Name:
Designation/Grade:
Station:
(4 m)
b Name three (3) of the basic work activity carried out during SI works.
(3 m)
(3 m)
(3 m)
(4 m)
c Name three (3) of the basic tools/instruments used in Particle Density Test
for soil.
(3 m)
3a Name three (3) types of equipment used in conducting Plastic Limit test.
(3 m)
Name:
Designation/Grade:
Station:
b Describe the steps in determining the Liquid Limit of soil in the laboratory.
(4 m)
(3 m)
(4 m)
b What are the two (2) values determined in lab compaction test?
(3 m)
c What will happen to the soil during compaction if the moisture content
exceed the optimal value?
(3 m)
(4 m)
b Explain the main difference in lab CBR and in-situ CBR testing procedures.
(3 m)
Name:
Designation/Grade:
Station:
c Given the following results in CBR for a fill material. Can this material be
accepted for subgrade according to SSRW? Why?
Top Bottom
2.5mm 12 32
5.0mm 10 25
(3 m)
6a What are two (2) limitations in carrying out Rebound Hammer alone on
concrete structure?
(4 m)
(4 m)
(2 m)
(4 m)
(3 m)
Name:
Designation/Grade:
Station:
(3 m)
(4 m)
(3 m)
(3 m)
THE END