Sunteți pe pagina 1din 28

MECPL,Pune

SUMMARY SHEET_RA-09
PROJECT : KALPATARU,Baner DATE : 30.09.2015
STRUCTURE : Central podium JMS No : KALPATARU

CONCRETE QTY in
Sr No. DESCRIPTION
(MT)
1 1st Slab Tendon (MT) 16.445
2 2nd Slab Tendon (MT) 16.445
3 3rd Slab Tendon (MT) 19.662
4 Club House (MT) 14.635
5 4th Slab Tendon (MT) 24.130
6 5th Slab Tendon (MT) 24.130
Total Qty 115.447
BCEF 86.000
BCEF-VO-02 10.250
Total Qty 96.250
Balance Qty 19.197
MECPL,Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER DATE: 30.09.2015


STRUCTURE : PODIUM JMS No : KALPATARU / CP/09/16
PARTICULARS :Tendons - Post Tensioning Slab (112.475 Lvl)
ITEM NO : 37 (1103400)

Including
Stressing Unit Weight of Total
SI NO. Tendon No Strand Length (Mtr) No of Strand 2% Profile Total length
Length strand (kg) Weight (kg)
length
Pour 3 1st slab Podium
1 108 TO 112 23.625 15 0.473 0.500 368.96 0.785 289.64
2 113,114 17.075 6 0.342 0.500 107.50 0.785 84.39
3 115 TO 123 23.625 28 0.473 0.500 688.73 0.785 540.65
4 131,132 23.800 6 0.476 0.500 148.66 0.785 116.69
5 133,134 23.865 6 0.477 0.500 149.05 0.785 117.01
6 135,136 23.915 6 0.478 0.500 149.36 0.785 117.25
7 137 TO 139 24.100 9 0.482 0.500 225.74 0.785 177.20
8 140 24.293 5 0.486 0.500 126.39 0.785 99.22
9 141 24.358 5 0.487 0.500 126.73 0.785 99.48
10 142 24.446 2 0.489 0.500 50.87 0.785 39.93
11 143 24.542 5 0.491 0.500 127.66 0.785 100.22
12 144,145 13.401 4 0.268 0.500 56.68 0.785 44.49
13 146,147 13.403 6 0.268 0.500 85.03 0.785 66.75
14 124 8.569 5 0.171 0.500 46.20 0.785 36.27
15 125 8.626 5 0.173 0.500 46.49 0.785 36.50
16 126 8.090 5 0.162 0.500 43.76 0.785 34.35
17 127 8.160 5 0.163 0.500 44.12 0.785 34.63
18 128,129 8.231 10 0.165 0.500 88.96 0.785 69.83

TOTAL WEIGHT(kg) 2104.49


A=TOTAL WEIGHT(MT) 2.104
Pour 5 1st slab Podium
1 38 TO 54 19.500 56 0.390 0.500 1141.84 0.785 896.34
2 55 25.400 3 0.508 0.500 79.22 0.785 62.19
3 56 25.230 3 0.505 0.500 78.704 0.785 61.78
4 57,58 25.033 6 0.501 0.500 156.20 0.785 122.62
5 59 24.941 5 0.499 0.500 129.70 0.785 101.81
6 60 24.788 2 0.496 0.500 51.568 0.785 40.48
7 61,62 24.600 6 0.492 0.500 153.55 0.785 120.54
8 63 TO 66 24.372 12 0.487 0.500 304.31 0.785 238.89
9 67 24.178 3 0.484 0.500 75.485 0.785 59.26
10 68 24.079 3 0.482 0.500 75.182 0.785 59.02
TOTAL WEIGHT(kg) 1762.93
B=TOTAL WEIGHT(MT) 1.763
Pour 1 1st slab Podium
1 67 TO 73 22.400 15 0.448 0.5 350.220 0.785 274.923
2 74,75 14.425 6 0.2885 0.5 91.281 0.785 71.656
3 76 TO 84 22.400 28 0.448 0.5 653.744 0.785 513.189
4 90,91 23.950 9 0.479 0.5 224.361 0.785 176.123
5 85 TO 89 7.775 25 0.1555 0.5 210.763 0.785 165.449
6 93,94,95 13.405 9 0.2681 0.5 127.558 0.785 100.133
7 96-107 23.650 41 0.473 0.5 1009.543 0.785 792.491
TOTAL WEIGHT(kg) 2093.96
C=TOTAL WEIGHT(MT) 2.094

RA-06
Pour 4 1st slab Podium
1 248 To 258 23.630 36 0.4726 0.5 885.694 0.785 695.269
2 259 17.170 5 0.3434 0.5 90.067 0.785 70.703
3 260 23.781 5 0.47562 0.5 123.783 0.785 97.170
4 261 23.782 2 0.47564 0.5 49.515 0.785 38.869
5 262 23.784 3 0.47568 0.5 74.279 0.785 58.309
6 263 23.785 2 0.4757 0.5 49.521 0.785 38.874
7 264 22.242 3 0.44484 0.5 69.561 0.785 54.605
8 265 25.343 4 0.50686 0.5 105.399 0.785 82.739
9 266 25.504 2 0.51008 0.5 53.028 0.785 41.627
10 267 25.673 5 0.51346 0.5 133.432 0.785 104.744
11 268 25.676 5 0.51352 0.5 133.448 0.785 104.756
12 269 25.967 2 0.51934 0.5 53.973 0.785 42.369

Prepared By MECPLF/QSS 06 / R0 Page 2 of 28 Verified By Client


MECPL,Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER DATE: 30.09.2015


STRUCTURE : PODIUM JMS No : KALPATARU / CP/09/16
PARTICULARS :Tendons - Post Tensioning Slab (112.475 Lvl)
ITEM NO : 37 (1103400)

Including
Stressing Unit Weight of Total
SI NO. Tendon No Strand Length (Mtr) No of Strand 2% Profile Total length
Length strand (kg) Weight (kg)
length
13 270 26.167 4 0.52334 0.5 108.761 0.785 85.378
14 271 26.377 2 0.52754 0.5 54.809 0.785 43.025
15 272 26.597 5 0.53194 0.5 138.145 0.785 108.444
16 273 26.725 5 0.5345 0.5 138.798 0.785 108.956
17 274 26.894 2 0.53788 0.5 55.864 0.785 43.853
18 275 27.068 5 0.54136 0.5 140.547 0.785 110.329
19 276 To 279 16.666 10 0.33332 0.5 174.993 0.785 137.370
20 280 7.884 5 0.15768 0.5 42.708 0.785 33.526
21 281 7.889 5 0.15778 0.5 42.734 0.785 33.546
22 282 8.103 5 0.16206 0.5 43.825 0.785 34.403
23 283 8.218 5 0.16436 0.5 44.412 0.785 34.863
24 284 8.335 5 0.1667 0.5 45.009 0.785 35.332
25 285 8.442 5 0.16884 0.5 45.554 0.785 35.760
26 286 8.010 5 0.1602 0.5 43.351 0.785 34.031
27 TOTAL WEIGHT(kg) 2308.85
D=TOTAL WEIGHT(MT) 2.309
Pour 2 1st slab Podium
1 212-220 22.400 31 0.448 0.500 723.79 0.785 568.17
2 221 14.427 3 0.289 0.500 45.65 0.785 35.83
3 222 14.454 4 0.289 0.500 60.972 0.785 47.86
4 223 22.425 5 0.449 0.500 116.87 0.785 91.74
5 224 22.432 2 0.449 0.500 46.76 0.785 36.71
6 225 to 227 22.433 8 0.449 0.500 187.053 0.785 146.84
7 228 24.036 2 0.481 0.500 50.03 0.785 39.28
8 229 24.082 5 0.482 0.500 125.32 0.785 98.37
9 230 To 232 13.750 9 0.275 0.500 130.725 0.785 102.62
10 233 24.306 5 0.486 0.500 126.461 0.785 99.27
11 234 24.366 2 0.487 0.500 50.71 0.785 39.80
12 235 24.433 5 0.489 0.500 127.11 0.785 99.78
13 236 24.488 5 0.490 0.500 127.389 0.785 100.00
14 237 24.594 2 0.492 0.500 51.172 0.785 40.17
15 238 24.709 4 0.494 0.500 102.81 0.785 80.71
16 239 24.834 2 0.497 0.500 51.66 0.785 40.55
17 240 24.969 5 0.499 0.500 129.842 0.785 101.93
18 241 25.048 5 0.501 0.500 130.245 0.785 102.24
19 242 25.148 2 0.503 0.500 52.302 0.785 41.06
20 243 7.711 5 0.154 0.500 41.826 0.785 32.83
21 244 7.742 5 0.155 0.500 41.984 0.785 32.96
22 245 7.776 5 0.156 0.500 42.158 0.785 33.09
23 246 7.813 5 0.156 0.500 42.346 0.785 33.24
24 247 7.852 5 0.157 0.500 42.545 0.785 33.40
TOTAL WEIGHT(kg) 2078.46
E=TOTAL WEIGHT(MT) 2.078
Pour 6 1st slab Podium
1 184-194 19.500 39 0.390 0.500 795.21 0.785 624.24
2 195-199 19.503 15 0.390 0.500 305.90 0.785 240.13
3 200 24.121 3 0.482 0.500 75.310 0.785 59.12
4 201 24.066 3 0.481 0.500 75.14 0.785 58.99
5 202-203 24.020 6 0.480 0.500 150.00 0.785 117.75
6 204 24.001 5 0.480 0.500 124.905 0.785 98.05
7 205 23.973 2 0.479 0.500 49.90 0.785 39.18
8 206 23.955 4 0.479 0.500 99.74 0.785 78.29
9 207 & 208 23.946 7 0.479 0.500 174.474 0.785 136.96
10 209 23.950 5 0.479 0.500 124.645 0.785 97.85
11 210 23.967 2 0.479 0.500 49.89 0.785 39.17
12 211 23.995 4 0.480 0.500 99.90 0.785 78.42
TOTAL WEIGHT(kg) 1668.14
F=TOTAL WEIGHT(MT) 1.668
Pour 7- 1st slab Podium

Prepared By MECPLF/QSS 06 / R0 Page 3 of 28 Verified By Client


MECPL,Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER DATE: 30.09.2015


STRUCTURE : PODIUM JMS No : KALPATARU / CP/09/16
PARTICULARS :Tendons - Post Tensioning Slab (112.475 Lvl)
ITEM NO : 37 (1103400)

Including
Stressing Unit Weight of Total
SI NO. Tendon No Strand Length (Mtr) No of Strand 2% Profile Total length
Length strand (kg) Weight (kg)
length
1 1 19.150 3 0.383 0.500 60.10 0.785 47.18
2 2 19.500 3 0.390 0.500 61.17 0.785 48.02
3 3 19.820 3 0.396 0.500 62.15 0.785 48.79
4 4 20.180 3 0.404 0.500 63.25 0.785 49.65
5 5 21.085 3 0.422 0.500 66.02 0.785 51.83
6 6 20.460 4 0.409 0.500 85.48 0.785 67.10
7 7 20.470 5 0.409 0.500 106.90 0.785 83.91
8 8 20.405 3 0.408 0.500 63.94 0.785 50.19
9 9 20.380 3 0.408 0.500 63.86 0.785 50.13
10 10,11,12,13,14,15,16,17 20.375 26 0.408 0.500 553.35 0.785 434.38
11 18,19,20.21 21.275 12 0.426 0.500 266.41 0.785 209.13
12 22 25.760 3 0.515 0.500 80.33 0.785 63.06
13 23 28.155 3 0.563 0.500 87.65 0.785 68.81
14 24 27.880 2 0.558 0.500 57.88 0.785 45.43
15 25 27.610 3 0.552 0.500 85.99 0.785 67.50
16 26 27.350 3 0.547 0.500 85.19 0.785 66.87
17 27 27.100 2 0.542 0.500 56.28 0.785 44.18
18 28 26.855 3 0.537 0.500 83.68 0.785 65.69
19 29 26.815 4 0.536 0.500 111.41 0.785 87.45
20 30 26.675 4 0.534 0.500 110.83 0.785 87.00
21 31 26.485 2 0.530 0.500 55.03 0.785 43.20
22 32 26.300 3 0.526 0.500 81.98 0.785 64.35
23 33 26.125 2 0.523 0.500 54.30 0.785 42.62
24 34 25.955 4 0.519 0.500 107.90 0.785 84.70
25 35 25.835 3 0.517 0.500 80.56 0.785 63.24
26 36 25.800 3 0.516 0.500 80.45 0.785 63.15
27 37 25.670 3 0.513 0.500 80.05 0.785 62.84

TOTAL WEIGHT(kg) 2160.40

G=TOTAL WEIGHT(MT) 2.160

Pour 8 - 1st slab Podium


1 148 20.376 2 0.408 0.500 42.57 0.785 33.42
2 149 20.376 3 0.408 0.500 63.85 0.785 50.12
3 150 20.376 4 0.408 0.500 85.13 0.785 66.83
4 151 20.376 4 0.408 0.500 85.13 0.785 66.83
5 152 20.376 3 0.408 0.500 63.85 0.785 50.12
6 153 20.376 2 0.408 0.500 42.57 0.785 33.42
7 154 20.376 3 0.408 0.500 63.85 0.785 50.12
8 155 20.376 2 0.408 0.500 42.57 0.785 33.42
9 156 20.376 3 0.408 0.500 63.85 0.785 50.12
10 157 20.376 4 0.408 0.500 85.13 0.785 66.83
11 158 20.376 5 0.408 0.500 106.42 0.785 83.54
12 159 20.376 3 0.408 0.500 63.85 0.785 50.12
13 160 20.376 3 0.408 0.500 63.85 0.785 50.12
14 161 20.385 5 0.408 0.500 106.46 0.785 83.57
15 162 21.378 3 0.428 0.500 66.92 0.785 52.53
16 163 21.311 3 0.426 0.500 66.71 0.785 52.37
17 164 21.077 3 0.422 0.500 66.00 0.785 51.81
18 165 20.823 3 0.416 0.500 65.22 0.785 51.20
19 166 20.570 3 0.411 0.500 64.44 0.785 50.59
20 167 20.317 3 0.406 0.500 63.67 0.785 49.98

Prepared By MECPLF/QSS 06 / R0 Page 4 of 28 Verified By Client


MECPL,Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER DATE: 30.09.2015


STRUCTURE : PODIUM JMS No : KALPATARU / CP/09/16
PARTICULARS :Tendons - Post Tensioning Slab (112.475 Lvl)
ITEM NO : 37 (1103400)

Including
Stressing Unit Weight of Total
SI NO. Tendon No Strand Length (Mtr) No of Strand 2% Profile Total length
Length strand (kg) Weight (kg)
length
21 168 25.412 3 0.508 0.500 79.26 0.785 62.22
22 169 25.337 3 0.507 0.500 79.03 0.785 62.04
23 170 25.192 5 0.504 0.500 130.98 0.785 102.82
24 171 25.054 3 0.501 0.500 78.17 0.785 61.36
25 172 25.924 3 0.518 0.500 80.83 0.785 63.45
26 173 24.803 5 0.496 0.500 129.00 0.785 101.26
27 174 24.689 3 0.494 0.500 77.05 0.785 60.48
28 175 24.670 4 0.493 0.500 102.65 0.785 80.58
29 176 24.606 4 0.492 0.500 102.39 0.785 80.38
30 177 24.523 5 0.490 0.500 127.57 0.785 100.14
31 178 24.446 3 0.489 0.500 76.30 0.785 59.90
32 179 24.374 5 0.487 0.500 126.81 0.785 99.54
33 180 24.308 4 0.486 0.500 101.18 0.785 79.42
34 181 24.263 3 0.485 0.500 75.74 0.785 59.46
35 182 24.236 3 0.485 0.500 75.66 0.785 59.39
36 183 24.205 3 0.484 0.500 75.57 0.785 59.32

TOTAL WEIGHT(kg) 2268.83

H=TOTAL WEIGHT(MT) 2.269

Total Quantity (A+B+C+D+E+F+G+H) 16.445 MT 100% CLAIMED


Previous Bill Quantity 12.016 MT REF RA 06
This Bill Quantity 4.429 MT

47.892
27.978
19.914

Prepared By MECPLF/QSS 06 / R0 Page 5 of 28 Verified By Client


MECPL,Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER Date: 26.10.2015


STRUCTURE : CENTRAL PODIUM
PARTICULARS:Tendons - Post Tensioning Slab (115.825 Lvl) JMS No: KPT / CP / 10 / 10
ITEM NO : 37 (1103400)

Including
Stressing Unit Weight of Total
SI NO. Tendon No Strand Length (Mtr) No of Strand 2% Profile Total length
Length strand (kg) Weight (kg)
length

Pour 3 2nd slab Podium

1 108 TO 112 23.625 15 0.473 0.500 368.96 0.785 289.64

2 113,114 17.075 6 0.342 0.500 107.50 0.785 84.39

3 115 TO 123 23.625 28 0.473 0.500 688.73 0.785 540.65

4 131,132 23.800 6 0.476 0.500 148.66 0.785 116.69

5 133,134 23.865 6 0.477 0.500 149.05 0.785 117.01

6 135,136 23.915 6 0.478 0.500 149.36 0.785 117.25

7 137 TO 139 24.100 9 0.482 0.500 225.74 0.785 177.20

8 140 24.293 5 0.486 0.500 126.39 0.785 99.22


9 141 24.358 5 0.487 0.500 126.73 0.785 99.48

10 142 24.446 2 0.489 0.500 50.87 0.785 39.93

11 143 24.542 5 0.491 0.500 127.66 0.785 100.22


12 144,145 13.401 4 0.268 0.500 56.68 0.785 44.49

13 146,147 13.403 6 0.268 0.500 85.03 0.785 66.75

14 124 8.569 5 0.171 0.500 46.20 0.785 36.27

15 125 8.626 5 0.173 0.500 46.49 0.785 36.50

16 126 8.090 5 0.162 0.500 43.76 0.785 34.35

17 127 8.160 5 0.163 0.500 44.12 0.785 34.63

18 128,129 8.231 10 0.165 0.500 88.96 0.785 69.83

TOTAL WEIGHT(kg) 2104.49

A=TOTAL WEIGHT(MT) 2.104

Pour 5 2nd slab Podium

1 38 TO 54 19.500 56 0.390 0.500 1141.84 0.785 896.34

2 55 25.400 3 0.508 0.500 79.22 0.785 62.19

3 56 25.230 3 0.505 0.500 78.704 0.785 61.78

4 57,58 25.033 6 0.501 0.500 156.20 0.785 122.62

5 59 24.941 5 0.499 0.500 129.70 0.785 101.81

6 60 24.788 2 0.496 0.500 51.568 0.785 40.48

7 61,62 24.600 6 0.492 0.500 153.55 0.785 120.54

8 63 TO 66 24.372 12 0.487 0.500 304.31 0.785 238.89

9 67 24.178 3 0.484 0.500 75.485 0.785 59.26

10 68 24.079 3 0.482 0.500 75.182 0.785 59.02

TOTAL WEIGHT(kg) 1762.93

B=TOTAL WEIGHT(MT) 1.763

Pour 1 2nd slab Podium

1 67 TO 73 22.400 15 0.448 0.5 350.220 0.785 274.923

2 74,75 14.425 6 0.2885 0.5 91.281 0.785 71.656

3 76 TO 84 22.400 28 0.448 0.5 653.744 0.785 513.189

4 90,91 23.950 9 0.479 0.5 224.361 0.785 176.123

5 85 TO 89 7.775 25 0.1555 0.5 210.763 0.785 165.449

6 93,94,95 13.405 9 0.2681 0.5 127.558 0.785 100.133

7 96-107 23.650 41 0.473 0.5 1009.543 0.785 792.491

TOTAL WEIGHT(kg) 2093.96

C=TOTAL WEIGHT(MT) 2.094

Prepared By MECPLF/QSS 06 / R0 Page 6 of 28 Verified By Client


Pour 4 2nd slab Podium

1 248 To 258 23.630 36 0.4726 0.5 885.694 0.785 695.269

2 259 17.170 5 0.3434 0.5 90.067 0.785 70.703

3 260 23.781 5 0.47562 0.5 123.783 0.785 97.170

4 261 23.782 2 0.47564 0.5 49.515 0.785 38.869

5 262 23.784 3 0.47568 0.5 74.279 0.785 58.309

6 263 23.785 2 0.4757 0.5 49.521 0.785 38.874

7 264 22.242 3 0.44484 0.5 69.561 0.785 54.605

8 265 25.343 4 0.50686 0.5 105.399 0.785 82.739

9 266 25.504 2 0.51008 0.5 53.028 0.785 41.627

10 267 25.673 5 0.51346 0.5 133.432 0.785 104.744

11 268 25.676 5 0.51352 0.5 133.448 0.785 104.756

12 269 25.967 2 0.51934 0.5 53.973 0.785 42.369

13 270 26.167 4 0.52334 0.5 108.761 0.785 85.378

14 271 26.377 2 0.52754 0.5 54.809 0.785 43.025

15 272 26.597 5 0.53194 0.5 138.145 0.785 108.444

16 273 26.725 5 0.5345 0.5 138.798 0.785 108.956

17 274 26.894 2 0.53788 0.5 55.864 0.785 43.853

18 275 27.068 5 0.54136 0.5 140.547 0.785 110.329

19 276 To 279 16.666 10 0.33332 0.5 174.993 0.785 137.370

20 280 7.884 5 0.15768 0.5 42.708 0.785 33.526

21 281 7.889 5 0.15778 0.5 42.734 0.785 33.546

22 282 8.103 5 0.16206 0.5 43.825 0.785 34.403

23 283 8.218 5 0.16436 0.5 44.412 0.785 34.863

24 284 8.335 5 0.1667 0.5 45.009 0.785 35.332

25 285 8.442 5 0.16884 0.5 45.554 0.785 35.760

26 286 8.010 5 0.1602 0.5 43.351 0.785 34.031

27 TOTAL WEIGHT(kg) 2308.85

D=TOTAL WEIGHT(MT) 2.309

Pour 2 2nd slab slab Podium

1 212-220 22.400 31 0.448 0.500 723.79 0.785 568.17

2 221 14.427 3 0.289 0.500 45.65 0.785 35.83

3 222 14.454 4 0.289 0.500 60.972 0.785 47.86

4 223 22.425 5 0.449 0.500 116.87 0.785 91.74

5 224 22.432 2 0.449 0.500 46.76 0.785 36.71

6 225 to 227 22.433 8 0.449 0.500 187.053 0.785 146.84

7 228 24.036 2 0.481 0.500 50.03 0.785 39.28

8 229 24.082 5 0.482 0.500 125.32 0.785 98.37

9 230 To 232 13.750 9 0.275 0.500 130.725 0.785 102.62

10 233 24.306 5 0.486 0.500 126.461 0.785 99.27

11 234 24.366 2 0.487 0.500 50.71 0.785 39.80

12 235 24.433 5 0.489 0.500 127.11 0.785 99.78

13 236 24.488 5 0.490 0.500 127.389 0.785 100.00

14 237 24.594 2 0.492 0.500 51.172 0.785 40.17

15 238 24.709 4 0.494 0.500 102.81 0.785 80.71

16 239 24.834 2 0.497 0.500 51.66 0.785 40.55

17 240 24.969 5 0.499 0.500 129.842 0.785 101.93

18 241 25.048 5 0.501 0.500 130.245 0.785 102.24

19 242 25.148 2 0.503 0.500 52.302 0.785 41.06

20 243 7.711 5 0.154 0.500 41.826 0.785 32.83

21 244 7.742 5 0.155 0.500 41.984 0.785 32.96

22 245 7.776 5 0.156 0.500 42.158 0.785 33.09

23 246 7.813 5 0.156 0.500 42.346 0.785 33.24

Prepared By MECPLF/QSS 06 / R0 Page 7 of 28 Verified By Client


24 247 7.852 5 0.157 0.500 42.545 0.785 33.40

TOTAL WEIGHT(kg) 2078.46

E=TOTAL WEIGHT(MT) 2.078

Pour 6 2nd slab slab Podium

1 184-194 19.500 39 0.390 0.500 795.21 0.785 624.24

2 195-199 19.503 15 0.390 0.500 305.90 0.785 240.13

3 200 24.121 3 0.482 0.500 75.310 0.785 59.12

4 201 24.066 3 0.481 0.500 75.14 0.785 58.99

5 202-203 24.020 6 0.480 0.500 150.00 0.785 117.75

6 204 24.001 5 0.480 0.500 124.905 0.785 98.05

7 205 23.973 2 0.479 0.500 49.90 0.785 39.18

8 206 23.955 4 0.479 0.500 99.74 0.785 78.29

9 207 & 208 23.946 7 0.479 0.500 174.474 0.785 136.96

10 209 23.950 5 0.479 0.500 124.645 0.785 97.85

11 210 23.967 2 0.479 0.500 49.89 0.785 39.17

12 211 23.995 4 0.480 0.500 99.90 0.785 78.42

TOTAL WEIGHT(kg) 1668.14

F=TOTAL WEIGHT(MT) 1.668

Pour 7- 2nd slab slab Podium

1 1 19.150 3 0.383 0.500 60.10 0.785 47.18

2 2 19.500 3 0.390 0.500 61.17 0.785 48.02

3 3 19.820 3 0.396 0.500 62.15 0.785 48.79

4 4 20.180 3 0.404 0.500 63.25 0.785 49.65

5 5 21.085 3 0.422 0.500 66.02 0.785 51.83

6 6 20.460 4 0.409 0.500 85.48 0.785 67.10

7 7 20.470 5 0.409 0.500 106.90 0.785 83.91

8 8 20.405 3 0.408 0.500 63.94 0.785 50.19

9 9 20.380 3 0.408 0.500 63.86 0.785 50.13

10 10,11,12,13,14,15,16,17 20.375 26 0.408 0.500 553.35 0.785 434.38

11 18,19,20.21 21.275 12 0.426 0.500 266.41 0.785 209.13

12 22 25.760 3 0.515 0.500 80.33 0.785 63.06

13 23 28.155 3 0.563 0.500 87.65 0.785 68.81

14 24 27.880 2 0.558 0.500 57.88 0.785 45.43

15 25 27.610 3 0.552 0.500 85.99 0.785 67.50

16 26 27.350 3 0.547 0.500 85.19 0.785 66.87

17 27 27.100 2 0.542 0.500 56.28 0.785 44.18

18 28 26.855 3 0.537 0.500 83.68 0.785 65.69

19 29 26.815 4 0.536 0.500 111.41 0.785 87.45

20 30 26.675 4 0.534 0.500 110.83 0.785 87.00

21 31 26.485 2 0.530 0.500 55.03 0.785 43.20

22 32 26.300 3 0.526 0.500 81.98 0.785 64.35

23 33 26.125 2 0.523 0.500 54.30 0.785 42.62

24 34 25.955 4 0.519 0.500 107.90 0.785 84.70

25 35 25.835 3 0.517 0.500 80.56 0.785 63.24

26 36 25.800 3 0.516 0.500 80.45 0.785 63.15

27 37 25.670 3 0.513 0.500 80.05 0.785 62.84

TOTAL WEIGHT(kg) 2160.40

G=TOTAL WEIGHT(MT) 2.160

Pour 8 - 2nd slab Podium

1 148 20.376 2 0.408 0.500 42.57 0.785 33.42

2 149 20.376 3 0.408 0.500 63.85 0.785 50.12

3 150 20.376 4 0.408 0.500 85.13 0.785 66.83

4 151 20.376 4 0.408 0.500 85.13 0.785 66.83

Prepared By MECPLF/QSS 06 / R0 Page 8 of 28 Verified By Client


5 152 20.376 3 0.408 0.500 63.85 0.785 50.12

6 153 20.376 2 0.408 0.500 42.57 0.785 33.42

7 154 20.376 3 0.408 0.500 63.85 0.785 50.12

8 155 20.376 2 0.408 0.500 42.57 0.785 33.42

9 156 20.376 3 0.408 0.500 63.85 0.785 50.12

10 157 20.376 4 0.408 0.500 85.13 0.785 66.83

11 158 20.376 5 0.408 0.500 106.42 0.785 83.54

12 159 20.376 3 0.408 0.500 63.85 0.785 50.12

13 160 20.376 3 0.408 0.500 63.85 0.785 50.12

14 161 20.385 5 0.408 0.500 106.46 0.785 83.57

15 162 21.378 3 0.428 0.500 66.92 0.785 52.53

16 163 21.311 3 0.426 0.500 66.71 0.785 52.37

17 164 21.077 3 0.422 0.500 66.00 0.785 51.81

18 165 20.823 3 0.416 0.500 65.22 0.785 51.20

19 166 20.570 3 0.411 0.500 64.44 0.785 50.59

20 167 20.317 3 0.406 0.500 63.67 0.785 49.98

21 168 25.412 3 0.508 0.500 79.26 0.785 62.22

22 169 25.337 3 0.507 0.500 79.03 0.785 62.04

23 170 25.192 5 0.504 0.500 130.98 0.785 102.82

24 171 25.054 3 0.501 0.500 78.17 0.785 61.36

25 172 25.924 3 0.518 0.500 80.83 0.785 63.45

26 173 24.803 5 0.496 0.500 129.00 0.785 101.26

27 174 24.689 3 0.494 0.500 77.05 0.785 60.48

28 175 24.670 4 0.493 0.500 102.65 0.785 80.58

29 176 24.606 4 0.492 0.500 102.39 0.785 80.38

30 177 24.523 5 0.490 0.500 127.57 0.785 100.14

31 178 24.446 3 0.489 0.500 76.30 0.785 59.90

32 179 24.374 5 0.487 0.500 126.81 0.785 99.54

33 180 24.308 4 0.486 0.500 101.18 0.785 79.42

34 181 24.263 3 0.485 0.500 75.74 0.785 59.46

35 182 24.236 3 0.485 0.500 75.66 0.785 59.39

36 183 24.205 3 0.484 0.500 75.57 0.785 59.32

TOTAL WEIGHT(kg) 2268.83

H=TOTAL WEIGHT(MT) 2.269

TOTAL WEIGHT(MT)A+B+C+D+E+F+G+H 16.445

:Tendons - Post Tensioning Slab (115.825 Lvl)

Total RCC Quantity = 16.445 MT 100% Claimed

Previous Bill Qty = 14.80 MT JMS No : KALPATARU / CP/09/17


This Bill Qty = 1.644 MT

Prepared By MECPLF/QSS 06 / R0 Page 9 of 28 Verified By Client


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
DRG NO.USS/DDP/15-277/14096/SD/P-P1

Pour 1

1 1 To 3 22.405 8 0.448 0.500 186.825 0.785 146.66

2 4 To 5 22.402 7 0.448 0.500 163.450 0.785 128.31

3 6 To 7 14.425 6 0.289 0.500 91.281 0.785 71.66

4 8 To 16 22.400 28 0.448 0.500 653.744 0.785 513.19


5 17 7.814 5 0.156 0.500 42.351 0.785 33.25

6 18 7.779 5 0.156 0.500 42.173 0.785 33.11

7 19 7.748 5 0.155 0.500 42.015 0.785 32.98

8 20 7.720 5 0.154 0.500 41.872 0.785 32.87

9 21 7.695 5 0.154 0.500 41.745 0.785 32.77

10 22 23.965 3 0.479 0.500 74.833 0.785 58.74

11 23 23.912 3 0.478 0.500 74.671 0.785 58.62

12 24 23.902 3 0.478 0.500 74.640 0.785 58.59

13 25 To 27 13.406 10 0.268 0.500 141.741 0.785 111.27


14 28 23.735 5 0.475 0.500 123.549 0.785 96.99

15 29 23.735 2 0.475 0.500 49.419 0.785 38.79

16 30 23.675 5 0.474 0.500 123.243 0.785 96.75

17 31 23.663 5 0.473 0.500 123.181 0.785 96.70

18 32 23.654 2 0.473 0.500 49.254 0.785 38.66


19 33 23.650 4 0.473 0.500 98.492 0.785 77.32

20 34 23.657 3 0.473 0.500 73.890 0.785 58.00

21 35 23.671 3 0.473 0.500 73.933 0.785 58.04

22 36 23.674 3 0.473 0.500 73.942 0.785 58.04

23 37 23.689 3 0.474 0.500 73.988 0.785 58.08

24 38 23.694 3 0.474 0.500 74.004 0.785 58.09

25 39 23.711 3 0.474 0.500 74.056 0.785 58.13

Pour 2

1 40-48 22.400 31 0.448 0.500 723.788 0.785 568.17


2 49 14.425 3 0.289 0.500 45.641 0.785 35.83

3 50 14.455 4 0.289 0.500 60.976 0.785 47.87

4 51 22.425 5 0.449 0.500 116.868 0.785 91.74

5 52,53,54,55 22.430 10 0.449 0.500 233.786 0.785 183.52

6 56 24.036 2 0.481 0.500 50.033 0.785 39.28

7 57 24.080 5 0.482 0.500 125.308 0.785 98.37

8 58,59,60 13.750 9 0.275 0.500 130.725 0.785 102.62

9 61 24.305 5 0.486 0.500 126.456 0.785 99.27

10 62 24.365 2 0.487 0.500 50.705 0.785 39.80

11 63 24.435 5 0.489 0.500 127.119 0.785 99.79

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 10 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
12 64 24.488 5 0.490 0.500 127.389 0.785 100.00

13 65 24.595 2 0.492 0.500 51.174 0.785 40.17

14 66 24.710 4 0.494 0.500 102.817 0.785 80.71

15 67 24.835 2 0.497 0.500 51.663 0.785 40.56

16 68 24.970 5 0.499 0.500 129.847 0.785 101.93

17 69 25.045 5 0.501 0.500 130.230 0.785 102.23


18 70 25.150 2 0.503 0.500 52.306 0.785 41.06

19 71 7.710 5 0.154 0.500 41.821 0.785 32.83

20 72 7.745 5 0.155 0.500 42.000 0.785 32.97

21 73 7.775 5 0.156 0.500 42.153 0.785 33.09

22 74 7.810 5 0.156 0.500 42.331 0.785 33.23

23 75 7.850 5 0.157 0.500 42.535 0.785 33.39

Pour 3

1 160 22.870 2 0.457 0.500 47.655 0.785 37.41

2 161 22.891 3 0.458 0.500 71.546 0.785 56.16

3 162 22.916 2 0.458 0.500 47.749 0.785 37.48


4 163 22.942 5 0.459 0.500 119.504 0.785 93.81

5 164 22.961 5 0.459 0.500 119.601 0.785 93.89

6 165 22.864 2 0.457 0.500 47.643 0.785 37.40

7 166 14.538 3 0.291 0.500 45.986 0.785 36.10

8 167 22.707 2 0.454 0.500 47.322 0.785 37.15

9 168 22.700 5 0.454 0.500 118.270 0.785 92.84

10 169 22.700 5 0.454 0.500 118.270 0.785 92.84

11 171 22.700 2 0.454 0.500 47.308 0.785 37.14

12 172 22.700 3 0.454 0.500 70.962 0.785 55.71


13 173 22.700 2 0.454 0.500 47.308 0.785 37.14

14 174 22.700 5 0.454 0.500 118.270 0.785 92.84

15 175 22.700 5 0.454 0.500 118.270 0.785 92.84

16 176 22.700 2 0.454 0.500 47.308 0.785 37.14

17 177 22.700 3 0.454 0.500 70.962 0.785 55.71

18 178 20.402 2 0.408 0.500 42.620 0.785 33.46

19 179 20.402 5 0.408 0.500 106.550 0.785 83.64

20 180 22.700 5 0.454 0.500 118.270 0.785 92.84

21 181 22.700 2 0.454 0.500 47.308 0.785 37.14

22 182 31.304 3 0.626 0.500 97.290 0.785 76.37

23 183 31.421 3 0.628 0.500 97.649 0.785 76.65

24 183A 31.464 3 0.629 0.500 97.780 0.785 76.76

25 184 31.631 5 0.633 0.500 163.818 0.785 128.60

26 185 31.840 2 0.637 0.500 65.954 0.785 51.77

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 11 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
27 186 32.076 3 0.642 0.500 99.653 0.785 78.23

28 187 32.291 2 0.646 0.500 66.874 0.785 52.50

29 188 32.538 5 0.651 0.500 168.444 0.785 132.23

30 189 32.727 5 0.655 0.500 169.408 0.785 132.99

31 190 33.005 3 0.660 0.500 102.495 0.785 80.46

32 191 33.294 3 0.666 0.500 103.380 0.785 81.15


33 192 33.592 3 0.672 0.500 104.292 0.785 81.87

34 193 33.905 5 0.678 0.500 175.416 0.785 137.70

35 194 28.889 5 0.578 0.500 149.834 0.785 117.62

36 195 29.028 3 0.581 0.500 90.326 0.785 70.91

Pour 4

1 196 23.893 3 0.478 0.500 74.613 0.785 58.57

2 196A 23.893 3 0.478 0.500 74.613 0.785 58.57

3 197 23.900 3 0.478 0.500 74.634 0.785 58.59

4 198 23.900 2 0.478 0.500 49.756 0.785 39.06

5 199 23.900 5 0.478 0.500 124.390 0.785 97.65


6 200 23.900 5 0.478 0.500 124.390 0.785 97.65

7 201 23.900 2 0.478 0.500 49.756 0.785 39.06

8 202 23.900 3 0.478 0.500 74.634 0.785 58.59

9 203 23.900 2 0.478 0.500 49.756 0.785 39.06

10 204 23.900 5 0.478 0.500 124.390 0.785 97.65

11 205 23.900 5 0.478 0.500 124.390 0.785 97.65

12 206 23.900 2 0.478 0.500 49.756 0.785 39.06

13 207 23.900 3 0.478 0.500 74.634 0.785 58.59

14 208 23.900 2 0.478 0.500 49.756 0.785 39.06


15 209 23.900 5 0.478 0.500 124.390 0.785 97.65

16 210 23.900 5 0.478 0.500 124.390 0.785 97.65

17 211 23.900 2 0.478 0.500 49.756 0.785 39.06

18 212 23.900 3 0.478 0.500 74.634 0.785 58.59

19 213 22.046 2 0.441 0.500 45.974 0.785 36.09

20 214 22.046 5 0.441 0.500 114.935 0.785 90.22

21 215 23.900 5 0.478 0.500 124.390 0.785 97.65

22 216 23.900 2 0.478 0.500 49.756 0.785 39.06

23 217 29.188 3 0.584 0.500 90.815 0.785 71.29

24 218 35.028 3 0.701 0.500 108.686 0.785 85.32

25 219 35.531 5 0.711 0.500 183.708 0.785 144.21

26 220 36.159 5 0.723 0.500 186.911 0.785 146.73

27 221 36.691 2 0.734 0.500 75.850 0.785 59.54

28 222 35.075 3 0.702 0.500 108.830 0.785 85.43

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 12 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
29 223 35.075 2 0.702 0.500 72.553 0.785 56.95

30 224 35.075 5 0.702 0.500 181.383 0.785 142.39

31 225 35.075 5 0.702 0.500 181.383 0.785 142.39

32 226 35.075 2 0.702 0.500 72.553 0.785 56.95

33 227 35.075 3 0.702 0.500 108.830 0.785 85.43

34 228 35.075 3 0.702 0.500 108.830 0.785 85.43


35 229 35.075 2 0.702 0.500 72.553 0.785 56.95

36 230 35.076 3 0.702 0.500 108.833 0.785 85.43

37 231 35.076 3 0.702 0.500 108.833 0.785 85.43

Pour 5

1 76 28.045 3 0.561 0.500 87.318 0.785 68.54

2 77 28.035 2 0.561 0.500 58.191 0.785 45.68

3 78,79 28.030 5 0.561 0.500 145.453 0.785 114.18

4 80 28.070 5 0.561 0.500 145.657 0.785 114.34

5 80a,81a,82a 5.800 9 0.116 0.500 57.744 0.785 45.33


6 81,82 17.070 6 0.341 0.500 107.468 0.785 84.36

7 83,84,85,86,87,88,89,90,91 28.020 28 0.560 0.500 814.251 0.785 639.19

8 92 8.565 5 0.171 0.500 46.182 0.785 36.25

9 93 8.625 5 0.173 0.500 46.488 0.785 36.49

10 94 8.690 5 0.174 0.500 46.819 0.785 36.75


11 95 8.760 5 0.175 0.500 47.176 0.785 37.03

12 96 8.830 5 0.177 0.500 47.533 0.785 37.31

13 97 8.895 5 0.178 0.500 47.865 0.785 37.57

14 98 23.765 3 0.475 0.500 74.221 0.785 58.26

15 99 23.810 3 0.476 0.500 74.359 0.785 58.37

16 100 23.865 3 0.477 0.500 74.527 0.785 58.50

17 101 23.875 3 0.478 0.500 74.558 0.785 58.53

18 102 23.927 3 0.479 0.500 74.717 0.785 58.65

19 103 23.941 3 0.479 0.500 74.759 0.785 58.69


20 104 24.000 3 0.480 0.500 74.940 0.785 58.83

21 105 24.100 3 0.482 0.500 75.246 0.785 59.07

22 106 24.185 3 0.484 0.500 75.506 0.785 59.27

23 107 24.290 5 0.486 0.500 126.379 0.785 99.21

24 108 24.360 5 0.487 0.500 126.736 0.785 99.49

25 109 24.450 2 0.489 0.500 50.878 0.785 39.94

26 110 24.540 5 0.491 0.500 127.654 0.785 100.21

27 111 13.400 3 0.268 0.500 42.504 0.785 33.37

28 112 13.400 3 0.268 0.500 42.504 0.785 33.37

29 113 13.400 3 0.268 0.500 42.504 0.785 33.37

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 13 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
30 114 25.080 3 0.502 0.500 78.245 0.785 61.42

31 115 25.120 3 0.502 0.500 78.367 0.785 61.52

32 116 25.265 3 0.505 0.500 78.811 0.785 61.87

33 117 25.450 3 0.509 0.500 79.377 0.785 62.31

Pour 6

1 118-129 28.020 39 0.560 0.500 1134.136 0.785 890.30


2 130 17.170 5 0.343 0.500 90.067 0.785 70.70

3 130a,131a,132a 5.795 9 0.116 0.500 57.698 0.785 45.29

4 131 28.230 5 0.565 0.500 146.473 0.785 114.98

5 132-134 28.235 7 0.565 0.500 205.098 0.785 161.00

6 135 28.240 3 0.565 0.500 87.914 0.785 69.01

7 136 25.345 4 0.507 0.500 105.408 0.785 82.74

8 137 25.505 2 0.510 0.500 53.030 0.785 41.63

9 138 25.675 5 0.514 0.500 133.443 0.785 104.75

10 139 25.775 5 0.516 0.500 133.953 0.785 105.15


11 140 25.965 2 0.519 0.500 53.969 0.785 42.37

12 141 26.167 4 0.523 0.500 108.761 0.785 85.38

13 142 26.377 2 0.528 0.500 54.809 0.785 43.03

14 143 26.595 5 0.532 0.500 138.135 0.785 108.44

15 144 26.725 5 0.535 0.500 138.798 0.785 108.96


16 145 26.915 2 0.538 0.500 55.907 0.785 43.89

17 146 27.070 5 0.541 0.500 140.557 0.785 110.34

18 147-149 16.665 9 0.333 0.500 157.485 0.785 123.63

19 150 27.990 3 0.560 0.500 87.149 0.785 68.41

20 151 28.035 3 0.561 0.500 87.287 0.785 68.52

21 152 28.285 3 0.566 0.500 88.052 0.785 69.12

22 153 28.575 3 0.572 0.500 88.940 0.785 69.82

23 154 7.885 5 0.158 0.500 42.714 0.785 33.53

24 155 7.990 5 0.160 0.500 43.249 0.785 33.95


25 156 8.100 5 0.162 0.500 43.810 0.785 34.39

26 157 8.220 5 0.164 0.500 44.422 0.785 34.87

27 158 8.335 5 0.167 0.500 45.009 0.785 35.33

28 159 8.440 5 0.169 0.500 45.544 0.785 35.75

Pour 7

1 232-235 22.700 15 0.454 0.500 354.810 0.785 278.53

2 236 14.100 2 0.282 0.500 29.764 0.785 23.36

3 237-241 22.700 16 0.454 0.500 378.464 0.785 297.09

4 242 14.525 3 0.291 0.500 45.947 0.785 36.07

5 243 14.605 3 0.292 0.500 46.191 0.785 36.26

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 14 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
6 244 23.075 4 0.462 0.500 96.146 0.785 75.47

7 245-248 23.120 12 0.462 0.500 288.989 0.785 226.86

8 249 23.135 3 0.463 0.500 72.293 0.785 56.75

9 250 23.360 3 0.467 0.500 72.982 0.785 57.29

10 251 23.535 3 0.471 0.500 73.517 0.785 57.71

11 252 23.585 3 0.472 0.500 73.670 0.785 57.83


12 253 23.840 3 0.477 0.500 74.450 0.785 58.44

13 254 23.890 3 0.478 0.500 74.603 0.785 58.56

14 255 24.190 2 0.484 0.500 50.348 0.785 39.52

15 256 24.470 4 0.489 0.500 101.838 0.785 79.94

16 257 24.740 2 0.495 0.500 51.470 0.785 40.40

17 258 25.095 5 0.502 0.500 130.485 0.785 102.43

18 259 25.275 5 0.506 0.500 131.403 0.785 103.15

19 260 25.785 3 0.516 0.500 80.402 0.785 63.12

20 261 26.160 3 0.523 0.500 81.550 0.785 64.02


21 262 26.560 3 0.531 0.500 82.774 0.785 64.98

22 263 26.975 5 0.540 0.500 140.073 0.785 109.96

23 264 27.305 5 0.546 0.500 141.756 0.785 111.28

24 265 27.640 3 0.553 0.500 86.078 0.785 67.57

Pour 8
1 266-277 23.900 39 0.478 0.500 970.24 0.785 761.64

2 278 23.945 5 0.479 0.500 124.62 0.785 97.83

3 279 23.946 3 0.479 0.500 74.77 0.785 58.70

4 280 23.946 3 0.479 0.500 74.77 0.785 58.70

5 281 23.969 2 0.479 0.500 49.90 0.785 39.17

6 282 24.072 2 0.481 0.500 50.11 0.785 39.33

7 283 24.223 2 0.484 0.500 50.41 0.785 39.58

8 284 24.418 2 0.488 0.500 50.81 0.785 39.89

9 285 24.658 3 0.493 0.500 76.95 0.785 60.41


10 286 27.890 3 0.558 0.500 86.84 0.785 68.17

11 287 27.593 3 0.552 0.500 85.93 0.785 67.46

12 288 28.290 5 0.566 0.500 146.78 0.785 115.22

13 289 28.708 5 0.574 0.500 148.91 0.785 116.89

14 290 29.188 3 0.584 0.500 90.82 0.785 71.29

15 291 29.669 3 0.593 0.500 92.29 0.785 72.45

16 292 30.150 3 0.603 0.500 93.76 0.785 73.60

17 293 30.630 5 0.613 0.500 158.71 0.785 124.59

18 294 31.195 5 0.624 0.500 161.59 0.785 126.85

19 295 31.629 2 0.633 0.500 65.52 0.785 51.44

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 15 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl) JMS No: N-KPT / POD / 02 / 12
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
20 296 32.070 3 0.641 0.500 99.63 0.785 78.21

21 297 32.519 3 0.650 0.500 101.01 0.785 79.29

22 298 32.976 2 0.660 0.500 68.27 0.785 53.59

23 299 33.441 3 0.669 0.500 103.83 0.785 81.51

24 300 33.546 3 0.671 0.500 104.15 0.785 81.76

IN KG 19661.81
IN MT 19.662

Item No-37 - P/L Tendons - Post Tensioning Slab 3RD SLAB (119.175 Lvl)

Total Quantity = = 19.662 MT 100% CLAIMED

Previous Quantity if any = = 16.786 MT ( Ref JMS NO-N-KPT / POD / 01 / 48 )

This bill Qty = = 2.876 MT

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 16 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.2017


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl) JMS No: N-KPT / POD / 14 / 04
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Tendon Length Weight (kg)
(Mtr) length (kg)
DRG NO.USS/DDP/15-277/14096/SD/P-P1,130052-C.PO-281-102

1 1 22.134 5 1 0.500 113.170 0.785 88.838

2 2 22.460 5 1 0.500 114.800 0.785 90.118

3 3 22.797 5 1 0.500 116.485 0.785 91.441

4 4 23.140 5 1 0.500 118.200 0.785 92.787

5 4a 23.533 4 1 0.500 96.132 0.785 75.464

6 5 23.546 5 1 0.500 120.230 0.785 94.381

7 6 23.546 5 1 0.500 120.230 0.785 94.381

8 7 23.546 5 1 0.500 120.230 0.785 94.381

9 8 23.546 5 1 0.500 120.230 0.785 94.381

10 9 23.546 5 1 0.500 120.230 0.785 94.381

11 9a 23.489 4 1 0.500 95.956 0.785 75.325

12 10a 23.453 4 1 0.500 95.812 0.785 75.212

13 10 23.301 5 1 0.500 119.005 0.785 93.419

14 11 23.301 5 1 0.500 119.005 0.785 93.419

15 12 23.301 5 1 0.500 119.005 0.785 93.419

16 13 15.107 5 1 0.500 78.035 0.785 61.26

17 14 15.107 5 1 0.500 78.035 0.785 61.26

18 15 15.107 5 1 0.500 78.035 0.785 61.26

19 16 15.107 5 1 0.500 78.035 0.785 61.26

20 17 16.615 4 1 0.500 68.460 0.785 53.74

21 18 16.615 4 1 0.500 68.460 0.785 53.74

22 19 16.610 4 1 0.500 68.440 0.785 53.73

23 20 16.610 4 1 0.500 68.440 0.785 53.73

24 20a 16.560 4 1 0.500 68.240 0.785 53.57

25 21 16.615 4 1 0.500 68.460 0.785 53.74

26 22 16.615 5 1 0.500 85.575 0.785 67.18

27 23 16.615 5 1 0.500 85.575 0.785 67.18

28 24 16.615 4 1 0.500 68.460 0.785 53.74

29 24a 13.745 3 1 0.500 42.735 0.785 33.55

30 25 16.675 5 1 0.500 85.875 0.785 67.41

31 26 16.675 5 1 0.500 85.875 0.785 67.41

32 27 14.275 3 1 0.500 44.325 0.785 34.80

33 28 14.275 3 1 0.500 44.325 0.785 34.80

34 29 14.275 3 1 0.500 44.325 0.785 34.80

35 30 14.275 3 1 0.500 44.325 0.785 34.80

36 30a 14.275 3 1 0.500 44.325 0.785 34.80

37 31 14.275 5 1 0.500 73.875 0.785 57.99

38 32 14.275 2 1 0.500 29.550 0.785 23.20

39 33 14.275 3 1 0.500 44.325 0.785 34.80

40 34 10.456 5 1 0.500 54.780 0.785 43.00

41 34a 10.456 5 1 0.500 54.780 0.785 43.00

42 35 10.456 5 1 0.500 54.780 0.785 43.00

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 17 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.2017


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl) JMS No: N-KPT / POD / 14 / 04
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Tendon Length Weight (kg)
(Mtr) length (kg)
43 36 10.456 5 1 0.500 54.780 0.785 43.00

PTB-12 (1300x750)
44 41a 16.339 4 1 0.500 67.356 0.785 52.87

45 41 16.324 5 1 0.500 84.120 0.785 66.03

46 42 16.324 5 1 0.500 84.120 0.785 66.03

47 43 16.324 4 1 0.500 67.296 0.785 52.83

48 44 16.324 5 1 0.500 84.120 0.785 66.03

49 45 16.324 5 1 0.500 84.120 0.785 66.03

50 46 16.324 5 1 0.500 84.120 0.785 66.03

51 47 14.275 2 1 0.500 29.550 0.785 23.197

52 47a 16.339 5 1 0.500 84.195 0.785 66.093

53 48 14.275 5 1 0.500 73.875 0.785 57.992

54 50 14.275 5 1 0.500 73.875 0.785 57.992

55 54 14.283 2 1 0.500 29.566 0.785 23.209

56 55 14.275 3 1 0.500 44.325 0.785 34.795

57 56 14.275 3 1 0.500 44.325 0.785 34.795

58 57 14.275 2 1 0.500 29.550 0.785 23.197

59 58 13.028 5 1 0.500 67.640 0.785 53.097

60 59 13.028 5 1 0.500 67.640 0.785 53.097

61 60 14.275 5 1 0.500 73.875 0.785 57.992

62 60a 12.624 5 1 0.500 65.620 0.785 51.512

63 61 12.624 5 1 0.500 65.620 0.785 51.512

64 62a 12.624 5 1 0.500 65.620 0.785 51.512

65 62 14.275 5 1 0.500 73.875 0.785 57.992

66 63 14.275 3 1 0.500 44.325 0.785 34.795

67 64 14.275 3 1 0.500 44.325 0.785 34.795

68 65 16.597 5 1 0.500 85.485 0.785 67.106

69 67 16.580 5 1 0.500 85.400 0.785 67.039

70 70 16.587 3 1 0.500 51.261 0.785 40.240

71 71 16.576 3 1 0.500 51.228 0.785 40.214

72 72 16.580 3 1 0.500 51.240 0.785 40.223

73 73 16.580 3 1 0.500 51.240 0.785 40.223

74 74 16.580 3 1 0.500 51.240 0.785 40.223

75 76 8.700 5 1 0.500 46.000 0.785 36.11

76 77 19.028 5 1 0.500 97.640 0.785 76.65

77 78 19.028 5 1 0.500 97.640 0.785 76.65

78 70a 25.161 3 1 0.500 76.983 0.785 60.43

79 75 13.320 5 1 0.500 69.100 0.785 54.24

80 71a 24.893 3 1 0.500 76.179 0.785 59.80

81 72b 24.642 3 1 0.500 75.426 0.785 59.21

82 72a 12.810 5 1 0.500 66.550 0.785 52.24

83 73a 24.390 3 1 0.500 74.670 0.785 58.616

84 74a 12.561 5 1 0.500 65.305 0.785 51.26

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 18 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.2017


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl) JMS No: N-KPT / POD / 14 / 04
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Tendon Length Weight (kg)
(Mtr) length (kg)
85 74b 24.139 3 1 0.500 73.917 0.785 58.02

86 83 12.875 5 1 0.500 66.875 0.785 52.497

87 84 12.875 5 1 0.500 66.875 0.785 52.497

88 85 12.875 5 1 0.500 66.875 0.785 52.497

89 86 11.224 5 1 0.500 58.620 0.785 46.017

90 87 11.224 5 1 0.500 58.620 0.785 46.017

91 88 11.224 5 1 0.500 58.620 0.785 46.017

92 89A 10.850 5 1 0.500 56.750 0.785 44.549

93 89 15.163 5 1 0.500 78.315 0.785 61.477

94 90 15.090 5 1 0.500 77.950 0.785 61.191

95 91 14.977 5 1 0.500 77.385 0.785 60.747

96 92 14.867 5 1 0.500 76.835 0.785 60.315

97 93 14.757 5 1 0.500 76.285 0.785 59.884

98 94 14.649 5 1 0.500 75.745 0.785 59.460

99 95 14.543 5 1 0.500 75.215 0.785 59.044

100 96 14.438 5 1 0.500 74.690 0.785 58.632

101 97 14.334 5 1 0.500 74.170 0.785 58.223

102 98 14.232 5 1 0.500 73.660 0.785 57.823

103 99 14.131 5 1 0.500 73.155 0.785 57.427

104 100 14.032 5 1 0.500 72.660 0.785 57.038

105 101 13.934 5 1 0.500 72.170 0.785 56.653

106 104 13.838 5 1 0.500 71.690 0.785 56.277

107 107 13.723 5 1 0.500 71.115 0.785 55.825

108 110 13.584 5 1 0.500 70.420 0.785 55.280

109 111 13.455 5 1 0.500 69.775 0.785 54.773

110 112 13.329 5 1 0.500 69.145 0.785 54.279

111 113 13.205 5 1 0.500 68.525 0.785 53.792

112 114 13.082 5 1 0.500 67.910 0.785 53.309

113 115 12.979 5 1 0.500 67.395 0.785 52.905

114 116 12.885 5 1 0.500 66.925 0.785 52.536

115 118 12.779 5 1 0.500 66.395 0.785 52.120

116 119 12.708 5 1 0.500 66.040 0.785 51.841

117 120 12.626 5 1 0.500 65.630 0.785 51.520

118 121 12.545 5 1 0.500 65.225 0.785 51.202

119 122 12.481 5 1 0.500 64.905 0.785 50.950

120 123 12.389 5 1 0.500 64.445 0.785 50.589

121 124 12.195 5 1 0.500 63.475 0.785 49.83

122 125 12.195 5 1 0.500 63.475 0.785 49.83

123 126 12.195 5 1 0.500 63.475 0.785 49.83

124 127 24.440 5 1 0.500 124.700 0.785 97.89

125 128 30.560 5 1 0.500 155.300 0.785 121.91

126 129 24.440 5 1 0.500 124.700 0.785 97.89

127 130 24.900 5 1 0.500 127.000 0.785 99.70

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 19 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.2017


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl) JMS No: N-KPT / POD / 14 / 04
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Tendon Length Weight (kg)
(Mtr) length (kg)
128 131 24.780 4 1 0.500 101.120 0.785 79.38

129 132 24.650 5 1 0.500 125.750 0.785 98.71

130 133 24.575 5 1 0.500 125.375 0.785 98.42

131 134 24.480 4 1 0.500 99.920 0.785 78.44

132 135 24.390 4 1 0.500 99.560 0.785 78.15

133 136 24.390 5 1 0.500 124.450 0.785 97.69

134 137 24.390 5 1 0.500 124.450 0.785 97.69

135 138 24.300 4 1 0.500 99.200 0.785 77.87

136 139 24.183 2 1 0.500 49.366 0.785 38.75

137 140 24.082 3 1 0.500 73.746 0.785 57.89

138 141 13.243 5 1 0.500 68.715 0.785 53.94

139 142 13.172 5 1 0.500 68.360 0.785 53.66

140 143 13.102 5 1 0.500 68.010 0.785 53.39

141 144 13.034 5 1 0.500 67.670 0.785 53.12

142 145 12.967 5 1 0.500 67.335 0.785 52.86

143 146 12.903 5 1 0.500 67.015 0.785 52.61

144 147 12.840 5 1 0.500 66.700 0.785 52.36

145 148 12.779 5 1 0.500 66.395 0.785 52.12

146 149 12.720 5 1 0.500 66.100 0.785 51.89

147 150 12.663 5 1 0.500 65.815 0.785 51.66

148 151 12.607 5 1 0.500 65.535 0.785 51.44

149 152 12.555 5 1 0.500 65.275 0.785 51.24

150 154 25.437 5 1 0.500 129.685 0.785 101.80

151 155 25.376 5 1 0.500 129.380 0.785 101.56

152 157 14.238 5 1 0.500 73.690 0.785 57.85

153 158 14.181 5 1 0.500 73.405 0.785 57.62

154 159 14.128 5 1 0.500 73.140 0.785 57.41

155 160 14.076 5 1 0.500 72.880 0.785 57.21

156 161 14.028 5 1 0.500 72.640 0.785 57.02

157 163 25.071 5 1 0.500 127.855 0.785 100.37

158 164 25.025 5 1 0.500 127.625 0.785 100.19

159 166 8.346 5 1 0.500 44.230 0.785 34.72

160 167 8.307 5 1 0.500 44.035 0.785 34.57

161 168 8.282 5 1 0.500 43.910 0.785 34.47

162 169 8.258 5 1 0.500 43.790 0.785 34.38

163 170 8.242 5 1 0.500 43.710 0.785 34.31

164 171 6.783 5 1 0.500 36.415 0.785 28.59

165 172 13.799 5 1 0.500 71.495 0.785 56.12

166 173 8.194 5 1 0.500 43.470 0.785 34.12

167 174 8.175 5 1 0.500 43.375 0.785 34.05

168 175 8.157 5 1 0.500 43.285 0.785 33.979

169 176 8.115 5 1 0.500 43.075 0.785 33.814

170 177 8.125 5 1 0.500 43.125 0.785 33.853

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 20 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.01.2017


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl) JMS No: N-KPT / POD / 14 / 04
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Tendon Length Weight (kg)
(Mtr) length (kg)
171 178 8.111 5 1 0.500 43.055 0.785 33.798

172 179 13.008 5 1 0.500 67.540 0.785 53.019

173 180 18.404 5 1 0.500 94.520 0.785 74.198

174 181 13.008 5 1 0.500 67.540 0.785 53.019

175 182 23.998 5 1 0.500 122.490 0.785 96.155

176 183 23.945 2 1 0.500 48.890 0.785 38.379

177 184 23.945 4 1 0.500 97.780 0.785 76.757

178 185 23.945 2 1 0.500 48.890 0.785 38.379

179 186 23.945 5 1 0.500 122.225 0.785 95.947

180 187 23.951 5 1 0.500 122.255 0.785 95.970

181 188 23.951 2 1 0.500 48.902 0.785 38.388

182 189 23.951 4 1 0.500 97.804 0.785 76.776

183 PTB-8 (1800x750)


T7-T14 12.120 5 8 0.500 504.800 0.785 396.268

184 PTB-18 (2000x750)


T7-T14 12.120 5 8 0.500 504.800 0.785 396.268

185 PTB-13 (1700x750)


T1-T11 11.975 5 11 0.500 686.125 0.785 538.608

186 PTB-14 (1200x750)


T1-T5 9.625 5 5 0.500 253.125 0.785 198.703

187 PTB-16 (1200x750)


T1-T5 26.500 5 2 0.500 270.000 0.785 211.950

188 PTB-18 (2000x750)


T1-T6 17.865 5 6 0.500 550.950 0.785 432.496

189 PTB-06 (900x750)


T1-T4 12.130 5 4 0.500 252.600 0.785 198.291

190 PTB-07 (1200x750)


T1-T4 23.455 5 5 0.500 598.875 0.785 470.117

191 PTB-08 (1800x750)


T1-T6 18.160 4 6 0.500 447.840 0.785 351.554

192 PTB-09 (1200x750)


T1-T5 9.625 5 5 0.500 253.125 0.785 198.703

193 PTB-10 (1700x750)


T1-T11 11.976 5 11 0.500 686.180 0.785 538.651

IN KG 14634.78
IN MT 14.635

: P/L Tendons - Post Tensioning Slab Club House (119.175 Lvl)

Total Quantity = 14.635 MT 100% CLAIMED

Previous Quantity if any = 10.976 MT REF.JMS No : N-KPT / POD / 13 / 06


This bill Qty = 3.659 MT

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 21 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
DRG NO.USS/DDP/15-277/14096/SD/P-P1

Pour 1

1 1 To 3 22.405 8 0.448 0.500 186.825 0.785 146.66

2 4 To 5 22.402 7 0.448 0.500 163.450 0.785 128.31

3 6 To 7 14.425 6 0.289 0.500 91.281 0.785 71.66

4 8 To 16 22.400 28 0.448 0.500 653.744 0.785 513.19


5 17 7.814 5 0.156 0.500 42.351 0.785 33.25

6 18 7.779 5 0.156 0.500 42.173 0.785 33.11

7 19 7.748 5 0.155 0.500 42.015 0.785 32.98

8 20 7.720 5 0.154 0.500 41.872 0.785 32.87

9 21 7.695 5 0.154 0.500 41.745 0.785 32.77


10 22 23.965 3 0.479 0.500 74.833 0.785 58.74

11 23 23.912 3 0.478 0.500 74.671 0.785 58.62

12 24 23.902 3 0.478 0.500 74.640 0.785 58.59

13 25 To 27 13.406 10 0.268 0.500 141.741 0.785 111.27

14 28 23.735 5 0.475 0.500 123.549 0.785 96.99


15 29 23.735 2 0.475 0.500 49.419 0.785 38.79

16 30 23.675 5 0.474 0.500 123.243 0.785 96.75

17 31 23.663 5 0.473 0.500 123.181 0.785 96.70

18 32 23.654 2 0.473 0.500 49.254 0.785 38.66

19 33 23.650 4 0.473 0.500 98.492 0.785 77.32


20 34 23.657 3 0.473 0.500 73.890 0.785 58.00

21 35 23.671 3 0.473 0.500 73.933 0.785 58.04

22 36 23.674 3 0.473 0.500 73.942 0.785 58.04

23 37 23.689 3 0.474 0.500 73.988 0.785 58.08

24 38 23.694 3 0.474 0.500 74.004 0.785 58.09

25 39 23.711 3 0.474 0.500 74.056 0.785 58.13

Pour 2

1 40-48 22.400 31 0.448 0.500 723.788 0.785 568.17

2 49 14.425 3 0.289 0.500 45.641 0.785 35.83

3 50 14.455 4 0.289 0.500 60.976 0.785 47.87


4 51 22.425 5 0.449 0.500 116.868 0.785 91.74

5 52,53,54,55 22.430 10 0.449 0.500 233.786 0.785 183.52

6 56 24.036 2 0.481 0.500 50.033 0.785 39.28

7 57 24.080 5 0.482 0.500 125.308 0.785 98.37

8 58,59,60 13.750 9 0.275 0.500 130.725 0.785 102.62


9 61 24.305 5 0.486 0.500 126.456 0.785 99.27

10 62 24.365 2 0.487 0.500 50.705 0.785 39.80

11 63 24.435 5 0.489 0.500 127.119 0.785 99.79

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 22 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
12 64 24.488 5 0.490 0.500 127.389 0.785 100.00

13 65 24.595 2 0.492 0.500 51.174 0.785 40.17

14 66 24.710 4 0.494 0.500 102.817 0.785 80.71

15 67 24.835 2 0.497 0.500 51.663 0.785 40.56

16 68 24.970 5 0.499 0.500 129.847 0.785 101.93

17 69 25.045 5 0.501 0.500 130.230 0.785 102.23


18 70 25.150 2 0.503 0.500 52.306 0.785 41.06

19 71 7.710 5 0.154 0.500 41.821 0.785 32.83

20 72 7.745 5 0.155 0.500 42.000 0.785 32.97

21 73 7.775 5 0.156 0.500 42.153 0.785 33.09

22 74 7.810 5 0.156 0.500 42.331 0.785 33.23


23 75 7.850 5 0.157 0.500 42.535 0.785 33.39

Pour 3

1 160 21.047 2 0.421 0.500 43.936 0.785 34.49

2 161 22.891 3 0.458 0.500 71.546 0.785 56.16

3 162 22.916 2 0.458 0.500 47.749 0.785 37.48


4 163 22.912 5 0.458 0.500 119.351 0.785 93.69

5 164 21.961 5 0.439 0.500 114.501 0.785 89.88

6 165 22.864 2 0.457 0.500 47.643 0.785 37.40

7 166 14.538 3 0.291 0.500 45.986 0.785 36.10

8 167 22.707 2 0.454 0.500 47.322 0.785 37.15


9 168 22.700 5 0.454 0.500 118.270 0.785 92.84

10 169 22.700 5 0.454 0.500 118.270 0.785 92.84

11 171 22.700 2 0.454 0.500 47.308 0.785 37.14

12 172 22.700 3 0.454 0.500 70.962 0.785 55.71

13 173 22.700 2 0.454 0.500 47.308 0.785 37.14

14 174 22.700 5 0.454 0.500 118.270 0.785 92.84

15 175 22.700 5 0.454 0.500 118.270 0.785 92.84

16 176 22.700 2 0.454 0.500 47.308 0.785 37.14

17 177 22.700 3 0.454 0.500 70.962 0.785 55.71

18 178 20.402 2 0.408 0.500 42.620 0.785 33.46


19 179 20.402 5 0.408 0.500 106.550 0.785 83.64

20 180 22.700 5 0.454 0.500 118.270 0.785 92.84

21 181 22.700 2 0.454 0.500 47.308 0.785 37.14

16 182 31.304 3 0.626 0.500 97.290 0.785 76.37

17 183 31.421 3 0.628 0.500 97.648 0.785 76.65


18 183a 31.464 3 0.629 0.500 97.780 0.785 76.76

19 184 31.631 5 0.633 0.500 163.818 0.785 128.60

20 185 31.840 2 0.637 0.500 65.954 0.785 51.77

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 23 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
21 186 32.076 3 0.642 0.500 99.653 0.785 78.23

22 187 32.291 2 0.646 0.500 66.874 0.785 52.50

23 188 32.538 5 0.651 0.500 168.444 0.785 132.23

24 189 32.727 5 0.655 0.500 169.408 0.785 132.99

25 190 33.005 3 0.660 0.500 102.495 0.785 80.46

26 191 33.294 3 0.666 0.500 103.380 0.785 81.15


27 192 33.592 3 0.672 0.500 104.292 0.785 81.87

28 193 33.905 5 0.678 0.500 175.416 0.785 137.70

29 194 28.899 5 0.578 0.500 149.885 0.785 117.66

30 195 28.640 3 0.573 0.500 89.138 0.785 69.97

Pour 4
1 196 14.059 3 0.281 0.500 44.521 0.785 34.95

2 196a 14.047 3 0.281 0.500 44.484 0.785 34.92

3 197 14.047 3 0.281 0.500 44.484 0.785 34.92

4 198 14.047 2 0.281 0.500 29.656 0.785 23.28

5 199 14.047 5 0.281 0.500 74.140 0.785 58.20


6 200 23.900 5 0.478 0.500 124.390 0.785 97.65

7 201 23.900 2 0.478 0.500 49.756 0.785 39.06

8 202 23.900 3 0.478 0.500 74.634 0.785 58.59

9 203 23.900 2 0.478 0.500 49.756 0.785 39.06

10 204 23.900 5 0.478 0.500 124.390 0.785 97.65


11 205 23.900 5 0.478 0.500 124.390 0.785 97.65

12 206 23.900 2 0.478 0.500 49.756 0.785 39.06

13 207 23.900 3 0.478 0.500 74.634 0.785 58.59

14 208 23.900 2 0.478 0.500 49.756 0.785 39.06

15 209 23.900 5 0.478 0.500 124.390 0.785 97.65

16 210 23.900 5 0.478 0.500 124.390 0.785 97.65

17 211 23.900 2 0.478 0.500 49.756 0.785 39.06

18 212 23.900 3 0.478 0.500 74.634 0.785 58.59

19 213 23.900 2 0.478 0.500 49.756 0.785 39.06

20 214 23.900 5 0.478 0.500 124.390 0.785 97.65


21 215 23.900 5 0.478 0.500 124.390 0.785 97.65

23 216 23.900 2 0.478 0.500 49.756 0.785 39.06

24 217 28.797 3 0.576 0.500 89.619 0.785 70.35

25 218 35.028 3 0.701 0.500 108.686 0.785 85.32

26 219 35.531 5 0.711 0.500 183.708 0.785 144.21


27 220 36.159 5 0.723 0.500 186.911 0.785 146.73

28 221 36.691 2 0.734 0.500 75.850 0.785 59.54

29 222 35.075 3 0.702 0.500 108.830 0.785 85.43

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 24 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
30 223 35.075 2 0.702 0.500 72.553 0.785 56.95

31 224 35.075 5 0.702 0.500 181.383 0.785 142.39

32 225 27.802 5 0.556 0.500 144.290 0.785 113.27

33 226 27.802 2 0.556 0.500 57.716 0.785 45.31

34 227 27.802 3 0.556 0.500 86.574 0.785 67.96

35 228 27.802 3 0.556 0.500 86.574 0.785 67.96


36 229 27.802 2 0.556 0.500 57.716 0.785 45.31

37 228 27.802 3 0.556 0.500 86.574 0.785 67.96

38 229 27.802 3 0.556 0.500 86.574 0.785 67.96

Pour 5

1 76 28.045 3 0.561 0.500 87.318 0.785 68.54


2 77 28.035 2 0.561 0.500 58.191 0.785 45.68

3 78,79 28.030 5 0.561 0.500 145.453 0.785 114.18

4 80 28.070 5 0.561 0.500 145.657 0.785 114.34

5 80a,81a,82a 5.800 9 0.116 0.500 57.744 0.785 45.33

6 81,82 17.070 6 0.341 0.500 107.468 0.785 84.36


7 83,84,85,86,87,88,89,90,91 28.020 28 0.560 0.500 814.251 0.785 639.19

8 92 8.565 5 0.171 0.500 46.182 0.785 36.25

9 93 8.625 5 0.173 0.500 46.488 0.785 36.49

10 94 8.690 5 0.174 0.500 46.819 0.785 36.75

11 95 8.760 5 0.175 0.500 47.176 0.785 37.03


12 96 8.830 5 0.177 0.500 47.533 0.785 37.31

13 97 8.895 5 0.178 0.500 47.865 0.785 37.57

14 98 23.765 3 0.475 0.500 74.221 0.785 58.26

15 99 23.810 3 0.476 0.500 74.359 0.785 58.37

16 100 23.865 3 0.477 0.500 74.527 0.785 58.50

17 101 23.875 3 0.478 0.500 74.558 0.785 58.53

18 102 23.927 3 0.479 0.500 74.717 0.785 58.65

19 103 23.941 3 0.479 0.500 74.759 0.785 58.69

20 104 24.000 3 0.480 0.500 74.940 0.785 58.83

21 105 24.100 3 0.482 0.500 75.246 0.785 59.07


22 106 24.185 3 0.484 0.500 75.506 0.785 59.27

23 107 24.290 5 0.486 0.500 126.379 0.785 99.21

24 108 24.360 5 0.487 0.500 126.736 0.785 99.49

25 109 24.450 2 0.489 0.500 50.878 0.785 39.94

26 110 24.540 5 0.491 0.500 127.654 0.785 100.21


27 111 13.400 3 0.268 0.500 42.504 0.785 33.37

28 112 13.400 3 0.268 0.500 42.504 0.785 33.37

29 113 13.400 3 0.268 0.500 42.504 0.785 33.37

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 25 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
30 114 25.080 3 0.502 0.500 78.245 0.785 61.42

31 115 25.120 3 0.502 0.500 78.367 0.785 61.52

32 116 25.265 3 0.505 0.500 78.811 0.785 61.87

33 117 25.450 3 0.509 0.500 79.377 0.785 62.31

Pour 6

1 118-129 28.020 39 0.560 0.500 1134.136 0.785 890.30


2 130 17.170 5 0.343 0.500 90.067 0.785 70.70

3 130a,131a,132a 5.795 9 0.116 0.500 57.698 0.785 45.29

4 131 28.230 5 0.565 0.500 146.473 0.785 114.98

5 132-134 28.235 7 0.565 0.500 205.098 0.785 161.00

6 135 28.240 3 0.565 0.500 87.914 0.785 69.01


7 136 25.345 4 0.507 0.500 105.408 0.785 82.74

8 137 25.505 2 0.510 0.500 53.030 0.785 41.63

9 138 25.675 5 0.514 0.500 133.443 0.785 104.75

10 139 25.775 5 0.516 0.500 133.953 0.785 105.15

11 140 25.965 2 0.519 0.500 53.969 0.785 42.37


12 141 26.167 4 0.523 0.500 108.761 0.785 85.38

13 142 26.377 2 0.528 0.500 54.809 0.785 43.03

14 143 26.595 5 0.532 0.500 138.135 0.785 108.44

15 144 26.725 5 0.535 0.500 138.798 0.785 108.96

16 145 26.915 2 0.538 0.500 55.907 0.785 43.89


17 146 27.070 5 0.541 0.500 140.557 0.785 110.34

18 147-149 16.665 9 0.333 0.500 157.485 0.785 123.63

19 150 27.990 3 0.560 0.500 87.149 0.785 68.41

20 151 28.035 3 0.561 0.500 87.287 0.785 68.52

21 152 28.285 3 0.566 0.500 88.052 0.785 69.12

22 153 28.575 3 0.572 0.500 88.940 0.785 69.82

23 154 7.885 5 0.158 0.500 42.714 0.785 33.53

24 155 7.990 5 0.160 0.500 43.249 0.785 33.95

25 156 8.100 5 0.162 0.500 43.810 0.785 34.39

26 157 8.220 5 0.164 0.500 44.422 0.785 34.87


27 158 8.335 5 0.167 0.500 45.009 0.785 35.33

28 159 8.440 5 0.169 0.500 45.544 0.785 35.75

Pour 7

1 232-235 22.700 15 0.454 0.500 354.810 0.785 278.53

2 236 14.100 2 0.282 0.500 29.764 0.785 23.36


3 237-241 22.700 16 0.454 0.500 378.464 0.785 297.09

4 242 14.525 3 0.291 0.500 45.947 0.785 36.07

5 243 14.605 3 0.292 0.500 46.191 0.785 36.26

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 26 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
6 244 23.075 4 0.462 0.500 96.146 0.785 75.47

7 245-248 23.120 12 0.462 0.500 288.989 0.785 226.86

8 249 23.135 3 0.463 0.500 72.293 0.785 56.75

9 250 23.360 3 0.467 0.500 72.982 0.785 57.29

10 251 23.535 3 0.471 0.500 73.517 0.785 57.71

11 252 23.585 3 0.472 0.500 73.670 0.785 57.83


12 253 23.840 3 0.477 0.500 74.450 0.785 58.44

13 254 23.890 3 0.478 0.500 74.603 0.785 58.56

14 255 24.190 2 0.484 0.500 50.348 0.785 39.52

15 256 24.470 4 0.489 0.500 101.838 0.785 79.94

16 257 24.740 2 0.495 0.500 51.470 0.785 40.40


17 258 25.095 5 0.502 0.500 130.485 0.785 102.43

18 259 25.275 5 0.506 0.500 131.403 0.785 103.15

19 260 25.785 3 0.516 0.500 80.402 0.785 63.12

20 261 26.160 3 0.523 0.500 81.550 0.785 64.02

21 262 26.560 3 0.531 0.500 82.774 0.785 64.98


22 263 26.975 5 0.540 0.500 140.073 0.785 109.96

23 264 27.305 5 0.546 0.500 141.756 0.785 111.28

24 265 27.640 3 0.553 0.500 86.078 0.785 67.57

Pour 8

1 266 23.900 3 0.478 0.500 74.634 0.785 58.59


2 267 23.900 2 0.478 0.500 49.756 0.785 39.06

3 268 23.900 5 0.478 0.500 124.390 0.785 97.65

4 269 23.900 5 0.478 0.500 124.390 0.785 97.65

5 270 23.900 2 0.478 0.500 49.756 0.785 39.06

6 271 23.900 3 0.478 0.500 74.634 0.785 58.59

7 272 23.900 2 0.478 0.500 49.756 0.785 39.06

8 273 23.900 5 0.478 0.500 124.390 0.785 97.65

9 274 23.900 5 0.478 0.500 124.390 0.785 97.65

10 275 23.900 2 0.478 0.500 49.756 0.785 39.06

11 276 23.900 3 0.478 0.500 74.634 0.785 58.59


12 277 14.200 2 0.284 0.500 29.968 0.785 23.52

13 278 14.247 5 0.285 0.500 75.160 0.785 59.00

14 279 14.247 3 0.285 0.500 45.096 0.785 35.40

15 280 14.247 3 0.285 0.500 45.096 0.785 35.40

16 281 16.782 2 0.336 0.500 35.235 0.785 27.66


17 282 24.073 2 0.481 0.500 50.109 0.785 39.34

18 283 24.233 2 0.485 0.500 50.435 0.785 39.59

19 284 24.418 2 0.488 0.500 50.813 0.785 39.89

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 27 of 28


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU, BANER Date: 31.03.16


STRUCTURE : BUILDING - C.POD
PARTICULARS : P/L Tendons - Post Tensioning Slab 4th SLAB (122.525 Lvl) JMS No: N-KPT / POD / 04 / 06
ITEM NO : 37 (1103400)
Strand Including Unit Weight
No of Stressing Total
SI No. Description Length 2% Profile Total length of strand
Strand Length Weight (kg)
(Mtr) length (kg)
20 285 24.644 3 0.493 0.500 76.911 0.785 60.37

21 286 27.890 3 0.558 0.500 86.843 0.785 68.17

22 287 27.593 3 0.552 0.500 85.935 0.785 67.46

23 288 28.290 5 0.566 0.500 146.779 0.785 115.22

24 289 28.708 5 0.574 0.500 148.911 0.785 116.89

25 290 29.188 3 0.584 0.500 90.815 0.785 71.29


26 291 29.669 3 0.593 0.500 92.287 0.785 72.45

27 292 30.150 3 0.603 0.500 93.759 0.785 73.60

28 293 30.630 5 0.613 0.500 158.713 0.785 124.59

29 294 19.101 5 0.382 0.500 99.915 0.785 78.43

30 295 19.101 2 0.382 0.500 39.966 0.785 31.37


31 296 19.101 3 0.382 0.500 59.949 0.785 47.06

32 297 19.101 3 0.382 0.500 59.949 0.785 47.06

33 298 19.101 2 0.382 0.500 39.966 0.785 31.37

34 299 19.101 3 0.382 0.500 59.949 0.785 47.06

35 300 19.101 3 0.382 0.500 59.949 0.785 47.06


36 294A 7.524 5 0.150 0.500 40.872 0.785 32.08

37 295A 7.516 5 0.150 0.500 40.832 0.785 32.05

38 296A 7.511 5 0.150 0.500 40.806 0.785 32.03

39 297A 7.510 5 0.150 0.500 40.801 0.785 32.03

40 298A 7.512 5 0.150 0.500 40.811 0.785 32.04


41 299A 7.519 5 0.150 0.500 40.847 0.785 32.06

42 300A 7.529 5 0.151 0.500 40.898 0.785 32.10

Qty for balance 2 Pour 4826.00

IN KG 24129.56
IN MT 24.130

Item No - P/L Tendons - Post Tensioning Slab 4TH SLAB (122.525 Lvl)
Total Quantity = = 24.130 MT 100% CLAIMED

Previous Quantity if any = = 16.718 MT JMS No: N-KPT / POD / 03 / 11


This bill Qty = = 7.412 MT

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 28 of 28