Badn
Item Descripcin Unidad Total
Km 0+570.0 Km 0+970.0 Km 3+290.0 Km 4+500.0 Km 5+674.0 Km 6+487.0 Km 7+000.0 Km 10+410.0 Km 11+244.0
04.02.01 TRAZO Y REPLANTEO m2 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 76.50 688.50
04.02.02 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 34.51 34.51 34.51 34.51 34.51 34.51 34.51 34.51 34.51 310.59
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 43.14 43.14 43.14 43.14 43.14 43.14 43.14 43.14 43.14 388.24
04.02.04 RELLENO CON MATERIAL GRANULAR COMPACTADO m3 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 92.07
04.02.05 ENCOFRADO Y DESENCOFRADO m2 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 97.20
04.02.06 MAMPOSTERA DE PIEDRA ASENTADA EN MORTERO 1:4 PARA BADENES m3 23.58 23.58 23.58 23.58 23.58 23.58 23.58 23.58 23.58 212.22
04.02.07 REVESTIMIENTO CON PIEDRA EMBOQUILLADA C/A 1:4 m3 10.09 10.09 10.09 10.09 10.09 10.09 10.09 10.09 10.09 90.81
MEJORAMIENTO Y CONSTRUCCION DE CAMINO VECINAL PUENTE QUEBRADA SALAS, CRUCE VALLE
PROYECTO:
CALLACATE, DISTRITO DE CUTERVO, DISTRITO DE COCHABAMBA CHOTA REGION CAJAMARCA
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO