Documente Academic
Documente Profesional
Documente Cultură
Repairs
2
Service Packages
Tailored Service Packages by
Terex Port Solutions
Customer benefit
Premium
Package
Comfort Repairs
Value chain
Service Packages 4
Tailored Service Packages by
Terex Port Solutions
Service Packages 5
Basic Package provides advantages, if
maintenance is performed by the customer
Preferential treatment
Regular expert feedback on maintenance status
Service Packages 6
Comfort Package
for regular maintenance by Terex
10
High-performance special wire ropes
11
Professional Crane Inspection
PCI Professional Crane Inspection
Basic PCI
In addition
Travel day 1,100
Costs Travelling costs, hotel, additional
Oil and grease analysis 2,000 expenses
(incl. report)
In addition
Crane inspection by a Terex expert Travel day 1,100
Crane out of service for the entire inspection Travelling costs, hotel, additional
period expenses
Options additional
Expected duration of approx. four man-days
Costs Costs
Theor. residual lifetime 4,000 Theor. residual value 3,000
(incl. report) (incl. report)
*) if applicable
17
Upgrades
Diesel engine replacement for
Terex Gottwald Harbour Cranes
20
Retrofit Industry PC incl. SPC 300 Assembly
Harbour Cranes of Generation Crane 1995
Replacement solution:
New Industry PC (IPC) incl. SPC 300
assembly
Modification of current S5 control program to Delivery lead time approx. 1 week
new hardware Delivery lead time up to 6 weeks
Pre-commissioning of new components in Installation time approx. 3 days
Dsseldorf
Budget price 25.500
Installation of modified S5 control program
Travelling costs, additional
Compatible with Siemens ET200U, ET200S hotel, expenses
and ET200M modules
Replacement solution:
New control panels in tower cab
Replacement of microelectronic by solution Quotation lead time approx. 1 week
based on standard components Delivery lead time up to 6 weeks
Installation time approx. 2 days
Installation and test on site
Modification of electric circuit diagrams and Budget price 25.500
spare parts documentation Travelling costs, additional
hotel, expenses
Replacement solution:
Replacement of propping control panel in chassis
cab
Replacement of microelectronic by solution based on Quotation lead time approx. 1 week
standard components
Delivery lead time up to 6 weeks
Installation and test on site Installation time approx. 3 days
Modification of electric circuit diagrams and spare
parts documentation Budget price 9.500
Travelling costs, additional
Remark: hotel, expenses
Precondition for this module is a new IPC incl.
SPC 300 assembly
Replacement solution:
Control system stays a Siematic S5 program
Siemens Industrial PC (IPC) for the
visualisation Quotation lead time approx. 1 week
Integrated SLOT-PLC for controller Delivery lead time up to 3 weeks
Keyboard and optical mouse Installation time approx. 3 days
Failsafe flash memory for controller
Price range 23,000 - 25,000
Travelling costs, additional
Hotel, expenses
Increased efficiency
Reduction of noise
emissions
No exhaust
emissions in the port
Reduced operating
costs
Less maintenance
cost Quotation lead time up to 4 weeks
Delivery lead time up to 6 months
Installation time 2 to 4 weeks
27
Medium voltage external power supply
Motor-driven cable
reel with one cable
Transformer
28
690 V external power supply
Motor-driven cable
reel with two cables
Transformer
Power cable
deflection funnel
29
Dynamic brake resistor upgrade
3 ~ AC supplied by
diesel generator
Upgrade:
Replacement of conventional brake
resistors by dynamic brake resistors AC AC AC
DC DC DC
Advantages:
Reduced diesel consumption
Reduced noise emissions due to
constant diesel motor operationAncillary DC DC 3 ~ AC
No black smoke emissions
0 10 20 30 40 50 60 70 80
Time [s]
Advantages:
Significant reduced diesel consumption
Reduced noise emissions due to
constant diesel motor operation
No black smoke emissions Quotation lead time approx. 1 week
Delivery lead time up to 5 weeks
Installation time approx. 5 days
Price range 22,000 - 48,000*
Travelling costs, additional
hotel, expenses,
*) depending on crane type and variant and whether
or not the brake resistor has to be replaced
Scope of supply
CDS hardware
CDS server and system setup Quotation lead time approx. 1 week
Delivery lead time up to 5 weeks*
System contract for 3 years, incl. free updates
Installation time on site approx. 2 days
Assembly of CDS
Responsibility of customer
Provision of 3G mobile SIM card
*) after receiving 3G mobile SIM card in Dsseldorf
36
Rail Welding / Rail Grinding
For Ship-to-Shore Cranes
37
Terex Port Solutions repairs
38
Holistic service from a single source
Service packages and
outsourcing partners
Repairs
39