Loading Diesel 1 Ensure grease and lubricant are already filled in Diesel Unloading Pump (376-P-1002) 2 Ensure diesel tank lorry is connected with flange connection and open: 376-GAT-2353 at suction 376-P-1002 376-GLO-1220 at discharge 376-P-1002 376-BAR-2323 at discharge 376-P-1002 3 Start Diesel Unloading Pump (376-P-1002) by 376-XI-1002 4 Open the isolation ball valve 376-BAR-2323 in suction line fully and open globe valve 376-GLO-1383 in discharge line a little bit 5 After reaching the operating speed the control system will start the motor Diesel Feed Pump (376-P-1004/M-01) and the feed valve (376-XV-1001) to the centrifuge will be opened. 6 Slowly open globe valve 376-GLO-1383 until the pump capacity has reached the rated capacity. 7 Start the Diesel Centrifuge motor (376-Y-1002/M-02) 8 The counter pressure in the treated fuel oil outlet shall be adjusted to about 30 psig with the globe valve 376-GLO-1384. The pressure is indicated and monitore with pressure transmitter 376-PIT-1012. 9 Check that the sludge pump (376-P-1003) starts after the discharge of the Diesel Centrifuge and empty the sludge tank (376-TK-1002) completely. 10 Check Diesel Storage Tank (376-TK-1001) level via 376-LG-1001 in normal condition (LLL: 475 mm; HLL: 2575 mm) Unloading Diesel 1 376-GAT-2373 at suction 376-P-1001 376-GAT-2363 at minimum flow 376-P-1001 376-GLO-1221 at discharge 376-P-1001 376-GAT-2778 at discharge 376-P-1001 Shall be open. 2 If the 376-LG-1001 indicate in LLL, ensure that the Diesel Distribution Pump (376-P-1001) is not running until reach normal level tank. 3 Start Diesel Distribution Pump (376-P-1001) via 376-XI-1001 4 Open 376-GAT-2366 for line distribution Diesel Fuel to: 1. Diesel Day Tank (375-TK-1001) by open 376-GAT-2370 2. EDG (372-G-1002) by open 376-GAT-2368 3. Main Power Generator (372-G-1001D) by open 376-GAT- 2369