A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by u

various cost involved in a construction project.


Total Area: 1296 sft

Bill of Quantity (This is an Estimate only. Exaxt


Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may
Item Quantity Unit
Bazri 28.512 CUM
Binding Wire 25.92 Kg
Bitumen 44.064 Kg
Brick Blast 11.664 CUM
Brick Tiles 5184 NOS
Bricks 25142.4 NOS
Cement 452.4271 Bags
Cement for Base Coarse 22.032 Bags
Cement Paint 194.4 SqM
CI Pipe 19.44 Meter
Coarse Sand 15.552 CUM
Commercial Hardwood 583.2 RFT
Earth 11.664 CUM
Fine Sand 18.144 CUM
Glaze Tile 191.808 SqM
Hard Wood Shutter 19.44 NOS

Hardwood and Commercial Plyboard 5.184 NOS

Hardwood Window Shutter 38.88 NOS


Iron Grills 324 Kg
Labour for Brick Sup. Str
Labour for Brick Tiles

Labour for Brick Work Foundation

Labour for Ceiling Plaster

Labour for Cement Concrete

Labour for Ceramic Glaze Tile


Labour for DPC

Labour for Earth Excavation & Earth Filling

Labour for pipe including cost of Joints


Labour for Pointing
Labour for RCC
Labour for Steel RCC
Labour for Wall Plaster
MS Steel 2592 Kg

Oil Bound Distemper with Labour 544.32 SqM


Paint Work with Labour 259.2 SqM
Sand 40.176 CUM
Shuttering 1944 SFT
Stone Blast 25.92 CUM
White Cement 1.296 Bags

Item Quantity Unit


Foundation
Cement Concrete 1:6:12
Cement 60.912 Bags
Stone Blast 25.92 CUM
Sand 12.96 CUM
Labour for Cement Concrete
Total for Cement Concrete 1:6:12

Brick Work in Foundation with Cement Mortar 1:6


Labour for Brick Work Foundation
Sand 3.888 CUM
Cement 18.144 Bags
Bricks 6480 NOS
Total for Brick Work in Foundation with Cement Mortar 1:6

Horizontal DPC with Cement Concrete 1:2:4( 40MM)


Labour for DPC
Bitumen 22.032 Kg
Cement 3.24 Bags
Coarse Sand 2.592 CUM
Bazri 5.184 CUM

Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM)

Earth Work in Excavation in Foundation and Filling under Floors


Labour for Earth Excavation & Earth Filling
Total for Earth Work in Excavation in Foundation and Filling
under Floors
Super Structure

RCC without Steel Cement Concrete 1:1.5:3


Labour for RCC
Shuttering 1944 SFT
Bazri 23.328 CUM
Coarse Sand 11.664 CUM
Cement 208.656 Bags
Total for RCC without Steel Cement Concrete 1:1.5:3
MS Steel For RCC
Labour for Steel RCC
MS Steel 2592 Kg
Binding Wire 25.92 Kg
Total for MS Steel For RCC

Brick Work in Super Structure Cement Mortar 1:6


Labour for Brick Sup. Str
Cement 46.656 Bags
Sand 10.368 CUM
Bricks 18662.4 NOS
Total for Brick Work in Super Structure Cement Mortar 1:6

Brick Tile Tracing on Roof


Earth 11.664 CUM
Sand 1.296 CUM
Cement 11.664 Bags
Labour for Brick Tiles
Brick Tiles 5184 NOS
Bitumen 22.032 Kg
Total for Brick Tile Tracing on Roof
Rain Water Pipe
CI Pipe 19.44 Meter
Labour for pipe including cost of Joints
Total for Rain Water Pipe
Flooring

Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course


Glaze Tile 127.008 SqM
Cement 24.0991 Bags
White Cement 1.296 Bags
Cement for Base Coarse 22.032 Bags
Fine Sand 18.144 CUM
Brick Blast 11.664 CUM
Coarse Sand 1.296 CUM
Labour for Ceramic Glaze Tile
Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality
with course
Plastering/Wall tiles

Plaster on Ceiling (Roof) Cement Mortar 1:4


Sand 2.592 CUM
Cement 14.256 Bags
Labour for Ceiling Plaster
Total for Plaster on Ceiling (Roof) Cement Mortar 1:4

Plaster on Walls Cement Mortar 1:4


Labour for Wall Plaster
Cement 51.84 Bags
Sand 7.776 CUM
Total for Plaster on Walls Cement Mortar 1:4

Cement Pointing Cement Mortar 1:2


Sand 1.296 CUM
Labour for Pointing
Cement 12.96 Bags
Total for Cement Pointing Cement Mortar 1:2

Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls


Glaze Tile 64.8 SqM
Total for Glazed Tiles in Dado or Skirting in Bathroom snd
Kitchen Walls

Door,Window,Cupboard shutter,Iron Grills


Hardwood Door
Hard Wood Shutter 19.44 NOS
Total for Hardwood Door

Hardwood Frame Including Labour


Commercial Hardwood 583.2 RFT
Total for Hardwood Frame Including Labour
Hardwood Window
Hardwood Window Shutter 38.88 NOS
Total for Hardwood Window

Hard Wood Frame and Commercial Plyboard Shutter


Hardwood and Commercial Plyboard 5.184 NOS

Total for Hard Wood Frame and Commercial Plyboard Shutter


Iron Grilling with Labour
Iron Grills 324 Kg
Total for Iron Grilling with Labour
Paint

Paint on Wooden Doors and Windows


Paint Work with Labour 259.2 SqM
Total for Paint on Wooden Doors and Windows

Oil Bound Distemper with Filling on Walls


Oil Bound Distemper with Labour 544.32 SqM
Total for Oil Bound Distemper with Filling on Walls

Exterior Finish Cement Paint Snowcem


Cement Paint 194.4 SqM
Total for Exterior Finish Cement Paint Snowcem

Add 10% for Electric fitting wiring & Labor:


Add 10% for Water Supply fitting & Sanitary:
Add 5% for Sewerage:
Grand Total:
Ask question from Experts See Elevation/Interior Designs
Construction Cost Estimate. A high level rough estimate.
levation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet o

Project Cost in Rs.: 1667943.9 Project Labor Cost in Rs.:


Project Cost Rs. Per SFT: 1287 Project Labor Rs. Cost Per SFT:
tity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to support@gharexpert
ur project. Note that actual quantity may vary depending upon the design.
Rate Total Amount Knowledgebase Links
1400 39916.8 Guidelines for Bazri
70 1814.4 Guidelines for Binding Wire
60 2643.84 Guidelines for Bitumen
600 6998.4 Guidelines for Brick Blast
7 36288 Guidelines for Brick Tiles
6 150854.4 Guidelines for Bricks
320 144776.16 Guidelines for Cement
320 7050.24 Guidelines for Cement for Base Coarse
35 6804 Guidelines for Cement Paint
500 9720 Guidelines for CI Pipe
1300 20217.6 Guidelines for Coarse Sand
201 117223.2 Guidelines for Commercial Hardwood
220 2566.08 Guidelines for Earth
975 17690.4 Guidelines for Fine Sand
800 153446.4 Guidelines for Glaze Tile
4380 85147.2 Guidelines for Hard Wood Shutter
Guidelines for Hardwood and Commercial
4590 23794.56 Plyboard

1030 40046.4 Guidelines for Hardwood Window Shutter


70 22680 Guidelines for Iron Grills
19440 Guidelines for Labour for Brick Sup. Str
14256 Guidelines for Labour for Brick Tiles
Guidelines for Labour for Brick Work
6480 Foundation

5184 Guidelines for Labour for Ceiling Plaster

9072 Guidelines for Labour for Cement Concrete

16848 Guidelines for Labour for Ceramic Glaze Tile


648 Guidelines for Labour for DPC
Guidelines for Labour for Earth Excavation &
25920 Earth Filling
Guidelines for Labour for pipe including cost
3240 of Joints
15552 Guidelines for Labour for Pointing
14256 Guidelines for Labour for RCC
7776 Guidelines for Labour for Steel RCC
20736 Guidelines for Labour for Wall Plaster
50 129600 Guidelines for MS Steel
Guidelines for Oil Bound Distemper with
62 33747.84 Labour
60 15552 Guidelines for Paint Work with Labour
975 39171.6 Guidelines for Sand
20 38880 Guidelines for Shuttering
1050 27216 Guidelines for Stone Blast
850 1101.6 Guidelines for White Cement
Sub Total: 1334355.12
Rate Total Amount
Guidelines for Foundation
Guidelines for Cement Concrete 1:6:12
320 19491.84
1050 27216
975 12636
9072
68415.84
Guidelines for Brick Work in Foundation with
Cement Mortar 1:6
6480
975 3790.8
320 5806.08
6 38880
54956.88
Guidelines for Horizontal DPC with Cement
Concrete 1:2:4( 40MM)
648
60 1321.92
320 1036.8
1300 3369.6
1400 7257.6

13633.92
Guidelines for Earth Work in Excavation in
Foundation and Filling under Floors
25920

25920
Guidelines for Super Structure
Guidelines for RCC without Steel Cement
Concrete 1:1.5:3
14256
20 38880
1400 32659.2
1300 15163.2
320 66769.92
167728.32
Guidelines for MS Steel For RCC
7776
50 129600
70 1814.4
139190.4
Guidelines for Brick Work in Super Structure
Cement Mortar 1:6
19440
320 14929.92
975 10108.8
6 111974.4
156453.12

Guidelines for Brick Tile Tracing on Roof


220 2566.08
975 1263.6
320 3732.48
14256
7 36288
60 1321.92
59428.08
Guidelines for Rain Water Pipe
500 9720
3240
12960
Guidelines for Flooring

Guidelines for Ceramic Glaze Tiles Flooring


300X300 MM First Quality with course
800 101606.4
320 7711.2
850 1101.6
320 7050.24
975 17690.4
600 6998.4
1300 1684.8
16848

160691.04
Guidelines for Plastering/Wall tiles
Guidelines for Plaster on Ceiling (Roof)
Cement Mortar 1:4
975 2527.2
320 4561.92
5184
12273.12
Guidelines for Plaster on Walls Cement
Mortar 1:4
20736
320 16588.8
975 7581.6
44906.4
Guidelines for Cement Pointing Cement
Mortar 1:2
975 1263.6
15552
320 4147.2
20962.8
Guidelines for Glazed Tiles in Dado or
Skirting in Bathroom snd Kitchen Walls
800 51840

51840
Guidelines for Door,Window,Cupboard
utter,Iron Grills shutter,Iron Grills
Guidelines for Hardwood Door
4380 85147.2
85147.2
Guidelines for Hardwood Frame Including
Labour
201 117223.2
117223.2
Guidelines for Hardwood Window
1030 40046.4
40046.4
Guidelines for Hard Wood Frame and
Commercial Plyboard Shutter
4590 23794.56

23794.56
Guidelines for Iron Grilling with Labour
70 22680
22680
Guidelines for Paint
Guidelines for Paint on Wooden Doors and
Windows
60 15552
15552
Guidelines for Oil Bound Distemper with
Filling on Walls
62 33747.84
33747.84
Guidelines for Exterior Finish Cement Paint
Snowcem
35 6804
6804
Sub Total: 1334355.12
133435.512
133435.512
66717.756
1667943.9
timate is based on the square feet of constructed area and would help you in understanding breakup of

199260
154
Write to support@gharexpert.com)

Vendor 1 Price Quoted by Vendor 1 Vendor 2 Price Quoted by Vendor 2