Sunteți pe pagina 1din 2

DevelopmentProject(EstimatedTimesheet)

# Tasks Time Assignments Notes


1 Conceptualization 12week
Brainstorming Working&functionalityof
Engineer,Borrower,Auditor,
AdministrativeAgent,Lender
Concepts
2 DevelopmentPhase
Designing 2Months
Beckend Chaincode Chaincodeforrespectiveall PBFT
implementation roles,functionality. workout,Noo
of(borrrower, Structureworkout. ps,Trigger
engineer, DigitalSignature Event
auditor,admin Handling.
agent&lender)
TestPrototype SubModulesIntegration PDFuploads
functionality,
Sureity
consensus.

3 Frontend 2Months
Simultaneously Node.jsframeworkstructure Rolesand
workingon tobedesignedand permissions
integrationwith integrationwithdashboard. tobe
allprovided DesignofDashboard. designedfor
Rolesand each
functions. individual
Roles.
Testing Tochecktheconnectivity Notifications.
withnodejsw.r.tchaincode

4. MiddlewareAPIs 1Month IntegrationofAPIs.

TotalEstimation:5months

S-ar putea să vă placă și