HAZARDS
* See the Risk Assessment Matrix Chart - L- Likelihood, S- Severity, R- Risk Rating
ACTIVITY HAZARD RISK Initial Existing Controls ADDITIONAL Resid Action
Risk CONTROL ual By
Rating* MEASURES Risk
Ratin
g*
L S (R L S (
) R
)
L S (R L S (
) R
)
should be support
properly
L S (R L S (
) R
)
L S (R L S (
) R
)
L S (R L S (
) R
)
L S (R L S (
) R
)
Improper Rigging Person damage/ 3 4 1 and Banks Men will flag man 1 2 4
operations/ Property damage 6 control the Signal
heavy loads to the operator. All the lifting
operation will be
STOPPED when
wind speed
exceed 40
kph/17 knots
*See the Risk Assessment Matrix Chart - L- Likelihood, S- Severity, R- Risk Rating
Continued? YES / NO
Control measures are required to ensure that the residual risk rating is at a minimum level so the activity can commence safely. If the
activity still has a high residual risk rating then it is necessary to find another method of carrying out the task.
(1) Rare -
Never 1 2 3 4 5
occurred
(2) Possible
2 4 6 8 10
Has occurred
(3) Likely
Occurred
3 6 9 12 15
more than
once
(4) Often
Occurs
4 8 12 16 20
several
times / year
(5) Frequent
Occurs 5 12 15 20 25
frequently
Risk Legend
1-3 Low No action required, unless escalation of risk is possible.
4-6 Moderate Activity or industry can operate subject to management and /or modification
Activity or industry should be modified to include remedial planning and action and be
8-12 High
subject to detailed EHS assessment.
15-25 Extreme Activity or industry should not proceed in current form.