Environmental Control Systems ESP and SWFGD for Yanbu III, KSA

SEAWATER FLUE GAS DESULPHURISATION


(SWFGD)
FOR
YANBU POWER AND DESALINATION
PLANT PHASE 3, PACKAGE P
5x600MW OIL FIRED UNITS

TECHNICAL PROPOSAL

Document No. 081019-TDF-0001


Revision 01

SECTION 7
SCOPE OF SUPPLY

Environmental Control Systems ESP and SWFGD for Yanbu III, KSA

LIST OF CONTENT
7
Battery limits/Terminal points for SWFGD .......................................
................................................. 3
Rev. 02 Page 2 of 4
Date: 19/03/2013

Environmental Control Systems ESP and SWFGD for Yanbu III, KSA
7 BATTERY LIMITS/TERMINAL POINTS FOR SWFGD
The following defines the physical interface points for the proposed Flue Gas De
sulphurisation
systems. The physical interface points are also indicated in Section PID included
in this
proposal.
Flue gas inlet
At inlet flange of GGH (untreated side), 1 terminal point per unit
Flue gas outlet
At outlet flange of GGH (treated side), 1 terminal point per unit
Seawater supply to SWTP
At the inlet of Seawater pump pit for seawater from condenser, 1 terminal point
per unit
At the inlet of mixing basin for make-up water from intake and brine water from
desalination
plant, excluding civil structures. 10 terminal points maximum for the whole plan
t,
At the inlet of bypass channel for make-up water from intake and brine water fro
m
desalination plant, excluding civil structures. 2 terminal points maximum for th
e whole plant.
Seawater supply to Absorber
Ends at the outlet flange of absorber pumps, 2 terminal points per unit.
From the inlet of absorber riser pipes (max. 2 meter away from the absorber shel
l to the
centreline of pipe and 2 meter above ground) for seawater supply to absorber. 2
terminal points
per unit.
At the merged pipe flange before piping goes into underground, 2m from ground le
vel and
max. 2m away from the centreline of merged pipe.1 terminal point per unit.
Seawater valves for seawater supply to absorbers are delivered as loose items.
Seawater effluent from Absorber
Ends at the outlet of the absorber sump. 1 terminal point per unit
Seawater discharge
Ends at the inlet of outfall channel downstream the seawater treatment plant (SW
TP). 1
terminal point per unit
Caustic soda dosing system
From the unloading nozzle flange on the caustic soda tanks. 2 terminal points fo
r the whole
plant.
Ends at discharge nozzle flange of caustic soda tanks
Rev. 02 Page 3 of 4
Date: 19/03/2013

Environmental Control Systems ESP and SWFGD for Yanbu III, KSA
From the outlet flange of discharge nozzles on the caustic soda tanks. 2 termina
l points for
the whole plant.
Ends at caustic dosing pump discharge flange, 5 terminal points for the whole pl
ant.
Service air
At 1 meter from absorber boundary and SWTP boundary, 1 terminal point for each a
bsorber
and 1 terminal point at each SWTP
Instrument air
At 1 meter from absorber island boundary and SWTP boundary, 1 terminal point for
each
absorber and 1 terminal point at each SWTP
Steam
At 1 meter from absorber island boundary, 1 terminal point for each boiler unit
Cooling Water supply and discharge
At 1 meter from absorber island boundary and SWTP island boundary, 1 terminal po
int for
each absorber and 1 terminal point at each SWTP
Service Water supply and discharge
At 1 meter from absorber island boundary and SWTP island boundary, 1 terminal po
int for
each absorber and 1 terminal point at each SWTP
Electrical
At terminals of motors and other power consumers
Instrument and control
At terminals of instruments
At terminals on FGD PLC panels
Instruments are delivered as loose items
Rev. 02 Page 4 of 4