PROJECT: SHOWROOM (TILES, KITCHEN AND BATHROOM ACCESSORIES)
LOCATION: BRGY. BUHANGIN, BALER, AURORA
ITEM OF WORKS AMOUNT 1 CONCRETE AND MASONRY WORKS Php 172,090.00 2 ROOFING AND TINSMITHING Php 219,770.00 3 PLUMBING WORKS Php 6,420.00 4 ELECTRICAL WORKS Php 20,761.00 MATERIAL COST Php 419,041.00 LABOR COST Php 188, 568.45 TOTAL PROJECT COST Php 607, 609.45 OWNER: LIGAYA L. VILLEGAS
S U M M A R Y ITEM DESCRIPTION
1. CONCRETE AND MASONRY WORKS
DESCRIPTION QTY UNIT QTY PRICE UNIT PRICE CHB 4" 2500 pcs. 8.00 20,000.00 CEMENT 360 bags 200.00 72,000.00 RSB 12 mm 45 pcs. 160.00 7,200.00 RSB 10mm 130 pcs. 111.00 14,430.00 RSB 9 mm 70 pcs. 78.00 5,460.00 G.I PIPE 4" 14 pcs. 2,500.00 35,000.00 GI WIRE #16 1 roll 1,200.00 1,200.00 GRAVEL AND SAND 6 tl. 2,800.00 16,800.00 SUB-TOTAL P 172,090.00
2. ROOFING AND TINSMITHING
DESCRIPTION QTY UNIT QTY PRICE UNIT PRICE ANGLE BAR X 2 65 pcs 709.00 46,085.00 ANGLE BAR 3/16 X 1 1/2 45 pcs 339.00 15,255.00 CEE PURLINS 2 X 4 80 pcs 530.00 42,400.00 WELDING ROD 2 box 1,500.00 3,000.00 EPOXY PRIMER 3 gal 520.00 1,560.00 LAC. THINNER 3 gal 250.00 750.00 PAINT BRUSH 2 6 pcs 30.00 180.00 CUT OFF DISC 14 3 pcs 180.00 540.00 ROOFING RIB TYPE LS LUMP SUM 110,000.00 SUB-TOTAL P 219,770.00