CALCULO DE RENDIMIENTOS (1)

TRANSPORTE DE MATERIAL TRANSPORTE DE AGREGADOS TRANSPORTE DE AGREGADOS TRANSPORTE DE MATERIAL TRANSPORTE DE MATERIAL AGUA
BASE DE CALCULO UND. DE FILTRO CONCRETO FC 175 KG/CM2 CONCRETO PARA CUNETAS EXCEDENTE EXCEDENTE RIEGO
D < 1 KM. D > 1 km. CONCRETO

DISTANCIA MEDIA PONDERADA KM 16.89 21.21 19.62 1.00 1.00 14.96


VELOCIDAD CARGADO KM/H 30.00 30.00 30.00 30.00 30.00 30.00
VELOCIDAD DESCARGADO KM/H 40.00 40.00 40.00 40.00 40.00 40.00
TIEMPO DE CARGA Y DESCARGA MIN 7.50 7.50 7.50 7.50 7.50 7.50
TIEMPO RECORRIDO CARGADO FORM. 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d
TIEMPO RECORRIDO DESCARGADO FORM. 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d
TIEMPO RECORRIDO MIN 3.5 d 3.5 d 3.5 d 3.5 d 3.5 d 3.5 d
CICLO FORM. 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d
CICLO MIN 66.62 81.74 76.19 11.00 5.00 59.86
TIEMPO TRABAJADO POR DA MIN 480.00 480.00 480.00 480.00 480.00 480.00
EFICIENCIA % 0.90 0.90 0.90 0.90 0.90 0.90
TIEMPO TIL TRABAJADO MIN 432.00 432.00 432.00 432.00 432.00 432.00
VOLMEN DEL VOLQUETE M3 10.00 10.00 10.00 10.00 10.00 7.57
VOLMEN DE CISTERNA GLN 2,000.00
NMERO DE VIAJES AL DA UND. 6.49 5.29 5.67 39.27 86.40 7.22
NUMERO EXACTO DE VIAJES A REALIZAR UND. 6.00 5.00 6.00 39.00 86.00 7.00
VOLMEN NETO TRANSPORTADO M3 60.00 50.00 60.00 390.00 860.00 52.99
VOLMEN REAL TRANSPORTADO ( * ) M3 46.15 50.00 60.00 312.00 688.00 52.99
RENDIMIENTO M3/DIA 46 50 60 312 688 53

( * ) SE HAN TOMADO EN CUENTA LAS SIGUIENTES CONSIDERACIONES:


UN ESPONJAMIENTO DEL 30% PARA EL CASO DE TRANSPORTE DE MATERIAL DE FILTRO Y SUBDRENES.
El TRANSPORTE DE AGREGADOS PARA EL PAVIMENTO, CONCRETOS TAMPOCO SE VEN AFECTADOS POR FACTOR DE ESPONJAMIENTO POR ESTAR INCLUIDOS EN EL ANALISIS DE COSTO.
UN ESPONJAMIENTO DEL 25 % EN TRANSPORTE DE MATERIAL DE EXCEDENTES DE CORTE .
UN ESPONJAMIENTO DEL 35% PARA EL CASO DE TRANSPORTE DE ROCA.
El TRANSPORTE DE MATERIAL DE DERRUMBES NO SE AFECTA POR ESPONJAMIENTO DEBIDO A QUE SU MEDICION SE REALIZA EN ESTADO SUELTO.
CALCULO DE RENDIMIENTOS (2)
TRANSPORTE DE AGREGADOS TRANSPORTE DE AGREGADOS TRANSPORTE DE AGREGADOS TRANSPORTE DE TRANSPORTE AGREGADO
BASE DE CALCULO UND. CONCRETO FC 210 KG/CM2 CONCRETO FC 280 KG/CM2 PARA SUBDRENES MATERIAL PARA CONCRETO FC 140 KG/CM2
ENROCADO EN SEALIZACION

DISTANCIA MEDIA PONDERADA KM 18.91 15.22 25.46 21.27 14.83


VELOCIDAD CARGADO KM/H 30.00 30.00 30.00 30.00 30.00
VELOCIDAD DESCARGADO KM/H 40.00 40.00 40.00 40.00 40.00
TIEMPO DE CARGA Y DESCARGA MIN 7.50 7.50 7.50 7.50 7.50
TIEMPO RECORRIDO CARGADO FORM. 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d
TIEMPO RECORRIDO DESCARGADO FORM. 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d
TIEMPO RECORRIDO MIN 3.5 d 3.5 d 3.5 d 3.5 d 3.5 d
CICLO FORM. 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d
CICLO MIN 73.69 60.78 96.60 81.93 59.41
TIEMPO TRABAJADO POR DA MIN 480.00 480.00 480.00 480.00 480.00
EFICIENCIA % 0.90 0.90 0.90 0.90 0.90
TIEMPO TIL TRABAJADO MIN 432.00 432.00 432.00 432.00 432.00
VOLMEN DEL VOLQUETE M3 10.00 10.00 10.00 10.00 10.00
VOLMEN DE CISTERNA GLN
NMERO DE VIAJES AL DA UND. 5.86 7.11 4.47 5.27 7.27
NUMERO EXACTO DE VIAJES A REALIZAR UND. 6.00 7.00 4.00 5.00 7.00
VOLMEN NETO TRANSPORTADO M3 60.00 70.00 40.00 50.00 70.00
VOLMEN REAL TRANSPORTADO ( * ) M3 60.00 70.00 30.77 37.04 70.00
RENDIMIENTO M3/DIA 60 70 31 37 70
CALCULO DE RENDIMIENTOS (3)
TRANSPORTE DE MATERIAL TRANSPORTE AGREGADOS TRANSPORTE DE AGREGADOS TRANSPORTES DE TRANSPORTE EXCEDENTE TRANSPORTE EXC.
BASE DE CALCULO UND. PARA CARPETA ASFALTICA PARA GAVIONES PARA CONCRETO FC = AGREGADOS PARA MATERIAL ROCOSO MAT. ROCOSO
BASE Y SUB-BASE 140 KG/CM2 ALIVIADEROS D<1 KM. D>1 KM.

DISTANCIA MEDIA PONDERADA KM 21.17 34.18 17.68 24.94 1.00 1.00


VELOCIDAD CARGADO KM/H 30.00 30.00 30.00 30.00 30.00 30.00
VELOCIDAD DESCARGADO KM/H 40.00 40.00 40.00 40.00 40.00 40.00
TIEMPO DE CARGA Y DESCARGA MIN 7.50 7.50 7.50 7.50 7.50 7.50
TIEMPO RECORRIDO CARGADO FORM. 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d 60xd/30=2.d
TIEMPO RECORRIDO DESCARGADO FORM. 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d 60xd/40=1.5.d
TIEMPO RECORRIDO MIN 3.5 d 3.5 d 3.5 d 3.5 d 3.5 d 3.5 d
CICLO FORM. 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d 7.5+3.5d
CICLO MIN 81.58 127.12 69.38 94.79 11.00 5.00
TIEMPO TRABAJADO POR DA MIN 480.00 480.00 480.00 480.00 480.00 480.00
EFICIENCIA % 0.90 0.90 0.90 0.90 0.90 0.90
TIEMPO TIL TRABAJADO MIN 432.00 432.00 432.00 432.00 432.00 432.00
VOLMEN DEL VOLQUETE M3 10.00 10.00 10.00 10.00 10.00 10.00
VOLMEN DE CISTERNA GLN
NMERO DE VIAJES AL DA UND. 5.30 3.40 6.23 4.56 39.27 86.40
NUMERO EXACTO DE VIAJES A REALIZAR UND. 5.00 3.00 6.00 5.00 39.00 86.00
VOLMEN NETO TRANSPORTADO M3 50.00 30.00 60.00 50.00 390.00 860.00
VOLMEN REAL TRANSPORTADO ( * ) M3 38.46 23.08 60.00 38.46 288.89 637.04
RENDIMIENTO M3/DIA 38 23 60 38 289 637
DISTANCIA MEDIA DEL MATERIAL GRANULAR PARA ESTRUCTURAS (FILTROS)
CANTERA ZONA DE INFLUENCIA DISTANCIA MUROS CANALES (ESCALONES)
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM) (M3) (M3-KM)

14 15 1.00 14.50 4.57 0.00 0.00


15 16 1.00 15.50 3.57 0.00 0.00
16 17 1.00 16.50 4.43 0.00 0.00
17 18 1.00 17.50 5.43 0.00 0.00
18 19 1.00 18.50 6.43 0.00 0.00
19 20 1.00 19.50 7.43 0.00 0.00
20 21 1.00 20.50 8.43 0.00 0.00
21 22 1.00 21.50 9.43 0.00 0.00
22 23 1.00 22.50 10.43 0.00 0.00
23 24 1.00 23.50 11.43 0.00 0.00
24 25 1.00 24.50 12.43 0.00 0.00
25 26 1.00 25.50 13.43 0.00 8.10 108.78
26 27 1.00 26.50 14.43 53.10 766.23 3.77 54.40
RIO AZUL 15.57 3.50 27 28 1.00 27.50 15.43 25.38 391.54 0.00
28 29 1.00 28.50 16.43 27.13 445.66 0.00
29 30 1.00 29.50 17.43 110.68 1929.07 0.00
30 31 1.00 30.50 18.43 57.60 1061.57 0.00
31 32 1.00 31.50 19.43 29.58 1119.17 0.00
32 33 1.00 32.50 20.43 61.75 604.22 0.00
33 34 1.00 33.50 21.43 266.90 1323.30 0.00
34 35 1.00 34.50 22.43 55.15 5986.57 0.00
35 36 1.00 35.50 23.43 0.00 0.00
36 37 1.00 36.50 24.43 161.23 3938.73 0.00
37 38 1.00 37.50 25.43 0.00 0.00
38 39 1.00 38.50 26.43 0.00 0.00
39 40 1.00 39.50 27.43 0.00 0.00
40 41 1.00 40.50 28.43 40.40 1148.57 0.00
41 42 1.00 41.50 29.43 0.00 0.00
42 43 1.00 42.50 30.43 0.00 0.00
43 44 1.00 43.50 31.43 41.20 1294.92 0.00
44 45 1.00 44.50 32.43 40.40 1310.17 0.00
45 46 1.00 45.50 33.43 0.00 0.00
46 47 1.00 46.50 34.43 0.00 0.00
47 48 1.00 47.50 35.43 0.00 0.00
48 49 1.00 48.50 36.43 0.00 0.00
49 50 1.00 49.50 37.43 0.00 0.00
50 51 1.00 50.50 38.43 0.00 14.82 569.53
51 51.55 0.55 51.28 39.21 0.00
TOTALES 970.48 21,319.71 26.69 732.71
DISTANCIA MEDIA GENERAL (KM.) 16.89
DISTANCIA MEDIA PARA CONCRETO f'c = 280 Kg/cm2
CANTERA ZONA DE INFLUENCIA DISTANCIA CUNETAS RECTANG. C/TAPA
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM)

15 16 1.00 15.50 3.57 0.00 0.00


16 17 1.00 16.50 4.43 0.00 0.00
17 18 1.00 17.50 5.43 0.00 0.00
18 19 1.00 18.50 6.43 390.00 2,507.70
19 20 1.00 19.50 7.43 0.00 0.00
20 21 1.00 20.50 8.43 120.00 1,011.60
21 22 1.00 21.50 9.43 0.00 0.00
22 23 1.00 22.50 10.43 702.00 7,321.86
23 24 1.00 23.50 11.43 0.00 0.00
24 25 1.00 24.50 12.43 0.00 0.00
25 26 1.00 25.50 13.43 0.00 0.00
26 27 1.00 26.50 14.43 0.00 0.00
27 28 1.00 27.50 15.43 0.00 0.00
28 29 1.00 28.50 16.43 48.00 788.64
29 30 1.00 29.50 17.43 120.00 2,091.60
30 31 1.00 30.50 18.43 222.00 4,091.46
31 32 1.00 31.50 19.43 519.00 10,084.17
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 123.00 2,512.89
33 34 1.00 33.50 21.43 0.00 0.00
34 35 1.00 34.50 22.43 0.00 0.00
35 36 1.00 35.50 23.43 0.00 0.00
36 37 1.00 36.50 24.43 0.00 0.00
37 38 1.00 37.50 25.43 0.00 0.00
38 39 1.00 38.50 26.43 0.00 0.00
39 40 1.00 39.50 27.43 0.00 0.00
40 41 1.00 40.50 28.43 0.00 0.00
41 42 1.00 41.50 29.43 264.00 7,769.52
42 43 1.00 42.50 30.43 0.00 0.00
43 44 1.00 43.50 31.43 0.00 0.00
44 45 1.00 44.50 32.43 0.00 0.00
45 46 1.00 45.50 33.43 0.00 0.00
46 47 1.00 46.50 34.43 0.00 0.00
47 48 1.00 47.50 35.43 0.00 0.00
48 49 1.00 48.50 36.43 0.00 0.00
49 50 1.00 49.50 37.43 0.00 0.00
50 51 1.00 50.50 38.43 0.00 0.00
51 51.55 0.55 51.28 39.21
TOTALES 2,508.00 38,179.44
DISTANCIA MEDIA POR ELEMENTO CONSTRUCTIVO (KM.) 15.22
DISTANCIA MEDIA GENERAL (KM.) 15.22
DISTANCIA MEDIA PARA CONCRETO f'c = 210 Kg/cm2
CANALES DEPOSITO
CANTERA ZONA DE INFLUENCIA DISTANCIA TMC NUEVOS MARCOS NUEVOS ALC. EXIST. A REPARAR CANALES EN ESCALONES BADENES MUROS D-4 LA VICTORIA
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM)

15 16 1.00 15.50 3.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 17 1.00 16.50 4.43 0.00 0.00 0.00 11.50 50.95 0.00 0.00 0.00 0.00
17 18 1.00 17.50 5.43 0.00 0.00 0.00 3.10 16.83 0.00 0.00 0.00 0.00
18 19 1.00 18.50 6.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19 20 1.00 19.50 7.43 0.00 0.00 0.00 2.00 14.86 0.00 0.00 0.00 0.00 1.00 7.43
20 21 1.00 20.50 8.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21 22 1.00 21.50 9.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22 23 1.00 22.50 10.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24 1.00 23.50 11.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
24 25 1.00 24.50 12.43 16.20 201.37 0.00 0.00 0.00 0.00 45.65 567.43 0.00 0.00
25 26 1.00 25.50 13.43 0.00 0.00 0.00 3.10 41.63 0.00 0.00 0.00 0.00
26 27 1.00 26.50 14.43 28.40 409.81 0.00 0.00 0.00 0.00 23.66 341.41 0.00 102.09 1,473.09
27 28 1.00 27.50 15.43 3.50 54.01 0.00 0.00 2.00 30.86 0.00 0.00 0.00 42.38 653.92
28 29 1.00 28.50 16.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.27 694.50
29 30 1.00 29.50 17.43 0.00 0.00 0.00 11.10 193.47 0.00 0.00 0.00 139.77 2,436.19
30 31 1.00 30.50 18.43 7.40 136.38 0.00 0.00 8.00 147.44 0.00 0.00 0.00 68.55 1,263.38
31 32 1.00 31.50 19.43 0.00 0.00 0.00 13.20 256.48 0.00 0.00 0.00 36.96 718.13
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 21.90 447.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.00 1,675.26
33 34 1.00 33.50 21.43 18.20 390.03 0.00 0.00 4.10 87.86 0.00 0.00 0.00 392.62 8,413.85
34 35 1.00 34.50 22.43 0.00 0.00 0.00 17.60 394.77 0.00 0.00 0.00 74.60 1,673.28
35 36 1.00 35.50 23.43 9.20 215.56 31.88 746.95 22.80 534.20 0.00 0.00 0.00 0.00
36 37 1.00 36.50 24.43 0.00 0.00 0.00 12.40 302.93 0.00 0.00 0.00 288.14 7,039.26
37 38 1.00 37.50 25.43 10.60 269.56 0.00 0.00 2.00 50.86 0.00 0.00 0.00 0.00
38 39 1.00 38.50 26.43 10.60 280.16 0.00 0.00 4.00 105.72 0.00 0.00 96.25 2,543.89 0.00
39 40 1.00 39.50 27.43 0.00 0.00 0.00 10.00 274.30 0.00 0.00 0.00 0.00
40 41 1.00 40.50 28.43 5.30 150.68 0.00 0.00 24.40 693.69 0.00 0.00 0.00 55.95 1,590.66
41 42 1.00 41.50 29.43 0.00 0.00 0.00 7.10 208.95 0.00 0.00 0.00 0.00
42 43 1.00 42.50 30.43 0.00 0.00 0.00 10.20 310.39 0.00 0.00 0.00 0.00
43 44 1.00 43.50 31.43 0.00 0.00 0.00 12.70 399.16 0.00 0.00 0.00 45.60 1,433.21
44 45 1.00 44.50 32.43 7.40 239.98 0.00 0.00 15.95 517.26 0.00 0.00 137.50 4,459.13 55.95 1,814.46
45 46 1.00 45.50 33.43 0.00 102.93 3,440.95 24.90 832.41 0.00 0.00 0.00 0.00
46 47 1.00 46.50 34.43 0.00 38.54 1,326.93 8.40 289.21 0.00 0.00 838.75 28,878.16 0.00
47 48 1.00 47.50 35.43 0.00 43.15 1,528.80 9.00 318.87 0.00 0.00 126.50 4,481.90 0.00
48 49 1.00 48.50 36.43 0.00 47.20 1,719.50 24.20 881.61 0.00 0.00 0.00 0.00
49 50 1.00 49.50 37.43 0.00 78.92 2,953.98 4.90 183.41 0.00 0.00 0.00 0.00
50 51 1.00 50.50 38.43 0.00 112.95 4,340.67 5.30 203.68 69.17 2,658.20 126.50 4,861.40 0.00
51 51.55 0.55 51.28 39.21 0.00 0.00 0.00 0.00 0.00 0.00
TOTALES 138.70 2,794.94 455.57 16,057.78 273.95 7,341.80 138.48 3,567.05 1,325.50 45,224.47 1,426.88 30,879.18 1.00 7.43
DISTANCIA MEDIA GENERAL (KM.) 18.91
DISTANCIA MEDIA PARA CONCRETO f'c = 175 Kg/cm2
CANTERA ZONA DE INFLUENCIA DISTANCIA SOBREANCHO DE BADENES CUNETAS TRIANGULARES ENCIMADO DE CUNETAS SARDINELES PROTECCION GAVIONES CAMA DE PIEDRA EMBOQU.
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM) (M3) (M3-KM)

14 15 1.00 14.50 4.57 0.00 318.42 1,455.18 0.00 68.08 311.13 0.00 7.65 34.96
15 16 1.00 15.50 3.57 0.00 190.89 681.48 0.00 0.00 0.00 0.00
16 17 1.00 16.50 4.43 0.00 47.04 208.40 0.00 0.00 0.00 31.47 139.41
17 18 1.00 17.50 5.43 0.00 20.20 109.66 0.00 0.00 0.00 0.00
18 19 1.00 18.50 6.43 0.00 15.22 97.86 0.00 0.00 0.00 0.00
19 20 1.00 19.50 7.43 0.00 66.80 496.31 0.00 0.00 0.00 15.30 113.68
20 21 1.00 20.50 8.43 0.00 32.81 276.55 0.00 0.00 0.00 0.00
21 22 1.00 21.50 9.43 0.00 41.00 386.67 0.00 0.00 0.00 0.00
22 23 1.00 22.50 10.43 0.00 246.60 2,572.04 0.00 0.00 0.00 0.00
23 24 1.00 23.50 11.43 0.00 217.44 2,485.34 0.00 0.00 0.00 0.00
24 25 1.00 24.50 12.43 0.00 444.24 5,521.90 0.00 0.00 0.00 0.00
25 26 1.00 25.50 13.43 0.00 212.22 2,850.11 0.00 0.00 0.00 0.00
26 27 1.00 26.50 14.43 0.00 113.50 1,637.79 31.94 460.89 0.00 0.00 35.02 505.34
27 28 1.00 27.50 15.43 0.00 36.94 569.92 49.38 761.93 0.00 0.00 22.95 354.12
28 29 1.00 28.50 16.43 0.00 13.35 219.29 23.28 382.49 0.00 0.00 0.00
29 30 1.00 29.50 17.43 0.00 55.80 972.59 40.43 704.69 0.00 0.00 10.49 182.84
30 31 1.00 30.50 18.43 0.00 139.55 2,571.98 42.00 774.06 0.00 0.00 15.30 281.98
31 32 1.00 31.50 19.43 0.00 136.39 2,649.98 55.81 1,084.39 0.00 0.00 42.39 823.64
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 0.00 110.05 2,248.36 30.47 622.50 0.00 0.00 7.65 156.29
33 34 1.00 33.50 21.43 0.00 114.25 2,448.29 11.69 250.52 0.00 0.00 7.65 163.94
34 35 1.00 34.50 22.43 0.00 140.26 3,145.94 32.86 737.05 0.00 0.00 15.30 343.18
35 36 1.00 35.50 23.43 0.00 128.57 3,012.28 0.00 0.00 0.00 0.00
36 37 1.00 36.50 24.43 0.00 142.74 3,487.14 10.32 252.12 0.00 0.00 0.00
37 38 1.00 37.50 25.43 0.00 133.92 3,405.59 23.05 586.16 0.00 0.00 15.30 389.08
38 39 1.00 38.50 26.43 20.83 550.40 0.00 0.00 11.36 300.24 0.00 0.00 22.95 606.57
39 40 1.00 39.50 27.43 0.00 64.80 1,777.46 44.49 1,220.36 0.00 0.00 19.89 545.58
40 41 1.00 40.50 28.43 0.00 56.16 1,596.63 39.80 1,131.51 0.00 0.00 74.73 2,124.57
41 42 1.00 41.50 29.43 0.00 62.76 1,846.94 65.69 1,933.26 0.00 0.00 0.00
42 43 1.00 42.50 30.43 0.00 168.66 5,132.32 30.05 914.42 0.00 0.00 15.30 465.58
43 44 1.00 43.50 31.43 0.00 166.22 5,224.33 13.74 431.85 0.00 0.00 0.00
44 45 1.00 44.50 32.43 29.75 964.79 90.00 2,918.70 0.00 0.00 60.00 1,945.80 54.60 1,770.68
45 46 1.00 45.50 33.43 0.00 150.84 5,042.58 15.61 521.84 0.00 0.00 21.41 715.74
46 47 1.00 46.50 34.43 181.48 6,248.18 89.10 3,067.71 0.00 0.00 76.25 2,625.29 0.00
47 48 1.00 47.50 35.43 27.37 969.72 55.62 1,970.62 0.00 0.00 17.50 620.03 0.00
48 49 1.00 48.50 36.43 0.00 162.36 5,914.77 11.46 417.49 0.00 0.00 0.00
49 50 1.00 49.50 37.43 0.00 64.08 2,398.51 0.00 0.00 0.00 38.22 1,430.57
50 51 1.00 50.50 38.43 27.37 1,051.83 158.40 6,087.31 0.00 0.00 15.00 576.45 0.00
51 51.55 0.55 51.28 39.21 0.00 0.00 0.00 0.00 0.00 0.00
TOTALES 286.79 9,784.93 4,407.17 86,488.55 583.43 13,487.78 68.08 311.13 168.75 5,767.56 473.57 11,147.75
DISTANCIA MEDIA POR ELEMENTO CONSTRUCTIVO (KM.) 34.12 19.62 23.12 4.57 34.18 23.54
DISTANCIA MEDIA GENERAL (KM.) 21.21
DISTANCIA MEDIA PARA CONCRETO f'c = 140 Kg/cm2
CANTERA ZONA DE INFLUENCIA DISTANCIA VEREDAS DE CONCRETO
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM)

15 16 1.00 15.50 3.57 27.00 96.39


16 17 1.00 16.50 4.43 0.00 0.00
17 18 1.00 17.50 5.43 0.00 0.00
18 19 1.00 18.50 6.43 82.50 530.48
19 20 1.00 19.50 7.43 15.00 111.45
20 21 1.00 20.50 8.43 30.00 252.90
21 22 1.00 21.50 9.43 15.00 141.45
22 23 1.00 22.50 10.43 160.50 1,674.02
23 24 1.00 23.50 11.43 0.00 0.00
24 25 1.00 24.50 12.43 0.00 0.00
25 26 1.00 25.50 13.43 0.00 0.00
26 27 1.00 26.50 14.43 42.00 606.06
27 28 1.00 27.50 15.43 69.00 1,064.67
28 29 1.00 28.50 16.43 24.00 394.32
29 30 1.00 29.50 17.43 18.00 313.74
30 31 1.00 30.50 18.43 42.00 774.06
31 32 1.00 31.50 19.43 145.60 2,829.01
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 15.00 306.45
33 34 1.00 33.50 21.43 0.00 0.00
34 35 1.00 34.50 22.43 0.00 0.00
35 36 1.00 35.50 23.43 0.00 0.00
36 37 1.00 36.50 24.43 0.00 0.00
37 38 1.00 37.50 25.43 0.00 0.00
38 39 1.00 38.50 26.43 0.00 0.00
39 40 1.00 39.50 27.43 12.80 351.10
40 41 1.00 40.50 28.43 63.00 1,791.09
41 42 1.00 41.50 29.43 0.00 0.00
42 43 1.00 42.50 30.43 0.00 0.00
43 44 1.00 43.50 31.43 15.00 471.45
44 45 1.00 44.50 32.43 28.50 924.26
45 46 1.00 45.50 33.43 30.00 1,002.90
46 47 1.00 46.50 34.43 0.00 0.00
47 48 1.00 47.50 35.43 0.00 0.00
48 49 1.00 48.50 36.43 60.00 2,185.80
49 50 1.00 49.50 37.43 0.00
50 51 1.00 50.50 38.43 0.00
51 51.55 0.55 51.28 39.21 0.00
TOTALES 894.90 15,821.59
DISTANCIA MEDIA POR ELEMENTO CONSTRUCTIVO (KM.) 17.68
DISTANCIA MEDIA GENERAL (KM.) 17.68
DISTANCIA MEDIA DE MEZCLA ASFALTICA
CANTERA ZONA DE INFLUENCIA DISTANCIA MEZCLA ASFALTICA
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM)
15.2 16 0.80 15.60 3.47 782.50 2,715.28
16 17 1.00 16.50 4.43 1,007.00 4,461.01
17 18 1.00 17.50 5.43 900.00 4,887.00
18 19 1.00 18.50 6.43 911.00 5,857.73
19 20 1.00 19.50 7.43 965.00 7,169.95
20 21 1.00 20.50 8.43 949.30 8,002.60
21 22 1.00 21.50 9.43 934.00 8,807.62
22 23 1.00 22.50 10.43 940.00 9,804.20
23 24 1.00 23.50 11.43 985.00 11,258.55
24 25 1.00 24.50 12.43 1,011.60 12,574.19
25 26 1.00 25.50 13.43 995.10 13,364.19
26 27 1.00 26.50 14.43 976.70 14,093.78
27 28 1.00 27.50 15.43 952.90 14,703.25
28 29 1.00 28.50 16.43 968.60 15,914.10
29 30 1.00 29.50 17.43 950.40 16,565.47
30 31 1.00 30.50 18.43 925.50 17,056.97
31 32 1.00 31.50 19.43 973.50 18,915.11
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 973.20 19,882.48
33 34 1.00 33.50 21.43 1,011.60 21,678.59
34 35 1.00 34.50 22.43 994.50 22,306.64
35 36 1.00 35.50 23.43 999.10 23,408.91
36 37 1.00 36.50 24.43 943.20 23,042.38
37 38 1.00 37.50 25.43 978.00 24,870.54
38 39 1.00 38.50 26.43 947.80 25,050.35
39 40 1.00 39.50 27.43 967.30 26,533.04
40 41 1.00 40.50 28.43 936.40 26,621.85
41 42 1.00 41.50 29.43 942.60 27,740.72
42 43 1.00 42.50 30.43 932.10 28,363.80
43 44 1.00 43.50 31.43 966.40 30,373.95
44 45 1.00 44.50 32.43 922.90 29,929.65
45 46 1.00 45.50 33.43 995.40 33,276.22
46 47 1.00 46.50 34.43 825.40 28,418.52
47 48 1.00 47.50 35.43 818.80 29,010.08
48 49 1.00 48.50 36.43 966.20 35,198.67
49 50 1.00 49.50 37.43 952.00 35,633.36
50 51 1.00 50.50 38.43 966.20 37,131.07
51 51.55 0.55 51.28 39.21 475.80 18,653.74
TOTALES 34,643.00 733,275.54
DISTANCIA MEDIA GENERAL (KM.) 21.17
DISTANCIA MEDIA DE MATERIAL DRENANTE (FILTROS)
CANTERA ZONA DE INFLUENCIA DISTANCIA SUBDRENES
NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM)

15 16 1.00 15.50 3.57 0.00 0.00


16 17 1.00 16.50 4.43 507.52 2,248.31
17 18 1.00 17.50 5.43 188.16 1,021.71
18 19 1.00 18.50 6.43 84.48 543.21
19 20 1.00 19.50 7.43 467.20 3,471.30
20 21 1.00 20.50 8.43 0.00 0.00
21 22 1.00 21.50 9.43 162.24 1,529.92
22 23 1.00 22.50 10.43 0.00 0.00
23 24 1.00 23.50 11.43 0.00 0.00
24 25 1.00 24.50 12.43 0.00 0.00
25 26 1.00 25.50 13.43 535.36 7,189.88
26 27 1.00 26.50 14.43 456.00 6,580.08
27 28 1.00 27.50 15.43 507.52 7,831.03
28 29 1.00 28.50 16.43 230.40 3,785.47
29 30 1.00 29.50 17.43 288.64 5,031.00
30 31 1.00 30.50 18.43 102.40 1,887.23
31 32 1.00 31.50 19.43 471.04 9,152.31
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 238.08 4,863.97
33 34 1.00 33.50 21.43 278.40 5,966.11
34 35 1.00 34.50 22.43 640.00 14,355.20
35 36 1.00 35.50 23.43 604.80 14,170.46
36 37 1.00 36.50 24.43 714.24 17,448.88
37 38 1.00 37.50 25.43 143.36 3,645.64
38 39 1.00 38.50 26.43 67.20 1,776.10
39 40 1.00 39.50 27.43 834.24 22,883.20
40 41 1.00 40.50 28.43 792.88 22,541.58
41 42 1.00 41.50 29.43 701.36 20,641.02
42 43 1.00 42.50 30.43 757.24 23,042.81
43 44 1.00 43.50 31.43 856.68 26,925.45
44 45 1.00 44.50 32.43 653.84 21,204.03
45 46 1.00 45.50 33.43 478.72 16,003.61
46 47 1.00 46.50 34.43 221.76 7,635.20
47 48 1.00 47.50 35.43 701.36 24,849.18
48 49 1.00 48.50 36.43 944.24 34,398.66
49 50 1.00 49.50 37.43 984.94 36,866.30
50 51 1.00 50.50 38.43 195.70 7,520.75
51 51.55 0.55 51.28 39.21
TOTALES 14,810.00 377,009.64
DISTANCIA MEDIA POR ELEMENTO CONSTRUCTIVO (KM.) 25.46
DISTANCIA MEDIA GENERAL (KM.) 25.46
TRAMO 1.2: Puente Pumahuasi - Puente Chino

DISTANCIA MEDIA DE MATERIAL PARA ENROCADO DE PROTECCION T


L
U
C
S
O
R
E
G
IN

CANTERA ZONA DE INFLUENCIA DISTANCIA CANALES


NOMBRE UBICACIN ACCESO DE A LONG. C.G. C.G./CANT. METRADO MOM. DE TRANSP.
(KM) (KM) (KM) (KM) (KM) (KM) (KM) (M3) (M3-KM)

15 16 1.00 15.50 3.57 0.00 0.00


16 17 1.00 16.50 4.43 7.20 31.90
17 18 1.00 17.50 5.43 0.00 0.00
18 19 1.00 18.50 6.43 0.00 0.00
19 20 1.00 19.50 7.43 5.25 39.01
20 21 1.00 20.50 8.43 0.00 0.00
21 22 1.00 21.50 9.43 0.00 0.00
22 23 1.00 22.50 10.43 0.00 0.00
23 24 1.00 23.50 11.43 0.00 0.00
24 25 1.00 24.50 12.43 0.00 0.00
25 26 1.00 25.50 13.43 0.00 0.00
26 27 1.00 26.50 14.43 14.40 207.79
27 28 1.00 27.50 15.43 22.00 339.46
28 29 1.00 28.50 16.43 6.25 102.69
29 30 1.00 29.50 17.43 7.20 125.50
30 31 1.00 30.50 18.43 5.25 96.76
31 32 1.00 31.50 19.43 14.55 282.71
RIO AZUL 15.57 3.50 32 33 1.00 32.50 20.43 5.25 107.26
33 34 1.00 33.50 21.43 17.75 380.38
34 35 1.00 34.50 22.43 5.25 117.76
35 36 1.00 35.50 23.43 16.55 387.77
36 37 1.00 36.50 24.43 8.20 200.33
37 38 1.00 37.50 25.43 10.50 267.02
38 39 1.00 38.50 26.43 15.75 416.27
39 40 1.00 39.50 27.43 10.50 288.02
40 41 1.00 40.50 28.43 21.00 597.03
41 42 1.00 41.50 29.43 11.50 338.45
42 43 1.00 42.50 30.43 5.25 159.76
43 44 1.00 43.50 31.43 0.00 0.00
44 45 1.00 44.50 32.43 5.25 170.26
45 46 1.00 45.50 33.43 7.35 245.71
46 47 1.00 46.50 34.43 0.00 0.00
47 48 1.00 47.50 35.43 0.00 0.00
48 49 1.00 48.50 36.43 0.00 0.00
49 50 1.00 49.50 37.43 7.35 275.11
50 51 1.00 50.50 38.43 0.00 0.00
51 51.55 0.55 51.28 39.21
TOTALES 229.55 5,176.91
DISTANCIA MEDIA GENERAL (KM.) 21.27
MINISTERIO DE TRANSPORTE, COMUNICACIONES,
VIVIENDA Y CONSTRUCCION
PROYECTO ESPECIAL REHABILITACION
INFRAESTRUCTURA DE TRANSPORTE Consorcio CES - Hidroenerga Actualizacin y Complementacin de los Estudios Definitivos
Carretera Hunuco - Tingo Mara - Pucallpa
TRAMO 1.2: Puente Pumahuasi - Puente Chino

ACTUALIZACION Y COMPLEMENTACION DE LOS ESTUDIOS DEFINTIVOS PARA EL MEJORAMIENTO VIAL


DE LA CARRETERA HUANUCO - TINGO MARIA - PUCALLPA SECTOR : TINGO MARIA - PUENTE CHINO
TRAMO1.2 : PUENTE PUMAHUASI - PUENTE CHINO

RENDIMIENTOS MECANICOS REFERENCIALES

UNIDAD MECANICA PARTIDA UNIDAD RENDIMIENTO DIARIO

EJECUTORA MECANIZADA BASICO % EFIC. R.EFECTIVO


TRACTOR SOBRE ORUGA 190 - 240 H.P. CORTE EN MATERIAL SUELTO m3 1020 48% 490
CORTE EN ROCA SUELTA 1020 37% 377
CORTE EN ROCA FIJA 1020 29% 296
EXTRACCION DE MATERIAL 1020 51% 520
ACONDIC. BOTADEROS 1200 80% 960
ACONDICION. PLANTA ASFALTO 1 80% 0.80
ACONDICION. CAMPAMENTO 2 80% 1.60

CARGADOR SOBRE LLANTAS 3.5 YDA3 CARGUIO m 3


1606 43% 690

MOTONIVELADORA 125 H.P. PERFILADO Y COMPACTADO m 3


4700 53% 2,491
TERRAPLENES 1645 50% 823
SUB BASE GRANULAR 940 46% 432
BASE GRANULAR 940 44% 414
ACONDIC. BOTADEROS 1200 80% 960
ZARANDA VIBRATORIA 4"x16" ARENA m3 690 44% 304
MATERIAL PARA AGREGADOS 690 80% 552
CHANCADORA PRIMARIA SECUNDARIA MATERIAL PARA AGREGADOS m3 690 24% 166
RODILLO NEUMATICO 5.5 - 20 TON BASE GRANULAR m3 927 44% 408
ASFALTO 927 27% 250
RODILLO VIBRATORIO 7-9 TON TERRAPLENES m3 1783 46% 820
SUB BASE GRANULAR 1783 24% 428
BASE GRANULAR 1783 23% 410
ACONDIC. BOTADEROS 1783 85% 1,516
PLANTA DE ASFALTO EN CALIENTE BASE Y CARPETA ASFALTICA m3 333 75% 250
CAMION IMPRIMADOR 1800 GLN IMPRIMACION m2 10748 46% 4,944
RIEGO DE LIGA 10748 46% 4,944
PAVIMENTADORA ASFALTO m3 605 41% 248
COMPRESORA 600-690 PCM CORTE EN ROCA FIJA m3 531 51% 271
CORTE EN ROCA SUELTA 531 64% 340