SECTION A. General description of the Bundle

A.1. Title of the Bundle:

Bundled Grid Connected Wind Power Generation Abi Energy Bundle 3

A.2. Version and Date:


Version : 01
Date : 01/02/2011

A.3. Description of the Bundle and the subbundles:

The project activity is the installation of Wind Turbine Generators (WTGs) in Erode District, Theni
District and Tirunelveli District in Tamil Nadu, India. The project will generate 8.75 MW power from 11
Wind Turbine Generator (WTG). The total capacity of this project activity is 8.75 MW from 11 wind mills
which are in the capacity of 3*1650 kW, 1*1500 kW, 1*800 and 6*250kW. Group A Wind Mills generate
power and wheel power to their concern via southern regional grid and Group B Wind Mills in this project
activity generate power and supply to Southern Regional grid. But both the projects are connected with
grid.

Project promoters Capacity Supplier End User


Group A
Naga Limited 1650 kW Vestas Wind Technology Wheeling
India Pvt Ltd
Jai Hind Wire Rod Mills 6*250 kW Chiranjjeevi Wind Energy Wheeling
Limited Limited
Nila Sea Foods 1650 kW Vestas Wind Technology Wheeling
India Pvt Ltd
Amulya Sea Foods 1650 kW Vestas Wind Technology Wheeling
India Pvt Ltd
Group B
Narasus Roller Flour Mills 1500 kW Suzlon Energy Ltd Sale to board
Pioneer Steels 800 kW Enercon India Limited Sale to Board

A.4. Project participants:


UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 2
CDM-SSC-BUNDLE

Name of Party Private and/or public entity (ies) project participants Kindly indicate if the
involved (as applicable) Party involved wishes
(host indicates a to be considered as
host Party) project participant
(Yes/No)
India Abi Energy Consultancy Services Private Limited No
(Host Party) (Private)

SECTION B. Technical description of the Bundle:

B.1. Location of the Bundle:

B.1.1. Host Party(ies):

India
B.1.2. Region/State/Province etc.:

Tamil Nadu
B.1.3. City/Town/Community etc:

Project promoters Location


Naga Limited Govindanagaram Village
Theni Taluka
Theni District.
Jai Hind Wire Rod Mills Limited Urmelagiyan Village
Tenkasi Taluka
Tirunelveli District.
Nila Sea Foods Thekampatti Village
Andipatti Taluka
Theni District.
Amulya Sea Foods Thekampatti Village
&G.Usilampatti Village,
Andipatti Taluka,
Theni District.
Narasus Roller Flour Mills Echanda Village
Sankarankoil Taluka
Tirunelveli District.
Pioneer Steels Gathelrev Village
Dharapuram Taluka
Erode District.

B.1.4. Details of physical location, including information allowing the unique identification of this
Bundle:

Name of the HT. Sc. No Commissioning Latitude Longitude


Project Proponent Date
UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 3
CDM-SSC-BUNDLE

Naga Limited T19 02/06/2009 N 9 54' 58.5'' E 77 29' 15.4''

Jai Hind Wire Rod 3065 22/03/2010 N 09 00 51.0 E 77 21 27.1


Mills Limited 3066 22/03/2010 N 09 00 44.9 E 77 21 26.1
3243 22/06/2010 N 09 01 02.6 E 77 21 20.7
3266 09/08/2010 N 09 01 03.9 E 77 21 12.9
3267 09/08/2010 N 09 00 57.4 E 77 21 12.7
3242 22/06/2010 N 09 01 01.4 E 77 20 50.7
Nila Sea Foods WEG T48 18/03/2010 N 9 56' 53'' E 77 32' 46''
Amulya Sea Foods WEG T47 18/03/2010 N 9 56' 37'' E 77 33' 12''
Narasus Roller Flour 3056 20/03/2010 N 10 03' 57'' E 77 74' 37''
Mills
Pioneer Steels U 1722 29/10/2009 N 10 56 22.04 E 77 25 7.07

B.2. Type(s), category(ies) and technology/(ies)/Measure/(s) of the bundle:

Type and Category:


The total capacity of the project activity is 8.75 MW (3* 1.65 MW, 1*15 MW, 1*0.8 MW and 6 *
0.250 MW WTGs) which is less than 15 MW, as limited under the Modalities and Procedures for Small
Scale CDM projects.
Group A Projects:
Project Type : I- Renewable Energy Industries
Category : Renewable electricity generation for captive use and mini-grid.
Group B Projects:
Project Type : I- Renewable Energy Industries
Category : Grid Connected Renewable Electricity Generation.
Technology:

In wind energy generation, kinetic energy of wind is converted into mechanical energy and subsequently
into electrical energy. Wind blowing at high speeds has a considerable amount of kinetic energy. When this
kinetic energy passes through the blades of the wind turbines, it is converted into mechanical energy and
rotates the wind blades. When the wind blades rotate, the connected generator also rotates, thereby
producing electricity. The technology is a clean technology since there are no GHG emissions associated
with the electricity generation. The project activity consists of Vestas, Suzlon, Enercon and Chiranjjeevi
make WTGs of capacity such as 1650 kW (3 Nos), 1500 kW (1 Nos), 800 kW (1 Nos) and 250 kW(6
Nos) respectively

Technical specifications of 1650KW WTG

Technical specification for


S.No Particulars
1650KW WTG
1 Cut In Wind Speed 3.5m/s
2 Cut out wind speed 20m/s
3 Hub Height 78 m
4 Gearbox Type Planetary/ Helical Stages
5 Gear Ratio 1:70.2
6 Rated Power Output 1650KW
7 Tower Type Conical Tubular
8 Tower Height 75.5m
9 No of blades 3
10 Rotor Diameter 82m
11 Brake System Hydraulic
12 Manufacturer Vestas Wind Technology India
Private Limited.
UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 4
CDM-SSC-BUNDLE

Technical specifications of Suzlon1500 KW WTG

Technical specification for 1500KW


S.No Particulars
WTG
1 Cut in Wind Speed 4 m/s
2 Cut off wind speed 20m/s
3 Hub Height 78.5m
4 Gearbox Type Integrated 3 stage 1 planetary & 2
Helical
5 Generator Asynchronous 4 pole
6 Rated Power Output 1500KW
7 Bearing Type Polyamide Slide Bearing
8 Rotating Speed 1511 rpm
9 No of blades 3
10 Rotor Diameter 82m
11 Brake System Aerodynamic
12 Manufacturer Suzlon Energy Limited

Technical specifications of Enercon 800 KW WTG

Technical specification for 800KW


S.No Particulars
WTG
1 Rated Power 800 KW
2 Rotor Diameter 52.90 m
3 Hub Height 75 m
4 Turbine Type Gearless horizontal axis wind turbine
with variable rotor speed.
5 Design life Time 20 years
6 Number of blades 3
7 Blade material Glass fiber reinforced epoxy.
8 Gear box type Gear less
9 Generator type Synchronous generator
10 Tower Height 74 m concrete
UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 5
CDM-SSC-BUNDLE

Technical specification for CWEL 250 KW WTG


Technical specification for CWEL
S.No Particulars
250 KW WTG
1 Cut In Wind Speed 3.5m/s
2 Cut out wind speed 25m/s
3 Hub Height 50 M
4 Gearbox Type Integrated-3 Stages with parallel
shafts.
5 Gear Ratio 1:39.4
6 Rated Power 250 KW
Output
7 Tower Type Lattice
8 Tower Height 50 m
9 No of blades 3
10 Rotor Diameter 29.60 m
11 Brake System Hydraulic
12 Manufacturer Chiranjjeevi Wind Energy Limited.

B.3 Estimated amount


of Years Estimation of annual emission emission reductions
reductions in tonnes of Co2e over the chosen
1 18,701 crediting period:
2 18,701
3 18,701
4 18,701
5 18,701
6 18,701
7 18,701
8 18,701
9 18,701
10 18,701
Total estimated reductions 1,87,010
(tonnes of CO2e)
Total number of crediting years 10

Annual average of the estimated 18,701


reductions over the crediting
period( tCO2 e )
UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 6
CDM-SSC-BUNDLE

SECTION C. Duration of the project activity / Crediting period:

C.1. Duration of the Bundle

C.1.1. Starting date of the Bundle:

10/04/2009(From the date of purchase order of Wind mill)

C.2. Choice of crediting period and related information:

C.2.1. Renewable crediting period:


UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 7
CDM-SSC-BUNDLE

C.2.1.1. Starting date of the first crediting period:


N.A

C.2.1.2. Length of the first crediting period:


N.A

C.2.2. Fixed crediting period:

C.2.2.1. Starting date:


12/12/2011 or date of registration whichever is later.

C.2.2.2. Length:
10 Years 00 Month
UNFCCC/CCNUCC
____________________________________________________________________________________
CDM Executive Board Version 2, page 8
CDM-SSC-BUNDLE

SECTION D. Application of a monitoring methodology:


The monitoring plan stated in PDD section B.7 shall apply to the bundle. A single monitoring report shall
be prepared for the bundle based on the parameters mentioned in section B.7 of the PDD.