.16
G3EM2CGN 88.10 19.10 10.30 1.50 0.10 8.20
G3IKM22 8.20 1.50 0.60 0.10 - 0.65
G3BERSAL 11.80 2.20 0.80 0.10 - 0.90
G3LOPPLA 17.90 3.00 1.10 0.20 - 1.31
G3CESPM1 21.30 4.40 1.20 0.20 - 1.69
G3CESPM2 8.60 1.60 0.50 0.10 - 0.65
G3CESPM3 23.40 4.60 1.20 0.20 - 1.78
G3RSJUAN 0.40 0.10 - - - 0.03
G3HAINAG 16.50 3.00 0.80 0.10 - 1.19
G3HAINA4 6.70 1.20 0.30 0.10 - 0.47
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -

Febrero 2019
G3TAVER2 17.30 17.30 14.10 7.60 4.10 7.44
G3JIGUE1 14.90 14.90 13.90 10.20 6.00 7.68
G3JIGUE2 15.20 15.20 11.50 3.40 - 5.30
G3TAVER1 21.60 21.20 18.20 12.20 9.10 10.38
G3PALOM1 3.70 3.70 2.00 0.20 0.20 1.09
G3PALOM2 3.70 3.70 1.10 - - 0.87
G3AGUAC1 10.30 10.30 10.00 3.40 - 4.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 189 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3AGUAC2 5.30 5.30 4.30 2.80 1.70 2.41
G3PINAL1 5.40 5.40 3.00 1.00 0.10 1.70
G3PINAL2 6.40 6.40 3.00 0.90 - 1.84
G3VALDE2 2.00 2.00 0.70 0.60 0.60 0.68
G3MONCI2 10.70 10.70 8.90 7.80 4.80 5.47
G3MONCI1 10.70 10.70 10.00 7.00 2.90 5.21
G3VALDE1 1.90 1.90 0.70 0.60 0.60 0.68
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 1.81
G3RBLAN2 11.00 10.50 9.30 8.00 4.60 5.52
G3RBLAN1 5.60 5.60 5.10 4.40 3.00 3.07
G3LANGOS 5.70 5.70 5.70 5.70 5.30 3.75
G3RINCON 4.10 4.10 4.10 1.10 - 1.63
G3HATILL 5.40 5.40 5.40 5.40 5.30 3.60
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 3.98
G3SYEGUA 3.20 3.20 3.20 3.20 3.20 2.16
G3JIMENO 4.00 4.00 4.00 3.90 3.50 2.58
G3JLOSCO 2.30 2.30 2.30 2.30 2.30 1.53
G3SABANE 3.20 3.20 3.20 2.60 0.20 1.57
G3LTORO2 3.10 3.10 3.10 3.10 2.80 2.03
G3LTORO1 2.50 2.50 2.50 2.50 2.30 1.65
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.19
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.28
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.13
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.11
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.56
G3CEMON2 0.60 0.60 0.60 0.60 0.60 0.43
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.16
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 23.40 23.40 23.40 23.40 23.40 15.70
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 74.68
G3CATAL1 353.70 353.70 353.70 353.70 353.70 237.69
G3CATAL2 354.00 354.00 354.00 354.00 354.00 237.89
G3AANDRE 244.20 244.20 244.20 244.20 244.20 164.08
G3ITABO1 34.70 34.70 34.70 34.70 34.70 23.35
G3LMINA5 78.90 78.90 78.90 78.90 78.90 53.04
G3LMINAC 107.20 107.20 107.20 107.20 107.20 72.04
G3LMINA6 80.20 80.20 80.20 80.20 80.20 53.91
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.24
G3BARAHC 40.80 40.80 40.80 40.80 40.80 27.42
G3CEPP2 30.80 30.80 30.80 30.80 30.80 20.73
G3PIMEN3 45.50 45.50 45.50 45.50 41.80 29.96
G3QUISQ2 193.20 193.20 193.20 193.20 67.40 109.70

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 190 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3METALD 28.40 28.40 28.40 28.40 5.60 15.43
G3PIMEN2 25.00 25.00 25.00 24.90 4.60 13.54
G3PIMEN1 27.90 27.90 27.90 26.30 4.50 14.75
G3SESTE 56.80 56.80 56.80 35.70 8.00 26.94
G3LVEGA 71.00 68.30 65.90 27.10 7.10 29.16
G3MRIO 87.50 80.80 54.30 20.50 3.60 28.17
G3QUISQ1 109.20 76.20 32.10 18.50 1.90 23.84
G3PALAMA 83.40 27.70 16.40 9.70 0.80 11.16
G3EM2CGN 87.80 18.70 12.90 4.10 0.40 8.29
G3IKM22 7.80 1.60 1.00 0.20 - 0.68
G3BERSAL 11.50 2.30 1.30 0.30 - 0.96
G3LOPPLA 17.40 3.30 1.60 0.50 - 1.36
G3CESPM1 19.40 4.60 1.80 0.60 - 1.68
G3CESPM2 9.20 2.00 0.80 0.30 - 0.76
G3CESPM3 20.00 4.60 1.70 0.60 - 1.69
G3RSJUAN 0.40 0.10 - - - 0.03
G3HAINAG 14.30 3.00 1.10 0.40 - 1.14
G3HAINA4 6.00 1.10 0.40 0.10 - 0.45
G3SPEDRV - - - - - -
G3SLORE1 - - - - - -
Marzo 2019
G3TAVER2 18.10 18.10 14.70 6.20 5.40 8.49
G3JIGUE1 10.80 9.60 7.10 3.30 3.30 4.50
G3JIGUE2 13.30 13.30 9.10 1.60 - 4.71
G3TAVER1 21.00 19.60 17.90 11.30 5.90 10.41
G3PALOM1 3.10 3.10 1.80 - - 0.96
G3PALOM2 2.60 2.60 0.90 - - 0.70
G3AGUAC1 10.80 10.80 10.70 3.70 0.10 4.84
G3AGUAC2 4.50 4.50 3.60 1.60 0.70 2.01
G3PINAL1 6.40 6.30 3.00 1.30 0.20 2.14
G3PINAL2 5.90 5.90 3.60 1.50 0.20 2.20
G3VALDE2 1.90 1.80 0.50 0.50 0.50 0.62
G3MONCI2 11.40 11.40 9.20 7.20 3.60 5.95
G3MONCI1 9.80 9.80 9.80 7.50 4.60 5.96
G3VALDE1 1.60 1.60 0.50 0.50 0.50 0.57
G3LCOCO2 3.70 3.70 3.70 3.70 3.70 2.78
G3RBLAN2 10.70 10.10 8.40 6.60 2.10 5.19
G3RBLAN1 8.50 8.50 6.80 4.80 2.80 4.33
G3LANGOS 6.00 6.00 6.00 5.70 5.40 4.30
G3RINCON 3.60 3.60 3.60 1.70 - 1.72
G3HATILL 6.90 6.90 6.90 6.90 6.40 5.03
G3LDAMAS 6.00 6.00 6.00 6.00 5.70 4.40
G3SYEGUA 2.80 2.80 2.80 2.80 2.80 2.10
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.30
G3JLOSCO 2.40 2.40 2.40 2.40 2.40 1.80
G3SABANE 3.00 3.00 3.00 2.00 0.10 1.54
G3LTORO2 2.70 2.70 2.70 2.70 2.40 1.93
G3LTORO1 2.10 2.10 2.10 2.10 2.00 1.54
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.23
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.16
G3QCABRE 0.40 0.40 0.30 0.20 0.20 0.23
G3DRODR2 0.10 0.10 0.10 0.10 0.10 0.10

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 191 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3DRODR1 0.20 0.20 0.20 0.20 0.20 0.12
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.65
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.53
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.17
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.17
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.07
G3BAIGU1 - - - - - 0.02
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 8.70 8.70 8.70 8.70 8.70 6.50
Centrales Trmicas
G3ITABO2 93.40 93.40 93.40 93.40 93.40 69.46
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.14
G3CATAL2 353.90 353.90 353.90 353.90 353.90 263.29
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.09
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.70
G3LMINA5 78.90 78.90 78.90 78.90 78.90 58.71
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.65
G3LMINA6 59.60 59.60 59.60 59.60 59.60 44.35
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.32
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.95
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 92.80 130.47
G3METALD 28.40 28.40 28.40 28.40 6.00 17.16
G3PIMEN2 25.00 25.00 25.00 25.00 4.90 15.07
G3PIMEN1 27.90 27.90 27.90 27.90 5.10 16.72
G3SESTE 57.50 57.50 57.50 54.50 8.80 33.61
G3LVEGA 83.20 83.20 83.20 44.30 9.60 41.89
G3MRIO 87.80 86.60 76.80 25.60 4.10 37.20
G3QUISQ1 109.90 98.10 48.90 21.00 2.00 33.75
G3PALAMA 95.10 55.50 22.30 12.70 1.00 19.23
G3EM2CGN 96.30 27.40 15.80 5.40 0.50 11.67
G3IKM22 9.40 2.10 1.30 0.30 - 0.95
G3BERSAL 14.00 3.00 1.70 0.40 - 1.34
G3LOPPLA 21.90 4.30 2.50 0.60 - 1.99
G3CESPM1 35.20 6.10 2.80 0.70 0.10 2.80
G3CESPM2 46.40 7.20 2.90 0.80 0.10 3.35
G3CESPM3 41.90 5.80 2.10 0.60 - 2.79
G3RSJUAN 0.80 0.10 - - - 0.05
G3HAINAG 30.60 3.90 1.30 0.40 - 1.93
G3HAINA4 13.00 1.50 0.50 0.10 - 0.78
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - -
Abril 2019
G3TAVER2 19.10 19.10 14.50 8.30 8.10 9.22
G3JIGUE1 12.90 12.90 11.60 6.30 3.80 6.36
G3JIGUE2 11.40 11.40 9.90 6.60 1.80 5.47

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 192 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3TAVER1 19.60 19.60 18.30 9.80 5.40 9.75
G3PALOM1 2.20 2.20 1.00 - - 0.62
G3PALOM2 3.00 3.00 2.50 0.30 - 1.08
G3AGUAC1 8.70 8.70 8.70 7.40 4.30 5.27
G3AGUAC2 5.60 5.60 4.00 2.30 1.70 2.51
G3PINAL1 5.50 5.30 3.10 2.50 0.90 2.21
G3PINAL2 6.70 6.60 3.70 2.40 0.40 2.47
G3VALDE2 1.20 1.20 - - - 0.24
G3MONCI2 9.00 9.00 8.20 6.20 5.10 5.18
G3MONCI1 11.50 11.50 11.50 8.50 3.60 6.41
G3VALDE1 1.40 1.40 0.50 0.50 0.50 0.52
G3LCOCO2 4.40 4.40 4.40 4.40 4.40 3.18
G3RBLAN2 7.80 7.80 7.80 6.70 3.10 4.59
G3RBLAN1 8.50 8.20 7.60 7.10 5.70 5.19
G3LANGOS 6.20 6.20 6.20 6.20 6.00 4.41
G3RINCON 4.20 4.20 4.20 2.80 0.80 2.18
G3HATILL 7.30 7.30 7.30 7.30 6.50 5.15
G3LDAMAS 5.80 5.80 5.80 5.80 5.40 4.11
G3SYEGUA 0.30 0.30 0.30 0.30 0.30 0.24
G3JIMENO 4.80 4.80 4.80 4.80 4.50 3.40
G3JLOSCO 1.80 1.80 1.80 1.80 1.80 1.30
G3SABANE 2.80 2.80 2.80 2.40 0.40 1.54
G3LTORO2 2.60 2.60 2.60 2.60 2.50 1.86
G3LTORO1 1.70 1.70 1.70 1.70 1.60 1.20
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.20 0.20 0.20 0.20 0.20 0.18
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.25
G3DRODR2 0.20 0.20 0.20 0.20 0.20 0.14
G3DRODR1 0.10 0.10 0.10 0.10 0.10 0.06
G3CEMON1 0.80 0.80 0.80 0.80 0.80 0.58
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.19
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 22.40 22.40 22.40 22.40 22.40 16.11
Centrales Trmicas
G3ITABO2 - - - - - -
G3CATAL1 353.30 353.30 353.30 353.30 353.30 254.37
G3CATAL2 353.70 353.70 353.70 353.70 353.70 254.63
G3AANDRE 244.00 244.00 244.00 244.00 244.00 175.68
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.08
G3LMINA5 79.30 79.30 79.30 79.30 79.30 57.06
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.12
G3LMINA6 77.70 77.70 77.70 77.70 77.70 55.92
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 193 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BARAHC 40.70 40.70 40.70 40.70 40.70 29.33
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 187.00 187.00 187.00 187.00 187.00 134.67
G3METALD 28.40 28.40 28.40 28.40 27.20 20.22
G3PIMEN2 25.00 25.00 25.00 25.00 22.10 17.53
G3PIMEN1 27.90 27.90 27.90 27.90 20.10 18.74
G3SESTE 63.80 63.80 63.80 63.80 29.00 39.93
G3LVEGA 71.80 71.80 71.80 71.40 20.70 42.83
G3MRIO 90.40 90.40 90.40 61.00 18.20 47.58
G3QUISQ1 109.70 108.80 85.70 34.00 15.80 45.43
G3PALAMA 95.10 83.70 33.90 18.80 6.60 27.48
G3EM2CGN 96.80 44.50 20.50 13.20 2.40 16.74
G3IKM22 9.40 3.20 1.80 1.00 0.20 1.33
G3BERSAL 14.00 4.40 2.50 1.20 0.20 1.83
G3LOPPLA 21.90 5.80 3.50 1.60 0.30 2.59
G3CESPM1 36.40 8.00 4.80 1.70 0.40 3.64
G3CESPM2 45.00 9.70 5.30 1.80 0.40 4.27
G3CESPM3 39.20 8.60 3.80 1.30 0.30 3.57
G3RSJUAN 0.70 0.20 0.10 - - 0.06
G3HAINAG 28.30 6.30 2.50 0.90 0.20 2.55
G3HAINA4 11.30 2.50 0.90 0.30 0.10 0.98
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - -

Mayo 2019
G3TAVER2 19.70 19.50 17.20 14.20 10.70 11.59
G3JIGUE1 11.30 11.30 9.50 5.00 4.50 5.75
G3JIGUE2 16.70 16.70 15.30 8.30 6.70 8.91
G3TAVER1 17.20 17.20 16.50 13.70 10.40 10.83
G3PALOM1 3.90 3.90 3.60 2.90 0.40 2.06
G3PALOM2 3.30 3.30 3.20 2.20 0.60 1.75
G3AGUAC1 6.80 6.80 6.70 4.10 2.50 3.81
G3AGUAC2 7.10 7.10 7.10 5.50 3.10 4.27
G3PINAL1 8.40 8.40 7.50 4.20 1.00 4.03
G3PINAL2 6.00 6.00 4.80 2.50 0.20 2.61
G3VALDE2 1.50 1.50 0.70 0.50 0.50 0.59
G3MONCI2 9.90 9.90 9.90 7.80 5.00 6.12
G3MONCI1 8.90 8.90 8.90 7.60 4.80 5.67
G3VALDE1 1.10 1.10 0.60 0.50 0.50 0.50
G3LCOCO2 4.80 4.80 4.80 4.80 4.80 3.56
G3RBLAN2 4.10 4.10 4.10 4.10 3.70 2.98
G3RBLAN1 6.00 6.00 6.00 6.00 5.40 4.36
G3LANGOS 5.00 5.00 5.00 5.00 4.40 3.61
G3RINCON 5.70 5.70 5.60 4.20 1.30 3.18
G3HATILL 6.60 6.60 6.60 6.60 6.40 4.88
G3LDAMAS 5.90 5.90 5.90 5.90 5.20 4.26
G3SYEGUA 0.20 0.20 0.20 0.20 0.20 0.18
G3JIMENO 5.90 5.90 5.90 5.90 5.50 4.34
G3JLOSCO 2.20 2.20 2.20 2.20 2.20 1.63
G3SABANE 3.20 3.20 3.20 2.70 1.20 1.95
G3LTORO2 2.70 2.70 2.70 2.70 2.50 1.96

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 194 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LTORO1 2.00 2.00 2.00 2.00 2.00 1.50
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.18
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.40 0.40 0.40 0.40 0.40 0.30
G3DRODR2 0.40 0.40 0.40 0.40 0.40 0.27
G3DRODR1 0.30 0.30 0.30 0.30 0.30 0.25
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.72
G3CEMON2 0.70 0.70 0.70 0.70 0.70 0.55
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.06
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.03
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.05
G3LARIM1 15.30 15.30 15.30 15.30 15.30 11.40
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.13
G3CATAL2 353.30 353.30 353.30 353.30 353.30 262.85
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.67
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.70
G3LMINA5 68.90 68.90 68.90 68.90 68.90 51.29
G3LMINAC 107.10 107.10 107.10 107.10 107.10 79.68
G3LMINA6 23.30 23.30 23.30 23.30 23.30 17.34
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.90
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.38
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 200.60 200.60 200.60 200.60 200.20 149.17
G3METALD 28.40 28.40 28.40 28.40 22.90 20.15
G3PIMEN2 25.00 25.00 25.00 25.00 17.00 17.20
G3PIMEN1 27.90 27.90 27.90 27.90 15.60 18.57
G3SESTE 63.70 63.70 63.70 63.70 23.50 40.28
G3LVEGA 76.00 76.00 76.00 71.00 19.30 45.61
G3MRIO 90.40 90.40 89.70 57.00 16.80 48.13
G3QUISQ1 109.80 109.80 91.50 33.70 13.60 47.77
G3PALAMA 87.20 80.80 34.40 17.00 4.60 27.09
G3EM2CGN 96.30 61.10 22.90 13.00 2.10 20.63
G3IKM22 9.40 3.90 1.90 1.00 0.20 1.52
G3BERSAL 14.00 5.60 2.80 1.20 0.20 2.18
G3LOPPLA 21.70 8.00 4.00 1.70 0.30 3.14
G3CESPM1 33.50 10.20 5.50 1.90 0.40 4.22
G3CESPM2 19.80 6.10 3.20 1.10 0.20 2.49
G3CESPM3 38.40 11.60 5.80 1.70 0.30 4.62
G3RSJUAN 0.70 0.20 0.10 - - 0.08
G3HAINAG 27.10 8.80 3.80 1.10 0.20 3.31
G3HAINA4 10.90 3.60 1.40 0.50 0.10 1.32
G3SPEDRV - - - - - -

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 195 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3SLORE1 0.10 - - - - 0.01
Junio 2019
G3TAVER2 18.00 18.00 17.00 14.50 12.90 11.31
G3JIGUE1 12.00 12.00 10.70 6.30 5.30 6.29
G3JIGUE2 18.00 18.00 16.20 14.40 5.90 9.94
G3TAVER1 19.30 19.10 16.50 15.60 13.30 11.71
G3PALOM1 4.50 4.50 4.50 4.50 1.70 2.76
G3PALOM2 4.20 4.20 4.20 1.30 - 1.81
G3AGUAC1 7.80 7.80 7.20 5.10 4.20 4.42
G3AGUAC2 7.80 7.80 7.80 6.20 2.40 4.40
G3PINAL1 9.30 9.30 7.90 4.60 - 4.03
G3PINAL2 4.70 4.70 4.40 2.60 0.10 2.18
G3VALDE2 1.20 1.20 0.60 0.40 0.50 0.50
G3MONCI2 9.60 9.60 9.30 7.40 5.50 5.80
G3MONCI1 9.40 9.40 9.00 7.50 4.80 5.57
G3VALDE1 1.00 1.00 0.70 0.50 0.50 0.51
G3LCOCO2 6.70 6.70 6.70 6.70 6.70 4.80
G3RBLAN2 6.30 6.30 6.30 6.10 5.40 4.34
G3RBLAN1 5.50 5.50 5.50 5.50 4.60 3.78
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.66
G3RINCON 5.50 5.50 5.50 3.20 0.10 2.66
G3HATILL 7.10 7.10 7.10 7.10 7.00 5.07
G3LDAMAS 5.50 5.50 5.50 5.50 4.90 3.87
G3SYEGUA 1.50 1.50 1.50 1.50 1.40 1.04
G3JIMENO 5.20 5.20 5.20 5.20 4.60 3.65
G3JLOSCO 4.10 4.10 4.10 4.10 4.10 2.97
G3SABANE 4.00 4.00 4.00 4.00 2.90 2.73
G3LTORO2 2.80 2.80 2.80 2.80 2.70 2.00
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.38
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.30
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.42
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.48
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.49
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.69
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 0.10 0.10 0.10 0.10 0.10 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.02
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.07
G3LARIM1 33.30 33.30 33.30 33.30 33.30 23.99
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.20
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.06
G3CATAL2 354.60 354.60 354.60 354.60 354.60 255.33
G3AANDRE 245.20 245.20 245.20 245.20 245.20 176.55

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 196 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO1 108.40 108.40 108.40 108.40 108.40 78.05
G3LMINA5 52.70 52.70 52.70 52.70 52.70 37.96
G3LMINAC 107.10 107.10 107.10 107.10 107.10 77.12
G3LMINA6 80.30 80.30 80.30 80.30 80.30 57.82
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.90 40.90 40.90 40.90 40.90 29.43
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.22
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.80 193.80 193.80 193.80 188.60 138.62
G3METALD 28.40 28.40 28.40 28.40 19.20 18.86
G3PIMEN2 25.00 25.00 25.00 25.00 12.80 15.92
G3PIMEN1 27.90 27.90 27.90 27.90 11.40 17.24
G3SESTE 57.20 57.20 57.20 57.00 18.50 34.47
G3LVEGA 71.80 71.80 71.80 67.80 16.00 41.41
G3MRIO 90.40 90.40 88.30 63.50 15.50 47.21
G3QUISQ1 109.50 109.50 97.40 36.00 11.90 47.33
G3PALAMA 95.10 90.20 43.80 18.80 3.90 29.95
G3EM2CGN 96.70 70.70 23.90 13.00 1.80 21.80
G3IKM22 9.40 4.70 1.90 1.00 0.10 1.62
G3BERSAL 14.10 6.00 2.70 1.20 0.20 2.17
G3LOPPLA 21.80 8.80 3.90 1.60 0.20 3.17
G3CESPM1 35.00 11.40 5.40 1.90 0.30 4.33
G3CESPM2 11.00 3.70 1.70 0.60 0.10 1.38
G3CESPM3 47.10 13.20 6.30 2.00 0.30 5.17
G3RSJUAN 0.80 0.20 0.10 - - 0.10
G3HAINAG 35.90 9.90 4.40 1.30 0.20 3.81
G3HAINA4 14.50 4.20 1.60 0.50 0.10 1.54
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Julio 2019
G3TAVER2 25.80 25.80 18.50 5.60 2.10 10.09
G3JIGUE1 5.30 5.30 4.10 4.00 0.50 2.63
G3JIGUE2 15.30 15.20 12.40 10.50 8.20 8.74
G3TAVER1 11.10 11.10 10.10 7.90 7.30 6.84
G3PALOM1 3.80 3.80 3.80 3.60 0.60 2.22
G3PALOM2 4.70 4.50 2.00 0.10 - 1.33
G3AGUAC1 7.20 7.20 6.10 5.50 3.60 4.22
G3AGUAC2 6.80 6.80 4.50 3.30 2.50 3.25
G3PINAL1 6.00 6.00 5.90 3.90 0.40 3.07
G3PINAL2 7.80 7.80 6.30 3.20 0.10 3.33
G3VALDE2 1.00 1.00 1.00 1.00 0.90 0.74
G3MONCI2 8.70 8.70 8.70 7.90 6.30 5.90
G3MONCI1 10.60 10.60 10.60 10.00 6.90 7.13
G3VALDE1 0.60 0.60 0.50 0.50 0.50 0.38
G3LCOCO2 5.80 5.80 5.80 5.80 5.80 4.31
G3RBLAN2 2.10 2.10 2.10 2.10 1.80 1.49
G3RBLAN1 6.30 5.90 5.60 5.60 5.10 4.17
G3LANGOS 5.40 5.40 5.40 5.40 5.40 4.02
G3RINCON 4.50 4.50 4.50 1.60 - 2.04
G3HATILL 6.20 6.20 6.20 6.20 6.20 4.60
G3LDAMAS 4.80 4.80 4.80 4.80 4.10 3.42
G3SYEGUA 3.70 3.70 3.70 3.70 3.70 2.74

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 197 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3JIMENO 4.60 4.60 4.60 4.60 3.80 3.28
G3JLOSCO 3.40 3.40 3.40 3.40 3.40 2.54
G3SABANE 4.30 4.30 4.30 4.30 3.30 3.01
G3LTORO2 3.10 3.10 3.10 3.10 3.00 2.32
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.47
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.22
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.50 0.50 0.50 0.50 0.50 0.39
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.58
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.57
G3CEMON1 0.90 0.90 0.90 0.90 0.90 0.70
G3CEMON2 1.00 1.00 1.00 1.00 1.00 0.78
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - -
G3LANONE - - - - - -
G3BDEREC - - - - - 0.02
G3LARIM1 30.90 30.90 30.90 30.90 30.90 23.01
Centrales Trmicas
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.50 353.50 353.50 353.50 353.50 263.00
G3CATAL2 352.80 352.80 352.80 352.80 352.80 262.50
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.68
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.65
G3LMINA5 20.40 20.40 20.40 20.40 20.40 15.20
G3LMINAC 106.90 106.90 106.90 106.90 106.90 79.54
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.64
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.70 40.70 40.70 40.70 40.70 30.28
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 201.10 149.62
G3METALD 28.40 28.40 28.40 28.40 28.40 21.12
G3PIMEN2 25.00 25.00 25.00 25.00 24.80 18.60
G3PIMEN1 27.90 27.90 27.90 27.90 24.10 20.08
G3SESTE 63.60 63.60 63.60 63.60 34.90 42.24
G3LVEGA 83.20 83.20 83.20 83.20 27.90 52.08
G3MRIO 90.40 90.40 90.40 85.50 19.10 53.76
G3QUISQ1 109.80 109.80 107.30 77.10 16.90 58.95
G3PALAMA 95.10 93.60 86.60 31.10 7.60 42.02
G3EM2CGN 96.30 89.30 50.70 19.00 2.90 31.86
G3IKM22 9.40 7.30 3.60 1.60 0.20 2.56
G3BERSAL 14.10 10.30 5.10 2.20 0.30 3.64
G3LOPPLA 21.90 15.60 6.90 3.20 0.40 5.31
G3CESPM1 37.00 18.70 8.70 4.80 0.40 6.95
G3CESPM2 50.60 20.90 10.50 4.80 0.50 8.08
G3CESPM3 53.70 17.40 9.30 3.60 0.30 7.11

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 198 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RSJUAN 1.00 0.30 0.20 0.10 - 0.13
G3HAINAG 46.30 13.00 7.20 2.30 0.20 5.44
G3HAINA4 21.20 5.40 2.90 0.90 0.10 2.29
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Agosto 2019
G3TAVER2 18.00 18.00 16.40 9.20 5.90 9.40
G3JIGUE1 9.50 9.40 8.30 7.50 5.60 5.78
G3JIGUE2 21.80 21.80 19.40 17.10 11.90 13.19
G3TAVER1 17.30 16.60 14.40 13.20 7.80 9.80
G3PALOM1 4.20 4.20 3.70 1.30 - 1.76
G3PALOM2 4.80 4.80 3.20 - - 1.58
G3AGUAC1 10.60 10.60 9.70 6.10 2.20 5.43
G3AGUAC2 4.80 4.80 4.00 2.90 1.20 2.46
G3PINAL1 7.80 7.80 7.60 5.20 0.70 4.05
G3PINAL2 7.50 7.50 6.90 2.40 0.10 3.26
G3VALDE2 0.80 0.80 0.60 0.60 0.60 0.47
G3MONCI2 9.20 9.20 9.20 8.30 6.50 6.21
G3MONCI1 9.70 9.70 9.70 8.20 5.60 6.24
G3VALDE1 0.70 0.70 0.60 0.60 0.60 0.46
G3LCOCO2 3.20 3.20 3.20 3.20 3.20 2.41
G3RBLAN2 9.60 9.60 9.00 6.50 2.60 5.25
G3RBLAN1 5.80 5.80 5.80 5.80 4.40 4.06
G3LANGOS 5.10 5.10 5.10 5.10 5.10 3.81
G3RINCON 4.10 4.10 4.10 1.00 - 1.77
G3HATILL 5.40 5.40 5.40 5.40 5.30 4.00
G3LDAMAS 4.60 4.60 4.60 4.60 4.30 3.38
G3SYEGUA 3.00 3.00 3.00 3.00 2.90 2.21
G3JIMENO 3.90 3.90 3.90 3.90 3.30 2.78
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.47
G3SABANE 4.20 4.20 4.20 4.20 3.30 2.96
G3LTORO2 2.90 2.90 2.90 2.90 2.70 2.13
G3LTORO1 1.90 1.90 1.90 1.90 1.70 1.40
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.13
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.33
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.26
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.55
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.71
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.21
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.12
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.04
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - -
G3LARIM1 28.90 28.90 28.90 28.90 28.90 21.49
Centrales Trmicas

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 199 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3ITABO2 111.30 111.30 111.30 111.30 111.30 82.80
G3CATAL1 353.60 353.60 353.60 353.60 353.60 263.08
G3CATAL2 352.80 352.80 352.80 352.80 352.80 262.46
G3AANDRE 244.70 244.70 244.70 244.70 244.70 182.02
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.76
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.92
G3LMINAC 106.90 106.90 106.90 106.90 106.90 79.55
G3LMINA6 80.20 80.20 80.20 80.20 80.20 59.69
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.37
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.00 201.00 201.00 201.00 200.50 149.44
G3METALD 28.40 28.40 28.40 28.40 24.70 20.46
G3PIMEN2 25.00 25.00 25.00 25.00 17.60 17.32
G3PIMEN1 27.90 27.90 27.90 27.90 17.70 18.95
G3SESTE 63.70 63.70 63.70 63.70 26.40 40.78
G3LVEGA 76.00 76.00 76.00 76.00 21.10 46.82
G3MRIO 87.80 87.80 87.80 71.00 17.20 49.80
G3QUISQ1 109.90 109.90 105.80 46.60 14.60 52.85
G3PALAMA 87.10 87.10 55.30 20.80 5.50 32.78
G3EM2CGN 96.40 86.80 31.90 16.10 2.50 27.48
G3IKM22 9.40 6.80 2.40 1.30 0.20 2.19
G3BERSAL 14.10 9.00 3.40 1.70 0.20 2.99
G3LOPPLA 21.80 11.90 4.90 2.30 0.30 4.14
G3CESPM1 36.90 15.30 6.80 2.80 0.40 5.63
G3CESPM2 50.90 17.40 8.10 2.90 0.40 6.67
G3CESPM3 40.60 12.00 5.80 1.80 0.20 4.77
G3RSJUAN 1.00 0.30 0.10 - - 0.11
G3HAINAG 43.50 11.60 5.10 1.50 0.20 4.59
G3HAINA4 19.00 4.90 2.00 0.50 0.10 1.90
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Septiembre 2019
G3TAVER2 17.40 17.40 15.40 6.30 3.30 7.83
G3JIGUE1 12.90 12.90 11.50 9.70 5.00 7.12
G3JIGUE2 19.80 19.60 15.60 12.60 7.70 10.19
G3TAVER1 18.50 18.50 16.50 14.60 11.00 11.02
G3PALOM1 6.80 6.80 6.50 5.60 0.10 3.47
G3PALOM2 5.40 5.30 4.00 3.70 1.90 2.74
G3AGUAC1 10.00 10.00 9.40 5.90 3.10 5.21
G3AGUAC2 5.90 5.90 5.80 2.50 0.80 2.77
G3PINAL1 10.60 10.60 8.90 2.50 - 4.13
G3PINAL2 6.70 6.70 6.40 2.60 0.10 2.94
G3VALDE2 0.70 0.60 0.40 0.40 0.40 0.33
G3MONCI2 9.70 9.70 9.50 8.50 5.30 5.99
G3MONCI1 9.20 9.20 8.60 7.30 6.10 5.69
G3VALDE1 0.50 0.50 0.40 0.40 0.40 0.31
G3LCOCO2 2.60 2.60 2.60 2.60 2.60 1.84
G3RBLAN2 10.80 10.80 10.30 7.80 3.70 5.95
G3RBLAN1 9.30 9.30 9.30 9.20 7.60 6.38
G3LANGOS 4.80 4.80 4.80 4.80 4.80 3.42

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 200 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3RINCON 3.70 3.70 3.60 0.60 - 1.47
G3HATILL 6.80 6.60 6.10 6.10 6.00 4.48
G3LDAMAS 4.90 4.90 4.90 4.90 4.50 3.46
G3SYEGUA 2.80 2.80 2.80 2.80 2.70 1.97
G3JIMENO 5.10 4.50 4.50 4.50 4.10 3.20
G3JLOSCO 1.00 1.00 1.00 1.00 1.00 0.76
G3SABANE 4.80 4.80 4.80 4.80 3.80 3.28
G3LTORO2 3.10 3.10 3.10 3.10 2.90 2.21
G3LTORO1 1.60 1.60 1.60 1.60 1.50 1.14
G3MAGUE2 0.30 0.30 0.30 0.30 0.30 0.24
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.35
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.54
G3DRODR1 0.70 0.70 0.70 0.70 0.70 0.54
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.73
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.61
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.02
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC - - - - - 0.03
G3LARIM1 8.90 8.90 8.90 8.90 8.90 6.40
Centrales Trmicas
G3ITABO2 111.40 111.40 111.40 111.40 111.40 80.20
G3CATAL1 352.90 352.90 352.90 352.90 352.90 254.06
G3CATAL2 353.80 353.80 353.80 353.80 353.80 254.77
G3AANDRE 244.40 244.40 244.40 244.40 244.40 176.00
G3ITABO1 108.70 108.70 108.70 108.70 108.70 78.29
G3LMINA5 78.90 78.90 78.90 78.90 78.90 56.78
G3LMINAC 107.40 107.40 107.40 107.40 107.40 77.31
G3LMINA6 80.20 80.20 80.20 80.20 80.20 57.72
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 40.80 40.80 40.80 40.80 40.80 29.37
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.22
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.90 193.90 193.90 193.90 193.50 139.54
G3METALD 28.40 28.40 28.40 28.40 21.50 19.26
G3PIMEN2 25.00 25.00 25.00 25.00 15.10 16.33
G3PIMEN1 27.90 27.90 27.90 27.90 13.80 17.66
G3SESTE 63.70 63.70 63.70 63.70 23.40 38.95
G3LVEGA 83.20 83.20 83.20 83.20 19.90 48.98
G3MRIO 87.70 87.70 87.70 82.40 15.50 49.84
G3QUISQ1 118.40 118.40 115.50 57.30 13.30 56.16
G3PALAMA 95.00 94.00 73.20 23.40 4.00 36.49
G3EM2CGN 96.60 81.50 36.40 16.30 1.80 26.38
G3IKM22 9.40 5.90 2.60 1.30 0.10 2.00
G3BERSAL 14.00 7.50 3.60 1.90 0.20 2.68

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 201 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LOPPLA 21.90 10.30 5.30 2.90 0.20 3.87
G3CESPM1 37.20 13.70 7.50 3.10 0.30 5.34
G3CESPM2 49.60 15.80 9.10 3.10 0.30 6.37
G3CESPM3 47.30 13.20 7.50 2.30 0.20 5.43
G3RSJUAN 0.90 0.20 0.10 - - 0.10
G3HAINAG 36.70 10.00 5.40 1.50 0.10 4.06
G3HAINA4 15.50 4.10 2.10 0.60 - 1.65
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Octubre 2019
G3TAVER2 19.90 19.90 17.60 8.40 3.30 9.41
G3JIGUE1 12.50 12.50 10.00 8.40 7.50 7.24
G3JIGUE2 20.10 20.10 16.40 7.70 5.10 9.43
G3TAVER1 18.40 18.40 17.10 14.30 13.80 11.91
G3PALOM1 6.20 6.20 5.70 4.80 0.70 3.30
G3PALOM2 6.10 6.10 5.60 3.50 0.80 3.06
G3AGUAC1 7.70 7.70 6.80 2.80 2.20 3.70
G3AGUAC2 9.80 9.80 8.70 5.60 3.50 5.23
G3PINAL1 8.30 8.30 7.80 4.10 0.20 3.88
G3PINAL2 9.50 9.50 7.30 3.60 0.30 3.98
G3VALDE2 0.10 0.10 0.10 0.10 - 0.08
G3MONCI2 8.40 8.40 8.40 7.20 6.60 5.72
G3MONCI1 10.90 10.90 10.90 8.80 6.00 6.86
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36
G3LCOCO2 2.70 2.70 2.70 2.70 2.70 2.01
G3RBLAN2 8.10 8.10 7.70 7.30 5.50 5.34
G3RBLAN1 8.50 8.50 8.50 7.10 5.80 5.57
G3LANGOS 5.40 4.90 4.80 4.80 4.70 3.59
G3RINCON 3.40 3.40 3.20 0.60 - 1.39
G3HATILL 7.30 7.30 7.30 7.30 7.10 5.37
G3LDAMAS 5.10 5.10 5.10 5.10 4.60 3.71
G3SYEGUA 0.60 0.60 0.60 0.50 0.50 0.40
G3JIMENO 5.30 5.30 5.30 5.30 4.30 3.76
G3JLOSCO 1.40 1.40 1.40 1.40 1.40 1.02
G3SABANE 4.60 4.60 4.60 4.60 4.10 3.34
G3LTORO2 3.10 3.10 3.10 3.10 3.10 2.33
G3LTORO1 1.90 1.90 1.90 1.90 1.90 1.43
G3MAGUE2 0.60 0.60 0.60 0.60 0.60 0.46
G3MAGUE1 0.50 0.50 0.50 0.50 0.50 0.38
G3QCABRE 0.20 0.20 0.20 0.20 0.20 0.15
G3DRODR2 0.60 0.60 0.60 0.60 0.60 0.48
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.42
G3CEMON1 1.00 1.00 1.00 1.00 1.00 0.75
G3CEMON2 0.90 0.90 0.90 0.90 0.90 0.70
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.19
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.20 0.20 0.20 0.20 0.20 0.11
G3BAIGU1 - - - - - 0.03
G3BAIGU2 - - - - - 0.03
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.01
G3NNAJAY - - - - - 0.01

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 202 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 8.30 8.30 8.30 8.30 8.30 6.20
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 82.67
G3CATAL1 353.70 353.70 353.70 353.70 353.70 263.16
G3CATAL2 352.70 352.70 352.70 352.70 352.70 262.38
G3AANDRE 244.20 244.20 244.20 244.20 244.20 181.71
G3ITABO1 108.40 108.40 108.40 108.40 108.40 80.67
G3LMINA5 79.20 79.20 79.20 79.20 79.20 58.91
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.78
G3LMINA6 80.30 80.30 80.30 80.30 80.30 59.75
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 40.80 40.80 40.80 40.80 40.80 30.35
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.94
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 194.20 194.20 194.20 194.20 191.00 143.90
G3METALD 28.40 28.40 28.40 28.40 20.00 19.64
G3PIMEN2 25.00 25.00 25.00 25.00 15.40 16.92
G3PIMEN1 27.90 27.90 27.90 27.90 13.90 18.27
G3SESTE 63.70 63.70 63.70 63.70 22.50 40.11
G3LVEGA 83.20 83.20 83.20 83.20 20.00 50.69
G3MRIO 87.80 87.80 87.80 81.80 15.30 51.41
G3QUISQ1 109.90 109.90 109.90 60.60 12.10 55.64
G3PALAMA 87.10 87.10 78.00 25.00 4.00 37.36
G3EM2CGN 96.60 91.30 46.30 18.20 1.90 31.12
G3IKM22 9.40 7.80 3.50 1.50 0.10 2.61
G3BERSAL 14.00 10.90 4.70 2.10 0.20 3.61
G3LOPPLA 21.90 15.50 6.00 3.00 0.30 5.10
G3CESPM1 2.40 1.60 0.60 0.30 - 0.52
G3CESPM2 51.50 24.30 11.80 5.20 0.40 9.01
G3CESPM3 53.30 19.90 10.30 3.80 0.30 7.76
G3RSJUAN 1.00 0.40 0.20 0.10 - 0.14
G3HAINAG 41.90 14.50 7.90 2.40 0.20 5.72
G3HAINA4 18.60 6.00 3.20 0.90 0.10 2.39
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01
Noviembre 2019
G3TAVER2 20.50 20.50 16.80 5.10 1.90 8.28
G3JIGUE1 12.50 12.50 9.80 7.60 7.60 6.85
G3JIGUE2 20.20 20.20 18.00 11.50 10.20 10.94
G3TAVER1 16.10 16.10 15.40 12.30 8.90 9.57
G3PALOM1 3.80 3.80 3.50 2.10 1.10 1.92
G3PALOM2 5.10 4.80 4.10 2.80 1.40 2.41
G3AGUAC1 7.80 7.80 7.30 3.10 1.40 3.63
G3AGUAC2 8.60 8.60 7.90 4.10 3.30 4.40
G3PINAL1 9.20 9.20 7.10 2.60 - 3.56
G3PINAL2 6.10 6.10 5.60 2.70 0.80 2.81
G3VALDE2 0.50 0.50 0.50 0.50 0.50 0.32
G3MONCI2 9.90 9.90 9.90 8.40 6.20 6.22
G3MONCI1 8.70 8.70 8.70 7.50 5.20 5.46
G3VALDE1 0.50 0.50 0.50 0.50 0.50 0.36

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 203 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3LCOCO2 4.30 4.30 4.30 4.30 4.30 3.06
G3RBLAN2 3.90 3.90 3.90 3.90 3.30 2.69
G3RBLAN1 5.90 5.90 5.90 5.80 4.50 3.98
G3LANGOS 4.20 4.20 4.20 4.20 4.20 3.06
G3RINCON 4.00 4.00 3.90 1.50 0.60 1.84
G3HATILL 6.30 5.80 5.60 5.60 5.20 4.03
G3LDAMAS 5.80 5.80 5.80 5.80 5.10 4.03
G3SYEGUA 0.50 0.50 0.50 0.50 0.40 0.35
G3JIMENO 4.60 4.60 4.60 4.60 3.90 3.21
G3JLOSCO 2.00 2.00 2.00 2.00 2.00 1.40
G3SABANE 4.50 4.50 4.50 4.50 3.70 3.11
G3LTORO2 2.50 2.50 2.50 2.50 2.40 1.77
G3LTORO1 2.00 2.00 2.00 2.00 1.80 1.40
G3MAGUE2 0.40 0.40 0.40 0.40 0.40 0.30
G3MAGUE1 0.40 0.40 0.40 0.40 0.40 0.32
G3QCABRE 0.30 0.30 0.30 0.30 0.30 0.24
G3DRODR2 0.70 0.70 0.70 0.70 0.70 0.49
G3DRODR1 0.60 0.60 0.60 0.60 0.60 0.44
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.78
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.58
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.18
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.22
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.08
G3BAIGU1 - - - - - 0.04
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.05
G3AVARG1 - - - - - -
G3AVARG2 - - - - - 0.03
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10
G3LARIM1 3.90 3.90 3.90 3.90 3.90 2.80
Centrales Trmicas
G3ITABO2 111.50 111.50 111.50 111.50 111.50 80.26
G3CATAL1 352.60 352.60 352.60 352.60 352.60 253.90
G3CATAL2 353.00 353.00 353.00 353.00 353.00 254.16
G3AANDRE 244.90 244.90 244.90 244.90 244.90 176.35
G3ITABO1 108.50 108.50 108.50 108.50 108.50 78.09
G3LMINA5 79.00 79.00 79.00 79.00 79.00 56.85
G3LMINAC 107.20 107.20 107.20 107.20 107.20 77.17
G3LMINA6 80.40 80.40 80.40 80.40 80.40 57.85
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.68
G3BARAHC 17.70 17.70 17.70 17.70 17.70 12.74
G3CEPP2 30.80 30.80 30.80 30.80 30.80 22.21
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 32.73
G3QUISQ2 193.70 193.70 193.70 193.70 175.60 136.34
G3METALD 28.40 28.40 28.40 28.40 14.30 18.02
G3PIMEN2 25.00 25.00 25.00 25.00 10.50 15.53
G3PIMEN1 27.90 27.90 27.90 27.90 10.00 17.00
G3SESTE 57.20 57.20 57.20 57.20 15.60 34.04
G3LVEGA 83.20 83.20 83.20 81.70 17.00 48.24
G3MRIO 87.70 87.70 87.70 74.50 13.20 48.07
G3QUISQ1 118.40 118.40 109.20 49.30 9.40 53.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 204 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3PALAMA 95.10 91.90 51.50 21.50 2.70 31.82
G3EM2CGN 96.70 68.40 27.40 15.10 1.40 22.31
G3IKM22 9.40 4.60 2.10 1.20 0.10 1.67
G3BERSAL 14.00 6.30 3.00 1.80 0.10 2.36
G3LOPPLA 21.90 8.80 4.40 2.30 0.20 3.36
G3CESPM1 35.20 11.20 6.10 2.50 0.20 4.51
G3CESPM2 43.60 13.30 7.20 2.60 0.20 5.34
G3CESPM3 37.90 11.60 6.00 1.90 0.10 4.53
G3RSJUAN 0.70 0.20 0.10 - - 0.08
G3HAINAG 27.90 8.70 4.00 1.30 0.10 3.27
G3HAINA4 11.40 3.60 1.50 0.50 - 1.31
G3SPEDRV - - - - - -
G3SLORE1 - - - - - 0.01
Diciembre 2019
G3TAVER2 20.30 20.30 14.30 4.00 - 7.50
G3JIGUE1 13.40 11.00 4.30 - - 3.14
G3JIGUE2 14.80 11.30 3.90 - - 3.18
G3TAVER1 16.80 15.60 7.10 2.70 - 5.04
G3PALOM1 3.20 3.20 2.00 1.70 1.10 1.50
G3PALOM2 4.60 4.60 3.60 1.10 - 1.79
G3AGUAC1 8.90 6.30 5.20 0.60 - 2.44
G3AGUAC2 8.30 6.00 4.10 0.60 - 2.17
G3PINAL1 6.60 6.30 3.70 1.20 - 2.21
G3PINAL2 7.40 7.40 6.60 1.90 0.40 3.14
G3VALDE2 0.60 0.60 0.60 0.60 0.50 0.43
G3MONCI2 9.70 8.70 7.20 5.90 3.30 4.78
G3MONCI1 9.20 9.20 8.30 7.20 3.50 5.34
G3VALDE1 0.70 0.70 0.70 0.70 0.60 0.49
G3LCOCO2 1.30 1.30 1.30 1.30 1.30 0.97
G3RBLAN2 6.20 6.20 6.10 5.50 4.80 4.23
G3RBLAN1 5.80 5.80 5.80 5.80 5.50 4.24
G3LANGOS 4.10 4.10 4.10 4.00 3.10 2.83
G3RINCON 4.70 4.70 4.50 1.30 0.30 2.05
G3HATILL 6.90 6.90 6.90 6.60 6.10 4.92
G3LDAMAS 6.00 6.00 6.00 6.00 5.80 4.43
G3SYEGUA 1.50 1.50 1.50 1.50 1.50 1.13
G3JIMENO 4.90 4.90 4.90 4.90 4.10 3.49
G3JLOSCO 3.80 3.80 3.80 3.80 3.80 2.84
G3SABANE 4.60 4.60 4.60 4.60 3.60 3.23
G3LTORO2 3.00 3.00 3.00 3.00 2.90 2.22
G3LTORO1 2.30 2.30 2.30 2.30 2.20 1.72
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.17
G3MAGUE1 0.30 0.30 0.30 0.30 0.30 0.24
G3QCABRE 0.60 0.60 0.60 0.60 0.60 0.45
G3DRODR2 0.80 0.80 0.80 0.80 0.80 0.59
G3DRODR1 0.80 0.80 0.80 0.80 0.80 0.59
G3CEMON1 1.10 1.10 1.10 1.10 1.10 0.80
G3CEMON2 0.80 0.80 0.80 0.80 0.80 0.57
G3LBARIA 0.30 0.30 0.30 0.30 0.30 0.20
G3ESALTO 0.30 0.30 0.30 0.30 0.30 0.23
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10
G3BAIGU1 - - - - - 0.03

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 205 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

RESULTADOS DESPACHO POR BLOQUE (MW)


bloq1 bloq2 bloq3 bloq4 bloq5 Energa
(MW) (MW) (MW) (MW) (MW) (GWh)
G3BAIGU2 0.10 0.10 0.10 0.10 0.10 0.06
G3AVARG1 - - - - - 0.01
G3AVARG2 - - - - - 0.02
G3NNAJAY - - - - - 0.01
G3LANONE - - - - - -
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.11
G3LARIM1 15.60 15.60 15.60 15.60 15.60 11.60
Centrales Trmicas
G3ITABO2 111.10 111.10 111.10 111.10 111.10 82.62
G3CATAL1 353.30 353.30 353.30 353.30 353.30 262.83
G3CATAL2 353.40 353.40 353.40 353.40 353.40 262.92
G3AANDRE 244.50 244.50 244.50 244.50 244.50 181.92
G3ITABO1 108.50 108.50 108.50 108.50 108.50 80.75
G3LMINA5 79.00 79.00 79.00 79.00 79.00 58.80
G3LMINAC 107.20 107.20 107.20 107.20 107.20 79.73
G3LMINA6 80.40 80.40 80.40 80.40 80.40 59.81
G3CEPP1 9.30 9.30 9.30 9.30 9.30 6.91
G3BARAHC 4.00 4.00 4.00 4.00 4.00 2.94
G3CEPP2 30.90 30.90 30.90 30.90 30.90 22.96
G3PIMEN3 45.50 45.50 45.50 45.50 45.50 33.82
G3QUISQ2 201.10 201.10 201.10 201.10 136.10 138.13
G3METALD 28.40 28.40 28.40 28.40 7.70 17.46
G3PIMEN2 25.00 25.00 25.00 25.00 5.70 15.20
G3PIMEN1 27.90 27.90 27.90 27.90 6.10 16.90
G3SESTE 63.70 63.70 63.70 63.70 12.40 38.34
G3LVEGA 83.20 83.20 83.20 68.10 12.00 46.58
G3MRIO 90.40 90.40 87.70 36.50 7.40 42.46
G3QUISQ1 118.40 117.50 79.00 27.00 3.70 44.20
G3PALAMA 95.10 81.10 30.50 14.70 1.40 25.71
G3EM2CGN 96.30 49.30 19.00 8.20 0.70 16.70
G3IKM22 9.40 3.50 1.50 0.50 - 1.29
G3BERSAL 14.10 5.10 2.20 0.70 - 1.85
G3LOPPLA 21.90 6.80 3.10 0.90 0.10 2.61
G3CESPM1 24.30 5.90 2.90 0.70 - 2.44
G3CESPM2 40.10 8.90 4.10 1.00 0.10 3.72
G3CESPM3 54.50 9.90 3.80 1.00 - 4.27
G3RSJUAN 1.00 0.20 0.10 - - 0.08
G3HAINAG 46.20 7.50 2.60 0.60 - 3.30
G3HAINA4 20.90 3.10 0.90 0.20 - 1.39
G3SPEDRV - - - - - -
G3SLORE1 0.10 - - - - 0.01

Resumen de Produccin Esperada

Resume de la produccin esperada, por centrales de generacin para el periodo de estudio.


Escenario de demanda (abastecida).

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 206 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 28. Produccin esperada por centrales de generacin [GWh], ao 2016.


TOTAL
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3LARIM1 15.7 6.5 16.1 11.4 24.0 23.0 21.5 6.4 6.2 2.8 11.6 145.2
G3TAVER1 7.8 10.4 10.4 9.7 10.8 11.7 6.8 9.8 11.0 11.9 9.6 5.0 114.9
G3TAVER2 9.9 7.4 8.5 9.2 11.6 11.3 10.1 9.4 7.8 9.4 8.3 7.5 110.4
G3JIGUE2 5.9 5.3 4.7 5.5 8.9 9.9 8.7 13.2 10.2 9.4 10.9 3.2 95.8
G3MONCI1 6.3 5.2 6.0 6.4 5.7 5.6 7.1 6.2 5.7 6.9 5.5 5.3 71.9
G3MONCI2 6.2 5.5 5.9 5.2 6.1 5.8 5.9 6.2 6.0 5.7 6.2 4.8 69.5
G3JIGUE1 5.5 7.7 4.5 6.4 5.7 6.3 2.6 5.8 7.1 7.2 6.9 3.1 68.8
G3HATILL 4.2 3.6 5.0 5.2 4.9 5.1 4.6 4.0 4.5 5.4 4.0 4.9 55.4
G3RBLAN1 4.9 3.1 4.3 5.2 4.4 3.8 4.2 4.1 6.4 5.6 4.0 4.2 54.2
G3AGUAC1 4.7 4.1 4.8 5.3 3.8 4.4 4.2 5.4 5.2 3.7 3.6 2.4 51.6
G3RBLAN2 1.8 5.5 5.2 4.6 3.0 4.3 1.5 5.3 6.0 5.3 2.7 4.2 49.4
G3LDAMAS 4.4 4.0 4.4 4.1 4.3 3.9 3.4 3.4 3.5 3.7 4.0 4.4 47.5
G3LANGOS 3.9 3.7 4.3 4.4 3.6 3.7 4.0 3.8 3.4 3.6 3.1 2.8 44.3
G3JIMENO 2.7 2.6 3.3 3.4 4.3 3.6 3.3 2.8 3.2 3.8 3.2 3.5 39.7
G3AGUAC2 2.8 2.4 2.0 2.5 4.3 4.4 3.3 2.5 2.8 5.2 4.4 2.2 38.8
G3PINAL1 2.9 1.7 2.1 2.2 4.0 4.0 3.1 4.1 4.1 3.9 3.6 2.2 37.9
G3LCOCO2 2.7 1.8 2.8 3.2 3.6 4.8 4.3 2.4 1.8 2.0 3.1 1.0 33.5
G3PINAL2 1.4 1.8 2.2 2.5 2.6 2.2 3.3 3.3 2.9 4.0 2.8 3.1 32.1
G3SABANE 2.7 1.6 1.5 1.5 1.9 2.7 3.0 3.0 3.3 3.3 3.1 3.2 30.8
G3LTORO2 2.4 2.0 1.9 1.9 2.0 2.0 2.3 2.1 2.2 2.3 1.8 2.2 25.1
G3RINCON 1.9 1.6 1.7 2.2 3.2 2.7 2.0 1.8 1.5 1.4 1.8 2.1 23.9
G3PALOM1 0.9 1.1 1.0 0.6 2.1 2.8 2.2 1.8 3.5 3.3 1.9 1.5 22.7
G3JLOSCO 2.5 1.5 1.8 1.3 1.6 3.0 2.5 1.5 0.8 1.0 1.4 2.8 21.7
G3PALOM2 1.3 0.9 0.7 1.1 1.7 1.8 1.3 1.6 2.7 3.1 2.4 1.8 20.4
G3LTORO1 2.3 1.7 1.5 1.2 1.5 1.4 1.5 1.4 1.1 1.4 1.4 1.7 18.1
G3SYEGUA 3.3 2.2 2.1 0.2 0.2 1.0 2.7 2.2 2.0 0.4 0.4 1.1 17.8
G3CEMON1 0.7 0.6 0.7 0.6 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 8.5
G3CEMON2 0.5 0.4 0.5 0.6 0.6 0.6 0.8 0.7 0.6 0.7 0.6 0.6 7.2
G3VALDE1 0.7 0.7 0.6 0.5 0.5 0.5 0.4 0.5 0.3 0.4 0.4 0.5 6.0
G3VALDE2 1.0 0.7 0.6 0.2 0.6 0.5 0.7 0.5 0.3 0.1 0.3 0.4 5.9
G3DRODR2 0.5 0.1 0.1 0.1 0.3 0.5 0.6 0.5 0.5 0.5 0.5 0.6 4.8
G3DRODR1 0.4 0.1 0.1 0.1 0.2 0.5 0.6 0.5 0.5 0.4 0.4 0.6 4.4
G3MAGUE1 0.3 0.3 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.3 0.2 3.4
G3QCABRE 0.2 0.1 0.2 0.3 0.3 0.4 0.4 0.3 0.2 0.1 0.2 0.5 3.2
G3MAGUE2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.1 0.2 0.5 0.3 0.2 2.8
G3LBARIA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 2.4
G3ESALTO 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 2.4
G3RJCRUZ 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.2
G3BDEREC 0.1 0.1 0.1 0.1 0.1 0.1 0.6
G3BAIGU2 0.1 0.1 0.1 0.1 0.4
G3BAIGU1 0.1 0.1

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 207 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AVARG1
G3AVARG2
G3NNAJAY
G3LANONE

G3AANDRE 157.9 164.1 181.5 175.8 181.8 176.4 181.9 181.8 175.9 182.0 175.6 181.9 2116.6
G3QUISQ2 149.5 130.1 149.4 134.7 149.3 139.4 149.6 149.6 139.6 144.5 139.6 149.7 1725.0
G3QUISQ1 67.7 63.4 72.1 78.8 81.6 78.9 81.7 81.6 85.3 76.7 77.6 74.2 919.6
G3ITABO1 80.7 23.4 80.6 78.2 80.8 77.9 80.6 80.8 78.1 80.5 77.8 80.7 900.1
G3ITABO2 82.7 74.8 69.6 82.8 80.0 82.9 82.8 80.2 82.9 80.3 83.1 882.1
G3MRIO 62.1 58.7 65.3 65.1 67.3 65.1 67.3 65.3 63.2 65.3 62.8 66.7 774.2
G3PALAMA 52.6 45.9 56.6 68.2 61.6 64.1 70.5 62.5 62.2 53.6 55.1 55.7 708.6
G3LVEGA 61.9 47.7 61.9 51.7 56.5 51.7 61.9 56.5 59.9 61.9 59.90 61.90 693.4
G3LMINA6 59.7 53.9 44.1 55.8 17.3 57.9 59.8 59.8 57.8 59.7 57.7 59.7 643.2
G3EM2CGN 40.4 43.3 51.7 62.0 59.1 56.3 62.7 61.1 56.5 54.3 49.8 45.3 642.5
G3LMINA5 58.8 53.1 58.8 56.8 51.2 38.0 15.2 59.0 56.9 59.0 56.9 58.9 622.6
G3SESTE 47.4 38.1 42.7 45.9 47.4 41.2 47.4 47.4 45.9 47.4 41.2 47.4 539.4
G3PIMEN3 33.8 30.5 33.8 32.7 33.8 32.7 33.8 33.8 32.7 33.8 32.7 33.8 397.9
G3BARAHC 30.4 27.4 30.4 29.4 30.4 29.4 30.4 30.4 29.4 30.3 12.7 2.9 313.5
G3CEPP2 22.9 20.7 22.9 22.2 22.9 22.2 23.0 22.9 22.2 22.9 22.20 22.90 269.9
G3METALD 21.1 19.1 21.1 20.4 21.1 20.4 21.1 21.1 20.4 21.1 20.4 21.1 248.4
G3PIMEN1 20.8 18.7 20.8 20.1 20.8 20.1 20.8 20.8 20.1 20.8 20.1 20.8 244.7
G3PIMEN2 18.6 16.8 18.6 18.0 18.6 18.0 18.6 18.6 18.0 18.6 18.0 18.6 219.0
G3CESPM3 11.4 9.9 12.2 19.9 20.8 21.8 25.8 17.7 20.9 18.2 11.3 11.3 201.2
G3CESPM2 3.9 4.3 14.9 22.7 10.4 5.4 27.3 24.0 22.8 21.2 13.9 10.5 181.3
G3CESPM1 10.1 9.6 12.6 18.5 17.1 16.9 21.2 19.4 17.9 1.1 12.4 7.2 164.0
G3HAINAG 8.0 6.6 8.6 14.5 15.2 16.7 20.6 18.0 15.7 12.8 7.7 7.7 152.1
G3LOPPLA 7.6 7.4 9.2 12.5 11.6 11.4 13.0 12.5 12.1 10.4 9.2 8.0 124.9
G3BERSAL 5.2 5.2 6.4 8.4 7.8 7.8 8.5 8.4 7.8 7.1 6.2 5.7 84.5
G3CEPP1 6.9 6.2 6.9 6.7 6.9 6.7 6.9 6.9 6.7 6.9 6.7 6.9 81.3
G3HAINA4 3.1 2.5 3.3 5.8 6.2 7.1 9.0 7.8 6.5 5.2 2.9 3.0 62.4
G3IKM22 3.6 3.6 4.4 5.6 5.3 5.3 5.7 5.7 5.3 4.9 4.2 3.9 57.5
G3RSJUAN 0.2 0.2 0.2 0.4 0.4 0.4 0.5 0.4 0.4 0.3 0.2 0.2 3.8
G3SLORE1
G3SPEDRV
G3LMINAC
G3CATAL1
G3CATAL2

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 208 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 29. Produccin esperada por centrales de generacin [GWh], ao 2017.


TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3LARIM1 23.6 15.7 6.5 16.1 11.4 24.0 23.0 21.5 6.40 6.20 2.80 11.60 168.8
G3TAVER1 7.8 10.4 10.4 9.7 10.8 11.7 6.8 9.8 11.0 11.9 9.6 5.0 114.9
G3TAVER2 9.9 7.4 8.5 9.2 11.6 11.3 10.1 9.4 7.80 9.40 8.30 7.50 110.4
G3JIGUE2 5.9 5.3 4.7 5.5 8.9 9.9 8.7 13.2 10.20 9.40 10.90 3.20 95.8
G3MONCI1 6.3 5.2 6.0 6.4 5.7 5.6 7.1 6.2 5.70 6.90 5.50 5.30 71.9
G3MONCI2 6.2 5.5 5.9 5.2 6.1 5.8 5.9 6.2 6.00 5.70 6.20 4.80 69.5
G3JIGUE1 5.5 7.7 4.5 6.4 5.7 6.3 2.6 5.8 7.10 7.20 6.90 3.10 68.8
G3HATILL 4.2 3.6 5.0 5.2 4.9 5.1 4.6 4.0 4.50 5.40 4.00 4.90 55.4
G3RBLAN1 4.9 3.1 4.3 5.2 4.4 3.8 4.2 4.1 6.40 5.60 4.00 4.20 54.2
G3AGUAC1 4.7 4.1 4.8 5.3 3.8 4.4 4.2 5.4 5.20 3.70 3.60 2.40 51.6
G3RBLAN2 1.8 5.5 5.2 4.6 3.0 4.3 1.5 5.3 6.00 5.30 2.70 4.20 49.4
G3LDAMAS 4.4 4.0 4.4 4.1 4.3 3.9 3.4 3.4 3.50 3.70 4.00 4.40 47.5
G3LANGOS 3.9 3.7 4.3 4.4 3.6 3.7 4.0 3.8 3.40 3.60 3.10 2.80 44.3
G3JIMENO 2.7 2.6 3.3 3.4 4.3 3.6 3.3 2.8 3.20 3.80 3.20 3.50 39.7
G3AGUAC2 2.8 2.4 2.0 2.5 4.3 4.4 3.3 2.5 2.80 5.20 4.40 2.20 38.8
G3PINAL1 2.9 1.7 2.1 2.2 4.0 4.0 3.1 4.1 4.10 3.90 3.60 2.20 37.9
G3LCOCO2 2.7 1.8 2.8 3.2 3.6 4.8 4.3 2.4 1.80 2.00 3.10 1.00 33.5
G3PINAL2 1.4 1.8 2.2 2.5 2.6 2.2 3.3 3.3 2.90 4.00 2.80 3.10 32.1
G3SABANE 2.7 1.6 1.5 1.5 1.9 2.7 3.0 3.0 3.30 3.30 3.10 3.20 30.8
G3LTORO2 2.4 2.0 1.9 1.9 2.0 2.0 2.3 2.1 2.20 2.30 1.80 2.20 25.1
G3RINCON 1.9 1.6 1.7 2.2 3.2 2.7 2.0 1.8 1.50 1.40 1.80 2.10 23.9
G3PALOM1 0.9 1.1 1.0 0.6 2.1 2.8 2.2 1.8 3.50 3.30 1.90 1.50 22.7
G3JLOSCO 2.5 1.5 1.8 1.3 1.6 3.0 2.5 1.5 0.80 1.00 1.40 2.80 21.7
G3PALOM2 1.3 0.9 0.7 1.1 1.7 1.8 1.3 1.6 2.70 3.10 2.40 1.80 20.4
G3LTORO1 2.3 1.7 1.5 1.2 1.5 1.4 1.5 1.4 1.10 1.40 1.40 1.70 18.1
G3SYEGUA 3.3 2.2 2.1 0.2 0.2 1.0 2.7 2.2 2.00 0.40 0.40 1.10 17.8
G3CEMON1 0.7 0.6 0.7 0.6 0.7 0.7 0.7 0.7 0.70 0.80 0.80 0.80 8.5
G3CEMON2 0.5 0.4 0.5 0.6 0.6 0.6 0.8 0.7 0.60 0.70 0.60 0.60 7.2
G3VALDE1 0.7 0.7 0.6 0.5 0.5 0.5 0.4 0.5 0.30 0.40 0.40 0.50 6.0
G3VALDE2 1.0 0.7 0.6 0.2 0.6 0.5 0.7 0.5 0.30 0.10 0.30 0.40 5.9
G3DRODR2 0.5 0.1 0.1 0.1 0.3 0.5 0.6 0.5 0.50 0.50 0.50 0.60 4.8
G3DRODR1 0.4 0.1 0.1 0.1 0.2 0.5 0.6 0.5 0.50 0.40 0.40 0.60 4.4
G3MAGUE1 0.3 0.3 0.2 0.2 0.2 0.3 0.3 0.3 0.40 0.40 0.30 0.20 3.4
G3QCABRE 0.2 0.1 0.2 0.3 0.3 0.4 0.4 0.3 0.20 0.10 0.20 0.50 3.2
G3MAGUE2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.1 0.20 0.50 0.30 0.20 2.8
G3LBARIA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.20 0.20 0.20 0.20 2.4
G3ESALTO 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.20 0.20 0.20 0.20 2.4
G3RJCRUZ 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1.2
G3BDEREC 0.1 0.1 0.1 0.10 0.10 0.10 0.6
G3BAIGU2 0.1 0.1 0.10 0.10 0.4
G3BAIGU1 0.1 0.1
G3AVARG1
G3AVARG2
G3NNAJAY
G3LANONE

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 209 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AANDRE 158.7 164.4 181.7 176.7 182.3 176.3 181.7 182.3 176.2 182.1 176.3 181.6 2120.3
G3QUISQ2 149.4 130.0 149.9 134.7 149.2 139.5 149.7 149.6 139.50 82.70 70.10 69.20 1513.5
G3CATAL1 263.1 254.70 263.10 253.80 262.80 1297.5
G3LMINAC 79.7 72.0 79.7 77.2 79.6 77.0 79.8 79.9 77.10 76.00 69.10 67.00 914.1
G3ITABO1 80.8 23.5 80.9 78.1 80.8 78.2 80.9 80.5 78.10 80.70 78.30 80.60 901.4
G3ITABO2 82.8 74.8 69.5 82.9 80.3 82.8 83.1 80.20 82.90 80.40 82.80 882.5
G3CATAL2 262.70 254.10 263.10 779.9
G3LMINA5 58.8 53.2 59.1 57.0 51.2 38.0 15.2 58.8 57.00 58.80 56.50 57.20 620.8
G3LMINA6 59.6 53.8 44.3 55.9 17.3 57.8 59.8 59.6 57.80 51.20 47.70 48.40 613.2
G3QUISQ1 60.8 59.4 66.9 78.9 79.8 76.9 81.7 44.5 47.00 4.10 3.40 3.50 606.9
G3MRIO 54.2 53.1 60.2 65.1 67.3 65.1 67.3 45.7 44.7 6.2 5.0 5.6 539.5
G3LVEGA 56.80 47.70 61.90 51.70 56.5 51.70 61.90 45.90 48.00 9.20 7.60 7.90 506.8
G3PALAMA 40.7 42.2 54.4 64.5 55.7 58.0 65.6 24.5 23.60 1.50 1.20 1.30 433.2
G3SESTE 47.4 38.1 42.7 45.9 47.4 41.2 47.4 40.9 38.70 10.00 7.60 8.30 415.6
G3PIMEN3 33.8 30.5 33.8 32.7 33.8 32.7 33.8 33.8 32.70 25.60 23.60 22.40 369.2
G3EM2CGN 31.3 34.6 43.4 56.2 53.3 52.3 58.3 15.5 12.7 0.8 0.6 0.7 359.7
G3BARAHC 30.4 27.4 30.4 29.3 30.4 29.4 30.4 30.4 29.50 24.90 10.20 2.20 304.9
G3CEPP2 23.00 20.70 23.00 22.20 22.90 22.20 22.90 22.90 22.20 18.30 17.40 16.80 254.5
G3METALD 21.1 19.1 21.1 20.4 21.1 20.4 21.1 20.7 19.50 7.90 6.00 5.60 204.0
G3PIMEN1 20.8 18.7 20.8 20.1 20.8 20.1 20.8 19.0 17.60 5.40 4.30 4.40 192.8
G3PIMEN2 18.6 16.8 18.6 18.0 18.6 18.0 18.6 17.6 16.3 6.1 4.5 4.3 176.0
G3CESPM3 8.8 9.8 14.6 22.7 21.0 21.6 28.5 3.5 3.50 0.10 0.10 0.10 134.3
G3CEPP1 6.9 6.2 6.9 6.7 6.9 6.7 6.9 6.9 6.70 5.70 5.40 5.40 77.3
G3HAINAG 4.5 4.5 5.9 10.4 11.7 13.3 17.1 1.8 1.30 0.10 0.10 70.7
G3CESPM2 2.1 2.7 9.5 16.2 7.7 4.2 22.9 2.4 1.70 0.10 0.10 0.10 69.7
G3LOPPLA 5.2 5.4 7.2 10.7 9.9 9.9 12.6 2.2 1.80 0.10 0.10 0.10 65.2
G3CESPM1 3.9 3.8 5.1 8.9 9.8 11.3 13.9 2.2 1.70 0.10 0.10 60.8
G3BERSAL 3.6 3.7 5.1 7.0 6.7 6.6 8.1 1.6 1.30 0.10 0.10 43.9
G3IKM22 2.5 2.6 3.6 5.0 4.6 4.5 5.5 1.1 1.00 30.4
G3HAINA4 1.7 1.7 2.4 4.2 4.5 5.5 7.3 0.7 0.50 28.5
G3RSJUAN 0.1 0.1 0.2 0.3 0.3 0.3 0.4 1.7
G3SLORE1
G3SPEDRV

Tabla 30. Produccin esperada por centrales de generacin [GWh], ao 2018.


TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3LARIM1 23.6 15.7 6.5 16.1 11.4 24.0 23.0 21.5 6.40 6.20 2.80 11.60 168.8
G3TAVER1 7.8 10.4 10.4 9.7 10.8 11.7 6.8 9.8 11.0 11.9 9.6 5.0 114.9
G3TAVER2 9.9 7.4 8.5 9.2 11.6 11.3 10.1 9.4 7.80 9.40 8.30 7.50 110.4
G3JIGUE2 5.9 5.3 4.7 5.5 8.9 9.9 8.7 13.2 10.20 9.40 10.90 3.20 95.8
G3MONCI1 6.3 5.2 6.0 6.4 5.7 5.6 7.1 6.2 5.70 6.90 5.50 5.30 71.9
G3MONCI2 6.2 5.5 5.9 5.2 6.1 5.8 5.9 6.2 6.00 5.70 6.20 4.80 69.5
G3JIGUE1 5.5 7.7 4.5 6.4 5.7 6.3 2.6 5.8 7.10 7.20 6.90 3.10 68.8
G3HATILL 4.2 3.6 5.0 5.2 4.9 5.1 4.6 4.0 4.50 5.40 4.00 4.90 55.4
G3RBLAN1 4.9 3.1 4.3 5.2 4.4 3.8 4.2 4.1 6.40 5.60 4.00 4.20 54.2

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 210 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AGUAC1 4.7 4.1 4.8 5.3 3.8 4.4 4.2 5.4 5.20 3.70 3.60 2.40 51.6
G3RBLAN2 1.8 5.5 5.2 4.6 3.0 4.3 1.5 5.3 6.00 5.30 2.70 4.20 49.4
G3LDAMAS 4.4 4.0 4.4 4.1 4.3 3.9 3.4 3.4 3.50 3.70 4.00 4.40 47.5
G3LANGOS 3.9 3.7 4.3 4.4 3.6 3.7 4.0 3.8 3.40 3.60 3.10 2.80 44.3
G3JIMENO 2.7 2.6 3.3 3.4 4.3 3.6 3.3 2.8 3.20 3.80 3.20 3.50 39.7
G3AGUAC2 2.8 2.4 2.0 2.5 4.3 4.4 3.3 2.5 2.80 5.20 4.40 2.20 38.8
G3PINAL1 2.9 1.7 2.1 2.2 4.0 4.0 3.1 4.1 4.10 3.90 3.60 2.20 37.9
G3LCOCO2 2.7 1.8 2.8 3.2 3.6 4.8 4.3 2.4 1.80 2.00 3.10 1.00 33.5
G3PINAL2 1.4 1.8 2.2 2.5 2.6 2.2 3.3 3.3 2.90 4.00 2.80 3.10 32.1
G3SABANE 2.7 1.6 1.5 1.5 1.9 2.7 3.0 3.0 3.30 3.30 3.10 3.20 30.8
G3LTORO2 2.4 2.0 1.9 1.9 2.0 2.0 2.3 2.1 2.20 2.30 1.80 2.20 25.1
G3RINCON 1.9 1.6 1.7 2.2 3.2 2.7 2.0 1.8 1.50 1.40 1.80 2.10 23.9
G3PALOM1 0.9 1.1 1.0 0.6 2.1 2.8 2.2 1.8 3.50 3.30 1.90 1.50 22.7
G3JLOSCO 2.5 1.5 1.8 1.3 1.6 3.0 2.5 1.5 0.80 1.00 1.40 2.80 21.7
G3PALOM2 1.3 0.9 0.7 1.1 1.7 1.8 1.3 1.6 2.70 3.10 2.40 1.80 20.4
G3LTORO1 2.3 1.7 1.5 1.2 1.5 1.4 1.5 1.4 1.10 1.40 1.40 1.70 18.1
G3SYEGUA 3.3 2.2 2.1 0.2 0.2 1.0 2.7 2.2 2.00 0.40 0.40 1.10 17.8
G3CEMON1 0.7 0.6 0.7 0.6 0.7 0.7 0.7 0.7 0.70 0.80 0.80 0.80 8.5
G3CEMON2 0.5 0.4 0.5 0.6 0.6 0.6 0.8 0.7 0.60 0.70 0.60 0.60 7.2
G3VALDE1 0.7 0.7 0.6 0.5 0.5 0.5 0.4 0.5 0.30 0.40 0.40 0.50 6.0
G3VALDE2 1.0 0.7 0.6 0.2 0.6 0.5 0.7 0.5 0.30 0.10 0.30 0.40 5.9
G3DRODR2 0.5 0.1 0.1 0.1 0.3 0.5 0.6 0.5 0.50 0.50 0.50 0.60 4.8
G3DRODR1 0.4 0.1 0.1 0.1 0.2 0.5 0.6 0.5 0.50 0.40 0.40 0.60 4.4
G3MAGUE1 0.3 0.3 0.2 0.2 0.2 0.3 0.3 0.3 0.40 0.40 0.30 0.20 3.4
G3QCABRE 0.2 0.1 0.2 0.3 0.3 0.4 0.4 0.3 0.20 0.10 0.20 0.50 3.2
G3MAGUE2 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.1 0.20 0.50 0.30 0.20 2.8
G3LBARIA 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.20 0.20 0.20 0.20 2.4
G3ESALTO 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.20 0.20 0.20 0.20 2.4
G3RJCRUZ 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1.2
G3BDEREC 0.1 0.1 0.1 0.10 0.10 0.10 0.6
G3BAIGU2 0.1 0.1 0.10 0.10 0.4
G3BAIGU1 0.1 0.1
G3AVARG1
G3AVARG2
G3NNAJAY
G3LANONE

G3CATAL2 263.1 237.2 263.1 254.9 263.1 254.1 262.4 262.7 254.80 262.90 254.00 262.40 3094.7
G3CATAL1 263.1 237.5 263.3 254.6 263.2 254.1 262.6 262.3 254.20 262.40 254.50 262.30 3094.1
G3AANDRE 158.6 164.0 181.9 176.1 182.1 176.4 181.8 182.1 175.9 181.8 175.3 181.5 2117.5
G3QUISQ2 67.1 60.6 86.7 102.7 105.8 100.2 122.7 114.6 107.00 95.40 83.30 81.10 1127.2
G3ITABO1 80.5 23.4 81.1 78.2 80.7 78.0 80.7 80.6 78.20 80.80 78.00 80.80 901.0
G3LMINAC 67.8 65.7 74.0 77.1 79.7 77.1 79.7 79.7 77.30 78.90 72.90 70.20 900.1
G3ITABO2 82.6 74.9 69.7 83.0 80.1 82.8 82.9 80.20 82.90 80.10 82.60 881.8
G3LMINA5 57.9 53.1 58.8 56.9 51.1 38.0 15.2 58.9 57.00 59.00 56.80 59.00 621.7
G3LMINA6 48.3 44.5 37.3 55.9 17.3 57.2 59.6 59.8 57.70 53.30 49.00 49.20 589.1
G3PIMEN3 20.8 20.8 27.0 29.7 28.9 27.4 31.7 29.7 27.80 27.10 25.80 25.30 322.0
G3BARAHC 21.8 22.1 24.7 29.1 28.4 26.8 30.4 29.2 26.80 25.40 10.50 2.40 277.6
G3CEPP2 15.00 16.10 18.60 21.50 20.70 19.20 22.70 21.10 19.50 18.90 17.80 18.60 229.7

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 211 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3SESTE 7.6 6.5 9.6 18.1 17.3 16.2 27.8 21.6 21.00 13.60 9.60 10.30 179.2
G3LVEGA 7.20 6.10 10.60 13.10 12.90 15.20 27.30 19.60 19.90 12.30 10.40 9.90 164.5
G3MRIO 4.8 4.7 7.9 11.6 10.6 12.4 19.8 14.4 13.3 8.3 6.9 7.6 122.3
G3METALD 5.7 4.7 8.1 12.0 11.5 11.6 15.4 13.3 13.10 9.50 8.00 7.60 120.5
G3PIMEN1 4.2 3.7 6.0 9.4 8.7 9.2 13.2 11.0 11.30 7.80 6.00 5.50 96.0
G3PIMEN2 4.2 3.6 6.7 9.3 8.4 8.9 12.3 10.7 11.1 7.7 6.2 6.1 95.2
G3QUISQ1 3.1 2.9 6.0 9.0 7.4 9.2 14.6 11.5 11.20 6.00 4.90 5.50 91.3
G3CEPP1 5.3 5.1 5.7 6.7 6.8 6.4 6.9 6.9 6.40 5.90 5.50 5.60 73.2
G3PALAMA 1.2 1.1 2.3 3.9 3.2 4.3 8.1 5.4 4.90 2.50 1.90 2.00 40.8
G3EM2CGN 0.6 0.7 1.1 1.8 1.7 2.3 4.5 3.3 2.5 1.3 0.9 1.1 21.8
G3CESPM3 0.1 0.1 0.2 0.2 0.2 0.4 0.6 0.4 0.30 0.20 0.10 0.20 3.0
G3CESPM2 0.2 0.3 0.1 0.1 0.8 0.6 0.40 0.20 0.10 0.20 3.0
G3CESPM1 0.1 0.1 0.2 0.3 0.2 0.3 0.7 0.5 0.40 0.10 0.10 3.0
G3LOPPLA 0.1 0.1 0.2 0.2 0.2 0.3 0.6 0.4 0.30 0.20 0.10 0.20 2.9
G3BERSAL 0.1 0.1 0.1 0.2 0.2 0.2 0.5 0.3 0.20 0.10 0.10 0.10 2.2
G3HAINAG 0.1 0.2 0.1 0.2 0.4 0.3 0.20 0.10 0.10 0.10 1.8
G3IKM22 0.1 0.1 0.1 0.2 0.3 0.2 0.20 0.10 0.10 0.10 1.5
G3HAINA4 0.1 0.1 0.2 0.1 0.10 0.6
G3RSJUAN
G3SLORE1
G3SPEDRV

Tabla 31. Produccin esperada por centrales de generacin [GWh], ao 2019.


TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3LARIM1 23.60 15.70 6.50 16.10 11.40 24.00 23.00 21.50 6.40 6.20 2.80 11.60 168.8
G3TAVER1 7.8 10.4 10.4 9.7 10.8 11.7 6.8 9.8 11.0 11.9 9.6 5.0 114.9
G3TAVER2 9.90 7.40 8.50 9.20 11.60 11.30 10.10 9.40 7.80 9.40 8.30 7.50 110.4
G3JIGUE2 5.90 5.30 4.70 5.50 8.90 9.90 8.70 13.20 10.20 9.40 10.90 3.20 95.8
G3MONCI1 6.30 5.20 6.00 6.40 5.70 5.60 7.10 6.20 5.70 6.90 5.50 5.30 71.9
G3MONCI2 6.20 5.50 5.90 5.20 6.10 5.80 5.90 6.20 6.00 5.70 6.20 4.80 69.5
G3JIGUE1 5.50 7.70 4.50 6.40 5.70 6.30 2.60 5.80 7.10 7.20 6.90 3.10 68.8
G3HATILL 4.20 3.60 5.00 5.20 4.90 5.10 4.60 4.00 4.50 5.40 4.00 4.90 55.4
G3RBLAN1 4.90 3.10 4.30 5.20 4.40 3.80 4.20 4.10 6.40 5.60 4.00 4.20 54.2
G3AGUAC1 4.70 4.10 4.80 5.30 3.80 4.40 4.20 5.40 5.20 3.70 3.60 2.40 51.6
G3RBLAN2 1.80 5.50 5.20 4.60 3.00 4.30 1.50 5.30 6.00 5.30 2.70 4.20 49.4
G3LDAMAS 4.40 4.00 4.40 4.10 4.30 3.90 3.40 3.40 3.50 3.70 4.00 4.40 47.5
G3LANGOS 3.90 3.70 4.30 4.40 3.60 3.70 4.00 3.80 3.40 3.60 3.10 2.80 44.3
G3JIMENO 2.70 2.60 3.30 3.40 4.30 3.60 3.30 2.80 3.20 3.80 3.20 3.50 39.7
G3AGUAC2 2.80 2.40 2.00 2.50 4.30 4.40 3.30 2.50 2.80 5.20 4.40 2.20 38.8
G3PINAL1 2.90 1.70 2.10 2.20 4.00 4.00 3.10 4.10 4.10 3.90 3.60 2.20 37.9
G3LCOCO2 2.70 1.80 2.80 3.20 3.60 4.80 4.30 2.40 1.80 2.00 3.10 1.00 33.5
G3PINAL2 1.40 1.80 2.20 2.50 2.60 2.20 3.30 3.30 2.90 4.00 2.80 3.10 32.1
G3SABANE 2.70 1.60 1.50 1.50 1.90 2.70 3.00 3.00 3.30 3.30 3.10 3.20 30.8
G3LTORO2 2.40 2.00 1.90 1.90 2.00 2.00 2.30 2.10 2.20 2.30 1.80 2.20 25.1
G3RINCON 1.90 1.60 1.70 2.20 3.20 2.70 2.00 1.80 1.50 1.40 1.80 2.10 23.9

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 212 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3PALOM1 0.90 1.10 1.00 0.60 2.10 2.80 2.20 1.80 3.50 3.30 1.90 1.50 22.7
G3JLOSCO 2.50 1.50 1.80 1.30 1.60 3.00 2.50 1.50 0.80 1.00 1.40 2.80 21.7
G3PALOM2 1.30 0.90 0.70 1.10 1.70 1.80 1.30 1.60 2.70 3.10 2.40 1.80 20.4
G3LTORO1 2.30 1.70 1.50 1.20 1.50 1.40 1.50 1.40 1.10 1.40 1.40 1.70 18.1
G3SYEGUA 3.30 2.20 2.10 0.20 0.20 1.00 2.70 2.20 2.00 0.40 0.40 1.10 17.8
G3CEMON1 0.70 0.60 0.70 0.60 0.70 0.70 0.70 0.70 0.70 0.80 0.80 0.80 8.5
G3CEMON2 0.50 0.40 0.50 0.60 0.60 0.60 0.80 0.70 0.60 0.70 0.60 0.60 7.2
G3VALDE1 0.70 0.70 0.60 0.50 0.50 0.50 0.40 0.50 0.30 0.40 0.40 0.50 6.0
G3VALDE2 1.00 0.70 0.60 0.20 0.60 0.50 0.70 0.50 0.30 0.10 0.30 0.40 5.9
G3DRODR2 0.50 0.10 0.10 0.10 0.30 0.50 0.60 0.50 0.50 0.50 0.50 0.60 4.8
G3DRODR1 0.40 0.10 0.10 0.10 0.20 0.50 0.60 0.50 0.50 0.40 0.40 0.60 4.4
G3MAGUE1 0.30 0.30 0.20 0.20 0.20 0.30 0.30 0.30 0.40 0.40 0.30 0.20 3.4
G3QCABRE 0.20 0.10 0.20 0.30 0.30 0.40 0.40 0.30 0.20 0.10 0.20 0.50 3.2
G3MAGUE2 0.20 0.20 0.20 0.20 0.20 0.30 0.20 0.10 0.20 0.50 0.30 0.20 2.8
G3LBARIA 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 2.4
G3ESALTO 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 2.4
G3RJCRUZ 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.2
G3BDEREC 0.10 0.10 0.10 0.10 0.10 0.10 0.6
G3BAIGU2 0.10 0.10 0.10 0.10 0.4
G3BAIGU1 0.10 0.1
G3AVARG1
G3AVARG2
G3NNAJAY
G3LANONE

G3CATAL2 262.20 237.90 263.30 254.60 262.80 255.30 262.50 262.50 254.80 262.40 254.20 262.90 3094.7
G3CATAL1 262.70 237.70 263.10 254.40 263.10 254.10 263.00 263.10 254.10 263.20 253.90 262.80 3094.1
G3AANDRE 158.5 164.1 182.1 175.7 181.7 176.6 181.7 182.0 176.0 181.7 176.4 181.9 2117.5
G3QUISQ2 77.20 71.40 99.80 110.90 114.80 107.70 127.90 122.20 113.30 104.20 95.20 92.90 1127.2
G3ITABO1 80.80 23.40 80.70 78.10 80.70 78.00 80.60 80.80 78.30 80.70 78.10 80.70 901.0
G3LMINAC 71.50 69.30 77.70 77.10 79.70 77.10 79.50 79.60 77.30 79.80 75.70 74.40 900.1
G3ITABO2 82.80 74.70 69.50 82.80 80.20 82.80 82.80 80.20 82.70 80.30 82.60 881.8
G3LMINA5 58.90 53.00 58.70 57.10 51.30 38.00 15.20 58.90 56.80 58.90 56.80 58.80 621.7
G3LMINA6 49.50 45.50 38.30 55.90 17.30 57.80 59.60 59.70 57.70 56.30 50.80 50.40 589.1
G3PIMEN3 22.40 23.90 27.40 31.70 30.60 28.60 33.60 31.50 28.90 28.00 26.40 27.40 322.0
G3BARAHC 24.20 22.40 25.20 29.30 30.20 28.70 30.30 30.40 29.10 26.30 10.70 2.40 277.6
G3CEPP2 17.00 16.80 18.70 22.20 21.70 20.60 23.00 22.40 20.60 19.30 18.40 18.70 229.7
G3SESTE 9.70 7.70 13.60 22.00 20.30 19.30 30.40 25.90 26.50 18.40 12.90 13.50 179.2
G3LVEGA 9.00 7.60 13.20 18.90 18.70 19.70 34.20 24.60 26.00 16.10 12.90 12.20 164.5
G3MRIO 6.8 6.5 9.6 14.7 13.7 16.3 26.0 20.0 17.9 11.3 9.1 9.1 122.3
G3METALD 7.70 6.90 9.70 14.00 13.10 13.00 16.80 14.70 14.20 12.40 9.50 9.00 120.5
G3PIMEN1 5.60 4.60 7.90 11.80 11.30 11.50 15.10 13.10 12.80 9.40 7.90 7.40 96.0
G3PIMEN2 6.0 5.0 7.7 11.4 11.0 11.0 14.5 12.2 11.9 10.2 7.7 7.2 95.2
G3QUISQ1 4.60 4.20 8.10 11.60 10.20 12.00 19.20 15.00 14.80 8.30 6.90 7.60 91.3
G3CEPP1 5.60 5.10 5.90 6.70 6.90 6.70 6.90 6.90 6.70 6.20 5.70 5.60 73.2
G3PALAMA 1.80 1.50 3.80 5.90 4.60 6.00 10.50 7.70 7.10 3.60 2.80 3.00 40.8
G3EM2CGN 0.9 0.9 1.7 2.9 2.7 3.3 6.6 4.7 3.8 2.0 1.4 1.4 21.8
G3CESPM3 0.10 0.10 0.30 0.40 0.40 0.50 0.90 0.50 0.50 0.30 0.20 0.20 3.0
G3CESPM2 0.10 0.10 0.30 0.50 0.20 0.20 1.20 0.80 0.60 0.40 0.20 0.30 3.0
G3CESPM1 0.10 0.10 0.30 0.40 0.40 0.50 1.10 0.70 0.60 0.20 0.20 3.0
G3LOPPLA 0.10 0.10 0.20 0.40 0.30 0.40 0.90 0.60 0.50 0.30 0.20 0.20 2.9
G3BERSAL 0.10 0.10 0.20 0.30 0.20 0.30 0.60 0.50 0.30 0.20 0.10 0.10 2.2
G3HAINAG 0.10 0.10 0.20 0.30 0.30 0.40 0.60 0.50 0.30 0.20 0.10 0.20 1.8
G3IKM22 0.10 0.10 0.10 0.20 0.20 0.20 0.50 0.30 0.30 0.10 0.10 0.10 1.5
G3HAINA4 0.10 0.10 0.10 0.10 0.20 0.20 0.10 0.10 0.10 0.6

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 213 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3RSJUAN
G3SLORE1
G3SPEDRV

Energa esperada por Empresas de generacin

Tabla 32.Energa esperada por empresas, ao 2016.


TOTAL
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
EMPRESAS PERIODO
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC DE ESTUDIO
HAINA 305.9 282.5 311.0 316.3 332.7 331.1 354.5 344.2 309.5 314.8 274.4 293.3 3,770
AES ANDRES 157.9 164.1 181.5 175.8 181.8 176.4 181.9 181.8 175.9 182.0 175.6 181.9 2,117
ITABO 163.4 98.2 150.2 78.2 163.6 157.9 163.5 163.6 158.3 163.4 158.1 163.8 1,782
GPLV 114.5 93.6 118.5 119.9 118.1 115.8 132.4 119.0 122.1 115.5 115.0 117.6 1,402
DPP 118.5 107.0 102.9 112.6 68.5 95.9 75.0 118.8 114.7 118.7 114.6 118.6 1,266
EGEHID 95.0 88.7 91.5 93.6 104.6 109.0 95.9 107.5 110.1 114.3 99.9 81.0 1,191
PVDC 67.7 63.4 72.1 78.8 81.6 78.9 81.7 81.6 85.3 76.7 77.6 74.2 920
LAESA 73.2 66.0 73.2 70.8 73.2 70.8 73.2 73.2 70.8 73.2 70.8 73.2 862
SEABOARD 40.4 43.3 51.7 62.0 59.1 56.3 62.7 61.1 56.5 54.3 49.8 45.3 643
CDEEE 25.6 24.0 39.9 61.5 48.7 44.5 74.8 61.5 62.0 40.8 37.8 29.2 550
CEPP 29.8 26.9 29.8 28.9 29.8 28.9 29.9 29.8 28.9 29.8 28.9 29.8 351
METALDOM 21.1 19.1 21.1 20.4 21.1 20.4 21.1 21.1 20.4 21.1 20.4 21.1 248
MONTE RO 8.8 8.8 10.8 14.0 13.1 13.1 14.2 14.1 13.1 12.0 10.4 9.6 142
LOS ORIGENES
7.6 7.4 9.2 12.5 11.6 11.4 13.0 12.5 12.1 10.4 9.2 8.0 125
POWER PLANT
TOTAL 1229 1093.0 1263.4 1245.3 1307.5 1310.4 1373.8 1389.8 1339.7 1327.0 1242.5 1246.6 15,368

Tabla 33.Energa esperada por empresas, ao 2017.


TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
EMPRESAS PERIODO
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC DE ESTUDIO
HAINA 316.6 273.9 302.8 310.5 327.4 326.2 349.4 294.8 263.4 133.2 100.4 101.3 3,100
CDEEE 14.9 16.4 29.4 48.1 38.8 37.4 65.7 271.2 261.6 526.0 508.2 526.2 2,344
AES ANDRES 158.7 164.4 181.7 176.7 182.3 176.3 181.7 182.3 176.2 182.1 176.3 181.6 2,120
DPP 198.1 179.0 183.1 190.1 148.1 172.8 154.8 198.3 191.9 186.0 173.3 172.6 2,148
ITABO 163.6 98.3 150.4 78.1 163.7 158.5 163.7 163.6 158.3 163.6 158.7 163.4 1,784
EGEHID 95.0 88.7 91.5 93.6 104.6 109.0 95.9 107.5 110.1 114.3 99.9 81.0 1,191
GPLV 97.5 89.9 116.3 116.2 112.2 109.7 127.5 70.4 71.6 10.7 8.8 9.2 940
LAESA 73.2 66.0 73.2 70.8 73.2 70.8 73.2 70.4 66.6 37.1 32.4 31.1 738
PVDC 60.8 59.4 66.9 78.9 79.8 76.9 81.7 44.5 47.0 4.1 3.4 3.5 607
SEABOARD 31.3 34.6 43.4 56.2 53.3 52.3 58.3 15.5 12.7 0.8 0.6 0.7 360
CEPP 29.9 26.9 29.9 28.9 29.8 28.9 29.8 29.8 28.9 24.0 22.8 22.2 332
METALDOM 21.1 19.1 21.1 20.4 21.1 20.4 21.1 20.7 19.5 7.9 6.0 5.6 204
MONTE RO 6.1 6.3 8.7 12.0 11.3 11.1 13.6 2.7 2.3 0.1 0.1 74
LOS ORIGENES
5.2 5.4 7.2 10.7 9.9 9.9 12.6 2.2 1.8 0.1 0.1 0.1 65
POWER PLANT
TOTAL 1272.0 1128.3 1305.6 1291.2 1355.5 1360 1429 1474 1412 1390 1291 1299 16,007

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 214 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 34. Energa esperada por empresas, ao 2018.


TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
EMPRESAS PERIODO
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC DE ESTUDIO
CDEEE 526.4 474.9 527.0 510.3 526.8 509.0 527.1 526.5 510.1 525.7 508.8 525.2 6,198
AES ANDRES 158.6 164.0 181.9 176.1 182.1 176.4 181.8 182.1 175.9 181.8 175.3 181.5 2,118
DPP 174.0 163.3 170.1 189.9 148.1 172.3 154.5 198.4 192.0 191.2 178.7 178.4 2,111
HAINA 130.3 113.0 140.3 182.7 179.1 188.1 231.5 205.9 177.6 152.1 117.9 117.4 1,936
ITABO 163.1 98.3 150.8 78.2 163.7 158.1 163.5 163.5 158.4 163.7 158.1 163.4 1,783
EGEHID 95.0 88.7 91.5 93.6 104.6 109.0 95.9 107.5 110.1 114.3 99.9 81.0 1,191
LAESA 29.2 28.1 39.7 48.4 46.0 45.5 57.2 51.4 50.2 42.6 38.0 36.9 513
CEPP 20.3 21.2 24.3 28.2 27.5 25.6 29.6 28.0 25.9 24.8 23.3 24.2 303
GPLV 8.4 7.2 12.9 17.0 16.1 19.5 35.4 25.0 24.8 14.8 12.3 11.9 205
METALDOM 5.7 4.7 8.1 12.0 11.5 11.6 15.4 13.3 13.1 9.5 8.0 7.6 121
PVDC 3.1 2.9 6.0 9.0 7.4 9.2 14.6 11.5 11.2 6.0 4.9 5.5 91
SEABOARD 0.6 0.7 1.1 1.8 1.7 2.3 4.5 3.3 2.5 1.3 0.9 1.1 22
MONTE RO 0.1 0.1 0.2 0.3 0.3 0.4 0.8 0.5 0.4 0.2 0.2 0.2 4
LOS ORIGENES
0.1 0.1 0.2 0.2 0.2 0.3 0.6 0.4 0.3 0.2 0.1 0.2 3
POWER PLANT
TOTAL 1315 1167 1354 1348 1415 1427 1512 1517 1453 1428 1326 1335 16,598

Tabla 35. Energa esperada por empresas, ao 2019.


TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
EMPRESAS PERIODO
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC DE ESTUDIO
CDEEE 525.2 475.9 527.3 510.3 526.9 510.6 528.7 527.6 510.6 526.3 508.7 526.4 6,205
HAINA 147.0 127.2 159.8 198.2 196.3 204.7 245.6 224.9 196.4 169.8 135.5 134.1 2,140
AES ANDRES 158.5 164.1 182.1 175.7 181.7 176.6 181.7 182.0 176.0 181.7 176.4 181.9 2,118
DPP 179.9 167.8 174.7 190.1 148.3 172.9 154.3 198.2 191.8 195.0 183.3 183.6 2,140
ITABO 163.6 98.1 150.2 78.1 163.5 158.2 163.4 163.6 158.5 163.4 158.4 163.3 1,782
EGEHID 95.0 88.7 91.5 93.6 104.6 109.0 95.9 107.5 110.1 114.3 99.9 81.0 1,191
GPLV 10.8 9.1 17.0 24.8 23.3 25.7 44.7 32.3 33.1 19.7 15.7 15.2 271
LAESA 34.0 33.5 43.0 54.9 52.9 51.1 63.2 56.8 53.6 47.6 42.0 42.0 575
PVDC 4.6 4.2 8.1 11.6 10.2 12.0 19.2 15.0 14.8 8.3 6.9 7.6 123
CEPP 22.6 21.9 24.6 28.9 28.6 27.3 29.9 29.3 27.3 25.5 24.1 24.3 314
SEABOARD 0.9 0.9 1.7 2.9 2.7 3.3 6.6 4.7 3.8 2.0 1.4 1.4 32
METALDOM 7.7 6.9 9.7 14.0 13.1 13.0 16.8 14.7 14.2 12.4 9.5 9.0 141
MONTE RO 0.2 0.2 0.3 0.5 0.4 0.5 1.1 0.8 0.6 0.3 0.2 0.2 5
LOS ORIGENES
0.1 0.1 0.2 0.4 0.3 0.4 0.9 0.6 0.5 0.3 0.2 0.2 4
POWER PLANT
TOTAL 1350 1199 1390 1384 1453 1465 1552 1558 1491 1467 1362 1370 17,041

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 215 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Caudales promedio turbinados

Tabla 36. Caudales promedios mensuales centrales hidroelctricas, ao 2016.


TOTAL
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3TAVER2 16.01 11.97 13.74 14.88 18.76 18.27 16.33 15.20 12.61 15.20 13.42 12.13 178.52
G3AGUAC1 4.17 3.64 4.26 4.70 3.37 3.90 3.72 4.79 4.61 3.28 3.19 2.13 45.75
G3JIGUE1 3.95 5.53 3.23 4.60 4.09 4.52 1.87 4.16 5.10 5.17 4.95 2.23 49.40
G3MONCI2 7.16 6.35 6.81 6.00 7.04 6.69 6.81 7.16 6.92 6.58 7.16 5.54 80.21
G3HATILL 19.35 16.59 23.04 23.96 22.58 23.50 21.20 18.43 20.74 24.88 18.43 22.58 255.28
G3LANGOS 14.64 13.89 16.15 16.52 13.52 13.89 15.02 14.27 12.77 13.52 11.64 10.51 166.34
G3TAVER1 12.72 16.97 16.97 15.82 17.62 19.09 11.09 15.99 17.94 19.41 15.66 8.16 187.44
G3PALOM1
G3LTORO1
G3JIGUE2 4.35 3.91 3.47 4.05 6.56 7.30 6.41 9.73 7.52 6.93 8.04 2.36 70.63
G3SABANE 8.38 4.96 4.65 4.65 5.89 8.38 9.31 9.31 10.24 10.24 9.62 9.93 95.55
G3PALOM2 0.59 0.41 0.32 0.50 0.77 0.81 0.59 0.72 1.22 1.40 1.08 0.81 9.18
G3PINAL1 0.84 0.49 0.60 0.63 1.15 1.15 0.89 1.18 1.18 1.12 1.04 0.63 10.92
G3AGUAC2 2.40 2.05 1.71 2.14 3.68 3.76 2.82 2.14 2.40 4.45 3.76 1.88 33.19
G3VALDE1 1.72 1.72 1.47 1.23 1.23 1.23 0.98 1.23 0.74 0.98 0.98 1.23 14.72
G3PINAL2 0.40 0.52 0.63 0.72 0.74 0.63 0.95 0.95 0.83 1.15 0.80 0.89 9.20
G3MAGUE2
G3MAGUE1
G3RBLAN1 3.10 1.96 2.72 3.29 2.79 2.41 2.66 2.60 4.05 3.55 2.53 2.66 34.32
G3JIMENO
G3RBLAN2 1.13 3.45 3.26 2.88 1.88 2.70 0.94 3.32 3.76 3.32 1.69 2.63 30.96
G3VALDE2 1.58 1.11 0.95 0.32 0.95 0.79 1.11 0.79 0.47 0.16 0.47 0.63 9.32
G3RINCON 8.63 7.27 7.72 9.99 14.54 12.26 9.08 8.18 6.81 6.36 8.18 9.54 108.56
G3MONCI1 7.30 6.03 6.96 7.42 6.61 6.49 8.23 7.19 6.61 8.00 6.38 6.15 83.37
G3LTORO2
G3LDAMAS
G3SYEGUA 12.16 8.11 7.74 0.74 0.74 3.69 9.95 8.11 7.37 1.47 1.47 4.05 65.61
G3DRODR2
G3DRODR1
G3CEMON1 7.66 6.57 7.66 6.57 7.66 7.66 7.66 7.66 7.66 8.76 8.76 8.76 93.05
G3CEMON2 5.56 4.45 5.56 6.67 6.67 6.67 8.90 7.78 6.67 7.78 6.67 6.67 80.07
G3LBARIA
G3ESALTO
G3RJCRUZ
G3BAIGU1
G3BAIGU2
G3AVARG1
G3AVARG2
G3NNAJAY

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 216 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 37. Caudales promedios mensuales centrales hidroelctricas, ao 2017.


TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3TAVER2 16.01 11.97 13.74 14.88 18.76 18.27 16.33 15.20 12.61 15.20 13.42 12.13 178.52
G3AGUAC1 4.17 3.64 4.26 4.70 3.37 3.90 3.72 4.79 4.61 3.28 3.19 2.13 45.75
G3JIGUE1 3.95 5.53 3.23 4.60 4.09 4.52 1.87 4.16 5.10 5.17 4.95 2.23 49.40
G3MONCI2 7.16 6.35 6.81 6.00 7.04 6.69 6.81 7.16 6.92 6.58 7.16 5.54 80.21
G3HATILL 19.35 16.59 23.04 23.96 22.58 23.50 21.20 18.43 20.74 24.88 18.43 22.58 255.28
G3LANGOS 14.64 13.89 16.15 16.52 13.52 13.89 15.02 14.27 12.77 13.52 11.64 10.51 166.34
G3TAVER1 12.72 16.97 16.97 15.82 17.62 19.09 11.09 15.99 17.94 19.41 15.66 8.16 187.44
G3PALOM1
G3LTORO1
G3JIGUE2 4.35 3.91 3.47 4.05 6.56 7.30 6.41 9.73 7.52 6.93 8.04 2.36 70.63
G3SABANE 8.38 4.96 4.65 4.65 5.89 8.38 9.31 9.31 10.24 10.24 9.62 9.93 95.55
G3PALOM2 0.59 0.41 0.32 0.50 0.77 0.81 0.59 0.72 1.22 1.40 1.08 0.81 9.18
G3PINAL1 0.84 0.49 0.60 0.63 1.15 1.15 0.89 1.18 1.18 1.12 1.04 0.63 10.92
G3AGUAC2 2.40 2.05 1.71 2.14 3.68 3.76 2.82 2.14 2.40 4.45 3.76 1.88 33.19
G3VALDE1 1.72 1.72 1.47 1.23 1.23 1.23 0.98 1.23 0.74 0.98 0.98 1.23 14.72
G3PINAL2 0.40 0.52 0.63 0.72 0.74 0.63 0.95 0.95 0.83 1.15 0.80 0.89 9.20
G3MAGUE2
G3MAGUE1
G3RBLAN1 3.10 1.96 2.72 3.29 2.79 2.41 2.66 2.60 4.05 3.55 2.53 2.66 34.32
G3JIMENO
G3RBLAN2 1.13 3.45 3.26 2.88 1.88 2.70 0.94 3.32 3.76 3.32 1.69 2.63 30.96
G3VALDE2 1.58 1.11 0.95 0.32 0.95 0.79 1.11 0.79 0.47 0.16 0.47 0.63 9.32
G3RINCON 8.63 7.27 7.72 9.99 14.54 12.26 9.08 8.18 6.81 6.36 8.18 9.54 108.56
G3MONCI1 7.30 6.03 6.96 7.42 6.61 6.49 8.23 7.19 6.61 8.00 6.38 6.15 83.37
G3LTORO2
G3LDAMAS
G3SYEGUA 12.16 8.11 7.74 0.74 0.74 3.69 9.95 8.11 7.37 1.47 1.47 4.05 65.61
G3DRODR2
G3DRODR1
G3CEMON1 7.66 6.57 7.66 6.57 7.66 7.66 7.66 7.66 7.66 8.76 8.76 8.76 93.05
G3CEMON2 5.56 4.45 5.56 6.67 6.67 6.67 8.90 7.78 6.67 7.78 6.67 6.67 80.07
G3LBARIA
G3ESALTO
G3RJCRUZ
G3BAIGU1
G3BAIGU2
G3AVARG1
G3AVARG2
G3NNAJAY

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 217 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 38. Caudales promedios mensuales centrales hidroelctricas, ao 2018.


TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3TAVER2 16.01 11.97 13.74 14.88 18.76 18.27 16.33 15.20 12.61 15.20 13.42 12.13 178.52
G3AGUAC1 4.17 3.64 4.26 4.70 3.37 3.90 3.72 4.79 4.61 3.28 3.19 2.13 45.75
G3JIGUE1 3.95 5.53 3.23 4.60 4.09 4.52 1.87 4.16 5.10 5.17 4.95 2.23 49.40
G3MONCI2 7.16 6.35 6.81 6.00 7.04 6.69 6.81 7.16 6.92 6.58 7.16 5.54 80.21
G3HATILL 19.35 16.59 23.04 23.96 22.58 23.50 21.20 18.43 20.74 24.88 18.43 22.58 255.28
G3LANGOS 14.64 13.89 16.15 16.52 13.52 13.89 15.02 14.27 12.77 13.52 11.64 10.51 166.34
G3TAVER1 12.72 16.97 16.97 15.82 17.62 19.09 11.09 15.99 17.94 19.41 15.66 8.16 187.44
G3PALOM1
G3LTORO1
G3JIGUE2 4.35 3.91 3.47 4.05 6.56 7.30 6.41 9.73 7.52 6.93 8.04 2.36 70.63
G3SABANE 8.38 4.96 4.65 4.65 5.89 8.38 9.31 9.31 10.24 10.24 9.62 9.93 95.55
G3PALOM2 0.59 0.41 0.32 0.50 0.77 0.81 0.59 0.72 1.22 1.40 1.08 0.81 9.18
G3PINAL1 0.84 0.49 0.60 0.63 1.15 1.15 0.89 1.18 1.18 1.12 1.04 0.63 10.92
G3AGUAC2 2.40 2.05 1.71 2.14 3.68 3.76 2.82 2.14 2.40 4.45 3.76 1.88 33.19
G3VALDE1 1.72 1.72 1.47 1.23 1.23 1.23 0.98 1.23 0.74 0.98 0.98 1.23 14.72
G3PINAL2 0.40 0.52 0.63 0.72 0.74 0.63 0.95 0.95 0.83 1.15 0.80 0.89 9.20
G3MAGUE2
G3MAGUE1
G3RBLAN1 3.10 1.96 2.72 3.29 2.79 2.41 2.66 2.60 4.05 3.55 2.53 2.66 34.32
G3JIMENO
G3RBLAN2 1.13 3.45 3.26 2.88 1.88 2.70 0.94 3.32 3.76 3.32 1.69 2.63 30.96
G3VALDE2 1.58 1.11 0.95 0.32 0.95 0.79 1.11 0.79 0.47 0.16 0.47 0.63 9.32
G3RINCON 8.63 7.27 7.72 9.99 14.54 12.26 9.08 8.18 6.81 6.36 8.18 9.54 108.56
G3MONCI1 7.30 6.03 6.96 7.42 6.61 6.49 8.23 7.19 6.61 8.00 6.38 6.15 83.37
G3LTORO2
G3LDAMAS
G3SYEGUA 12.16 8.11 7.74 0.74 0.74 3.69 9.95 8.11 7.37 1.47 1.47 4.05 65.61
G3DRODR2
G3DRODR1
G3CEMON1 7.66 6.57 7.66 6.57 7.66 7.66 7.66 7.66 7.66 8.76 8.76 8.76 93.05
G3CEMON2 5.56 4.45 5.56 6.67 6.67 6.67 8.90 7.78 6.67 7.78 6.67 6.67 80.07
G3LBARIA
G3ESALTO
G3RJCRUZ
G3BAIGU1
G3BAIGU2
G3AVARG1
G3AVARG2
G3NNAJAY

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 218 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Tabla 39. Caudales promedios mensuales centrales hidroelctricas, ao 2019.


TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3TAVER2 16.01 11.97 13.74 14.88 18.76 18.27 16.33 15.20 12.61 15.20 13.42 12.13 178.52
G3AGUAC1 4.17 3.64 4.26 4.70 3.37 3.90 3.72 4.79 4.61 3.28 3.19 2.13 45.75
G3JIGUE1 3.95 5.53 3.23 4.60 4.09 4.52 1.87 4.16 5.10 5.17 4.95 2.23 49.40
G3MONCI2 7.16 6.35 6.81 6.00 7.04 6.69 6.81 7.16 6.92 6.58 7.16 5.54 80.21
G3HATILL 19.35 16.59 23.04 23.96 22.58 23.50 21.20 18.43 20.74 24.88 18.43 22.58 255.28
G3LANGOS 14.64 13.89 16.15 16.52 13.52 13.89 15.02 14.27 12.77 13.52 11.64 10.51 166.34
G3TAVER1 12.72 16.97 16.97 15.82 17.62 19.09 11.09 15.99 17.94 19.41 15.66 8.16 187.44
G3PALOM1
G3LTORO1
G3JIGUE2 4.35 3.91 3.47 4.05 6.56 7.30 6.41 9.73 7.52 6.93 8.04 2.36 70.63
G3SABANE 8.38 4.96 4.65 4.65 5.89 8.38 9.31 9.31 10.24 10.24 9.62 9.93 95.55
G3PALOM2 0.59 0.41 0.32 0.50 0.77 0.81 0.59 0.72 1.22 1.40 1.08 0.81 9.18
G3PINAL1 0.84 0.49 0.60 0.63 1.15 1.15 0.89 1.18 1.18 1.12 1.04 0.63 10.92
G3AGUAC2 2.40 2.05 1.71 2.14 3.68 3.76 2.82 2.14 2.40 4.45 3.76 1.88 33.19
G3VALDE1 1.72 1.72 1.47 1.23 1.23 1.23 0.98 1.23 0.74 0.98 0.98 1.23 14.72
G3PINAL2 0.40 0.52 0.63 0.72 0.74 0.63 0.95 0.95 0.83 1.15 0.80 0.89 9.20
G3MAGUE2
G3MAGUE1
G3RBLAN1 3.10 1.96 2.72 3.29 2.79 2.41 2.66 2.60 4.05 3.55 2.53 2.66 34.32
G3JIMENO
G3RBLAN2 1.13 3.45 3.26 2.88 1.88 2.70 0.94 3.32 3.76 3.32 1.69 2.63 30.96
G3VALDE2 1.58 1.11 0.95 0.32 0.95 0.79 1.11 0.79 0.47 0.16 0.47 0.63 9.32
G3RINCON 8.63 7.27 7.72 9.99 14.54 12.26 9.08 8.18 6.81 6.36 8.18 9.54 108.56
G3MONCI1 7.30 6.03 6.96 7.42 6.61 6.49 8.23 7.19 6.61 8.00 6.38 6.15 83.37
G3LTORO2
G3LDAMAS
G3SYEGUA 12.16 8.11 7.74 0.74 0.74 3.69 9.95 8.11 7.37 1.47 1.47 4.05 65.61
G3DRODR2
G3DRODR1
G3CEMON1 7.66 6.57 7.66 6.57 7.66 7.66 7.66 7.66 7.66 8.76 8.76 8.76 93.05
G3CEMON2 5.56 4.45 5.56 6.67 6.67 6.67 8.90 7.78 6.67 7.78 6.67 6.67 80.07
G3LBARIA
G3ESALTO
G3RJCRUZ
G3BAIGU1
G3BAIGU2
G3AVARG1
G3AVARG2
G3NNAJAY

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 219 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Consumo promedio de combustibles

Tabla 40. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2016.
TOTAL
2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016 2016
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AANDRE 1209.8 1257.3 1390.6 1346.9 1392.9 1351.5 1393.6 1392.9 1347.7 1394.4 1345.4 1393.6 16216.3
G3CATAL1
G3CATAL2
G3QUISQ2 28.0 24.4 28.0 25.2 27.9 26.1 28.0 28.0 26.1 27.1 26.1 28.0 322.9
G3ITABO1 37.9 11.0 37.9 36.8 38.0 36.6 37.9 38.0 36.7 37.8 36.6 37.9 423.0
G3ITABO2 38.9 35.2 32.7 38.9 37.6 39.0 38.9 37.7 39.0 37.7 39.1 414.6
G3LMINAC
G3LMINA5 722.9 652.8 722.9 698.3 629.4 467.2 186.9 725.3 699.5 725.3 699.5 724.1 7654.0
G3LMINA6 744.6 672.2 550.0 695.9 215.8 722.1 745.8 745.8 720.9 744.6 719.6 744.6 8022.1
G3QUISQ1 12.9 12.1 13.7 15.0 15.5 15.0 15.6 15.5 16.2 14.6 14.8 14.1 175.1
G3MRIO 13.3 12.6 14.0 14.0 14.5 14.0 14.5 14.0 13.6 14.0 13.5 14.3 166.3
G3LVEGA 13.7 10.6 13.7 11.5 12.5 11.5 13.7 12.5 13.3 13.7 13.3 13.7 153.8
G3PIMEN3 7.3 6.6 7.3 7.0 7.3 7.0 7.3 7.3 7.0 7.3 7.0 7.3 85.6
G3SESTE 9.7 7.8 8.7 9.4 9.7 8.4 9.7 9.7 9.4 9.7 8.4 9.7 110.3
G3PALAMA 11.6 10.1 12.5 15.0 13.6 14.1 15.5 13.8 13.7 11.8 12.1 12.3 156.0
G3BARAHC 15.7 14.1 15.7 15.1 15.7 15.1 15.7 15.7 15.1 15.6 6.5 1.5 161.5
G3EM2CGN 325.4 348.7 416.4 499.3 476.0 453.4 505.0 492.1 455.0 437.3 401.1 364.8 5174.6
G3CEPP2 5.3 4.8 5.3 5.1 5.3 5.1 5.3 5.3 5.1 5.3 5.1 5.3 62.3
G3METALD 4.5 4.0 4.5 4.3 4.5 4.3 4.5 4.5 4.3 4.5 4.3 4.5 52.6
G3PIMEN1 4.7 4.3 4.7 4.6 4.7 4.6 4.7 4.7 4.6 4.7 4.6 4.7 55.9
G3PIMEN2 4.2 3.8 4.2 4.0 4.2 4.0 4.2 4.2 4.0 4.2 4.0 4.2 49.3
G3CESPM3 2.2 1.9 2.3 3.8 3.9 4.1 4.9 3.3 4.0 3.4 2.1 2.1 38.0
G3CEPP1 1.5 1.4 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 18.1
G3CESPM2 0.7 0.8 2.8 4.3 2.0 1.0 5.2 4.5 4.3 4.0 2.6 2.0 34.3
G3CESPM1 1.9 1.8 2.4 3.5 3.2 3.2 4.0 3.7 3.4 0.2 2.3 1.4 31.0
G3HAINAG 2.6 2.2 2.8 4.8 5.0 5.5 6.8 5.9 5.2 4.2 2.5 2.5 50.1
G3LOPPLA 33.7 32.8 40.8 55.5 51.5 50.6 57.7 55.5 53.7 46.2 40.8 35.5 554.4
G3BERSAL 1.1 1.1 1.4 1.8 1.7 1.7 1.9 1.8 1.7 1.6 1.4 1.3 18.6
G3HAINA4 1.2 1.0 1.3 2.3 2.5 2.9 3.6 3.1 2.6 2.1 1.2 1.2 25.1
G3IKM22 0.8 0.8 1.0 1.3 1.2 1.2 1.3 1.3 1.2 1.1 1.0 0.9 13.1
G3RSJUAN 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.0
G3SLORE1
G3SPEDRV

Tabla 41. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2017.
TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AANDRE 1215.9 1259.6 1392.1 1353.8 1396.7 1350.7 1392.1 1396.7 1350.0 1395.2 1350.7 1391.3 16244.7
G3CATAL1 135.5 131.2 135.5 130.7 135.3 668.2
G3CATAL2 135.3 130.9 135.5 401.6
G3QUISQ2 28.0 24.3 28.1 25.2 27.9 26.1 28.0 28.0 26.1 15.5 13.1 13.0 283.3
G3ITABO1 38.0 11.0 38.0 36.7 38.0 36.8 38.0 37.8 36.7 37.9 36.8 37.9 423.7
G3ITABO2 38.9 35.2 32.7 39.0 37.7 38.9 39.1 37.7 39.0 37.8 38.9 414.8
G3LMINAC 979.8 885.1 979.8 949.1 978.6 946.6 981.0 982.3 947.8 934.3 849.5 823.7 11237.6
G3LMINA5 722.9 654.0 726.6 700.7 629.4 467.2 186.9 722.9 700.7 722.9 694.6 703.2 7631.9
G3LMINA6 743.3 671.0 552.5 697.2 215.8 720.9 745.8 743.3 720.9 638.6 594.9 603.6 7647.9
G3QUISQ1 11.6 11.3 12.7 15.0 15.2 14.6 15.6 8.5 9.0 0.8 0.6 0.7 115.6
G3MRIO 11.6 11.4 12.9 14.0 14.5 14.0 14.5 9.8 9.6 1.3 1.1 1.2 115.9
G3LVEGA 12.6 10.6 13.7 11.5 12.5 11.5 13.7 10.2 10.6 2.0 1.7 1.8 112.4

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 220 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3PIMEN3 7.3 6.6 7.3 7.0 7.3 7.0 7.3 7.3 7.0 5.5 5.1 4.8 79.4
G3SESTE 9.7 7.8 8.7 9.4 9.7 8.4 9.7 8.4 7.9 2.0 1.6 1.7 85.0
G3PALAMA 9.0 9.3 12.0 14.2 12.3 12.8 14.4 5.4 5.2 0.3 0.3 0.3 95.4
G3BARAHC 15.7 14.1 15.7 15.1 15.7 15.1 15.7 15.7 15.2 12.8 5.3 1.1 157.0
G3EM2CGN 252.1 278.7 349.5 452.6 429.3 421.2 469.5 124.8 102.3 6.4 4.8 5.6 2897.0
G3CEPP2 5.3 4.8 5.3 5.1 5.3 5.1 5.3 5.3 5.1 4.2 4.0 3.9 58.8
G3METALD 4.5 4.0 4.5 4.3 4.5 4.3 4.5 4.4 4.1 1.7 1.3 1.2 43.2
G3PIMEN1 4.7 4.3 4.7 4.6 4.7 4.6 4.7 4.3 4.0 1.2 1.0 1.0 44.0
G3PIMEN2 4.2 3.8 4.2 4.0 4.2 4.0 4.2 4.0 3.7 1.4 1.0 1.0 39.6
G3CESPM3 1.7 1.9 2.8 4.3 4.0 4.1 5.4 0.7 0.7 0.0 0.0 0.0 25.4
G3CEPP1 1.5 1.4 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.3 1.2 1.2 17.3
G3CESPM2 0.4 0.5 1.8 3.1 1.5 0.8 4.3 0.5 0.3 0.0 0.0 0.0 13.2
G3CESPM1 0.7 0.7 1.0 1.7 1.9 2.1 2.6 0.4 0.3 0.0 0.0 11.5
G3HAINAG 1.5 1.5 1.9 3.4 3.9 4.4 5.6 0.6 0.4 0.0 0.0 23.3
G3LOPPLA 23.1 24.0 32.0 47.5 43.9 43.9 55.9 9.8 8.0 0.4 0.4 0.4 289.4
G3BERSAL 0.8 0.8 1.1 1.5 1.5 1.5 1.8 0.4 0.3 0.0 0.0 9.7
G3HAINA4 0.7 0.7 1.0 1.7 1.8 2.2 2.9 0.3 0.2 11.5
G3IKM22 0.6 0.6 0.8 1.1 1.1 1.0 1.3 0.3 0.2 6.9
G3RSJUAN 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.5
G3SLORE1
G3SPEDRV

Tabla 42. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2018.
TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AANDRE 1215.1 1256.5 1393.6 1349.2 1395.2 1351.5 1392.9 1395.2 1347.7 1392.9 1343.1 1390.6 16223.2
G3CATAL1 135.5 122.3 135.6 131.1 135.5 130.9 135.2 135.1 130.9 135.1 131.1 135.1 1593.5
G3CATAL2 135.5 122.2 135.5 131.3 135.5 130.9 135.1 135.3 131.2 135.4 130.8 135.1 1593.8
G3QUISQ2 12.6 11.3 16.2 19.2 19.8 18.8 23.0 21.5 20.0 17.9 15.6 15.2 211.0
G3ITABO1 37.8 11.0 38.1 36.8 37.9 36.7 37.9 37.9 36.8 38.0 36.7 38.0 423.5
G3ITABO2 38.8 35.2 32.8 39.0 37.6 38.9 39.0 37.7 39.0 37.6 38.8 414.4
G3LMINAC 833.5 807.7 909.7 947.8 979.8 947.8 979.8 979.8 950.3 970.0 896.2 863.0 11065.5
G3LMINA5 711.8 652.8 722.9 699.5 628.2 467.2 186.9 724.1 700.7 725.3 698.3 725.3 7642.9
G3LMINA6 602.4 555.0 465.2 697.2 215.8 713.4 743.3 745.8 719.6 664.8 611.1 613.6 7347.3
G3QUISQ1 0.6 0.6 1.1 1.7 1.4 1.8 2.8 2.2 2.1 1.1 0.9 1.0 17.4
G3MRIO 1.0 1.0 1.7 2.5 2.3 2.7 4.3 3.1 2.9 1.8 1.5 1.6 26.3
G3LVEGA 1.6 1.4 2.4 2.9 2.9 3.4 6.1 4.3 4.4 2.7 2.3 2.2 36.5
G3PIMEN3 4.5 4.5 5.8 6.4 6.2 5.9 6.8 6.4 6.0 5.8 5.6 5.4 69.3
G3SESTE 1.6 1.3 2.0 3.7 3.5 3.3 5.7 4.4 4.3 2.8 2.0 2.1 36.6
G3PALAMA 0.3 0.2 0.5 0.9 0.7 0.9 1.8 1.2 1.1 0.6 0.4 0.4 9.0
G3BARAHC 11.2 11.4 12.7 15.0 14.6 13.8 15.7 15.0 13.8 13.1 5.4 1.2 143.0
G3EM2CGN 4.8 5.6 8.9 14.5 13.7 18.5 36.2 26.6 20.1 10.5 7.2 8.9 175.6
G3CEPP2 3.5 3.7 4.3 5.0 4.8 4.4 5.2 4.9 4.5 4.4 4.1 4.3 53.0
G3METALD 1.2 1.0 1.7 2.5 2.4 2.5 3.3 2.8 2.8 2.0 1.7 1.6 25.5
G3PIMEN1 1.0 0.8 1.4 2.1 2.0 2.1 3.0 2.5 2.6 1.8 1.4 1.3 21.9
G3PIMEN2 0.9 0.8 1.5 2.1 1.9 2.0 2.8 2.4 2.5 1.7 1.4 1.4 21.4
G3CESPM3 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.6
G3CEPP1 1.2 1.1 1.3 1.5 1.5 1.4 1.5 1.5 1.4 1.3 1.2 1.3 16.3
G3CESPM2 0.0 0.1 0.0 0.0 0.2 0.1 0.1 0.0 0.0 0.0 0.6
G3CESPM1 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.6
G3HAINAG 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.6
G3LOPPLA 0.4 0.4 0.9 0.9 0.9 1.3 2.7 1.8 1.3 0.9 0.4 0.9 12.9
G3BERSAL 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.5

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 221 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

TOTAL
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3HAINA4 0.0 0.0 0.1 0.0 0.0 0.2
G3IKM22 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.3
G3RSJUAN
G3SLORE1
G3SPEDRV

Tabla 43. Consumo promedio de combustible aproximado mensual de las centrales de generacin, ao 2019.
TOTAL
2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019
CENTRALES / PERIODO
UNIDADES DE
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
ESTUDIO
G3AANDRE 1214.3 1257.3 1395.2 1346.1 1392.1 1353.0 1392.1 1394.4 1348.4 1392.1 1351.5 1393.6 16230.1
G3CATAL1 135.3 122.4 135.5 131.0 135.5 130.9 135.4 135.5 130.9 135.5 130.8 135.3 1594.0
G3CATAL2 135.0 122.5 135.6 131.1 135.3 131.5 135.2 135.2 131.2 135.1 130.9 135.4 1594.1
G3QUISQ2 14.5 13.4 18.7 20.8 21.5 20.2 23.9 22.9 21.2 19.5 17.8 17.4 231.7
G3ITABO1 38.0 11.0 37.9 36.7 37.9 36.7 37.9 38.0 36.8 37.9 36.7 37.9 423.4
G3ITABO2 38.9 35.1 32.7 38.9 37.7 38.9 38.9 37.7 38.9 37.7 38.8 414.3
G3LMINAC 879.0 851.9 955.2 947.8 979.8 947.8 977.3 978.6 950.3 981.0 930.6 914.6 11294.1
G3LMINA5 724.1 651.6 721.6 702.0 630.7 467.2 186.9 724.1 698.3 724.1 698.3 722.9 7651.5
G3LMINA6 617.4 567.5 477.7 697.2 215.8 720.9 743.3 744.6 719.6 702.2 633.6 628.6 7468.3
G3QUISQ1 0.9 0.8 1.5 2.2 1.9 2.3 3.7 2.9 2.8 1.6 1.3 1.4 23.3
G3MRIO 1.5 1.4 2.1 3.2 2.9 3.5 5.6 4.3 3.8 2.4 2.0 2.0 34.6
G3LVEGA 2.0 1.7 2.9 4.2 4.1 4.4 7.6 5.5 5.8 3.6 2.9 2.7 47.3
G3PIMEN3 4.8 5.1 5.9 6.8 6.6 6.2 7.2 6.8 6.2 6.0 5.7 5.9 73.2
G3SESTE 2.0 1.6 2.8 4.5 4.2 3.9 6.2 5.3 5.4 3.8 2.6 2.8 45.0
G3PALAMA 0.4 0.3 0.8 1.3 1.0 1.3 2.3 1.7 1.6 0.8 0.6 0.7 12.8
G3BARAHC 12.5 11.5 13.0 15.1 15.6 14.8 15.6 15.7 15.0 13.5 5.5 1.2 148.9
G3EM2CGN 7.2 7.2 13.7 23.4 21.7 26.6 53.2 37.9 30.6 16.1 11.3 11.3 260.1
G3CEPP2 3.9 3.9 4.3 5.1 5.0 4.8 5.3 5.2 4.8 4.5 4.2 4.3 55.3
G3METALD 1.6 1.5 2.1 3.0 2.8 2.8 3.6 3.1 3.0 2.6 2.0 1.9 29.9
G3PIMEN1 1.3 1.1 1.8 2.7 2.6 2.6 3.4 3.0 2.9 2.1 1.8 1.7 27.0
G3PIMEN2 1.3 1.1 1.7 2.6 2.5 2.5 3.3 2.7 2.7 2.3 1.7 1.6 26.1
G3CESPM3 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.8
G3CEPP1 1.3 1.1 1.3 1.5 1.5 1.5 1.5 1.5 1.5 1.4 1.3 1.3 16.7
G3CESPM2 0.0 0.0 0.1 0.1 0.0 0.0 0.2 0.2 0.1 0.1 0.0 0.1 0.9
G3CESPM1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.9
G3HAINAG 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.0 0.1 1.1
G3LOPPLA 0.4 0.4 0.9 1.8 1.3 1.8 4.0 2.7 2.2 1.3 0.9 0.9 18.6
G3BERSAL 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.7
G3HAINA4 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.4
G3IKM22 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.5
G3RSJUAN
G3SLORE1
G3SPEDRV

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 222 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Datos de la Generacin

Sobre la base de los datos declarados por los agentes generadores, se muestran en la Tabla 44,
los costos variables de produccin9 y de despacho esperados de las centrales generadoras,
organizados en orden de mrito para este periodo de estudio.
Tabla 44. Rendimientos y costos de combustibles.
Costo Variable Costo Variable No Costo Variable de Costo Variable de
Consumo
No. Unidad Combustible Combustible Produccin Despacho
Especfico kgr/kWh
RD$/MWh RD$/MWh RD$/MWh RD$/MWh
1 G3AANDRE 7.66 1030.05 4.99 1035.03 1101.08
2 G3ITABO1 0.47 1222.79 90.65 1313.44 1327.45
3 G3ITABO2 0.47 1222.79 90.65 1313.44 1330.47
4 G3LMINA5 12.29 1764.25 35.35 1799.60 1818.00
5 G3LMINA6 12.47 1789.87 35.81 1825.67 1843.39
6 G3BARAHC 0.52 1991.12 248.84 2239.96 2283.90
7 G3QUISQ2 0.19 2153.09 33.54 2186.63 2329.79
8 G3LOPPFO 191.85 2236.95 46.69 2283.64 2373.33
9 G3CEPP1 0.22 2394.60 95.78 2490.39 2388.94
10 G3CEPP2 0.23 2476.44 99.06 2575.50 2466.64
11 G3SESTE 0.20 2350.41 93.82 2444.23 2542.82
12 G3PIMEN3 0.22 2538.79 101.55 2640.35 2558.09
13 G3METALD 0.21 2503.01 50.06 2553.07 2567.16
14 G3QUISQ1 0.19 2355.54 95.06 2450.60 2611.04
15 G3MRIO 0.21 2482.76 99.31 2582.08 2647.37
16 G3PIMEN2 0.22 2654.48 106.18 2760.66 2674.72
17 G3PIMEN1 0.23 2694.68 107.79 2802.47 2716.27
18 G3LVEGA 0.22 2790.64 111.63 2902.27 2804.21
19 G3PALAMA 0.22 2711.60 108.46 2820.07 2826.50
20 G3EM2CGN 8.05 2887.81 115.51 3003.33 3038.38
21 G3BERSAL 0.22 2921.81 116.87 3038.68 3150.41
22 G3IKM22 0.23 3097.77 123.92 3221.68 3178.41
23 G3LOPPGN 8.69 3994.19 46.71 4040.90 4199.61
24 G3CESPM2 0.19 3859.85 231.59 4091.44 4262.91
25 G3CESPM3 0.19 3859.85 231.59 4091.44 4262.91
26 G3CESPM1 0.19 3859.85 231.59 4091.44 4262.91
27 G3RSJUAN 0.27 6939.69 208.19 7147.89 6794.87
28 G3SFELIP 0.28 8701.92 167.25 8869.17 8447.97
29 G3HAINAG 0.33 8876.77 177.68 9054.44 9071.65
30 G3HAINA2 0.35 9875.43 691.21 10566.64 10575.28
31 G3PPLAT1 0.37 10447.91 731.55 11179.47 10677.63
32 G3HAINA4 0.40 11521.33 806.79 12328.12 12338.20
33 G3HAINA1 0.40 11527.05 806.79 12333.85 12343.93
34 G3PPLAT2 0.42 12696.02 887.92 13583.95 12995.72
35 G3SPEDRV 0.41 11824.83 827.64 12652.47 13016.37
36 G3SLORE1 0.41 16692.62 328.62 17021.24 17053.45

9
El costo variable de produccin considerado en esta programacin de mediano plazo se obtuvo del promedio mensual de las declaraciones de
precios de combustibles de los Agentes del MEM, y el Factor de Nodo Calculado para la Semana de Programacin del 03 al 09 de octubre,
igualmente, la tasas de cambio utilizada fue la de venta del dlar de la entidades Financieras de la semana en cuestin.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 223 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Concesiones provisionales otorgadas por la Comisin Nacional de Energa (CNE)

Tabla 45. Concesiones provisionales otorgadas por la CNE.

FECHA
TIPO DE POTENCIA TIPO DE
RESOLUCION EMPRESA UBICACIN
CONCESION (MVA) ENERGIA
AO MES DIA

EL NARANJO,
ENERGIA PROVINCIA
CNE-CP-0002- CONCESIN SOLAR POWER
2014 FEB 24 20 SOLAR SANTIAGO DE
2014 PROVISIONAL NARANJO S.R.L
FOTOVOLTAICA LOS
CABALLEROS

ENERGIA
CNE-CP-0003- CONCESIN GREEN POWER
2014 FEB 24 20 SOLAR MONTECRISTI
2014 PROVISIONAL ZWOLF,UG
FOTOVOLTAICA

LIGHTYEAR
ENRIQUILLO,
CNE-CP-0004- CONCESIN CORPORATIVE ENERGIA
2014 FEB 24 50 PROVINCIA
2014 PROVISIONAL SOLUTIONS EOLICA
BARAHONA
S.R.L

MAIMON
CNE-CP-0010- CONCESIN ENERGIA PUERTO
2014 AGOS 8 POWER GROUP, 50
2014 PROVISIONAL EOLICA PLATA
S.A.S.

CONSORCIO
ENERGETICO ENERGIA
CNE-CP-0008- CONCESIN BAVARO, LA
2014 AGOS 26 PUNTA CANA 7.2 SOLAR
2014 PROVISIONAL ALTAGRACIA
MACAO S.A FOTOVOLTAICA
(CEPM)

LEVITALS ENERGIA
CNE-CP-0012- CONCESIN
2014 AGOS 11 GRUPO 20 SOLAR AZUA
2014 PROVISIONAL
INVERSOR, L.T. FOTOVOLTAICA

PUERTO
CNE-CP-0001- CONCESIN IC POWER DR ENERGIA PLATA,
2015 ABRI 17 50
2015 PROVISIONAL OPERATIONS EOLICA MONTECRISTI,
VALVERDE

AEROPUERTO ENERGIA
CNE-CP-0002- CONCESIN
2015 ABRI 20 INTERNACIONAL 3 SOLAR SANTIAGO
2015 PROVISIONAL
DEL CIBAO FOTOVOLTAICA

MADORAL GAS NATURAL


CNE-CP-0003- CONCESIN
2015 ABRI 30 OVERSEAS 414 CICLO MONTECRISTI
2015 PROVISIONAL
LIMITED COMBINADO

RAFEY,
GREEN WHEELS
CNE-CP-0004- CONCESIN RENOVABLE SANTIAGO DE
2015 MAY 5 DOMINICANA 20
2015 PROVISIONAL (GAS METANO) LOS
S.R.L
CABALLEROS

CONSORCIO
ENERGETICO
CNE-CP-0006- CONCESIN ENERGIA POLO,
2015 JUL 16 PUNTA CANA 50
2015 PROVISIONAL EOLICA BARAHONA
MACAO S.A
(CEPM)

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 224 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

FECHA
TIPO DE POTENCIA TIPO DE
RESOLUCION EMPRESA UBICACIN
CONCESION (MVA) ENERGIA
AO MES DIA

ENERGIA
CNE-CP-0005- CONCESIN MONTELUX
2015 JUL 20 15 SOLAR MONTECRISTI
2015 PROVISIONAL S.R.L
FOTOVOLTAICA

BIOMASA (
CNE -CP- CONCESIN CRISTBAL SAN PEDRO
2015 JUL 21 7 BAGAZO DE
0007 -2015 PROVISIONAL COLON, S. A DE MACORS
CANA)

AEROPUERTO ENERGIA
CNE-AD-0005- CONCESIN
2015 JUL 31 INTERNACIONAL 3 SOLAR SANTIAGO
2015 PROVISIONAL
DEL CIBAO FOTOVOLTAICA

TOTAL 729.2

Programa de Mantenimiento Mayor

Se asume la aplicacin del Programa de Mantenimiento Mayor Propuesto para el ao 2016, y


su repeticin para los aos siguientes del periodo de estudio.
A continuacin de muestra la con el Programa de Mantenimiento Mayor propuesto para el
ao 2016.

Tabla 46. Programa de Mantenimiento Mayor propuesto de centrales de generacin ao 2016.

FECHA INICIO DIAS DE


CENTRAL COMENTARIOS-OC
PROGRAMADA DURACION

Se propone adelantarlo en 15 das con respecto a la fecha de inicio


TAVERA 2 22 de julio de 2016 8
declarada por el Agente. (Fecha de holgura no declarada).

Se propone adelantarlo en 15 das con respecto a la fecha de inicio


JIGUEY 1 31 de julio de 2016 9
declarada por el Agente. (Fecha de holgura no declarada).

12 de septiembre Se propone retrasarlo en 15 das con respecto a la fecha de inicio


JIGUEY 2 9
de 2016 declarada por el Agente. (Fecha de holgura no declarada).

20 de septiembre Se propone retrasarlo en 15 das con respecto a la fecha de inicio


RIO BLANCO 1 13
de 2016 declarada por el Agente. (Fecha de holgura no declarada).

3 de octubre de Se propone retrasarlo en 15 das con respecto a la fecha de inicio


RIO BLANCO 2 14
2016 declarada por el Agente. (Fecha de holgura no declarada).

Se propone adelantarlo en 15 das con respecto a la fecha de inicio


MONCION 1 19 de junio de 2016 20
declarada por el Agente. (Fecha de holgura no declarada).

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 225 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

FECHA INICIO DIAS DE


CENTRAL COMENTARIOS-OC
PROGRAMADA DURACION

8 de agosto de Se propone retrasarlo en 15 das con respecto a la fecha de inicio


MONCION 2 20
2016 declarada por el Agente. (Fecha de holgura no declarada).

LOPEZ 22 de mayo de Se propone adelantarlo en 15 das con respecto a la fecha de inicio


18
ANGOSTURA 2016 declarada por el Agente. (Fecha de holgura no declarada).

2 de febrero de
EL SALTO 26 La fecha del MM permanece igual a la declarada por el Agente.
2016

SABANETA 11 de abril de 2016 18 La fecha del MM permanece igual a la declarada por el Agente.

26 de enero de Se propone retrasarlo en 7 das con respecto a la fecha de inicio


AES ANDRES 10
2016 declarada por el Agente . (Holgura declarada)

19 de marzo de
LOS MINA 6 8 La fecha del MM permanece igual a la declarada por el Agente.
2016

LOS MINA 6 30 de abril de 2016 23 La fecha del MM permanece igual a la declarada por el Agente.

28 de mayo de
LOS MINA 5 23 La fecha del MM permanece igual a la declarada por el Agente.
2016

LOS MINA 5 21 de junio de 2016 33 La fecha del MM permanece igual a la declarada por el Agente.

BARAHONA 14 de noviembre Se propone retrasarlo en 30 das con respecto a la fecha de inicio


45
CARBON de 2016 declarada por el Agente. (Holgura declarada).

27 de marzo de
ITABO 2 35 La fecha del MM permanece igual a la declarada por el Agente.
2016

8 de febrero de Se propone adelantarlo en 7 das con respecto a la fecha de inicio


ITABO 1 19
2016 declarada por el Agente. (Holgura declarada)

20 de septiembre Se propone retrasarlo en 15 das con respecto a la fecha de inicio


CESPM 1 40
de 2016 declarada por el Agente. (Fecha de holgura no declarada).

10 de enero de Se propone adelantarlo en 15 das con respecto a la fecha de inicio


CESPM 2 40
2016 declarada por el Agente. (Holgura declarada)

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 226 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

FECHA INICIO DIAS DE


CENTRAL COMENTARIOS-OC
PROGRAMADA DURACION

15 de mayo de Se propone adelantarlo en 15 das con respecto a la fecha de inicio


CESPM 2 40
2016 declarada por el Agente. (Holgura no declarada).

6 de diciembre de Se propone retrasarlo en 15 das con respecto a la fecha de inicio


CESPM 2 7
2016 declarada por el Agente . (Fecha de holgura no declarada).

23 de agosto de Se propone retrasarlo en 15 das con respecto a la fecha de inicio


CESPM 3 7
2016 declarada por el Agente. (Fecha de holgura no declarada).

BRAZO
4 de abril de 2016 9 La fecha del MM permanece igual a la declarada por el Agente.
DERECHO

Comparacin Costos Variables de Despacho

La Figura 53. Comparacin Costos variables de Despacho. compara los Costos Variables de Despacho de
las centrales termoelctricas del SENI de enero a octubre del 2015.

RD/MWh
Comparacin de Costos Variables de Despacho (RD$ / MWh)
20,000
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0

Costo Variable de Despacho Diciembre RD$/MWh Costo Variable de Despacho Enero RD$/MWh

Costo Variable de Despacho Febrero RD$/MWh Costo Variable de Despacho Marzo RD$/MWh

Costo Variable de Despacho Abril RD$/MWh Costo Variable de Despacho Mayo RD$/MWh

Costo Variable de Despacho Junio RD$/MWh Costo Variable de Despacho Julio RD$/MWh

Costo Variable de Despacho Agosto RD$/MWh Costo Variable de Despacho Septiembre RD$/MWh

Costo Variable de Despacho Octubre RD$/MWh

Figura 53. Comparacin Costos variables de Despacho.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 227 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Propuestas de mejoras realizadas en los Programas de Mediano Plazo del 2015.


Tabla 47. Recomendaciones hechas por el OC en los PMP del 2015
PROPUESTAS DE MEJORAS REALIZADAS POR EL ORGANISMO COORDINADOR EN EL PROGRAMA DE MEDIANO PLAZO 2015
No Mes Nombre Propuesto en el PMP Impacto Tcnico / Seguridad Impacto econmico

Alta probabilidad de dficit de


generacin en caso de no encontrarse
disponibles las centrales de CESPM 1, 2 y
3 as y centrales como Haina 4, Haina 1 y
Anlisis elctrico del SENI Haina TG.
considerando la salida
esperada de enero a febrero Baja tensin en la zona del sur profundo
2015 por el mantenimiento producto de la salida para
1 ENE Ene_Dic 2015
mayor de las unidades (AES mantenimiento mayor de Barahona
ANDRES, ITABO 1 y Carbn. Tambin en la zona de Arroyo
BARAHONA CARBON). Hondo y reas aledaas.

Posibilidad de sobrecarga del


transformador de Piedra Blanca, por
inyecciones al SENI.

-Anlisis Modal del SENI 1. Los resultados del anlisis modal


mostraron los diferentes
modos de oscilacin entre las
unidades de generacin del
SENI. Se verifico a las
-Anlisis de generacin unidades Los Mina 5 y 6
hidroelctrica participando en algunas de
estas oscilaciones. Se observ
que todos los
amortiguamientos de estas
oscilaciones fueron mayores
2 al 5% mnimo exigido.
FEB Feb 2015 _Ene 2016

2. La generacin Hidroelctrica,
representa el 10% de todo el
parque energtico del SENI.
Con relacin al ao 2006
como base se tiene una
variacin promedia
acumulada de generacin
hidroelctrica del orden 25%.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 228 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

PROPUESTAS DE MEJORAS REALIZADAS POR EL ORGANISMO COORDINADOR EN EL PROGRAMA DE MEDIANO PLAZO 2015
No Mes Nombre Propuesto en el PMP Impacto Tcnico / Seguridad Impacto econmico

Puede observarse una mejora en la


calidad de la frecuencia del SENI, debido
a la aplicacin de las resolucin SIE-030-
2014, y el ingreso de nuevos oferentes a
Evaluacin del efecto la prestacin del servicio de regulacin
operativo de la habilitacin de de frecuencia del SENI. Con el
3 MAY las centrales del SENI a May 2015 _Mar 2016 incremento de nuevos oferentes para el
ofrecer el servicio de servicio de regulacin secundaria se
regulacin de frecuencia vislumbra mejoras considerables en la
calidad del servicio de energa elctrica
del SENI.

Se evidencia que con las coordinaciones


de las protecciones y pruebas de los
equipo del sistema de proteccin se
Anlisis Desempeo de las
estn reduciendo los eventos relevantes
4 JUL Protecciones periodo 2011 Jul 2015 _Jun 2016
en el SENI. Los criterios de coordinacin
2015.
de ajustes de protecciones han sido
efectivos.

Se estima que actualmente


el SENI por motivo
de las recientes habilitaciones
en el servicio de
Impacto tcnico - econmico
regulacin secundaria
de las recientes habilitaciones
Mejoras en los indicadores de calidad de de frecuencia
de unidades generadoras al
frecuencia. Encontrndose stos en los se economiza
5 SEP servicio de regulacin Sep 2015 _Ago 2016
lmites definiditos por la Normativa. en el costo operativo
secundaria de frecuencia del
aproximadamente
SENI.
unos RD$ 2,438,776.05
diariamente,
que al ao se traducira
en unos RD$ 890,153,261.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 229 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

Propuestas de mejoras realizadas en los Programas de Mediano Plazo del 2014.

Tabla 48. Propuestas hechas por el OC en los PMP del 2014


PROPUESTAS DE MEJORAS REALIZADAS POR EL ORGANISMO COORDINADOR EN EL PROGRAMA DE MEDIANO PLAZO 2014
No Mes Nombre Propuesto en el PMP Impacto Tcnico / Seguridad Impacto econmico
Aumento de los niveles de
confiabilidad y la operacin
ptima del SENI, mayor
flexibilidad en la operacin de la
zona debido a que con una falla
Operacin de la Doble Barra en en una de las barras el SENI solo
la S/E Palamara 138 kV: perder una parte de las
1 ENE Ene_Dic 2014
Distribucin ptima de los instalaciones. Con la distribucin
elementos. de barras propuestas por este
estudio, se garantiza que ante la
salida de cualquiera de ellas cada
una de las zonas conectadas a
Itabo, se mantendr conectada a
travs de la barra sana.
Metodologa para la Asignacin
Feb_ 2014 Ene_ Aumento de los niveles de
2 FEB de las Consignas de Tensin
2015 calidad y confiabilidad del SENI.
para los Generadores.
Los esquemas de proteccin de
las lneas San Felipe Puerto
Plata 2, no permiten obtener una
coordinacin adecuada de las Los resultados de los casos
protecciones, analizados fueron los siguientes:
independientemente de si existe para el escenario sin el cambio en
o no, la conexin en T la zona de Puerto Plata 138 kV, el
planteada por ETED. costo total esperado de operacin
del sistema resultara en el monto
Para fallas en cualquiera de estas 664.85 millones de pesos,
lneas podramos tener tiempos mientras que el caso con el cambio
altos de despejes de fallas y de topologa arroja un costo total
Impacto en el SENI del cambio disparos indeseados en El esperado para la operacin del
de topologa en la zona DE Mar_ 2014 Feb_ Naranjo y Navarrete 2.
3 MAR sistema de 660.85 millones de
PUERTO PLATA 138 KV. 2015
pesos para la semana. La
Mediante la simulacin del diferencia en los costos totales
despacho econmico semanal del entre estos escenarios result en
SENI, se verific que el cambio de 4.3 millones de pesos debido
topologa en la zona de Puerto mayormente al cambio de la
Plata 138 kV desde el punto de topologa mencionada, se muestra
vista econmico tiene un impacto un posible ahorro por un aumento
positivo en cuanto a la reduccin de la capacidad mxima de
del costo total de operacin del transferencia debida a la
SENI, debido a que se aplicacin del criterio N-1.
incrementa la capacidad de flujo
de potencia desde esta zona.

Impacto en el SENI del cambio


de topologa en la zona DE Abr_ 2014 Mar_
4 ABR Ver mes de marzo Ver mes de marzo
PUERTO PLATA 138 KV 2015

Se presentan para su
consideracin a la ETED, las
Estudio de posicionamiento de posiciones de los Taps de los
taps de los May_ 2014 Jun_ autotransformadores 138 kV/ 69
5 MAY
autotransformadores del SENI 2015 kV y 345/138 kV que definen los
mejores niveles de voltaje del
SENI, ante la implementacin de
la regulacin de tensin segn la

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 230 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

PROPUESTAS DE MEJORAS REALIZADAS POR EL ORGANISMO COORDINADOR EN EL PROGRAMA DE MEDIANO PLAZO 2014
No Mes Nombre Propuesto en el PMP Impacto Tcnico / Seguridad Impacto econmico
Normativa.

1. Estudio de Posicionamiento
de TAPS de Los 1. Se obtuvieron, las posiciones 1. Mejora en la calidad del servicio
Autotransformadores del SENI. de taps de los y reduccin en prdidas de energa
en el SENI.
2. Impacto en los costos totales autotransformadores 138 kV/69
de produccin con de la entrada kV y 345/138 kV que definen los 2. El despacho con las nuevas
de nuevas centrales a oferentes centrales incorporadas al SENI a
mejores niveles de voltaje del
de Regulacin Secundaria de Jun_ 2014 May_ ofrecer el servicio de RSF,
6 JUN
Frecuencia. 2015 SENI, ante la implementacin de proyecta una reduccin
la regulacin de tensin segn la significativa en el costo de
3. Impacto en las valorizaciones despacho.
del servicio de regulacin Normativa.
secundaria (RSF) con nuevas 3. Se estima una reduccin del
centrales oferentes del servicio. costo del servicio de RSF en el
orden del 48%.

Para que las cargas del SENI


cumplan en el 100% del tiempo
Se estima una reduccin de un
Estudio de Compensacin con un FP de 0.9, es necesario
7 JUL Jul_ 2014 Jun_ 2015 100%, en el saldo deudor de la
Reactiva de las Cargas del SENI.
instalar un total de 83.2 MVAR, demanda del SENI.
distribuidos en estas.

Los bancos de capacitores se


pueden instalar
Estudio de Compensacin
Reactiva Esttica de las Cargas permanentemente inyectando al
8 AGO del SENI. Ago_ 2014 Jul_ 2015 SENI, ya que no provocan sobre

tensiones en las diferentes


subestaciones del mismo.

Se enumeran y/o detallan las


soluciones principales barreras Estudio externo (tesis de
Sector elctrico: Barreras para
maestra) de un integrante del
el desarrollo de las energas Sep _ 2014 Ago_ que para el desarrollo de las
9 SEP rea de Estudios, incorporado por
renovables en Repblica 2015
energas renovables en Repblica ser tema afn y de relevancia para
Dominicana (PUCMM EOI)
Dominicana. el sector.

1. Se observan perfiles de voltaje


1. Impacto de la desconexin muy bajos para los escenarios de
del autotransformador demanda simulados.
1. Una posible opcin tcnica que
Barahona Carbn para
permitira la realizacin de
mantenimiento programado. 2. Considerando la configuracin
mantenimiento sera la instalacin
topolgica de la zona sur
10 OCT Oct _ 2014 Sep _ de un autotransformador mvil en
2. Habilitacin de Nuevas profundo, este mantenimiento
2015 el periodo de mantenimiento.
Centrales para la prestacin del podra comprometer la calidad y
Servicio de RPF en el SENI. confiabilidad del suministro de
energa en esa zona.

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 231 de 232
ORGANISMO COORDINADOR DEL SISTEMA ELCTRICO NACIONAL INTERCONECTADO DE LA
REPBLICA DOMINICANA, INC.

PROPUESTAS DE MEJORAS REALIZADAS POR EL ORGANISMO COORDINADOR EN EL PROGRAMA DE MEDIANO PLAZO 2014
No Mes Nombre Propuesto en el PMP Impacto Tcnico / Seguridad Impacto econmico

1. Resumen Restricciones
Operativas Sistema de
Transmisin SENI 2015. Nov_ 2014 Oct _
11 NOV
2015
2. Resumen Estudio de
Cortocircuito del SENI 2015
Estudio restricciones operativas de
la red de transmisin del SENI,
Ver resultado de los informes 2015-2018.
12 DIC siguientes, para el ao 201510: Dic_ 2014 Nov_ 2015
Estudio de corrientes de
cortocircuito 2015-2018.

10
www.oc.org.do

PROGRAMACIN DE LA OPERACIN DE LARGO PLAZO ENE_2016 DIC _ 2019 OC-GO-14-POLP1510-151031-V0 232 de 232