SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Security Lighting (Fence, Area, and Checkpoint Ltg.) -


SATR-P-3613 30-Apr-13 ELECT-
Illumination level Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A. Illumination Level Test Procedure and checklist

Lighting systems shall be designed for energy efficient operation and SAES-P-123
A1
installed in conformance with drawings and specifications. Sec. 4.1.3

Lighting levels stated in this specification refer to minimum maintained


SAES-P-123
A2 illuminance. Illuminance levels shall be maintained as per SAES-P-123
Sec. 4.1.7
Table 2.

Photocell switches shall be of the twist-lock type and perform test to


SAES-P-123
A3 check that it shall incorporate an inherent time delay to prevent spurious
Sec. 4.1.12
operations.

Illumination levels should be taken with " Weston" or similar light meter SAES-P-123
A4
calibrated in foot candles or similar. Sec. 5

During the illumination level check a note should be made of black spots
SAES-P-123
A5 (which could cause a safety hazard) and any additional task lighting that
Sec. 5
may be required.

SAES-P-123
A6 Light loss factors shall be used in computing illuminance levels.
Sec. 4.7

When illumination level checks are made on new installations allowance


should be made for lamp lumen depreciation and dirt depreciation,
dependent upon the amount of time that the installation has been in
service. A rough rule of thumb is the initial lighting level on a completely SAES-P-123
A7
new installation should be 50-40% above the installation level listed in Sec. 5
SAES-P-123. If however, the installation has been in service or installed
for some time before the illumination levels are checked this figure will
be considerably lower.

SAES-P-123
A8 Check that Series street lighting connections have not been made.
Sec. 4.3.2

Page 1 of 6
Loss Factors that shall be used in computing illuminance levels.
Table 1 Light Loss Factors
Lamp Lumen Depreciation Luminaire Dirt Depreciation
HPS 0.90 Outdoor Industrial 0.71
SAES-P-123
A9 MV 0.67 Outdoor Residential 0.77
Sec. 4.7
MH (above 400 W) 0.83 Indoor Non-Industrial 0.86
MH (400 W & below) 0.77 Indoor Industrial 0.79
Fluorescent (40 W) 0.86
Incandescent 0.90

Page 2 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Security Lighting (Fence, Area, and Checkpoint Ltg.) -


SATR-P-3613 30-Apr-13 ELECT-
Illumination level Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

The following minimum maintained (in service) illuminance levels in


Table 2 shall be used. The initial field measurement after installation SAES-P-123
A10
shall be no less than the specified illuminance divided by the light loss Sec. 5
factor (LLF) from Table 1 and other factors utilized in the design.

Check that lighting requirements for Saudi Aramco industrial facilities SAES-O-204
A11
classified under SAES-O-201, Section 4.2. Sec. 1.1

Check that the security lighting is installed per SAES-P-123 as amended SAES-O-204
A12
by Security Directive SEC-04 Sec. 1.2

Perimeter lighting shall illuminate the fence line and its surrounding area
with the minimum light levels specified in SEC-04. The design shall SAES-O-204
A13
ensure that lighting system components do not interfere with cameras Sec. 4.1
and other sensors.

Lighting poles shall typically be 5 m high, spaced 20 m apart and be


installed in the area allocated for lighting in SAES-O-202. The type of
perimeter lighting shall depend on the facility classification. The light pole SAES-O-204
A14
height and spacing may be varied as long as the light intensity specified Sec. 4.1
in SEC-04 is met. If required, higher light intensity levels shall be used to
maximize the quality of perimeter camera images.

Area lighting deployed for security related requirements shall have an


SAES-O-204
A15 average illuminance of 5 lux. Poles used for area lighting shall be
Sec. 4.2
between 10 m to 30 m in height.

Area lighting shall be designed so that it shall not interfere with perimeter
intrusion detection sensors, assessment cameras (such as glare, SAES-O-204
A16
blinding or extreme bright spots within the camera field-of-view or the Sec. 4.2
intrusion detection area), or be an aid to defeating the intrusion sensors.

Checkpoint lighting shall illuminate designated areas with the minimum


light levels specified in SEC-04. Designated areas are the approach, exit
and gatehouse area of the checkpoint or locations within the checkpoint SAES-O-204
A17
where illumination is required due to operational considerations. Lighting Sec. 4.3
in the checkpoint area shall be uniform with all light illumination
overlapping adjacent light illumination.

Lights used for checkpoint Lighting shall have a Color Rendering Index
SAES-O-204
A18 (CRI)>50 as defined by the Illuminating Engineering Society of North
Sec. 4.3
America (IESNA) handbook.

Light levels and luminaire aiming angles shall be sufficient to clearly


identify incoming vehicles, vehicle license plates, pedestrians, vehicle
SAES-O-204
A19 drivers and cargo at least 10 m away from the gate house anywhere in
Sec. 4.3
the checkpoint area and permit inspection of people, vehicles, goods
and documents.
Gate House interior lighting shall provide adequate task level lighting
with illuminance at the countertop level, inside the gate house, at least SAES-O-204
A20
300 lux (30 fc). It shall be controlled by a dimmer mounted inside the Sec. 4.4
gatehouse.
Shared fence lighting requirements apply when a new facility is set up
next to an existing facility that already has perimeter lighting and
SAES-O-204
A21 intrusion detection. The intention of this requirement is to ensure that
Sec. 4.5
there is minimal interaction between the two facilities security systems
and each security system functions independently of the other.

Check that High Pressure Sodium Fixtures are used for outdoor area SAES-P-123
A22
illumination. Sec. 4.2.4

Page 3 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Security Lighting (Fence, Area, and Checkpoint Ltg.) -


SATR-P-3613 30-Apr-13 ELECT-
Illumination level Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

SAES-P-123
A23 Check suitability of lighting fixtures based on area and application.
Sec. 4.2.1

Check mounting method of lighting fixtures for best illuminance and SAES-P-123
A24
access during maintenance. Sec. 4.1.15

B. TEST EQUIPMENT AND MATERIALS CRITERIA

Illumination level measuring instrument- Lux Meter.


SECURITY LIGHTING ( FENCE, AREA AND CHECKPOINT LIGHTING)
ILLUMINANCE HEIGHT PLANE
ILLUMINANCE TEST. ACTUAL COMMENTS
LUX (fc) (mm) V/H

Launcher Receiver Station for Hydrocarbon Pipelines. Area Lighting only


B1
(SD SEC-04).

Water Injection Plant. Perimeter/ Area and Checkpoint lighting required


B2
(SD SEC-04).

Metering Station for Hydrocarbon Pipelines. Area Lighting only (SD SEC-
B3
04).

GOSP's Perimeter / Area and Checkpoint Lighting Required (SD SEC-


B4
04).

B5 Data Acquisition Stations. Area Lighting only (SD SEC-04).

Communication Facilities. Perimeter / Area and Checkpoint Lighting


B6
Required (SD SEC-04).

Gas Plants. Perimeter / Area and Checkpoint Lighting Required (SD


B7
SEC-04).

Harbor Facilities. Perimeter / Area and Checkpoint Lighting Required


B8
(SD SEC-04).

Offshore Installations Perimeter/ Area lighting required per letter


B9
F/1400/609.

B10 Communication Towers. Area Lighting only (SD SEC-04).

NOTE 1:
H refers to the Horizontal Plane and V for the Vertical Plane. For [7]
&[8] refer to SAES-P-123 Table 2 under Notes. Refer to SAES-P-123
"Table 2" for illuminance levels in other locations.

NOTE 2:
SD refers to Security Directives. SD's can be obtained from the Industrial
Security Department in your respective areas. Refer to SD SEC-04 &
letter F/1400/609 for lighting intensities and illuminance levels at above
locations.

Page 4 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Security Lighting (Fence, Area, and Checkpoint Ltg.) -


SATR-P-3613 30-Apr-13 ELECT-
Illumination level Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

C. TEST RESULTS

D. CONCLUSIONS

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

Test results are acceptable and in accordance with Saudi Aramco


E1 N/A
Engineering Standards and contractual requirements.

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (MP LSTK & LSPB Pro Forma, Revised 2/08)
2. Schedule G -- Materials, Tools and Equipment (MP LSTK & LSPB Pro Forma, Revised 3/06)
3. SAES-O-204 Security Lighting System, 10 March 2012
4. SAES-P-123 Lighting, 2 March 2011

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states

Page 5 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Security Lighting (Fence, Area, and Checkpoint Ltg.) -


SATR-P-3613 30-Apr-13 ELECT-
Illumination level Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED