Weekly-Monthly Safety 1. TP-NG-6450-005-001 Reports 2. TP-NG-6450-009-001 Technical Problem Form T&C Contractor Test 3. TP-NG-6450-010-001 Equipment List T&C Contractor Performance If Project is completed 4. TP-NG-6450-010-004 Report more than 80%. Mandatory Documentation 5. TP-NG-6460-001-001 Approval Form 6. TP-NG-6460-001-002 Joint Site Visit Checklist 7. TP-NG-6460-001-003 Three Weeks Schedule 8. TP-NG-6460-002-002 Punch List Weekly Safety and 9. TP-NG-6460-002-001 Coordination Meeting Uncontrollable Project Delay 10. TP-NG-6460-002-003 If project is on hold. Form 11. TP-NG-6460-002-005 Pre-Energization Check List If Fault occurred during energization or 12. TP-NG-6460-003-001 Fault Report upto one year after energization. 13. TP-NG-6460-003-002 Energization Report 14. TP-NG-6460-001-005 Project Commissioning Plan T&C Contractors Staff 15. TP-NG-6460-001-004 Organization Chart
Check List of Substation equipment's
Sr No: Procedure No: Description Remarks. CL-NG-6460-002-001 Prerequisites to Start the 1. SAS Commissioning Commissioning Checklist of CL-NG-6460-002-002 2. Substation Automation System (SAS) Checklist for Commissioning CL-NG-6460-002-018 3. of Oil-Immersed Power Transformer Checklist for Oil-Immersed CL-NG-6460-002-019 4. Shunt Reactors Commissioning Checklist for Pole CL-NG-6460-002-114 5. Discrepancy Panel Scheme If Applicable Check and Function Test CL-NG-6460-002-113 Checklist for TEE Protection 6. Stability & Sensitivity Test Checklist for Load Shedding CL-NG-6460-002-112 (Under Voltage) Panel 7. Scheme Check and Function Test CL-NG-6460-002-020 Checklist of Surge Arrestors 8. Commissioning CL-NG-6460-002-060 Checklist of Timers (62) 9. Commissioning CL-NG-6460-002-059 Checklist of Auxiliary Relays 10. . Commissioning CL-NG-6460-002-021 Checklist of Station Service 11. Transformers Commissioning Checklist of Neutral Earthing CL-NG-6460-002-022 12. Resistor (NER) Commissioning CL-NG-6460-002-023 Checklist of Current 13. Transformer Commissioning CL-NG-6460-002-024 Checklist of Voltage 14. Transformers Commissioning Checklist of Capacitive CL-NG-6460-002-025 Voltage Transformers (CVT) 15. 110kV through 380kV Commissioning Checklist of Coupling CL-NG-6460-002-026 Capacitor Voltage 16. Transformer (CCVT) 69kV through 380kV Commissioning CL-NG-6460-002-027 Checklist of Hybrid/Gas 17. insulated Switchgear (GIS) Commissioning CL-NG-6460-002-029 Check list of Metal Clad 18. Switchgear Commissioning CL-NG-6460-002-030 Checklist of Metal Enclosed 19. Bus Duct Commissioning CL-NG-6460-002-031 Checklist of Indoor and 20. Outdoor Bus Structures Commissioning CL-NG-6460-002-111 Checklist for TEE Protection 21. Differential Relay (87TEE) Commissioning CL-NG-6460-002-109 Checklist for Transducer 22. Commissioning CL-NG-6460-002-032 Checklist for Indoor Circuit 23. Breakers Commissioning 24. CL-NG-6460-002-033 Checklist of Outdoor Circuit Breakers Commissioning CL-NG-6460-002-034 Checklist of Disconnect & 25. Grounding Switches Commissioning CL-NG-6460-002-035 Checklist of Circuit Switchers 26. Commissioning CL-NG-6460-002-036 Checklist of 230kV and 27. 380kV XLPE Cables Commissioning CL-NG-6460-002-037 Checklist of 230kV and 28. 380kV LPOF Commissioning CL-NG-6460-002-038 Checklist of 110kV and 29. 115kV and 132kV XLPE Cables Commissioning CL-NG-6460-002-039 Checklist of 110kV and 30. 115kV and 132kV LPOF Cables Commissioning. CL-NG-6460-002-040 Checklist of 69kV XLPE 31. Power Cables Commissioning CL-NG-6460-002-041 Checklist of 13.8kV and 33kV 32. XLPE Power Cables Commissioning CL-NG-6460-002-042 Checklist of LV Cables 33. Commissioning CL-NG-6460-002-043 Checklist of Control Cable 34. Commissioning CL-NG-6460-002-044 Checklist of Overhead Lines 35. Commissioning CL-NG-6460-002-045 Checklist of Protection and 36. Control Panels Commissioning CL-NG-6460-002-108 Checklist for Power Factor 37. Meter Commissioning CL-NG-6460-002-046 Checklist of Station Batteries 38. Commissioning CL-NG-6460-002-047 Checklist of Battery Charger 39. Commissioning CL-NG-6460-002-048 Checklist of AC Distribution 40. Panels Commissioning CL-NG-6460-002-107 Checklist for Frequency 41. Meter Commissioning CL-NG-6460-002-049 Checklist of DC Distribution 42. Panels Commissioning
CL-NG-6460-002-050 Checklist of LV AC Auto-
43. Transfer Switching Scheme Commissioning CL-NG-6460-002-106 Checklist for Energy Meter 44. Commissioning CL-NG-6460-002-105 Checklist for Power Meter 45. Commissioning CL-NG-6460-002-104 Checklist for Voltmeter 46. Commissioning CL-NG-6460-002-103 Checklist for Ammeter 47. Commissioning CL-NG-6460-002-102 48. Checklist for On Load Tests
CL-NG-6460-002-101 Checklist for CSD
49. Energization CL-NG-6460-002-051 Checklist of Dry Type 50. Transformer Commissioning CL-NG-6460-002-052 Checklist of Ring Main Unit 51. (RMU) Commissioning CL-NG-6460-002-100 Checklist for SCADA Point 52. List Test CL-NG-6460-002-053 Checklist of Capacitors Bank 53. Test Commissioning CL-NG-6460-002-054 Checklist of Capacitor Bank 54. And Associated Reactor (Reactor Test) CL-NG-6460-002-055 Checklist of Static VAR 55. Compensation System Commissioning CL-NG-6460-002-056 Checklist of Protection Relays 56. General Mechanical Checks & Visual Inspection CL-NG-6460-002-057 Checklist of Protection Relays 57. General Electrical Tests CL-NG-6460-002-058 Checklist of Testing Digital & 58. Numerical Protection & Control Relays and IEDs CL-NG-6460-002-061 Checklist of Over/Under- 59. Voltage Supervision Relays (59/27) Commissioning Checklist of Stability & CL-NG-6460-002-097 Sensitivity Test for 60. Differential Protection of Transformer / Reactor CL-NG-6460-002-098 Checklist of Restricted Earth 61. Fault Protection Stability & Sensitivity Test CL-NG-6460-002-062 Checklist of Compensation 62. Voltage Protection 59ND Commissioning CL-NG-6460-002-063 Checklist of Trip Circuit 63. Supervision Commissioning CL-NG-6460-002-064 Checklist of Over-Current & 64. Earth Fault Protection Relay Commissioning CL-NG-6460-002-065 Checklist of Circuit Breaker 65. Fail (CBF) Protection (50/62) Commissioning 66. CL-NG-6460-002-099 Checklist for End To End Test for Over Head Line Feeders CL-NG-6460-002-096 Checklist for Stuck Breaker 67. Protection Stability & Sensitivity Test CL-NG-6460-002-095 Checklist for Bus Bar 68. Protection Stability & Sensitivity Test CL-NG-6460-002-094 Checklist for Synchronizing 69. Scheme Check and Function Test CL-NG-6460-002-093 70. Checklist for Final Trip Test
CL-NG-6460-002-092 Checklist for Common
71. Alarms Panel Scheme check and Function Test Checklist for ACCS CL-NG-6460-002-091 Automatic Capacitor Control 72. System Scheme check and Function Test CL-NG-6460-002-090 Checklist for ACSE /ABTS 73. /TOP Scheme Check & Function Test CL-NG-6460-002-089 Checklist for Bus Bar Prot 74. Panel Scheme Check & Function Test CL-NG-6460-002-066 Checklist of Bus Bar 75. Differential Protection Relay (87B) Commissioning CL-NG-6460-002-067 Checklist of Metrosil and 76. Non-Linear Resistor Commissioning CL-NG-6460-002-068 Checklist of Synchronism 77. Check (25) Commissioning CL-NG-6460-002-069 Checklist of Distance / 78. Impedance Protection Relay (21) Commissioning Checklist of Directional Over- CL-NG-6460-002-070 Current and Directional Earth 79. Fault Protection Relay (67/67N) Commissioning Checklist for Load Shedding CL-NG-6460-002-088 & Under Frequency Panel 80. Scheme check and Function Test Checklist of Directional CL-NG-6460-002-071 Negative Phase Sequence 81. Over-Current 67Q Commissioning CL-NG-6460-002-072 Checklist of Line & Cable 82. Differential Protection (87L/87C) Commissioning Checklist for Automatic CL-NG-6460-002-087 Voltage Control Panel 83. Scheme check and Function Test CL-NG-6460-002-073 Checklist of Auto Re-closer 84. Commissioning CL-NG-6460-002-074 Checklist of Transformer 85. Differential Protection Relay (87T) Commissioning Checklist for Transformer CL-NG-6460-002-086 Relay and Control Panel 86. Scheme Check and Function Test Checklist of Restricted Earth CL-NG-6460-002-075 Fault (REF) Transformer 87. Protection Relay (64NP/64NS) Commissioning and Testing Checklist of Over/Under- CL-NG-6460-002-076 Frequency & Frequency Rate 88. of Change Protection (81/81R) Commissioning CL-NG-6460-002-077 Checklist of Automatic 89. Voltage Regulation (AVR) & Control (90) Commissioning CL-NG-6460-002-078 Checklist of Disturbance & 90. Fault Recorders (DFR) Commissioning CL-NG-6460-002-079 Checklist of Sequence of 91. Events Recorder (SOE) Commissioning CL-NG-6460-002-080 Checklist of Annunciator 92. Commissioning CL-NG-6460-002-081 Checklist of ACSE / ABTS / 93. TOP Commissioning CL-NG-6460-002-082 Checklist for ACCS - 94. Automated Capacitor Control System Commissioning CL-NG-6460-002-083 Checklist of General Panel 95. Scheme Check and Function Tests CL-NG-6460-002-084 Checklist of Local Control 96. Cubicle (LCC) Panel Scheme Check and Function Test CL-NG-6460-002-085 Checklist for Relay & Control 97. Panels Scheme Check and Function Test CL-NG-6460-002-115 Checklist for Final Setting 98. Review CL-NG-6460-003-001 Checklist of Normalization 99. before Energization CL-NG-8300-005-001 Checklist for Transmission 100. Substation Entry 101.