Manpower

slippage has been identified


cut the damage cable flowerette 2 labors
remove the stressing jack
bring the detensioning chair, detensioning jack 2 labors
do the detensioning 3 labors, 1 supervisor
remove the jaws
take out the detensioning chair, detensioning jack
remove the damage anchor blocks 2 labors
remove the damage cables 4 labors
bring the coil strand dispenser 4 labors
thread the tendon with new cables 4 labors
cut the new cables from dispenser 2 labors
install new anchor block 4 labors
install new jaws/wedges 4 labors
install stressing jack 4 labors
re-stressing 6 labors, 2 supervisors

disposing of damage cables 2 labors

REPAIR OF ANCHOR BLOCKS


labor cost
equipment cost 3 drill press
vehicle cost service vehicle + site service pick up
consumables rags, engine oil, plywood, lightings, convenience outlets, electrica
tools consumables Hours

angle grinder grinder blade 0.5

0.5
labors, 1 supervisor 1

0.5
1
0.5
1
angle grinder 1
0.5
0.5
0.5
labors, 2 supervisors 1

s, convenience outlets, electrical wires,