Sunteți pe pagina 1din 2

PROJECT : PROPOSED RESORT BUILDING

LOCATION : CAMOTES ISLAND, CEBU


OWNER : MR. MARIO LUA
ARCHITECT : ROSELLER DEODITO S. JOSOL
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 5 - 16 mm 2 - 16 mm 5 - 16 mm 10 @ 5 , 4 @ 10 Conventional
2B1 25 40 4.50 -
bottom 2 - 16 mm 4 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 10 @ 5 , 4 @ 10 Conventional
2B2 25 40 2.40 -
bottom 2 - 16 mm 3 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 7 - 16 mm 2 - 16 mm 7 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2B3 25 45 7.20 -
bottom 3 - 16 mm 8 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 16 mm 2 - 16 mm 5 - 16 mm 10 @ 5 , 4 @ 10 Conventional
2B4 25 40 3.68 -
bottom 2 - 16 mm 3 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 8 @ 5 , 4 @ 10 Conventional
RB1 25 30 3.68 -
bottom 2 - 16 mm 2 - 16 mm 2 - 16 mm rest @ 26 cm O.C. Beam
NOTE: USE LARGER QUANTITY OF REBARS BETWEEN TWO ADJACENT BEAMS.

Page 1 of 2
PROJECT : PROPOSED RESORT BUILDING
LOCATION : CAMOTES ISLAND, CEBU
OWNER : MR. MARIO LUA
ARCHITECT : ROSELLER DEODITO S. JOSOL

SCHEDULE OF WOODEN MEMBERS

SIZE SPAN (m)


DESIGNATION QUANTITY REMARKS
(inches)

PURLINS 2x5 1 4.50 LAUAN

R-1 2x7 2 4.50 LAUAN

R-2 2x6 1 3.00 LAUAN

TOP CHORD 2x6 1 verify LAUAN

BOTTOM CHORD 2x4 2 verify LAUAN

KING POST 2x6 1 2.60 LAUAN

WEBS 2x4 1 verify LAUAN

Page 2 of 2