Sunteți pe pagina 1din 20

OWNER INSPECTION REPORT

CLIENT PT. TACHI-S INDONESIA OWNER Mr. Ari

PROJECT TACHI-S INDONESIA NEW FACTORY & OFFICE MAEDA MAEDA


ATTENDANTS
PUNCH ITEMS on 27th APRIL 2017 Tomita Ikuta

NO LOCATION D

7
External Wall
1 Repaint above canop
(North)

External Wall
2 Repair hair cracks ab
(North)

5
External Wall
3 Repaint between wall
4 (North)

3
External Wall
4 Repaint around colum
(North)

external 1 Page 1 / 20
External Wall
OWNER INSPECTION REPORT 4
(North)
Repaint around colum

External Wall
5 Repaint around colum
(North)
2

External Wall
6 Repaint around colum
(North)
1

External Wall
7 Repaint above hood
(West)

external 1 Page 2 / 20
OWNER INSPECTION REPORT
Mr. Ari DATE

MAEDA NRC NRC TSRT TSRT


2017.04.27
Ikuta Said

PHOTO
DESCRIPTION Contractor Situation
BEFORE AFTER

Finish before
paint above canopy NRC 06th May
2017

Finish before
pair hair cracks above window between GL15-16 NRC 06th May
2017

Finish before
paint between wall and column at GL13 NRC 06th May
2017

Finish before
paint around column at GL9 NRC 06th May
2017

external 1 Page 3 / 20
Finish before
OWNER INSPECTION REPORT
paint around column at GL9 NRC 06th May
2017

Finish before
paint around column at GL8 NRC
06th May 2017

Finish before
paint around column at GL3 NRC
06th May 2017

Finish before
paint above hood NRC 06th May
2017

external 1 Page 4 / 20
OWNER INSPECTION REPORT
CLIENT PT. TPR INDONESIA OWNER

PROJECT TPR INDONESIA PHASE 2 TPR TPR


ATTENDANTS
CHECK LIST on 05th May 2017

NO LOCATION D

1 External Area Repair Ground Tank R

External Wall
2 Repair Hair Crack
(Depan)

3 Indoor Area Repair Pintu Besi

External Wall
4 Sealant Jendela
(Belakang)

external 1.1 1/3


External Wall
OWNER INSPECTION REPORT 4
(Belakang)
Sealant Jendela

5 External Wall (depan) Repair Crack

External Wall
6 Repair Crack
(Faade depan)

external 1.1 1/3


OWNER INSPECTION REPORT
DATE

TPR NRC NRC TSRT TSRT


5.May.2017

PHOTO
DESCRIPTION Contractor Situation
BEFORE AFTER

pair Ground Tank Rembesan NRC

pair Hair Crack NRC

pair Pintu Besi NRC

alant Jendela NRC

external 1.1 1/3


alant JendelaOWNER INSPECTION REPORT NRC

pair Crack NRC

pair Crack ` NRC

NRC

external 1.1 1/3


OWNER INSPECTION REPORT
CLIENT PT. TPR INDONESIA OWNER

PROJECT TPR INDONESIA PHASE 2 TPR TPR


ATTENDANTS
CHECK LIST on 05th May 2017

NO LOCATION D

External Wall
8 Repair Crack
(Depan)

External Wall
9 Repaint between GL
(West)

External Wall
10 Repair hole of canopy
(West)

External Wall Repair hole at corner


11
(South) GL6

external 2 Page 9 / 20
External Wall Repair hole at corner
OWNER INSPECTION REPORT 11
(South) GL6

External Wall
12 Cleaning frame of win
(South)

external 2 Page 10 / 20
OWNER INSPECTION REPORT
DATE

TPR NRC NRC TSRT TSRT


5.May.2017

PHOTO
DESCRIPTION Contractor Situation
BEFORE AFTER

pair Crack NRC

paint between GL F and GL G NRC

pair hole of canopy NRC

SEALANT

pair hole at corner of window between GL5 and


NRC
6

external 2 Page 11 / 20
OWNER INSPECTION REPORT NRC

aning frame of window between GL 8 and GL 9 NRC

NRC

NRC

external 2 Page 12 / 20
OWNER INSPECTION REPORT
CLIENT PT. TPR INDONESIA OWNER

PROJECT TPR INDONESIA PHASE 2 TPR TPR


ATTENDANTS
CHECK LIST on 05th May 2017

NO LOCATION D

External Wall
15 Repaint Motif Biru
(Depan)

External Wall
16 Repaint Motif Biru
(Depan)

17 Interior Wall Repair Rembesan

17

16 Interior Wall Repair Crack

external 3 3/3
OWNER INSPECTION REPORT 16 Interior Wall Repair Crack

18 Exterior faade Repaint

13 14 15

16

external 3 3/3
OWNER INSPECTION REPORT
DATE

TPR NRC NRC TSRT TSRT


5.May.2017

PHOTO
DESCRIPTION Contractor Situation
BEFORE AFTER

paint Motif Biru NRC

paint Motif Biru NRC

pair Rembesan NRC

pair Crack NRC

external 3 3/3
pair Crack OWNER INSPECTION REPORT NRC

paint NRC

external 3 3/3
OWNER INSPECTION REPORT
CLIENT PT. TACHI-S INDONESIA OWNER Mr. Ari

PROJECT TACHI-S INDONESIA NEW FACTORY & OFFICE MAEDA MAEDA


ATTENDANTS
PUNCH ITEMS on 27th APRIL 2017 Tomita Ikuta

NO LOCATION

18 Entrance Hall Repaint around groo


Wednesday

Window is not close


19 Director Room
modify rubber or cre

19

18

Office Page 17 / 20
OWNER INSPECTION REPORT

Office Page 18 / 20
OWNER INSPECTION REPORT
Mr. Ari DATE

MAEDA NRC NRC TSRT TSRT


2017.04.27
Ikuta Said

PHOTO
DESCRIPTION Contractor Situation
BEFORE AFTER

Finish before
paint around groove NRC 06th May
2017

ndow is not close properly, need to adjustment or Still Modif, Wednesday Finish before
NRC 06th May
dify rubber or crescent Install 2017

Office Page 19 / 20
OWNER INSPECTION REPORT

Office Page 20 / 20

S-ar putea să vă placă și