NEPAL TELECOM
NEPAL DOORSANCHAR COMPANY LIMITED
EASTERN REGIONAL DIRECTORATE
CIVIL SECTION
BIRATNAGAR, MORANG
DISTRICT:- ILAM
RATES for 2071/72
Rate With 15%
S.N. Items Unit Remarks
Overhead
1. EARTHWORK
1.1 EarthWork in exc. in soft soil Cu.M. 364.83
1.2 EarthWork in exc. in- BMS Cu.M. 416.94
1.3 E/W for foun. trench (soft soil) Cu.M. 521.18
1.4 E/W for foun. trench - BMS Cu.M. 828.68
1.5 Earth fill. With water compact Cu.M. 253.00
1.6 Mud filling with transportation of mud up to 2.00
Cu.M. 480.19
Km. distance.
1.7 Stone filling at foundation Cu.M. 3,351.89
1.8 Sand fill. With compaction Cu.M. 3,045.74
1.9 Stone Dust Filling. Cu.M. 1,482.36
2. BRICK WORK
2.1 Brick soling in sand - flat Sq.M. 1,205.09
2.2 Brick soling in sand - vert Sq.M. 2,097.68
2.4 For ground floor
2.4a Brick mas.in c.m. - 1:3 Cu.M. 17,853.52
2.4b Brick mas.in c.m. - 1:4 Cu.M. 17,355.06
2.4c Brick mas.in c.m. - 1:6 Cu.M. 16,881.06
2.4d Brick mas.in mud mortar Cu.M. 14,442.87
2.5 Above ground floor
2.5a Brick mas.in c.m. - 1:3 Cu.M. 18,114.11
2.5b Brick mas.in c.m. - 1:4 Cu.M. 17,615.65
2.5c Brick mas.in c.m. - 1:6 Cu.M. 17,141.65
2.5d Brick mas.in mud mortar Cu.M. 14,703.46
3. STONE WORK
3.1 Dry Stone soling in sand Cu.M. 5,518.54
3.2 Stone mas.in c.m. - 1:4 Cu.M. 9,917.97
3.3 Stone mas.in c.m. - 1:6 Cu.M. 9,043.05
3.4 Stone mas.in c.m. - mud Cu.M. 4,407.70
3.5 Stone work for dry wall Cu.M. 4,147.82
4. CONCRETE WORK
4.1 PCC 1:5:10 general work (gravel) Cu.M. 9,846.94
4.2 PCC 1:4:8 general work (gravel) Cu.M. 10,544.19
4.3 PCC 1:3:6 general work (gravel) Cu.M. 11,415.75
4.4 PCC 1:2:4 general work (gravel) Cu.M. 12,933.75
4.5 For RCC -PCC 1:2:4 crush. Agg.-M15 Cu.M. 14,053.10
4.6 For RCC -PCC 1:1.5:3 cru. Agg. -M20 Cu.M. 15,436.74
4.7 For RCC -PCC 1:1:2 cru. Agg. -M25 Cu.M. 19,059.20
5. WOODEN WORK
5.1 Sal wood- Chaukhat Cu.M. 202,807.35
5.2 Sal wood- Beam Cu.M. 176,487.03
6. PLASTERING WORK
6.1 12.5mm cement plaster - 1:3 ceil. Sq.M. 355.31
6.2 - 1:4 ceil. Sq.M. 344.55
6.3 - 1:4 On Walls Sq.M. 301.54
6.4 - 1:6 On Walls Sq.M. 277.04
6.5 20mm " " " - 1:4 Sq.M. 397.42
6.6 Flush cem.pointing1:2- brick wall Sq.M. 184.12
6.7 Flush cem.pointing1:2- stone wall Sq.M. 236.21
6.8 3 mm cement punning Sq.M. 219.25
6.9 Plain Plaster of Paris Sq.M. 316.16
7. FLOORING WORK
7.1 Brick vertical soling in (1:6) and Pointing Sq.M. 2,174.55
7.2 25mm thick Mozaic flooring Sq.M. 2,790.23
7.3-a Tile Porcelain -Glazed-Wall-NS-76 Sq.M. 2,319.02
7.3-b Tile Porcelain -Glazed-floor-NS-76 Sq.M. 2,229.86
7.4-a Marble slab flooring Sq.M. 4,628.88
7.4-b 38mm cement concrete flooring with punning Sq.M. 603.82
7.4-c 50mm cement concrete flooring with punning Sq.M. 749.17
7.4-d Granite flooring Sq.M. 5,873.88
8. ROOFING WORK
8.1 CGI sheet roof - 26 # plain Sq.M. 758.39
8.2 CGI sheet roof - 26 # coloured Sq.M. 873.24
8.3 GI sheet ridge-24 # (60 cm wide) R.Mt. 712.51
8.4 GI sheet ridge-26 # (60 cm wide) Colour R.Mt. 852.61
8.5 GI plain sheet fixing work - 24 # Sq.M. 1,126.46
8.7 False ceilling of 4mm ply.in sal wood frame Of 50
mm.*75 mm. size & Room 600 mm.*900 mm. Sq.M. 2,805.54
9. STEEL WORK
9.1 Barbed wire fencing 12 # R.Mt. 55.32
9.2 M.S. grill 3x20 (13.45Kg/sm) Sq.M. 1,956.98
9.3 M.S. grill 4.5x20 (20.17Kg/sm) Sq.M. 2,931.87
9.4 Collapsible Gate(37.66 Kg.) Sq.M. 4,651.75
9.5 Rolling Shutter(18 Gauge) Sq.M. 4,847.25
9.6 MS Angle Fixing work Kg 174.23
Excavation of hard clay and soils mixed Unskilled m.d. 0.80 440.00 352.00
with soft moorum stones (upto 30mm Equipment
size) including disposal upto 10m lead 3%of labour 10.56
and 1.5m lift
Item No. per Sub-Total 362.56
1.2 1 cu.m. Contract Rate(1.15) 416.94
Norms - 2(2) page 5 Contract U.Rate cu.m. 416.94
Earthwork in excav. : B.M.Soil per cu.m. 416.94
Excavation of soft soil, disposal upto Unskilled m.d. 1.00 440.00 440.00
10m lead and 1.5m lift Equipment
3%of labour 13.20
Item No. per Sub-Total 453.20
1.3 1 cu.m. Contract Rate(1.15) 521.18
Norms - 2(9) page 8 Contract U.Rate cu.m. 521.18
E/W excav. for found. Trench - soft soil per cu.m. 521.18
Excavation for foundation drain, pipe Unskilled m.d. 1.59 440.00 699.60
line etc.in boulder mixed soil, disposal Equipment
(upto 10m lead and 1.5m lift) 3%of labour 20.99
Item No. per Sub-Total 720.59
1.4 1 cu.m. Contract Rate(1.15) 828.68
Norms - 2(14) page 9 Contract U.Rate cu.m. 828.68
E/w in excav. for found. trench B.M.Soil per cu.m. 828.68
Filling with ordinary soil in 15 cm thick Unskilled m.d. 0.50 440.00 220.00
layer and hand compaction (haulage
distance 10m) with sprinkling water
Item No. per Sub-Total 220.00
1.5 1 cu.m. Contract Rate(1.15) 253.00
Norms - 2(25a) page 15 Contract U.Rate cu.m. 253.00
Earth filling and compaction with watering per cu.m. 253.00
Filling with ordinary soil by transportation of Unskilled m.d. 0.25 440.00 110.00
mud from 5 km distance Mud Cum. 1.00 307.56 307.56
Item No. per Sub-Total 417.56
1.6 1 cu.m. Contract Rate(1.15) 480.19
Norms - 2(25b) page 15 Contract U.Rate cu.m. 480.19
Mud filling by transportation per cu.m. 480.19
Filling by sand and hand compaction Unskilled m.d. 0.70 440.00 308.00
(haulage distance 10m) with sprinkling Sand cu.m. 1.10 2127.70 2340.47
water
Item No. per Sub-Total 2648.47
1.8 1 cu.m. Contract Rate(1.15) 3045.74
Norms - 2(42) page 21 Contract U.Rate cu.m. 3045.74
Filling of sand with water compaction per cu.m. 3045.74
Filling with stone dust by transportation of Unskilled m.d. 0.50 440.00 220.00
dusty from 15 km distance With compaction Stone dust Cum. 1.00 1069.01 1069.01
Item No. per Sub-Total 1289.01
1.9 1 cu.m. Contract Rate(1.15) 1482.36
Norms - 2(25b) page 15 Contract U.Rate cu.m. 1482.36
stone dust filling by transportation per cu.m. 1482.36
2. BRICK WORKS
Dry brick laying (soling) in sand skilled m.d. 0.50 660.00 330.00
a) flat unskilled m.d. 1.00 440.00 440.00
Brick nos. 420.00 19.52 8198.40
Sand cu.m. 0.71 2127.70 1510.67
Item No. per Sub-Total 10479.07
2.1 10 sq.m. Contract Rate(1.15) 12050.93
Norms - 11(15a) page 107 Contract U.Rate sq.m. 1205.09
Dry Brick flat soling. per sq.m. 1205.09
Dry brick laying (soling) in sand skilled m.d. 1.00 660.00 660.00
a) on edge (vertical) unskilled m.d. 3.25 440.00 1430.00
Brick nos. 750.00 19.52 14640.00
Sand cu.m 0.71 2127.70 1510.67
Item No. per Sub-Total 18240.67
2.2 10 sq.m. Contract Rate(1.15) 20976.77
Norms - 11(15b) page 107 Contract U.Rate sq.m. 2097.68
Dry Brick on edge soling. per sq.m. 2097.68
Chimney (bhatta) brick masonry works skilled m.d. 1.50 660.00 990.00
along with supplying bricks making unskilled m.d. 2.20 440.00 968.00
Chimney (bhatta) brick masonry works skilled m.d. 1.50 660.00 990.00
along with supplying bricks making unskilled m.d. 2.20 440.00 968.00
cement sand mortar and construction Brick nos. 560.00 19.52 10931.20
of brick wall including haulage distance Cement m.t. 0.07 15157.55 1061.03
upto 30m Sand cu.m 0.30 2127.70 638.31
a) 1:6 Add.unskill m.d. 0.20 440.00 88.00
At Ground floor Scaffolding 3% of add. Unskilled 2.64
Item No. per Sub-Total 14679.18
2.4c 1 cu.m. Contract Rate(1.15) 16881.06
Norms - 5(1a &1b6) page 32,33 Contract U.Rate cu.m. 16881.06
Brick work in c.m. - 1:6 per cu.m. 16881.06
Chimney (bhatta) brick masonry works skilled m.d. 1.00 660.00 660.00
along with supplying bricks making unskilled m.d. 1.70 440.00 748.00
mud mortar and construction of brick Brick nos. 560.00 19.52 10931.20
wall including haulage distance upto mud cu.m 0.42 307.56 129.18
30m Add.unskill m.d. 0.20 440.00 88.00
a) mud mortar Scaffolding 3% of add. Unskilled 2.64
Item No. per Sub-Total 12559.02
2.4d 1 cu.m. Contract Rate(1.15) 14442.87
Norms - 5(1a &1b6) page 32,33 Contract U.Rate cu.m. 14442.87
Brick work in mud mortar per cu.m. 14442.87
b. BRICK WORK IN MORTAR (above ground floor)
Chimney (bhatta) brick masonry works skilled m.d. 1.50 660.00 990.00
along with supplying bricks making unskilled m.d. 2.20 440.00 968.00
cement sand mortar and construction Brick nos. 560.00 19.52 10931.20
of brick wall including haulage distance Cement m.t. 0.13 15157.55 1970.48
upto 30m Sand cu.m 0.27 2127.70 574.48
a) 1:3 Add.unskill m.d. 0.70 440.00 308.00
Scaffolding 3% of add. Unskilled 9.24
Item No. per Sub-Total 15751.40
2.5a 1 cu.m. Contract Rate(1.15) 18114.11
Norms - 5(1a &1b6) page 32,33 Contract U.Rate cu.m. 18114.11
Brick work in c.m. - 1:3 per cu.m. 18114.11
Chimney (bhatta) brick masonry works skilled m.d. 1.50 660.00 990.00
along with supplying bricks making unskilled m.d. 2.20 440.00 968.00
cement sand mortar and construction Brick nos. 560.00 19.52 10931.20
of brick wall including haulage distance Cement m.t. 0.10 15157.55 1515.76
upto 30m Sand cu.m 0.28 2127.70 595.76
a) 1:4 Add.unkill m.d. 0.70 440.00 308.00
Scaffolding 3% of add. Unskilled 9.24
Item No. per Sub-Total 15317.96
2.5b 1 cu.m. Contract Rate(1.15) 17615.65
Norms - 5(1a &1b6) page 32,33 Contract U.Rate cu.m. 17615.65
Brick work in c.m. - 1:4 per cu.m. 17615.65
Chimney (bhatta) brick masonry works skilled m.d. 1.50 660.00 990.00
Chimney (bhatta) brick masonry works skilled m.d. 1.00 660.00 660.00
along with supplying bricks making unskilled m.d. 1.70 440.00 748.00
mud mortar and construction of brick Brick nos. 560.00 19.52 10931.20
wall including haulage distance upto mud cu.m 0.42 307.56 129.18
30m Add.unkill m.d. 0.70 440.00 308.00
a) mud mortar Scaffolding 3% of add. Unskilled 9.24
Item No. per Sub-Total 12785.62
2.5d 1 cu.m. Contract Rate(1.15) 14703.46
Norms - 5(1a &1b6) page 32,33 Contract U.Rate cu.m. 14703.46
Brick work in mud mortar per cu.m. 14703.46
3. STONE WORKS
Dry stone laying (soling) in sand skilled m.d. 1.00 660.00 660.00
unskilled m.d. 3.50 440.00 1540.00
stone cu.m 1.10 1878.91 2066.80
Sand cu.m 0.25 2127.70 531.93
Item No. per Sub-Total 4798.73
3.1 1 cu.m. Contract Rate(1.15) 5518.54
Norms - 11(16) page 107 Contract U.Rate cu.m. 5518.54
Stone soling in sand per cu.m. 5518.54
Rubble masonry work including supply skilled m.d. 1.50 660.00 990.00
of hard stone blocks preparing cement unskilled m.d. 5.00 440.00 2200.00
sand mortar and construction of the cement m.t. 0.159 15157.55 2410.05
wall upto 5m high haulage distance Sand cu.m 0.45 2127.70 957.47
upto 10m bl.stone " 1.00 1878.91 1878.91
a) cement sand mortar 1:4 bond st. " 0.10 1878.91 187.89
Item No. per Sub-Total 8624.32
3.2 1 cu.m. Contract Rate(1.15) 9917.97
Norms - 6a(2) page 35 Contract U.Rate cu.m. 9917.97
Stone work in c.m. - 1:4 per cu.m. 9917.97
Rubble masonry work including supply skilled m.d. 1.50 660.00 990.00
of hard stone blocks preparing cement unskilled m.d. 5.00 440.00 2200.00
sand mortar and construction of the cement m.t. 0.106 15157.55 1606.70
wall upto 5m high haulage distance Sand cu.m 0.47 2127.70 1000.02
upto 10m bl.stone " 1.00 1878.91 1878.91
a) cement sand mortar 1:6 bond st. " 0.10 1878.91 187.89
Item No. per Sub-Total 7863.52
3.3 1 cu.m. Contract Rate(1.15) 9043.05
Norms - 6a(3) page 35 Contract U.Rate cu.m. 9043.05
Stone work in c.m. - 1:6 per cu.m. 9043.05
Rubble masonry work including supply skilled m.d. 1.00 660.00 660.00
of hard stone blocks preparing mud unskilled m.d. 2.22 440.00 976.80
mortar and construction of the wall bl.stone cu.m 1.00 1878.91 1878.91
Rubble masonry work including supply skilled m.d. 1.00 660.00 660.00
of hard stone blocks and construction unskilled m.d. 2.00 440.00 880.00
of the wall upto 5m high haulage bl.stone cu.m 1.00 1878.91 1878.91
distance upto 30 m a) dry wall bond st. " 0.10 1878.91 187.89
Item No. per Sub-Total 3606.80
3.5 1 cu.m. Contract Rate(1.15) 4147.82
Norms - 6(1) page 36 Contract U.Rate cu.m. 4147.82
Stone work - dry wall per cu.m. 4147.82
4. CONCRETE WORKS
Concreting of foundation, vertical faces skilled m.d. 1.00 660.00 660.00
walls (cement concrete) including supply unskilled m.d. 4.00 440.00 1760.00
of materials and haulage distance upto cement m.t. 0.13 15157.55 1970.48
30 m a) P.C.C.(1:3:6) gravel_1 cu.m. 0.65 3564.11 2316.67
Gravel_1 =40 mm gravel from river gravel_2 cu.m. 0.24 3564.11 855.39
Gravel_2 =20 mm gravel from river sand cu.m. 0.47 2127.70 1000.02
Item No. per Sub-Total 8562.56
4.1 1 cu.m. Contract Rate(1.15) 9846.94
Norms-7-2(a) page 44 Contract U.Rate cu.m. 9846.94
P.C.C. - ( 1:3:6 ) - river gravel per cu.m. 9846.94
5. WOODEN WORKS
Making and fixing sal wood skilled m.d. 34.00 660.00 22440.00
chaukhat unskilled m.d. 3.40 440.00 1496.00
salwood cu.m 1.10 134212.93 147634.22
holdfast nos. 92.00 50.00 4600.00
killa " 184.00 1.00 184.00
Item No. per Sub-Total 176354.22
Making beams, rafter, purlin cross skilled m.d. 17.65 660.00 11649.00
beams from seasoned sal wood with unskilled m.d. 1.76 440.00 774.40
fitting and fixing wood cu.m 1.05 134212.93 140923.58
killa-L/S Kg. 1.00 120.00 120.00
Item No. per Sub-Total 153466.98
5.2 1 cu.m. Contract Rate(1.15) 176487.03
Norms - 10(17) page 90 Contract U.Rate cu.m. 176487.03
Sal wood work - beam, rafter etc. per cu.m. 176487.03
Making and fixing sal wood panelled skilled m.d. 10.00 660.00 6600.00
shutters using 38 mm sal wood frame unskilled m.d. 1.00 440.00 440.00
wood cu.m 0.084 134212.93 11273.89
Shutter size: hinges nos. 6.00 50.00 300.00
1.07m * 1.982 m=2.114 sq.m. bolt_1 nos. 1.00 75.00 75.00
Hinges (Kabja) - 100 mm bolt_2 nos. 1.00 85.00 85.00
bolt _1(Chheskini) - 150 mm lock nos. 1.00 985.00 985.00
bolt _2(Chheskini) - 300 mm handle nos. 2.00 150.00 300.00
lock - Mortise lock 250 mm nails-L/S Kg. 1.00 120.00 120.00
Item No. per Sub-Total 20178.89
5.3 2.114 sq.m. Contract Rate(1.15) 23205.72
Norms - 10(2) page 76 Contract U.Rate sq.m. 10977.16
Salwood frame panelled shutters (38mm thick) per sq.m. 10977.16
Making and fixing 4 mm thick glazed skilled m.d. 9.00 660.00 5940.00
shutter using sal wood shutter of the unskilled m.d. 0.90 440.00 396.00
size : 38 mm x 75 mm wood cu.m 0.049 134212.93 6576.43
glass sq.m. 1.085 516.48 560.38
hinges nos. 8.00 50.00 400.00
hinges (Kabja) - 75 mm bolts nos. 4.00 45.00 180.00
bolts (Chheskini) - 100 mm handle nos. 2.00 150.00 300.00
screws-L/S Kg. 0.50 120.00 60.00
Item No. per Sub-Total 14412.81
5.4 2.23 sq.m. Contract Rate(1.15) 16574.73
Norms - 10(4) page 78 Contract U.Rate sq.m. 7432.61
Sal frame 38mm thick 4 mm glazed shutters per sq.m. 7432.61
Making and fixing 24 # G.I. plain sheet skilled m.d. 7.00 660.00 4620.00
flush shutters (GI sheer both sides) unskilled m.d. 0.70 440.00 308.00
in 38 mm sal wood frame. wood cu.m 0.0346 134212.93 4643.77
sheet sq.m. 4.65 580.44 2699.05
Shutter size : hinges nos 3.00 50.00 150.00
Making and fixing 4 mm thick glass skilled m.d. 0.06 660.00 39.60
using necessary listi. unskilled m.d. 0.006 440.00 2.64
glass sq.m. 1.00 516.48 516.48
listi r.m. 4.05 12.04 48.76
nails-L/S Kg. 0.50 120.00 60.00
Item No. per Sub-Total 667.48
5.10 1 sq.m. Contract Rate(1.15) 767.60
Norms-10(11)b page 84 Contract U.Rate sq.m. 767.60
4 mm glass with listi on frames per sq.m. 767.60
Making wooden form work including supply skilled m.d. 1.72 660.00 1135.20
and selection of materials fixing, nailing unskilled m.d. 2.57 440.00 1130.80
according to drawings, placing separa- wood cu.m. 0.07 22979.03 1608.53
tors, dismantling forms and hauling killa kg 2.50 120.00 300.00
upto 30 m distance (Use of wood 7 times)
Item No. per Sub-Total 4174.53
5.12 10 sq.m. Contract Rate(1.15) 4800.71
Norms-8(2a) page 55 Contract U.Rate sq.m. 480.07
Wooden Form work for slab per sq.m. 480.07
with wooden listy on joints sal wood cu.m. 0.35 134212.93 46974.53
= analysis =10m2
For
6. PLASTERING WORKS
12.5 mm thick cement sand plastering skilled m.d. 15.00 660.00 9900.00
works for ceiling unskilled m.d. 20.00 440.00 8800.00
a) Cement sand ratio - 1:3 cement m.t. 0.625 15157.55 9473.47
sand cu.m 1.28 2127.70 2723.46
Item No. per Sub-Total 30896.93
6.1 100 sq.m. Contract Rate(1.15) 35531.47
Norms-12(1b) page 110 Contract U.Rate sq.m. 355.31
12.5mm cement sand (1:3) plaster in ceilling. per sq.m. 355.31
12.5 mm thick cement sand plastering skilled m.d. 15.00 660.00 9900.00
works on ceiling unskilled m.d. 20.00 440.00 8800.00
a) Cement sand ratio - 1:4 cement m.t. 0.538 15157.55 8154.76
sand cu.m 1.46 2127.70 3106.44
Item No. per Sub-Total 29961.20
6.2 100 sq.m. Contract Rate(1.15) 34455.38
Norms-12(1c) page 110 Contract U.Rate sq.m. 344.55
12.5mm cement sand (1:4) plaster in ceilling. per sq.m. 344.55
12.5 mm thick cement sand plastering skilled m.d. 12.00 660.00 7920.00
works on walls unskilled m.d. 16.00 440.00 7040.00
a) Cement sand ratio - 1:4 cement m.t. 0.538 15157.55 8154.76
sand cu.m 1.46 2127.70 3106.44
Item No. per Sub-Total 26221.20
6.3 100 sq.m. Contract Rate(1.15) 30154.38
Norms-12(1c) page 110 Contract U.Rate sq.m. 301.54
12.5mm cement sand (1:4) plaster work. per sq.m. 301.54
12.5 mm thick cement sand plastering skilled m.d. 12.00 660.00 7920.00
works unskilled m.d. 16.00 440.00 7040.00
a) Cement sand ratio - 1:6 cement m.t. 0.382 15157.55 5790.18
sand cu.m 1.57 2127.70 3340.49
Item No. per Sub-Total 24090.67
6.4 100 sq.m. Contract Rate(1.15) 27704.27
Norms-12(1d) page 110 Contract U.Rate sq.m. 277.04
12.5mm cement sand (1:6) plaster work. per sq.m. 277.04
Flush ruled pointing works in cement skilled m.d. 10.00 660.00 6600.00
sand ratio 1:2 unskilled m.d. 14.00 440.00 6160.00
a) In stone masonry cement m.t. 0.408 15157.55 6184.28
sand cu.m 0.75 2127.70 1595.78
Item No. per Sub-Total 20540.06
6.7 100 sq.m. Contract Rate(1.15) 23621.07
Norms-14(2b) page 122 Contract U.Rate sq.m. 236.21
Flush cement pointing 1:2 - in stone per sq.m. 236.21
3 mm thick fine cement rubbing works skilled m.d. 1.00 660.00 660.00
unskilled m.d. 1.00 440.00 440.00
cement kg 53.20 15.16 806.51
Item No. per Sub-Total 1906.51
6.8 10 sq.m. Contract Rate(1.15) 2192.49
Norms-11(20) page 109 Contract U.Rate sq.m. 219.25
3mm cement punning per sq.m. 219.25
Plain Plaster of Paris on walls and ceilings skilled m.d. 1.00 660.00 660.00
unskilled m.d. 1.00 440.00 440.00
POP kg 53.20 31.00 1649.20
Item No. per Sub-Total 2749.20
6.9 10 sq.m. Contract Rate(1.15) 3161.58
Norms-11(20) page 110 Contract U.Rate sq.m. 316.16
Plain Plaster of Paris per sq.m. 316.16
7. FLOORING WORKS
Dry brick on edge soling with cement sand skilled m.d. 1.10 660.00 726.00
(1:6) and pointing by (1:2) C/S in joints unskilled m.d. 1.80 440.00 792.00
Cement m.t. 0.121 15157.55 1834.06
Brick nos. 750.00 19.52 14640.00
Sand cu.m 0.431 2127.70 917.04
Item No. per Sub-Total 18909.10
7.1 10 sq.m. Contract Rate(1.15) 21745.47
Norms - 11(13) page 106 Contract U.Rate sq.m. 2174.55
Brick vertical soling in (1:6) and Pointing per sq.m. 2174.55
38mm Cement oncreting for flooring skilled m.d. 1.25 660.00 825.00
and cement punning all complete unskilled m.d. 2.00 440.00 880.00
50mm Cement oncreting for flooring skilled m.d. 1.25 660.00 825.00
and cement punning all complete unskilled m.d. 2.50 440.00 1100.00
cement m.t. 0.17 15157.55 2576.78
a) P.C.C.(1:2:4) gravel_1 cu.m. 0.46 3311.58 1523.33
Gravel_1 =12 mm broken aggregate gravel_2 cu.m. 0.00
sand cu.m. 0.230 2127.70 489.37
Item No. per Sub-Total 6514.48
4.4 10 sq.m. Contract Rate(1.15) 7491.65
Norms-11(1)d page 87 Contract U.Rate cu.m. 749.17
P.C.C. flooring in 1:2:4 with punning per cu.m. 749.17
8. ROOFING WORKS
26 gause C.G.I. sheet roofing works skilled m.d. 1.10 660.00 726.00
with supply of materials all complete unskilled m.d. 1.25 440.00 550.00
CGIsheet sq.m. 12.00 335.33 4023.96
nutbolt nos. 30.00 19.00 570.00
J-hook nos. 25.00 28.33 708.25
bit.washer nos. 55.00 0.30 16.50
Item No. per Sub-Total 6594.71
8.1 10 sq.m. Contract Rate(1.15) 7583.92
Norms-9(1) page 69 Contract U.Rate sq.m. 758.39
CGI sheet roofing - 26 # per sq.m. 758.39
26 gauge C.G.I. sheet roofing works skilled m.d. 1.10 660.00 726.00
with supply of materials all complete unskilled m.d. 1.25 440.00 550.00
(Colourded CGI sheet) CGIsheet sq.m. 12.00 418.55 5022.60
nutbolt nos. 30.00 19.00 570.00
J-hook nos. 25.00 28.33 708.25
bit.washer nos. 55.00 0.30 16.50
Item No. per Sub-Total 7593.35
8.2 10 sq.m. Contract Rate(1.15) 8732.35
Norms-9(1) page 69 Contract U.Rate sq.m. 873.24
CGI sheet roofing - 26 # Coloured per sq.m. 873.24
Making ridge of 24 gause G.I. plain skilled m.d. 2.00 660.00 1320.00
sheet and fitting with supply of unskilled m.d. 3.00 440.00 1320.00
materials all complete GIplain r.m. 12.00 280.48 3365.76
nutbolt nos. 10.00 19.00 190.00
Item No. per Sub-Total 6195.76
8.3 10 r.m. Contract Rate(1.15) 7125.12
Norms-9(2) page 69 Contract U.Rate Rm 712.51
CGI sheet ridge - 24 # (60cm wide) per Rm 712.51
Making various types of false ceiling in salwood skilled m.d. 23.00 660.00 15180.00
frame of size 50mm*75mm making room unskilled m.d. 2.30 440.00 1012.00
600*900 using 4 mm commercial plywood wood cu.m. 0.45 134212.93 60395.82
Ceiling size plywood sq.m. 37.50 269.00 10087.50
9.75 x 3.65 = 35.59 sq.m. listi, killa L.S. 150.00
Item No. per Sub-Total 86825.32
8.7 35.59 sq.m. Contract Rate(1.15) 99849.12
Norms-10(16a) page 89 Contract U.Rate sq.m. 2805.54
False Ceiling - 4mm plywood with sal frame per sq.m. 2805.54
9. STEEL WORKS
G.I. barbed wire fencing with supply skilled m.d. 1.076 660.00 710.16
of materials and fitting all complete unskilled m.d. 5.380 440.00 2367.20
barb.wire Rm 110.00 13.57 1492.70
nails-L/S Kg. 2.00 120.00 240.00
Item No. per Sub-Total 4810.06
9.1 100 m Contract Rate(1.15) 5531.57
Norms-24(6) page 240 Contract U.Rate Rm 55.32
Barbed wire 12# fencing per Rm 55.32
Iron Rolling Shutter(18 Gauge) Rolling Sh. Sq.M. 10.00 4215.00 42150.00
Arround 30 Kg./Sq.m. Fitting charge Sq.M. 10.00 0.00 0.00
Primer L/s 0.00
Item No. per Sub-Total 42150.00
9.11 10 sq.m. Contract Rate(1.15) 48472.50
Norms-24-2 Contract U.Rate sq.m. 4847.25
Iron Rolling Shutter per sq.m. 4847.25
Making of gabin with 100*120 mm size mesh skilled m.d. 0.45 660.00 297.00
with Medium GI wire mesh unskilled m.d. 0.20 440.00 88.00
(2.00*1.00*1.00 m.) GI wire Kg. 34.35 86.00 2954.10
Item No. per Sub-Total 3339.10
9.14 10 Sqm. Contract Rate(1.15) 3839.97
Norms-16(4a) page 159 Contract U.Rate Sqm 384.00
Gi Gabin (100*120 mm mesh size) per Sqm 384.00
Making of gabin with 80*100 mm size mesh skilled m.d. 0.50 660.00 330.00
with Mesh wire 10 SWG,Selwage Wire-7 SWG unskilled m.d. 0.20 440.00 88.00
GI wire Kg. 28.40 86.00 2442.40
Box size (2.00*1.00*1.00 m.) Selwage wire Kg. 3.15 86.00 270.90
Item No. per Sub-Total 3131.30
9.15 10 Sqm. Contract Rate(1.15) 3601.00
Norms-16(2a) page 156 Contract U.Rate Sqm 360.10
Gi Gabin (80*100 mm mesh size) per Sqm 360.10
Water proof cement paint (Snowcem) skilled m.d. 5.00 660.00 3300.00
application unskilled m.d. 5.00 440.00 2200.00
a) in 2 coats Snowcem kg 48.50 100.00 4850.00
Item No. per Sub-Total 10350.00
10.2 100 sq.m. Contract Rate(1.15) 11902.50
Norms-13(4b) page 116 Contract U.Rate sq.m. 119.03
2 coats Snowcem painting per sq.m. 119.03
Two or more coats of distemper paint skilled m.d. 5.80 660.00 3828.00
application unkilled m.d. 5.80 440.00 2552.00
Primer Lit. 8.00 330.00 2640.00
a) in 2 coats Distemper kg 11.50 450.00 5175.00
Item No. per Sub-Total 14195.00
10.7 100 sq.m. Contract Rate(1.15) 16324.25
Norms-13(3a,b & c) page 115 Contract U.Rate sq.m. 163.24
2 coats distemper painting per sq.m. 163.24
One Coats of Plastic Emulsion Paint skilled m.d. 8.00 660.00 5280.00
Two or more coats of Plastic Emulsion paint skilled m.d. 12.00 660.00 7920.00
application unkilled m.d. 8.00 440.00 3520.00
Primer Lit. 8.10 330.00 2673.00
a) in 2 coats Emulsion Lit. 16.00 750.00 12000.00
Item No. per Sub-Total 26113.00
10.9 100 sq.m. Contract Rate(1.15) 30029.95
Norms-13(5 a,b & c) page 117 Contract U.Rate sq.m. 300.30
2 coats Plastic Emulsion painting per sq.m. 300.30
Two or more coats of Apex paint skilled m.d. 12.00 660.00 7920.00
application unkilled m.d. 8.00 440.00 3520.00
Primer Lit. 8.10 330.00 2673.00
a) in 2 coats Apex Lit. 16.00 750.00 12000.00
Item No. per Sub-Total 26113.00
10.11 100 sq.m. Contract Rate(1.15) 30029.95
Norms-13(5 a,b & c) page 117 Contract U.Rate sq.m. 300.30
2 coats Apex painting with Primer per sq.m. 300.30
Site clearence work Cutting of Top soil, Unskilled m.d. 0.06 440.00 26.40
levelling,and Leading of disposal.
19mm plywood form work including supply skilled m.d. 2.67 660.00 1762.20
of materials fixing, nailing according to drawing unkilled m.d. 4.00 440.00 1760.00
and dismantling of formworks. plywood sq.m 1.65 1100.00 1815.00
(Use of plywood six times) Local-wood cu.m 0.039 22979.03 896.18
Steel Prop No 0.400 665.00 266.00
nails kgs 2.50 120.00 300.00
Item No. per Sub-Total 6799.38
13.3 10 sq.m. Contract Rate(1.15) 7819.29
Norms - 51(a) -KTM Contract U.Rate sq.m. 781.93
19 mm plywood Form work. per sq.m. 781.93
laying of 6 meter long 110mm dia, PVC Plumber m.d. 1.00 520.00 520.00
Duct pipe in proper level and jiont Unskilled m.d. 8.00 350.00 2800.00
Item No. per Sub-Total 3320.00
13.4 1000 Rft Contract Rate(1.15) 3818.00
Norms as available from Network PID. Contract U.Rate R.ft. 3.82
laying of 110 mm PVC duct pipe. per Rmt. 12.53
Filling with ordinary soil in 15 cm thick layer Unskilled m.d. 0.25 440.00 110.00
with hand compaction (haulage distance 10M)
Disposal of excess earth work from site Disposal cu.m. 1.00 291.97 291.97
at least 2.00KM far from site.
Norms of Item No.13.3 and 13.4 are available from NTC, PID Kupandol
NEPAL TELECOM
NEPAL DOORSANCHAR COMPANY LIMITED
CENTRAL OFFICE
(CIVIL DEPARTMENT)
BHADRAKALI PLAZA
DISTRICT:- BANKE SITE:- NEPALGANJ
RATES for 2068/69
Items Description Unit Quantity U.Rate Amount
Making of hecxagonal box of 100mm*120mm mesh, 10 SWG skilled m.d. 0.45 660.00 297.00
mesh wire and 7 SWG salwage wire boxes size: 2*1*1m unskilled m.d. 1.100 440.00 484.00
GI wire Kg. 24.15 80.00 1932.00
Salvedge wire Kg. 3.15 80.00 252.00
Binding wire (11SWG) Kg. 1.15 75.00 86.25
Stone Cum 2.20 564.96 1242.91
Item No. per Sub-Total 4294.16
1.1 1 box Contract Rate(1.15) 4938.28
Norms - similar to 16(5)Ka, 16(6) ka, 16(11) Contract U.Rate Box 4938.28
Gabion box , size 2*1*1m per Box 4938.28
Making of rectangular box of 100mm*100mm mesh, 10 SWG skilled m.d. 0.70 660.00 462.00
mesh wire and 7 SWG salwage wire boxes size: 3*1.5*0.75m unskilled m.d. 1.54 440.00 677.60
GI wire Kg. 33.30 80.00 2664.00
binding wire (11SWG) Kg. 1.60 75.00 120.00
Stone Cum 3.71 564.96 2096.00
Item No. per Sub-Total 6019.60
1.2 1 Box Contract Rate(1.15) 6922.54
Norms - similar to 16(9)Ka, 16(6) Kha, 16(11) Contract U.Rate Box 6922.54
Gabion box , size 3*1.5*0.75m per Box 6922.54
ANALYSIS OF RATES
FOR
DESCRIPTION OF WORKS : WOODEN FORM WORK FOR R.C.C. COMPONENETS INCLUDING
REMOVING OF FORM WORK ALL COMPLETE.
ITEM NO.
54, 8-2KA UNIT : 10 Sqm
S.NO. ITEMS QUANTITY RATE AMOUNT REMARKS
A MATERIALS
a LOCAL WOOD 0.07 m3 33,000.00 2,310.00
b NAILS 2.50 Kg 120.00 300.00
Making and fixing sal wood panelled skilled m.d. 10.00 660.00 6,600.00
shutters using 38 mm sal wood frame unskilled m.d. 1.00 440.00 440.00
wood cu.m 0.084
Shutter size: hinges nos. 6.00 50.00 300.00
1.07m * 1.982 m=2.114 sq.m. bolt_1 nos. 1.00 75.00 75.00
Hinges (Kabja) - 100 mm bolt_2 nos. 1.00 85.00 85.00
bolt _1(Chheskini) - 150 mm lock nos. 1.00 985.00 985.00
bolt _2(Chheskini) - 300 mm handle nos. 2.00 150.00 300.00
lock - Mortise lock 250 mm nails-L/S Kg. 1.00 120.00 120.00
Item No. per Sub-Total 8,905.00
5.3 2.114 sq.m. Contract Rate(1.15) 10,240.75
Norms - 10(2) page 76 Contract U.Rate sq.m. 4,844.25
Salwood frame panelled shutters (38mm thick) per sq.m. 4,844.25
Notes:
2. The table is based on assumption that the voids in sand and crushed stone are 40 and 45 percent respectively.
4. For gravel aggregates decrease cement by 5 percent, increase sand by 2 percent and coarse aggregate in proportion to fine aggregate in mix
4. No allowance has been made in the table for bulking of sand and wastage./>
0.3
3.333333