Sunteți pe pagina 1din 13

Gigawatt

Ingenieros

"AMPLIACIN DE CAPACIDAD DE LA S.E. BOLIVAR EN 5.0/3.5/3


MVA, 33/4.16/0.48 KV - COMPAA MINERA CATALINA HUANCA"

PRESUPUESTO OBRAS - RESUMEN

LUGAR: CANARIAS - VICTOR FAJARDO- AYACUCHO

TEM DESCRIPCIN UND COSTO (US$)

1.0 SUBESTACIN DE POTENCIA


1.01 EQUIPOS ELECTROMECANICOS Glb 603,080.99
1.02 MONTAJE ELECTROMECNICO Glb 64,866.10
1.03 OBRAS CIVILES Glb 50,464.60
1.04 MALLA DE TIERRA Glb 2,968.00
1.05 TRANSPORTE (13%Suministro) 13% 78,786.37

SUB TOTAL 800,166.06


2.0 GASTOS GENERALES 12% 96,019.93
3.0 UTILIDADES 10% 80,016.61

COSTO TOTAL (NO INCLUYE IGV) 976,202.59


Gigawatt
Ingenieros
Distrito : Canarias

TEM DESCRIPCIN UND METRADO


01 TRANSFORMADOR DE POTENCIA
01.01 Transformador de potencia 5.0/5.0/2.5 MVA, 33/4.16/0.44 kV, Dyn5y
Und. 1.00
01.02 Resistencia de aterramiento 400 A, para 4.16 kV Und. 1.00
01.03 Pararrayos para 33 KV Und. 3.00
01.04 Pararrayos para 4.16 KV Und. 3.00

2 CELDAS MT ORMAZABAL 36 y 24 kV
SUMINISTRO CELDA DE 33 kV

Celdas modulares con aislamiento integral en SF6, marca


Ormazbal (Espaa), 36 kV, 630 A, 20 kA, compuesto por:
1- Celda de remonte de cables, modelo CGM.3-RC.
Incluye 1 Kit de 3 conectores tipo T, modelo M400TB, 36 kV,
630 A.
1- Set de Cables de interconexin para Celda modular, tipo
02.01 CGM.3-M. Celda 0.00
3- Celda de proteccin con interruptor automtico de corte en
vaco, modelo CGMCOSMOS-V, 24 kV, 630 A, 20 kA de poder
de corte en cortocircuito. Incluye medidor ION 7400 y rels
de proteccin SEL-751 y SEL-387.
Incluye 1 Kit de 3 conectores tipo T, modelo M400TB, 36 kV,
630 A.

SUMINISTRO CELDA DE 4.16 kV


Celda modular con aislamiento integral en SF6, marca
Ormazbal (Espaa), 24 kV, 630 A, 20 kA, compuesto por:
1- Celda de proteccin con interruptor automtico de corte en
vaco, modelo CGMCOSMOS-V, 24 kV, 630 A, 20 kA de poder
02.02 Celda 1.00
de corte en cortocircuito. Incluye rel de proteccin SEL 751
y medidor METSEPM5560 (EX PM820).
Incluye 1 Kit de 3 conectores tipo T, modelo K430TB, 24 kV,
630 A.
Conjunto de conectores para celdas modulares exixtentes,
02.03 marca Euromold (Blgica), compuesto por: Celda 0.00
4- Kit de 3 conectores tipo T, modelo K430TB, 24 kV, 630 A.
Conjunto de conectores para celdas modulares exixtentes,
02.04 marca Euromold (Blgica), compuesto por: Celda 0.00
4- Kit de 3 conectores tipo T, modelo M400TB, 36 kV, 630 A.
marca Ormazabal, compuesto por:

1- Celda de Medida CGMCOSMOS-M, 24 kV.

02.05 1- Celda de proteccin con interruptor Celda 0.00


automtico CGMCOSMOS-V, 24 kV, 630 A, 20 kA de poder de
corte en cortocircuito. Incluye medidor ION 7400 y rel SEL 751.
1- Celda de remonte
de cables CGMCOSMOS-RC, 24 kV, 630 A.
Incluye 1 Kit de 3 conectores tipo T, modelo
Conjunto de celdas compactas con aislamiento integral en gas
marca Ormazabal, compuesto por:
1- Celda de proteccin con
interruptor automtico CGMCOSMOS-V, 24 kV, 630 A, 20 kA de
02.06 poder de corte en cortocircuito. Celda 0.00
Incluye rel de proteccin SEL 751 y medidor
METSEPM5560 (EX PM820).
Incluye 1 Kit de
3 conectores tipo T, modelo K430TB, 24 kV, 630 A.

Pgina 3
Distrito : Canarias

TEM DESCRIPCIN UND METRADO


Conjunto de celdas compactas con aislamiento integral en gas
marca Ormazabal, compuesto por:
1- Celda de proteccin con
interruptor automtico CGMCOSMOS-S, 24 kV, 630 A, 20 kA de
02.07 Celda 0.00
poder de corte en cortocircuito.
Rele de sincronizacin manual.
Incluye
1 Kit de 3 conectores tipo T, modelo K430TB, 24 kV, 630 A.

3 SWITCHGEAR BT
Tablero de distribucin de baja tensin, 600 VAC, 5000 A, 65 kA,
03.01 con puertas frontal y de acceso posterior, diseo para arcos Tablero 1.00
elctricos.
Comprende c/celda:
(02) Interruptor BT automtico, 5000 A, 600 VAC, 65 kA, diseo
03.01.01
extraible
Bobina de dispato (Shunt trip) en 125 VDC.
Motor de recarga 125 VDC.
Bobina de mnima tensin 125 VDC.
Botones de apertura y cierre de interruptor
Palanca de recarga manual
Microrel de proteccin LSIG
Indicador de posicin y resorte de interruptor.
Interbloqueo con candado
Contador de operaciones
(03) Interruptor BT automtico, 1600 A, 600 VAC, 65 kA, diseo
03.01.02
extraible
Bobina de dispato (Shunt trip) en 125 VDC.
Motor de recarga 125 VDC.
Bobina de mnima tensin 125 VDC.
Botones de apertura y cierre de interruptor
Palanca de recarga manual
Microrel de proteccin LSIG
Indicador de posicin y resorte de interruptor.
Interbloqueo con candado
Contador de operaciones
03.01.03 (01) Medidor de energa ION 7550
03.01.04 (03) Transformadores de corriente tipo toroidal, 4000:1A, 10VA, Cl 0.5.
03.01.05 (02) Transformadores de tensin 0.46/0.12 kV, 5 VA.
03.01.06 (01) Gra de extraccin de interruptores

4 CABLES DE ENERGIA y CONTROL, TERMINALES


04.01 Cable de Energia N2XSY 35 KV, 1X95MM m 60.00
04.02 Cable de Energia N2XSY 35 KV, 1X50MM m 90.00
04.03 Cable de Energia N2XSY 6/10 KV, 1X95MM m 90.00
04.04 Cable de Energia N2XSY 6/10 KV, 1X120MM m 0.00
04.05 Cable de Control N2XSY, 1 KV, 7X1.5MM m 110.00
04.06 Cable de Control N2XSY, 1 KV, 4X4MM m 175.00
04.07 Cable de Energia NYY 1 KV, 1X400MM m 250.00
04.08 Conductor cobre desnudo, temple suave, 95 MM, 19 hilos m 100.00
Terminacin Kit para Cable, Exterior 36KV, 35 - 95 MM, Incluye
04.09 KIT 2.00
termina comp. 95 MM
Terminacin Kit para Cable, Exterior 36KV, 35 - 95 MM, Incluye
04.10 KIT 1.00
termina comp. 50 MM

Pgina 4
Distrito : Canarias

TEM DESCRIPCIN UND METRADO


Terminacin Kit para Cable, Exterior 12KV, 16 - 120 MM, Incluye
04.11 KIT 2.00
termina comp. 95 MM
Terminacin Kit para Cable, Exterior 12KV, 16 - 120 MM, Incluye
04.12 KIT 0.00
termina comp. 120 MM
04.13 Terminacin de compresin 400MM UND 36.00
04.14 Cinta Scoth 23 de 3M UND 2.00

05 SS. AA. AC/DC


5.01 Banco de bateras de plomo acido, 125 VDC. Glb 0.00
5.02 Interruptores termomagnticos Und. 0.00
5.03 Conductores, terminales y otros Glb 0.00

6 SUMINISTRO DE MATERIALES MENUDOS


6.01 Suministro de materiales menores diversos Glb 1.00

SUB TOTAL EQUIPOS y MATERIALES ELECTROMECANICOS

06 TRANSPORTE EQUIPOS y MATERIALES Glb 0.00

TOTAL COSTO DIRECTO

Pgina 5
P.U. (US$) PARCIAL (US$)
261,089.39
243,600.00 243,600.00
10,836.59 10,836.59
1,276.80 3,830.40
940.80 2,822.40

40,236.00

229,174.40 0.00

40,236.00 40,236.00

4,188.80 0.00

1,884.96 0.00

91,240.80 0.00

40,236.00 0.00

Pgina 6
P.U. (US$) PARCIAL (US$)

40,236.00 0.00

271,040.00

271,040.00 271,040.0

27,865.60
26.60 1,596.00
14.00 1,260.00
26.60 2,394.00
26.60 0.00
4.20 462.00
7.00 1,225.00
56.00 14,000.00
11.20 1,120.00
954.80 1,909.60

687.40 687.40

Pgina 7
P.U. (US$) PARCIAL (US$)
336.00 672.00

240.00 0.00
70.00 2,520.00
9.80 19.60

0.00
13,521.76 0.00
32.25 0.00
824.40 0.00

2,850.00
2,850.00 2,850.00

603,080.99

603,080.99 0.00

(US$) 603,080.99

Pgina 8
TEM DESCRIPCIN UND METRADO
01 Sistema de Malla Superficial (Ampliacin de Malla y Derivaciones)
1.1 Conductores de Cobre
1.1.1 Conductor de cobre desnudo, temple suave, 95mm, 19 hilos Und 30.00
1.1.2 Conductor de cobre forrado blando de 95 mm2 - 1kV Und 0.00
1.1.3 Terminal a compresin de conductor CU 95mm2 Und 0.00
1.1.4 Conector doble va de bronce para cable 95mm2/35-95mm2 a supericie plan Und 0.00
1.1.5 Grapa de fijacin de conductor de 95mm2 a superficie plana Und 0.00
1.2 Moldes y Soldaduras 0.00
1.2.1 Molde para Soldadura en "T" Und 0.00
1.2.2 Molde para Soldadura en "L" Und 0.00
1.2.3 Molde para Soldadura Varilla a Conductor 95 mm2 Und 2.00
1.2.4 Soldadura exotermica tipo "T" Und 6.00
1.2.5 Soldadura exotermica tipo "L" Und 8.00
1.2.6 Soldadura exotermica Varilla Conductor 95 mm2 Und 2.00
1.3 Varios - Puesta a Tierra
1.3.1 Varilla de cobre de 3/4 " dimetro y 2.4 m. longitud + conector Und 1.00
1.3.2 Tierra de prestamo vegetal m3 1.88
1.3.3 Cemento conductivo de 25kG Und 8.00
1.3.4 Caja de registro cuadrada 0.4x0.4x0.4 m Und 2.00
1.3.5 Accesorios varios (alicate para molde de soldadura, conectores, etc) Glb. 1.00

1.4 Transporte de materiales Glb. 0.00

2 Montaje:
2.1 Excavacin malla (m) m 1.88
2.2 Rellenado tierra cernida m 1.88
2.4 Montaje de tierra superficial Glb 0.30

TOTAL COSTO DIRECTO

Pgina 9
COSTO (US$) COSTO (US$)

13.44 403.20
16.12 0.00
10.28 0.00
9.37 0.00
10.48 0.00

234.93 0.00
234.93 0.00
205.63 411.26
10.88 65.28
10.88 87.04
9.18 18.36

190.04 190.04
73.73 138.98
90.31 722.48
19.60 39.20
250.00 250.00

2,325.84 0.00

170.65 320.82
68.54 129.19
640.50 192.15

Total (US$) 2,968.00

Pgina 10
Costos Referenciales de Obras Civiles

Propietario : Catalina Huanca Sociedad Minera S.A.C.


Departamento : Ayacucho
Provincia : Victor Fajardo
Distrito : Canarias

Costo Parcial
tem Descripcin Unidad Cantidad
(S/.) (S/.)
1 Obras provisionales y trabajos preliminares Glb 0.50 9,850.00 4,925.00

2 Demolicin de cimentacin para banco de condensadores m3 1.68 186.00 312.48

3 Demolicin de cimentacin existente m3 1.02 186.00 189.72


4 Demolicin de canaletas existentes m3 0.78 186.00 145.01
5 Trazo y replanteo de ejes m 2
30.55 18.00 549.90
6 Movilizacin y desmovilizacin de maquinarias Glb 0.50 12,960.00 6,480.00
7 Flete terrestre de materiales Glb 0.50 12,960.00 6,480.00
8 Sealizacin temporal para seguridad Glb 0.50 3,456.00 1,728.00
9 Eliminacin de material excedente m 3
27.60 43.00 1,186.80
10 Ampliacin de sala de control m2 8.75 3,310.00 28,962.50
Reubicacin de cimentacin para banco de
11 m3 3.36 5,285.00 17,757.60
condensadores
Construccin de cimentacin para transformador de
12 Und 1.00 40,109.00 40,109.00
potencia
13 Construccin de canaletas m 17.80 1,109.00 19,740.20
14 Construccin de muro de contencin Und 0.50 31,853.00 15,926.50
15 Construccin de muros cortafuego Und 1.00 16,994.00 16,994.00

Total (S/.) 161,486.71


Total (US$) 3.2 50,464.60
ITEM DESCRIPCION UNID CANT P.U. US$ TOTAL US$

1.00 INGENIERIA DE DETALLE Glb 1.00 17,000.00 17,000.00


0
2.00 SALA DE CONTROL -
2.01 Montaje de celdas Ormazabal 36 kV Glb - 7,566.00 -
2.02 Montaje de celdas Ormazabal 24 kV Glb 0.10 12,389.00 1,238.90
2.03 Montaje de switchgear BT Glb 1.00 3,246.00 3,246.00
2.04 Montaje de terminales de celdas Ormazabal Kit 1.00 1,332.00 1,332.00
2.05 Montaje de terminales 33 kV Kit 1.00 1,212.00 1,212.00
2.06 Montaje de terminales 4.16 kV Kit 1.00 936.00 936.00
2.07 Montaje de cables de energa MT y cables de control Glb 0.20 3,528.00 705.60
2.08 Montaje de cables de energa BT Glb 1.00 1,994.00 1,994.00
- -
3.00 PATIO LLAVES - -
3.01 Montaje transformador de potencia Glb 1.00 9,488.00 9,488.00
3.02 Montaje de portacables de transformador + materiales Und 3.00 2,088.00 6,264.00
3.03 Montaje de banco de condensadores Glb 0.50 4,680.00 2,340.00
3.04 Montaje de resistencia de aterramiento MT Und 1.00 540.00 540.00
-
PRUEBAS, PUESTA EN SERVICIO y PLANOS
4.00 - -
CONFORME A OBRA
4.01 Pruebas y ajustes finales Glb 0.20 24,520.00 4,904.00
4.02 Supervisin de montaje Mes 1.00 7,920.00 7,920.00
4.03 Capacitacin Glb 0.50 5,040.00 2,520.00
4.04 Planos conforme a obra Glb 0.40 8,064.00 3,225.60

PRECIO FINAL US$ 64,866.10