Professional Summary
Main responsibilities:
Planning and execution of Import parts Supply chain activities along with RNAIPL [Renault
Nissan Automotive India PVT LTD] Chennai plant, by which the RENAULT expectations at the
milestones are met without any delays.
Responsibilities
1. IMPORTS LOGISTICS - BOM Analysis to confirm the accuracy of Nissan [G2B] and Renault
- Inbound Logistics [Signe] Ordering Systems.
- Import parts order quantity calculation based on the project milestone
[PT1, PT2 (Trial Phases) and SOP].
- Parts availability confirmation with all ILNs [ International Logistics
Network], total 7 ILNs [ Brasil , France (2), Romania, Spain, Turkey &
South korea ]. Introduced Parts tracking sheet which helped us to
have track of each parts.
- Shipments (Both sea and Air) follow-up with all 7 ILNs and shipping lines
[Hapag lloyd, CMA-CGM and Safmarine]. Implementaion of shipment
tracking and follow-up sheet in common website with access to all liners.
- Packaging validation of all the parts during trial stage and feedback to
ILNs and take Countermeasures. [Co ordination with RNAIPL
shopfloor, RNTBCI Packaging team and Renault ILNs ]
4. Design change COMODIF Committee for design change
Management. [ Weekly meeting where all design Changes will be
discussed and finalized]
- Leading COMODIF meeting involving all CFTs [Engineering,
Design, Plant SCM, Purchase and Management] and make
decision on adopt or abolish.
- Co ordinate to implement design change part based on the plant
Stock, supplier stock and transit stock.
2. Packaging Design: Packaging design for all supplier parts from supplier
till parts usage location at plant.
- Established centralised bin vendor[Nilkamal] for all suppliers, to ensure
uniform quality and with minimum cost at the required leadtime.
- Sourced steel pallets vendor regionwise and deligated to suppliers
again to ensure uniform quality and with minimum cost.
- Established returnables tracking system to prevent returnables losses
and to track the life of returnables.
- Introduce EURO STANDARD bins for the first time in INDIA, which
will help in interstackability of bins and improve loading efficiency in
truck.
- Studied to introduce Plastic skids considering long life and easy
handling.
Responsibilities
3. NEW PROJECTS: A. PLANT #2 Logistics [ TOYOTAS Etios Production ]
- Estimation of the entire logistics planning for TOYOTA Plant#2 which
Started production from December 2010. Arrived at efficient logistics
network & arrived at resource in terms of No of trucks , No of Drivers,
and other resource planning and also established truck yard
management system.
B. P-LANE Implementation - 2010 [ Progressive Lane ]
- Established P-lane which is dividing the internal storage area as per
the production progress in the plant. This supports parts supply to
line side as per the production progress and external logistics
frequency can be made flexible to reduce logistics cost.
- Trained & implementation of E-kanban. For Implementation of P-LANE,
a supporting ordering system is E-kanban.
C. TLMS [ TOYOTA LOGISTICS MANAGEMENT SYSTEM ]
- TLMS is a global TOYOTA logistics management system which
supports the route planner to optimise the route grouping with best
milk run combination considering transportation lead time & this lead
time data is transmitted to e-kanban to calculate exact no of parts
required.
- Trained in E-Kanban and TLMS at JAPAN and THAILAND
TOYOTA plants for 1 month and certified as Super User to
Implement the same in TOYOTA INDIA PLANT by April 2010.
RESULT :
1. Standardised work in shop & reduce the movement of tow motor.
2. Minimum inventroy in plant for supplier park suppliers.
Responsibilities