Calculation
CONSTRUCTION
Nomor Dokumen
Jetty Platform
Rev
Nomor Halaman
Tidal Data :
LWS = 7 m from seabed
MSL = 8.5 m from seabed
HWL = 9.9 m from seabed
Current Data :
Direction = From northeast
C surface = 0.2 m/s
C seabed = 0.18 m/s
Wind Data :
Velocity = 13 m/s
Direction = From west-southwest
Soil Data :
WIJAYA
TRADE -KARYA
Rev
REALTY - INDUSTRY
Nomor Halaman
PT WIJAYA
- TRADE -K
Calculation
CONSTRUCTION
Number of Document
Jetty Platform
Rev
Number of Page
1
Ce 2
l
1
r
d
Cm 1
2Cb B
Cm = 1.340429726
Now, we get all variable needed to calc berthing forces
Ef = 101.520733 kN.m
SF = 1.1
Ef = 111.6728063 kN.m
= 11.20748284 Ton.m
WIJAYA
TRADE -KARYA
RevREALTY - INDUSTRY
Number of Page
PT WIJAYA
Calculation
CONSTRUCTION
Number of Document
- TRADE Jetty Platform
Rev
Number of Page
Profil Gelombang :
Free-surface water deflection from still water :
1
s
n 1
Fn cos n( kx t )
k
Dimana :
F1 = a
F2 = a2F22 + a4F24
F3 = a2F33 + a4F35
F4 = a4F44
F5 = a5F55
Parameter F menunjukkan profil gelombang, sedangkan parameter a menunjukkan tinggi gelombang
s
cosh nky
u
k
G
n 1
n
sin nkh
cos n( kx t )
s
sinh nky
v
k
G
n 1
n
sin nkh
sin n( kx t )
Dimana :
G1 = aG11 + a3G13 + a5G15
G2 = 2(a2G22 + a4G24)
G3 = 3(a3G33 + a5G35)
G4 = 4a4G44
G5 = 5a5G55
Dengan G adalah parameter kecepatan gelombang
Berikut adalah tabel harga parameter gelombang
h/ F22 F24 F33 F35 F44
0.1 3.892 -28.61 13.09 -138.6 44.99
0.15 1.539 1.344 2.381 6.935 4.147
0.2 0.927 1.398 0.996 3.679 1.259
0.25 0.699 1.064 0.63 2.244 0.676
0.3 0.599 0.893 0.495 1.685 0.484
0.35 0.551 0.804 0.435 1.438 0.407
0.4 0.527 0.759 0.41 1.33 0.371
0.5 0.507 0.722 0.384 1.23 0.344
0.6 0.502 0.712 0.377 1.205 0.337
Based on Skjelbreia and Hendrickson (1961)
Taken from Thomas H. Dawson. Offshore Structural Engineering (1983 p. 104)
2 gk (1 a 2 C1 a 4 C 2 ) tanh kh
Persamaan kecepatan gelombang adalah
0.5
g
c (1 a 2 C1 a 4 C 2 ) tanh kh
k
Berikut adalah tabel parameter tekanan dan frekuensi
h/ C1 C2 C3 C4
0.1 8.791 383.7 -0.31 -0.06
0.15 2.646 19.82 -0.155 0.257
0.2 1.549 5.044 -0.082 0.077
0.25 1.229 2.568 -0.043 0.028
0.3 1.107 1.833 -0.023 0.01
0.35 1.055 1.532 -0.012 0.004
0.4 1.027 1.393 -0.007 0.002
0.5 1.008 1.283 -0.001 ~0
0.6 1.002 1.24 -0.001 ~0
Based on Skjelbreia and Hendrickson (1961)
Taken from Thomas H. Dawson. Offshore Structural Engineering (1983 p.105)
Koefisien kecepatan gelombang adalah
cosh nky
U n Gn
sinh nkh
sinh nky
Vn G n
sinh nkh
Percepatan gelombang adalah
kc 2 5
ax Rn sin n(kx t )
2 n 1
kc 2 5
ay S n cos n(kx t )
2 n 1
Koefisien R dan S diberikan dalam persamaan bentuk U dan V berikut :
R1 = 2U1 - U1U2 - V1V2 - U2U3 - V2V3
R2 = 4U2 - U12 + V12 - 2U1U2 - 2V1V2
R3 = 6U3 - 3U1U2 + 3V1V2 - 3U1U4 - 3V1V4
R4 = 8U4 - 2U22 + 2V22 - 4U1U3 + 4V1V3
R5 = 10U5 - 5U1U4 - 5U2U3 + 5V1V4 + 5V2V3
dan komponen S adalah
S0 = -2U1V1
S1 = 2V1 - 3U1V2 - 3U2V1 - 5U2V3 - 5U3V2
S2 = 4V2 - 4U1V3 - 4U3V1
S3 = 6V3 - U1V2 + U2V1 - 5U1V4 - 5U4V1
S4 = 8V4 - 2U1V3 + 2U3V1 + 4U2V2
S5 = 10V4 - 3U1V4 + 3U4V1 - U2V3 + U3V2
Persamaan tekanan gelombang adalah sebagai berikut
1 g 3
P u (u 2 v 2 ) ( a C 3 a 4 C 4 ky' )
k 2 k
Dimana y' = y - h
Calculation :
Menentukan nilai a
h/ = 0.1545181249
= 0.15
Kita dapatkan nilai
F33 = 2.381
F35 = 6.935
F55 = 7.935
kH = 2(a + a F33 + a5(F35 + F55))
3
F ( xr )
x r 1 x r
F ' ( xr )
F (xr) = 0.16663 - 2a - 4.762a3 - 29.776a5
F' (xr) = 2 - 14.286a2 - 148.88a4
Asumsi awal yang dipakai xr = 0
Iterasi xr F (xr) F' (xr) x r+1
1 0 0.16663 -2 0.083315
2 0.083315 -0.0028735001 -2.1063381543 0.081950784
3 0.081950784 -2.518320E-006 -2.1026588336 0.0819495864
4 0.0819495864 -1.914453E-012 -2.1026556367 0.0819495864
5 0.0819495864 1.9244589E-018 -2.1026556367 0.0819495864
6 0.0819495864 1.9244589E-018 -2.1026556367 0.0819495864
7 0.0819495864 1.9244589E-018 -2.1026556367 0.0819495864
x r+1 konstan pada iterasi ke 5, yakni pada angka 0.0819495864
a = 0.0819495864
F1 = 0.0819495864
F2 = 0.0103961316
F3 = 0.0013360192
F4 = 0.0001870342
F5 = 2.932789E-005
Selanjutnya parameter F dimasukkan dalam persamaan
Sehingga :
= (1/0.098)x(0.08195 cos1 + 0.0104 cos2 + 0.0013 cos3 + 0.0002 cos4 + 0.00003 cos5)
= kx-t
Angka yang dicari adalah defleksi maksimum (puncak) dan minimum (lembah), dengan
puncak = 0, dan lembah = .
maks = 0.9579591837 m
min = -0.7416326531 m
Tinggi gelombang akibat defleksi maksimum adalah
y maks = h + maks
= 10.8579591837 m
y min = h + min
= 9.1583673469 m
Kecepatan Gelombang :
G1 = 0.0806554583
G2 = 0.0114692503
G3 = 0.0005433504
G4 = -3.012753E-005
G5 = -3.086173E-006
Masukkan parameter G ke persamaan
Sehingga :
/k = 8.6581288684 sin kh = 0.8250969784
cosh ky = 1.6218516937 sin 2kh = 0.9323449473
cosh 2ky = 4.2608058329 sin 3kh = 0.2284362709
cosh 3ky = 12.1989386196 sin 4kh = -0.6742160139
cosh 4ky = 35.3089326906 sin 5kh = -0.9902884051
cosh 5ky = 102.332765956
u = 2.0941190503 m/s
v = 0.3747460696 m/s
R1 = 0.2994172236
R2 = 0.170763196 1.2
R3 = 0.1669039077 0.4
R4 = 0.0083569229
R5 = 0.0026854304
ax = 0.5058806807 m2/s
Fx FD FI
1
FD C D u 2
2
1
FI C m D 2 u
4
Fd = 2359.85817998 N
= 2.35985818 kN
Fi = 175.843112833 N
= 0.1758431128 kN
Ftotal = 2.5357012928 kN
WIJAYA
TRADE -KARYA
Rev
REALTY - INDUSTRY
Number of Page
F55
163.8
7.935
1.734
0.797
0.525
0.42
0.373
0.339
0.329
G44
7.671
-0.167
-0.044
-0.005
0.002
0.001
0
0
PT WIJAYA KA
Calculation
CONSTRUCTION - TRADE - R
Number of Document
Jetty Platform
Rev
Number of Page
1. Curent load
From pre design, we know that
U surface = 0.2 m/s
U seabed = 0.18 m/s
D cyl = 0.4 m
Water depth = 9.9 m
1
FD C D U 2 A
2
Cd = 1.05 (for roughness form)
A = Pile area affected by current
= r.d
= 6.237 m2
Fd surface = down, load will be smaller
= 1/2. Fd
= 0.25 x 1.025 x 1.05 x 0.22 x 6.237
= 0.0671257125 kN
Fd seabed = Uniform load distribution
= 0.5 x 1.025 x 1.05 x 0.182 x 6.237
= 0.1087436543 kN
F total = Fd1 + Fd2
= 0.1758693668 kN
2. Wind load
Wave load equations
1
Fwind C s AV 2
2
For this case, we will divide to 3 form
a. Concrete deck area
L concrete = 200 m
t concrete = 0.5 m
A concrete = Lxt
= 200 x 0.5
= 100 m2
= wind density
= 1.226 kg/m3
Cs = Shape coefficient
= 1.5 (for beam section)
V = 13 m/s
Fwa = 0.5 x 1 x 1 x 100 x 132
= 12675 N
= 12.675 kN
c. Pile leg
D = 0.6 m
L lws = 4 m
A = 3.768 m2
n = 14
Cs = 0.5 (for cylindrical section)
Fwc1 = 195.176748 N
Fwc = 2732.474472 N
= 2.732474472 kN
Fw total = 28.286653512 kN
WIJAYA KARYA
TRADE - REALTY - INDUSTRY
Rev
Number of Page
Fd1
Fd
2
PT WIJAYA
Calculation
CONSTRUCTION - TRADE
Number of Document
Jetty Platform
Rev
Number of Page
from table above, we choose type E1.8 as fender used. Fender specification is
H (mm) = 800
DW (mm) = 1050
DB (mm) = 900
D (mm) = 30
d (mm) = 40
Anchor (mm) = 6xM30
W (kg) = 400
E (kN.m) = 114
E (Ton.m) = 11.44104
R (kN) = 326
R (Ton) = 32.71736
Deflection (%) = 52.2
R percentage (%) = 98
So, we get value of energy absorption
True Reaction = 319.48 kN
= 32.0630128 Ton
Check fender :
True Reaction < R fender
319.48 < 326 (Check OK)
1 M max
Lt 2
6 y
t2 = Mmax/L.y
= (6 x 30.065742)/(4 x 10124.202)
= 0.0161865373 m2
t = 0.1272263233 m
= 12.7226323304 cm
= 13 cm (Pembulatan)
Mass of frantal frame (W) :
V = 0.2289664 m3
baja = 7860 kg/m3
W frontal frame = 1799.675904 kg
= 1.799675904 Ton
W fender n frame = 2199.675904 kg
= 2.199675904 Ton
n fender = 28
W total = 61.590925312 Ton
We choose chain C = 14 mm
L = 42 mm
W/links = 0.2 kg
L chain = 126 mm
W chain = 0.6 kg
Chain requirement = 24.7063492063
= 25 (Pembulatan)
W chain req = 15 kg
n chain = 2
W chain fender = 30 kg
Number of Document
CONSTRUCTION - TRADE Jetty Platform
Rev
Number of Page
= 0.005915 m3
Volume = 0.018075 m3
baja = 7860 kg/m3
Bollard mass = 142.0695 kg 3
n Bollard = 8
Total mass = 1136.556 kg
1.136556 Ton
WIJAYA
TRADE -KARYA
Rev
REALTY - INDUSTRY
Number of Page
PT WIJAYA
- TRADE -KA
Calculation
CONSTRUCTION
Number of Document
R Jetty Platform
Rev
Number of Page
Live load adalah semua beban yang berasal dari equipment yang berada di atas Jetty, yakni :
Hopper = 50 Ton
Unloading = 88 Ton
Kendaraan = 4 Ton
Jumlah hopper dan unloading adalah 2, sedangkan estimasi kendaraan yang bongkar muat adalah 6, sehingga
Berat beban total = 300 Ton
2. Dead Load
Dead load merupakan beban mati yang ditopang oleh girder yakni berupa slab Jetty dengan dimensi sbb ;
Panjang Jetty = 200 m
Lebar Jetty = 32 m
Tebal slab = 0.3 m
Beton = 2400 kg/m3
Berat slab Jetty = 4608 Ton
Sehingga beban total yang ditopang oleh secondari girder adalah 4908 Ton
Beban total (P) merupakan beban titik, dan akan dijadikan beban merata terhadap panjang Jetty, sehingga
P
q
L
P= 4908 Ton
A= 200 m
q= 24.54 Ton/m
AYA -KARYA
ADE
f Page
REALTY - INDUSTRY