PROJECT DETAILS ENTER THE INPUT VALUES IN BLUE SECTIONS!


Distributor:- Boiler Output rating:- 700
Sales Engineer:- Average Firing Rate:- 50
Customer:- Fuel Fired:- gas
Address:- Annual Hours Run 4118

Site Contact:- Fuel Cost:- $0.60


Site Telephone:- Current Boiler Efficiency 79.00
Site Fax:- Projected Boiler Efficiency 82.00

BOILER EFFICIENCY CALCULATIONS


BOILER OPERATING CALCULATED VALUES - EXISTING BOILER OPERATING CALCULATED VALUES - PROJECTED
Boiler Average Output 350 HP Boiler Average Output 350
Average BTU Output:- 11,732,000 BTU/Hr Average BTU Output:- 11,732,000
Current Boiler Efficiency:- 79.00 % Projected Boiler Efficiency:- 82.00
Average BTU Input:- 14,850,633 BTU/Hr Average BTU Input:- 14,307,317
Annual Hours Run:- 4118 Hours Annual Hours Run:- 4118
Fuel Cost:- $0.60 $ Per Therm Fuel Cost:- $0.60
Annual Fuel Cost:- 366,929.44 $US Annual Fuel Cost:- 353,505.19
Projected Boiler US$ Savings:-

COMBUSTION EFFICIENCY CALCULATIONS


COMBUSTION IMPROVEMENTS AND ENERGY SAVINGS CALCULATIONS - PROJECTED
Removal of Linkage Play:- 1.2 % 4,403.15 US$
Improved Combustion:- 1.1 % 4,036.22 US$
Increased Turndown:- 0.8 % 2,935.44 US$
Improve Load Response:- 0.5 % 1,834.65 US$
O2 Trim Correction:- 1.4 % 5,137.01 US$
Projected % Annual Savings:- 5.0 % Projected Combustion US$ Savings:-
Predicted Savings (between S1 & S2): S1 S2
From: 13,424.25 18,346.47
US$ US$
Prepared by
Fireye Inc
3 Manchester Road
Derry, N.H. 03038
Fireye Nexus Energy Saving Calculation Program

Boiler HP
% Max 100
Gas/Oil/HFO
Max 8760

$ Per Therm
%
%

UES - PROJECTED
HP
BTU/Hr
%
BTU/Hr
Hours
$ Per Therm
$US
13,424.25

18,346.47

Prepared by
Fireye Inc
3 Manchester Road
Derry, N.H. 03038

S-ar putea să vă placă și