Sunteți pe pagina 1din 1

Plastering Checklist Checklist No.

Name of Work :
Date / Time
Item Description :
Inspection Requested By

Drawing Reference
Block Floor Flat No
1st Coat 2nd Coat

Points to Check O/P Action Required O/P Action Required


1 Drawings & Spec. Details Finalised

Material Approvals
2
Completion of Masonry in all respect
3
Doors & Window frames fixed as req.
4
All Services lines laid and approved
Pre Plaster Checklist

5
Hacking of related RCC Surfaces
6
Racking of Masonry Joints
7
Fixing of Wire mesh at interfaces
8
Button Marks fixed around walls
9
Old mortar flakes removal & cleaning
10
Availability of adaquate lighting
11
Wetting of base masonry surface
12
Stability of Scaffolding / frame work
13

1 Line, level & Verticality

2 Plastering Pattern laid as per Drg.

3 Surface finish & evenness


After Plastering

4 Making of grooves as specified if any

5 Thickness of Grooves & Evenness

6 Cleaning of Joints & Corners finishing

7 Provision for skirting

8 Cleaning of Splashing in adj. surface

9 Rough finish for Cladding area if any

10 Curing as specified
Work Approval Approved Approved to subject of rectifications Not Approved

Approval Date Task End Date


Remarks

Contractor Sign Project Engineer Sign Project Manager

S-ar putea să vă placă și