REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Severity
Probability
Severity
Page 1 of 8 Health,
Safety, and Environmental
2 4 6 8 10
10 20 40 60 80 100 REF:
REVISION:
8 16 32 48 64 80
AFIA Jeddah Factory Project DATE: 27/01/2016
6 12 24 36 48 60
4 8 16 24 32 40
2
2 4 8 12 16 20
First aid
Unlikely
Probability
Page 2 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Possible
Likely
Page 3 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Very Likely
10
10
Imminent
Page 4 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Page 5 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Potential P S Risk Existing control Risk After control Additional Control Final
Hazard Rat measure measure measure required risk
e P S
R
Overloading 6 10 60 Material properly 2 6 12 Assign rigger for
hazard inspected and communication purpose.
supervised before
loading. Appropriate
crane is using for
unloading which have
TUV, work permit
required, area
barricaded before
material unloading.
Unstable 6 10 60 Area inspected before 2 10 20 Assign a competent
ground or parking truck, Crain or person for supervision.
blind spots where unload the
material, it can cause
of any big accident.
Electrical 6 10 60 Electrical cables 2 10 20 Inspect the area before
hazard energized or De- starting the job, away
energized near the from the electrical
Page 6 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Page 7 of 8 Health,
Safety, and Environmental
REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016
Page 8 of 8 Health,
Safety, and Environmental