No Work Item
Issued
1 29/04/17
ESP Trafo #1 can not reach the working voltage which is 72kV
1#2 Boiler
2 29/04/17 #1 Coal Bunker #2 the coal level indication not accurate
1#
3 29/04/17 The indication Boiler #1 temperature of
desuperheater is not displayed
1#
4 29/04/17 The indication of Boiler #1 temperature of ignition burner left
hand side is not displayed
1# Flow
5 29/04/17 transmitter of fuel return are not displayed
PUNC
Date
No Work Item
Issued
1# Flow
6 29/04/17 transmitter of fuel incoming are not displayed
7 29/04/17 The indication of IDF #1 & #2 Of Boiler #1 front bearing
vibration is not displyed
8 29/04/17 The indication of IDF #1 & #2 Of Boiler #1 rear bearing vibration
is not displyed
9 29/04/17 The indication of PAF #1 & #2 Of Boiler #1 front & rear bearing
vibration is not displyed
10 29/04/17 The indication of SAF #1 & #2 Of Boiler #1 front & rear bearing
vibration is not displyed
B
11 29/04/17
Small compressor #B trip because of overheating
PUNC
Date
No Work Item
Issued
B
12 29/04/17
Big compressor #B can not be started
13 29/04/17 Boiler #1 refractory of cyclone leg is not casted
14 29/04/17
Safety valve is not installed in the slag cooler
15 29/04/17
The sensor of fire in the ignition burner is broken
16 29/04/17
Refractory of air plenum Boiler #1 is fall out & damage
17 29/04/17 The igniter burner panel device (spark transformer & capacitor)
is damaged
PUNC
Date
No Work Item
Issued
18 29/04/17
Dust collector solenoid valve is broken
19 29/04/17
There is no output value for the belt conveyor #2
Coal Feeder #1 & #2 Boiler #1
20 29/04/17
Coal Feeder #1 & #2 Boiler #2
have not been calibrated.
Protection
21 29/04/17
fuse for big compressor #B not available
The
22 29/04/17 displayer device of IDF A&B Boiler #1 & IDF A&B Boiler #2
speed indicator (local panel) are not working correctly.
PUNC
Date
No Work Item
Issued
Radar Level
23 29/04/17 Meter Transmitter of coal bunker #B Boiler #1 is not working
correctly.
Level
24 29/04/17
transmitter of fuel tank are broken.
Travel switch
25 29/04/17
of PAF A&B Boiler #1 & Boiler #2 are not working correctly.
Module of
26 29/04/17
water transmitter steam drum Boiler #2 are broken.
Secondary air
27 29/04/17
outlet actuator motor water ground
PUNC
Date
No Work Item
Issued
URGENT
Error in displayer
SQSC-485A
PUNCH LIST ALL AREA BOILER
Picture Analysis / Effects
S7-200 CN CPU226 CN
REGULAR
PUNCH LIST ALL AREA BOILER
Picture Analysis / Effects
Proposed Improvement Status PIC
2 29/04/17 Interlock test for Boiler Feed Water Pump
#1, #2 & #3 have not been done
3 29/04/17 Interlock Test for HP Heater #1 & #2 have
not been done
4 29/04/17 Flushing pipe
line HP Heater to Deaerator not yet done.
5 29/04/17 Extraction steam check valve 1#, #2,
#3, #4 & #5 needs to be commissioning
P
Date
Work Item Picture
Issued
No
6 29/04/17 Thermal
overload for close cooling is too small which
is 120A. It should be 140A
Open
Date
No Work Item
Issued
The indication of
3 29/04/17 Winding Temperature Main Transformer #1 not accurate as displayed in the
generator protection panel (DCS)
The standby
5 29/04/17
auxiliary transformer has an abnormal noise
13 29/04/17 Cabel tray in the water pump room has not been covered, falling objects
easily damage the cable.
Need to be removed
Do the testing
Do the testing
Re-setting
XSM/C-H1GT1A1B2V1
Re-setting
PUNCH LIST ELECTRIC
Picture Analysis / Effects
Connect
Do the testing
need to be paint
need to be paint
need to be paint
need to be paint