This short report presents the design calculations of the proposed soldier pile wall as a temporary
earth retaining system for the proposed substation at Colombo.
Subsoil condition
Properties of soil
Ka = 0.33
Consider a surcharge of 10 kN/m2. Following pressures will apply on a unit width of shoring.
1m
1m
2.6m
Prop
Bottom of excavation
MOMENT DESIGN
M Mc Mb K L m mLt
Moment Capacity Capacity Factor Factor Factor Factor
Major Moment -82.897 488.263 454.388 1.000 1.000 0.600 1.000
Minor Moment 0.000 155.434 1.000 1.000 1.000
SHEAR DESIGN
Fv Pv Stress Status Tu
Force Capacity Ratio Check Torsion
Major Shear 24.382 1005.256 0.024 OK 0.000
Minor Shear 0.000 1675.426 0.000 OK 0.000