This document provides a checklist for shuttering works with 8 items to inspect. The checklist ensures that shuttering boards are cleaned and oiled, joints and holes are sealed, lines and levels are within tolerance, supports are tightened, ledger pipes prevent movement, and the area is cleared for reinforcement before pouring concrete.
This document provides a checklist for shuttering works with 8 items to inspect. The checklist ensures that shuttering boards are cleaned and oiled, joints and holes are sealed, lines and levels are within tolerance, supports are tightened, ledger pipes prevent movement, and the area is cleared for reinforcement before pouring concrete.
This document provides a checklist for shuttering works with 8 items to inspect. The checklist ensures that shuttering boards are cleaned and oiled, joints and holes are sealed, lines and levels are within tolerance, supports are tightened, ledger pipes prevent movement, and the area is cleared for reinforcement before pouring concrete.
SR No. Date Time Descriptoin 9 Am To 6 PM 9 Am To 9 PM 6Pm To 9Pm 9 PM To 12 Am 9 Am To 12 Am 6 PM To 12 Am Extra Time Cahallen NO. 9 Am To 12 Am Above