A(m2)(wetted P(m)(wetted Q(m3/s)(flow rate)

area) perimeter)

0.75 2.14 0.373

3.7 2.97 4.28

6.65 2.14 14.16

1.12 0.30 2.14

4 2.65 7.37

5.775 1.01 25.85

11.73 2 53.41

11.83 2 54.17

5.825 1.03 25.88

5.7 1 25.46

8.55 2.8 25.2

1.9 0.5 4.63

6.98 2.1 15.55

4.83 2.52 7.45

0.825 1.93 0.468

QTotal=266.391 m3/s

Total area of the cross section 1 = 80.165m2

Wetted perimeter of the cross section 1= 27.29m

Hydraulic radius of the cross section 1 = 2.94m

Breadth (B) of the cross section 1 = 21m

Hydraulic depth of the cross section 1 = 3.817m


Section 02

A(m2)(wetted P(m)(wetted Q(m3/s)(flow


area) perimeter) rate)

11.285 7.1344 21.89

9.69 3.70 36.82

10.485 1.8062 67.73

11.21 1.9026 73.14

9.456 1.60199 61.77

6.3635 1.1131 40.69

4.56 2.75 12.78

2.90 0.8382 13.27

9.36 6.2682 24.46

QTotal=352.55 m3/s

Total area of the cross section 1 = 75.309m2

Wetted perimeter of the cross section 1=27.115m

Hydraulic radius of the cross section 1 = 2.78m

Breadth (B) of the cross section 1 = 21m

Hydraulic depth of the cross section 1 = 3.586m


Section 3

A(m2)(wetted P(m)(wetted Q (m3/s)(flow


area) perimeter) rate)

10.875 6.907 21.03

5.6 2.85 17.57

20.664 3.611 132.22

22.96 4.01 146.96

3.36 2.5 8.18

3.6 1.02 16.69

8.4 5.941 21.164

Total area of the cross section 1 = 75.459m2

Wetted perimeter of the cross section 1=26.84m

Hydraulic radius of the cross section 1 = 2.81m

Breadth (B) of the cross section 1 = 21m

Hydraulic depth of the cross section 1 = 3.593m


Section 4

A(m2) (wetted P(m) (wetted Q(m3/s) (flow


area) perimeter) rate)

2.475 3.424 4.224

8.528 3.789 31.034

3.42 2.601 12.177

5.8 1.013 55.066

11.81 2.001 114.418

11.81 2.001 114.418

5.8 1.013 55.067

14.275 4.503 91.383

2.16 0.632 10.385

9.068 3.306 37.650

2.35 3.086 4.152

Total area of the cross section 1 = 77.496m2

Wetted perimeter of the cross section 1=27.369m

Hydraulic radius of the cross section 1 = 2.83m

Breadth (B) of the cross section 1 = 21m

Hydraulic depth of the cross section 1 = 3.69m


Section 01

A(m2)(wetted P(m)(wetted Q(m3/s)(flow


area) perimeter) rate)
0.075 1.011 0.019
0.33 2.00 0.139
0.43 2.001 0.216
0.3755 1.25 0.235

Total area of the cross section 1 = 1.2105m2

Wetted perimeter of the cross section 1=6.262m

Hydraulic radius of the cross section 1 = 0.336m

Breadth (B) of the cross section 1 = 6m

Hydraulic depth of the cross section 1 = 0.202m

Velocity of water in section 1 = 0.068ms-1

Fraud's number = u/(gD)0,5

=0.048
Section 02
A(m2)(wetted P(m)(wetted Q(m3/s)(flow rate)
area) perimeter)
1.135 1.806 1.665
0.38 1.903 0.260
0.336 1.602 0.237
0.094 1.113 0.036

Total area of the cross section 1 = 1.945m2

Wetted perimeter of the cross section 1=6.424m

Hydraulic radius of the cross section 1 = 0.303m

Breadth (B) of the cross section 1 = 6.4m

Hydraulic depth of the cross section 1 = 0.304m

Velocity of water in section 1 = 0.071ms-1

Fraud's number = u/(gD)0,5

=0.0411
Section3
A(m2)(wetted P(m)(wetted Q(m3/s)(flow
area) perimeter) rate)
0.504 3.611 0.271
0.56 4.010 0.301

Total area of the cross section 1 = 1.064m2

Wetted perimeter of the cross section 1(P)=7.621m

Hydraulic radius of the cross section 1(R) = 0.134m

Breadth (B) of the cross section 1 = 7.6m

Hydraulic depth of the cross section 1 = 0.14m

Velocity of water in section 1 = 0.045ms-1

Fraud's number = u/(gD)0,5

=0.0384
Section 4
A(m2)(wetted P(m)(wetted Q(m3/s)(flow
area) perimeter) rate)
0.08 1.013 0.0437
0.37 2.001 0.356
0.37 2.001 0.356
0.08 1.013 0.0437

Total area of the cross section 1 = 0.9m2

Wetted perimeter of the cross section 1(P)=6.028m

Hydraulic radius of the cross section 1(R) = 0.149m

Breadth (B) of the cross section 1 = 6m

Hydraulic depth of the cross section 1 = 0.15m

Velocity of water in section 1 = 0.0497ms-1

Fraud's number = u/(gD)0,5

=0.041