Documente Academic
Documente Profesional
Documente Cultură
Achieving Operational Excellence and Maximum Performance from your Assets by Implementing
Effective Maintenance Strategy to Increase your Production, While Keeping Operating Costs low
and Improve Reliability
Conference Highlights:
FinRestructuring Existing Maintenance Strategies and Updating Current Expert Speakers Included:
Asset Integrity Programs for Cost Considerations
Convert Implementation Project as solution for cost effective Maintenance Barun Roy
Proposal Manager, Project
Understand Project Planning for Effective Maintenance and Reliability Development
Siemens
Focus on efficiency improvement strategies and how to optimise processes
for increased asset integrity management SHARUL A-RASHID
Principal Engineer,
Improve your Operations Management System Reduce Business Complexity Instrument and Control
Optimize Maintenance and Reliability Petronas
Thomas Aas Saethre
Vice President Integrity
Oceaneering Cordon Lawrence
REASONS TO ATTEND Manager Capital Project
Consulting-EMEA
-&"3/: from maintenance best practices, reliability centred Akachidike Kan AP-Networks Amsterdam
maintenance, root cause analysis and cost effective inspection Technical Analysis and
and maintenance. Business Development Sherif Anwar
*/$3&"4&: your Operations Management System Reduce Repsol Integrity Management, Gulf
Business Complexity Optimize Maintenance and Reliability of Suez Operations
("*/ valuable insight from our top industry best speakers Dr. Henry Tan GUPCO-BP joint venture
.&&5 the entire industry under one roof - unrivalled Senior Lecturer
industry networking School of Engineering, Ammer Jadoon
University of Aberdeen Technical Authority -
Materials & Corrosion
.FEJB1BSUOFS
Ahmed El-Sharkawy BP
Snr Engineer Planning
& Services Abdullah Al Dhafer, MBA
Kuwait Oil Company OE Coordinator Riyadh
Refinery
Michael Bassey Aramco
Turnaround HES
Supervisor Andy Bowes
Chevron Maintenace & Integrity Team
Leader
PDO
Peter Adam
Managing Director
Add energy Mark Wilkinson
Maintenance & Reliability
Team Lead - Asset
Management (MENA Region)
Petrofac
www.tmoe-form.com
Global Forum on Total Maintenance & Operational 26-27 October 2017
Excellence
t Collection methods/process
t Implementation Methods/process
t Implementation frequency
t Examples
Barun Roy
Proposal Manager, Project Development
Siemens simon.rodriguez@oilpro-
Global Forum on Total Maintenance & Operational
26-27 October 2017
Excellence
TBC
Abdullah Al Dhafer
OE Coordinator Riyadh Refinery
ARAMCO
15:20 - Coffee and Networking Break
10:30 - Morning Coffee and Networking Break
15:50 Case Study
11:00 Case Study
Integrating Capital Project Work into Maintenance Turnarounds
Pipeline In-line Inspection (ILI) for a mature asset -
t Capital Project Work is typically a major source of issues for mainte-
implementing and sustaining a successful programme
nance turnaround events.
t The GUPCO joint venture operations has a huge footprint with
t The issues stem from a lack of alignment on objectives and lack of clarity
over 300 mostly subsea pipelines (3,500km), and transporting
in coordinating and integrating the work.
over 400,000 barrels of fluids per day
t The average age of a pipeline is around 25 years. The asset is 50 t This paper will examine how the issues can be simply and easily avoided,
leading to faster, cheaper, more predictable turnarounds.
years old and faces many integrity challenges
Cordon Lawrence
t Pipeline In-line inspection (ILI) was started 5 years ago Manager Capital Project Consulting-EMEA
t A case study is presented outlining this - the challenges faced to AP-Networks Amsterdam
implement and sustain this, benefits and key learning
16:30 Round Table Discussions
Sherif Anwar t This session is an open discussion, where delegates will be divided into
Integrity Management, Gulf of Suez Operations groups, each group will include representatives from NOCs, service
GUPCO-BP joint ventureDevelopment
providers and the summits speakers and will get to exchange their thoughts,
11:40C ase Study discuss and ask questions in regards as conclusion of the conference
16:00 Closing Remarks & End of the conference
Mark Wilkinson
Maintenance & Reliability Team Lead-Asset Managment
(MENA Region)
Petrofac
GLOBAL FORUM ON TOTAL
MAINTENANCE & OPERATIONAL
EXCELLENCE
the delegate will receive and invoice within 24hrs of sending the signed
Contact person: _________________________________
form. The hotel details will be sending two to three weeks before the
Postal code: ____________________________________ date of the conference.
Speaker pack:3999 EURO - 2 days conference +Include speaking slot 45 min + online documentation + Gala Dinner
Full 3ack2799 EURO - 2 days conference + online documentation + Gala Dinner
Standard Pack: 2000 EURO - 1 day conference + online documentation + Gala Dinner
Doc Pack: 799 EURO - Unlimited online access to all presentations of the conference
www.tmoe-form.com