Sunteți pe pagina 1din 2

Project Activity and

Expected Timing

About the
Survey/Route
Planning - May 2014 - Ongoing Pipeline
project
This project is Isabel
FERC Pre-filing Request -
October 2014
or Pipe
Mastrangelis Senior
Project for the Legal FERC Application -
September 2015
Dream
Studies Academy. A Critical Examination of the
Each student was Atlantic Coast Pipeline
tasked with picking Draft Environmental Impact
an issue important Statement (EIS) - December
to them and she 2016
chose the Atlantic
Coast Pipeline. Final EIS - June 2017
The documentary
was filmed over a Construction - 2017 - 2019
three month span
and was the product In-Service - Late 2019
of the passionate
work of many
people.

The work features


interviews from
Thomas Hadwin, a
private citizen with a
background in public
utilities, Tom Fenton,
a small business
owner, as well as
Aaron Ruby, the
public relations
manager for
Dominon Energy.
What is it?
The Atlantic Coast Pipeline is a 554 mile
Its a matter of education,
pipeline that goes from West Virginia,
of getting the story out, through Virginia, and down to North
and letting people decide. Carolina. It is meant to bring natural gas
They should talk to their to customers along the eastern seaboard.
local representatives, their
delegates, and their Key Issues
senators at the state Eminent Domain
The Environment
level.
The Tourism Industry
- Thomas Hadwin Cost of the Pipeline

Contact Me
Isabel Mastrangeli
Thank you!
iemastrangeli@gmail.com
This project would not mean what it does
without the community support that I (757)572-8886
have received.
Schedule
A special thank you to:
Seating and Arrival
Lucas Anderton

Annie Dempsey Documentary Screening


Jenna Heenan
Intermission
Karen Heenan
Guest Speakers:
Jasmine Geonzon

- Harrison Wallace-
CCAN
- Professor Tom Ellis
Question and Answer
Session

S-ar putea să vă placă și