Sunteți pe pagina 1din 12

HYBRID ANNUITY Project list @RFP stage

Sr no.

Four laning of Gagalheri-Saharanpura-Yamunanagar


(UP/Haryana Boarder) section of Nh-73 From km 33
(desgin chainage km 35.4) to km 71.64 (design
chainage km 86.855) in the state of Uttar Pradesh
under NHDI-IV on HAM

1
Four lane stand alone ring road/bypasses for
Nagpur city,package-1 from km 0+500 to km
34+000(Total length-33+500km) in the state of
maharashtra on BOT (Hybrid Annuity) basis
2
Four Lane alone ring road/bypasses for nagpur
city ,package-II from km 34+000 to km 62+035
3 (Total lengh- 28+035 km)
four laning of chutmaipur-ganeshpur section of NH-
72A from Km 0 (Km 22.825 of NH-73) to km 16
(design chainage km 17.9) and roorkee-chutmalpur-
gagalheri section of NH-73 from km 0 (km 167.8 of
NH-58 ) to km 33 (design chainage 35.4) in the
states of uttarakhand and UP under NHDP phase-IV

4
Four laning of rampur-kathgodam section of NH-87
(New NH No.9) from km 0 (km 190 of NH-24) to km
42.791 (design chainage 43.446) [package-I] in the
state of UP under NHDP-III
5
Four laning of rampur-kathgodam section of NH-87
(New NH No.9,109) from km 42.791 (design
chainage 43.446) TO KM 88 (design chainage
93.226) [package-II] in the state of UP under NHDP-
III
6
Tuljapur-Ausa(including Tuljapur Bypass) Section of
NH-361 from km o to km 55.835 (exisiting
chainage: km 416 to km 470) under NHDP Phase IV
7
Development of delhi-meerut expressway from km
0 to km 27.5 including 6/8 laning of NH-24 from km
0 to km 49.346 (hapur bypass) in the state of delhi
and UP under on DBFOT basis
Package II from existing km 8.360 to existing km
27.740 (UP border to dasna) in the state of UP-HAM
on Hybrid annuity mode

8
4/6 laning of kharar to ludhianansection of NH-95
(new NH-05) from kharar km.0+185 (design
chainage) to samrala chowk,ludhiana
km.86+199(design chainage)
9
Four laning of lucknow-sultanpur section of NH-56
(new NH-731) from km 11.5 (design chainage km
138.925) (total length- 127.425km.) in the state of
UP under NHDP phase -IV on HAM
10
Construction of new link (NH -1338) from km 0 (km
200.87 of sahibganj bypass) in jharkhand to km
15.885 (junction of NH -1338 and 131A on manihari
bypass) and contruction of manihari bypass from
km 0 (junction of NH 1338 and 131A on manihari
bypass) to km 6000 near narenpur of NH- 131A
including ganga bridge

11
Construction and upgradation of NH 131A from km
34.578 near narenpur to km 81. near purnea
(design chainage km 6 to km 55) [design length- 49
km]
12
Four laning of talaja -mahuva section of NH-8E from
km 53.585 to km 100.450)(package-II) in the state
of gujarat on HAM under NHDP phase IV
13
Four laning of mahuva to kagavadarof NH - BE from
100.110 (design chainage km 100.450) (package-II)
in the state of gujarat on HAM under NHDP phase III
under NHDP Phase IV
14
Four laning of kagavadar -una section of NH-8E
from km 139.915 (design chainage km 140.470) to
km 180 .478 (design chainage km 181.450) Pkg-IV
15
Four laning of una to kodinar of NH-8E from km,
180.478(design chainage km 181.450) to
km221.610(design chainage km 222.400)pkg V
16
Four laning of kodinar to veraval section of NH-8E
from km 221.61 to km 263 (design ch. From km
17 222.4 to km 263.180 ) pkg VI
Binijhabahal to telebani section km 414 to km
491.710 (design chainage km 414.982 to km 493.3
18 of NH -6 (new NH-49) NHDP-IV
Construction of 4-lane (partial access controlled
laddowal bypass from km 0 to km 17.041 unking
NH-95 with 1 via laddowal seed farm at ludhiana
19
Construction of partially access controlled 4 lane
elevated highway betn samrala chowk (design
chainage km 12+951) of NH 95 (section passing
through ludhiana city
20
2 laning with formation for 4 lane of proposed
shimla bypass of NH-22 from km 129.050 to km
156.507 in the state of himachal pradesh under
phase 3 on BOT annuity hybrid mode
21
4- laning of phagwara rupnagar section of NH-344A
from km 0 (design chainage) to km 80.820 (design
chainage) in the state of punjab HAM
22
Rehabilitation & upgradation by 4 laning of singhara
to bijhabahal section from km 311 to km 414
(design chainage from km km 310.806 to km
414.982) of NH-6 (New NH-49) under NHDP-$
23

24
25
26
Length NHAI TPC Cost of Civil Contruction on
State Laning
in km in Crs Works period

UP 4 51.455 1009.36 861.88 2 years

Mahrashtra 4 33.5 495.56 435.33 2.5 years

Mahrashtra 4 28.035 547.99 482.47 2.5 years

UP/Uttarakha
nd 4 53.3 809.88 717.11 2 years

UP 4 43.446 615.94 572.74 2 years

UP 4 49.78 571.44 526.26 2 years

Mahrashtra 4 67.428 905 not provided 2.5 years


6L
express
way +
UP 4L NH 19.284 1376.51 not provided 2.5 years

Punjab 4/6 76.014 1472.61 not provided 2.5 years

UP 4 127.425 1661.94 not provided 2.5 years

Bihar 4 21.885 1905.55 not provided 4 years

Bihar 4 49 1160.65 1030.71 2.5 years

Gujarat 4 45.46 649.13 not provided 2.5 years

Gujarat 4 40.02 632.42 not provided 2.5 years

Gujarat 4 40.98 566.73 not provided 2.5 years

Gujarat 4 40.95 592.22 not provided 2.5 years


Gujarat 4 40.78 610.43 not provided 2.5 years

Odisha 4 78.381 1067.13 not provided 2.5 years

Punjab 4 17.041 370.17 not provided 2.5 years

Punjab 4 12.951 867.72 not provided 2.5 years

Himachal
Pradesh 4 27.457 1223.84 not provided 2.5 years

Punjab 4 80.82 1215.5 not provided 2.5 years

Odisha 4 103.796 1097.25 not provided 2.5 years

not provided 2.5 years


Concession Bid Due
Period Date

15 years 10/3/2016

15 years 11/3/2016

15 years 11/3/2016

15 years 11/3/2016

15 years 14/3/2016

15 years 15/3/2016

15 years
15 years

15 years

15 years

15 years

15 years

15 years

15 years

15 years

15 years
15 years

15 years

15 years

15 years

15 years

15 years

15 years

15 years
15 years

S-ar putea să vă placă și