Diseo de Escalera
4.50 m
2.70 1.8
1 Tramo
0.30
X = 0.345 m
0.170
X Cos = 0.87
Peso de los Pasos = 0.170 x 0.30 x 1.00 x 2.4 x 3.19 = 0.195 Tn/m2
2
1er Tramo: P.P. x Unidad de Proyeccion Horizontal Sera = 0.469 Ton/m2
Peso de los Pasos = 0.195 Ton/m2
Acabados = 0.100 Ton/m2
WD = 0.764 Ton/m2
WL = 0.400 Ton/m2
Wu = 1.4 WD + 1.7 WL
Wu = 1.7499 Ton/m2
Descanso: P.P. x Unidad de Proyeccion Horizontal Sera =
Wu = 1.4 WD = + 1.7 WL =
Wu = 1.3912 Ton/m2
R1 R2
2.70 1.8
M2 = 0
R1 = 3.81 Ton
R2 = 3.42 Ton
0 x 3.00
Mx = R1x - Wx^2
= 0
2
x = 2.18 m
Cuantia minima
b = 0.80 f'c ^0.5
= 0.0028
f'y
d = t - (r+/2) = 12.37 cm
a min. = b*f'y^.5
= 0.80
0.85* f 'c
MU As Fy
As = a =
Fy 0.9 d 0.85 f'c b
4.993
As = = 11.87
0.90 4200 0.90 x 12.37
11.870 x 4200
a = = 2.793 cm
0.85 210 100
4.993
As = = 12.043
0.90 4200 12.37 - 1.40
12.043 x 4200
a = = 2.834 cm
0.85 210 100
4.993
As = = 12.065
0.90 4200 12.37 - 1.42
12.065 x 4200
a = = 2.839 cm
0.85 210 100
4.993
As = = 12.068
0.90 4200 12.37 - 1.42
12.068 x 4200
a = = 2.840 cm
0.85 210 100
4.993
As = = 12.068
0.90 4200 12.37 - 1.42
12.068 x 4200
a = = 2.840 cm
0.85 210 100
Usar 1/2 @ 15 cm
3/8 @ 0.71
= 0.23
3.06