Village in Sitamarhi District under INDO-NEPAL Border Road Project for the Year 2
13 Piles of Abutment 'A1' (Bhangaha Side) - Rig No.1 nos 12 36 01.10.13 to 05.11.13
14 Pile of Pier P1 - Rig No.1 nos 16 36 06.11.13 to 11.12.13
15 Pile of Pier P2 - Rig No.1 nos 16 36 12.12.13 to 16.01.14
16 Pile of Abutment 'A2' - Rig No.2 nos 12 36 1.10.13 to 05.11.13
17 Pile of Pier P3 - Rig No.2 nos 16 36 06.11.13 to 11.12.13
18 Pile of Pier P4 - Rig No.2 nos 16 36 12.12.13 to 16.01.14
19 Pile Cap for Abutment A1 including from next day of
completion of Piling work i.e. S.No.5 no. 1 21 06.11.13 to 26.11.13
20 Breacking Pile head, Excavation upto founding level & P/L
PCC, levelling bed etc. complete.
21 Reinforcement i/c Cutting, binding& bending etc.
22 Shuttering i/c shuttering & proping etc.
23 Concreting i/c compaction, curing etc.
24 Deshuttering i/c shifting of material to the other location
25 Pile Cap for
Breacking Pier
Pile P1 Excavation upto founding level & P/L
head, no. 1 21 12.12.13 to 01.01.14
26 PCC, levelling bed etc. complete.
27 Reinforcement i/c Cutting, binding& bending etc.
28 Shuttering i/c shuttering & proping etc.
29 Concreting i/c compaction, curing etc.
30 Deshuttering i/c shifting of material to the other location
31 Pile Cap for Pier P2 21 17.01.14 to 06.02.14
Breacking Pile head, Excavation upto founding level & P/L
32 PCC, levelling bed etc. complete.
33 Reinforcement i/c Cutting, binding& bending etc. nos
34 Shuttering i/c shuttering & proping etc.
35 Concreting i/c compaction, curing etc. nos 1
36 Deshuttering i/c shifting of material to the other location nos 1
37 Pile Cap for
Breacking Abutment
Pile A2
head, Excavation upto founding level & P/L nos 1 21 06.11.13 to 26.11.13
38 PCC, levelling bed etc. complete. nos 1
39 Reinforcement i/c Cutting, binding& bending etc.
40 Shuttering i/c shuttering & proping etc.
41 Concreting i/c compaction, curing etc.
42 Deshuttering i/c shifting of material to the other location
43 Pile Cap for Pier P4 21 12.12.13 to 01.01.14
44 Breacking Pile head, Excavation upto founding level & P/L
PCC, levelling bed etc. complete.
45 Reinforcement i/c Cutting, binding& bending etc.
46 Shuttering i/c shuttering & proping etc.
47 Concreting i/c compaction, curing etc.
48 Deshuttering i/c shifting of material to the other location
49 Pile Cap for Pier P3 21 17.01.14 to 06.02.14
50 Breacking Pile head, Excavation upto founding level & P/L
PCC, levelling bed etc. complete.
51 Reinforcement i/c Cutting, binding& bending etc.
52 Shuttering i/c shuttering & proping etc.
53 Concreting i/c compaction, curing etc.
54 Deshuttering i/c shifting of material to the other location
EXECUTION TIME
May-2014 June-2014 July-2014 July-2014 August-2014 September-2014 October-2014 November-2014 December-2014
Work: Construciton and Upgradation of Road and other structures from Phulwaria ghat at Lalbakiya River to Bahar (Bahera) Village in Sitamarhi District under INDO-NEPAL
nos 88
13 Abutment 'A1' (Bhangaha Side) nos 12
14 Pile Cap Group Pier P1 nos 16
15 Pile Cap Group Pier P2 nos 16
16 Abutment 'A2' nos 12
17 Pile Cap Group Pier P3 nos 16
18 Pile Cap Group Pier P4 nos 16
19 Pile Cap for Abutment A1 no. 1
Excavation upto founding level & P/L PCC, levelling bed
etc. complete.
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
7 Pile Cap forupto
Excavation Abutment
founding A2level & P/L PCC, levelling bed nos 1
etc. complete. nos 1
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
8 Concreting of Abutment A1
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
9 Concreting of Abutment A2
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
Concreting of Bearing Pedastal i/c Centring, Shuttering
10 & Proping etc. nos. 6
Abutment A1 no. 1
Abutment A2 no. 1
11 Pre-casting of I-Beam on Casting Bed i/c Prestressing,
Shifting to the stacking bed & erction thereof in the
Span 'A1-A2' nos 4
Concreting i/c Shuttering, proping & reinforcement i/c
cutting, bending, binding etc.
Shifting of I-Beam from Casting Bed to Stacking Bed
Prestressing of I-Beam
Erection of prestressed I-Beam in the respective Span
12 Concreting of Intermediate Cross Girders of Span A1-
A2 nos 15
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
13 Deck Slab Concreting of Span A1-A2 cum
Reinforcement i/c Cutting, bending & binding etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
14 Concreting of Crash Barrier & Footpath
Unstream side Mtr. 180
Downstream side Mtr. 180
15 Bituminous work on Deck slab
DBC
Mastic
Fancing GI Pipe Railing
Painting & Road Marking
der INDO-NEPAL Border Road Project for the Year 2012-13.
EXECUTION TIME
May-2014 June-2014 July-2014 July-2014 August-2014 September-2014 October-2014 November-2014 December-2014
Work: Construciton and Upgradation of Road and other structures from Phulwaria ghat at Lalbakiya River to Bahar (Bahera) Village in Sitamarhi District under INDO-NEPAL
Agreement No. 27/SBD/2012-13
Ageny: M/s Aarpee Infraprojects Pvt. Ltd. (M/s Rajesh Kumar Garg)
Programme of Work
Sl. EXECUTION
ACTIVITY UNIT QNTY
No. October-2013 November-2013 December-2013 January-2014 February-2014 March-2014 April-2014
1 Selection of Site for Casting Yard
Setting up Casting Yard i.e. Cement Godown, Site
2 office, Site Lab i/c Fencing etc.
Job 1
3 Procurement of Shuttering material like MS Sheet,
Angle Iron, I Section, etc. Job 1
4 Fabrication of Shuttering
Pile Liner nos 4
Pile Cap (Size 900x1200, 600x900, 300x1200 &
300x900mm ) nos
Pier i/c Pier Cap set 1
Abutment i/c Cap set 1
I-Beams i/c intermediate cross Girders etc. set 3
Wing Wall, Retain Wall, Deck Slab, etc. (Size 900x1200,
600x900, 300x1200 & 300x900mm ) sqm 400.00
5 Piling i/c boring, using Bentonite Slurry, Temporary
liner, preparing Reinforcement Cage i/c Cutting,
Bending, Binding, Lowering the Case in the Bore hole,
concreting & Removal of Temp. Liner.
nos 88
Abutment 'A1' (Bhangaha Side) nos 12
Pile Cap Group Pier P1 nos 16
Pile Cap Group Pier P2 nos 16
Abutment 'A2' nos 12
Pile Cap Group Pier P3 nos 16
Pile Cap Group Pier P4 nos 16
6 Pile Cap for Abutment A1 no. 1
Excavation upto founding level & P/L PCC, levelling bed
etc. complete.
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
7 Pile Cap forupto
Excavation Abutment
founding A2level & P/L PCC, levelling bed nos 1
etc. complete. nos 1
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
8 Concreting of Abutment A1
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
9 Concreting of Abutment A2
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
Concreting of Bearing Pedastal i/c Centring, Shuttering
10 & Proping etc. nos. 6
Abutment A1 no. 1
Abutment A2 no. 1
11 Pre-casting of I-Beam on Casting Bed i/c Prestressing,
Shifting to the stacking bed & erction thereof in the
Span 'A1-A2' nos 4
Concreting i/c Shuttering, proping & reinforcement i/c
cutting, bending, binding etc.
Shifting of I-Beam from Casting Bed to Stacking Bed
Prestressing of I-Beam
Erection of prestressed I-Beam in the respective Span
12 Concreting of Intermediate Cross Girders of Span A1-
A2 nos 15
Reinforcement i/c Cutting, binding& bending etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
13 Deck Slab Concreting of Span A1-A2 cum
Reinforcement i/c Cutting, bending & binding etc.
Shuttering i/c shuttering & proping etc.
Concreting i/c compaction, curing etc.
Deshuttering i/c shifting of material to the other location
14 Concreting of Crash Barrier & Footpath
Unstream side Mtr. 180
Downstream side Mtr. 180
15 Bituminous work on Deck slab
DBC
Mastic
Fancing GI Pipe Railing
Painting & Road Marking
der INDO-NEPAL Border Road Project for the Year 2012-13.
EXECUTION TIME
May-2014 June-2014 July-2014 July-2014 August-2014 September-2014 October-2014 November-2014 December-2014