Documente Academic
Documente Profesional
Documente Cultură
I. P R O J E C T D E S C R IP T IO N
1 . Project T itl e: C O N C R E T IN G O F 0 .5 K M F A R M T O
M A R K E T R O A D
C om m on E x cavation ,
S u b-G rade Preparation ,
S u b-B ase An d B ase C ou rse Ag g reg ate
C om paction ,
C on cretin g W ork s Pccp,
I n stal l ation O f R cpc An d
R eg rou ted R iprap.
III. P R O J E C T J U S T IF IC A T IO N
pa g e - 1
M ost of the residen ts of this baran g ay rel y on farm in g as their m ean s of
l ivel ihood. I ts total l an d area is 6 0 6 hectares of w hich 5 0 % is pl ain an d
1 5 % is m ou n tain ou s. I n term s of its total l an d area, 8 5 % is ag ricu l tu ral
l an d, 1 5 % is residen tial an d 5 % is idl e l an d. Presen tl y, the total
hou sehol ds is 3 2 7 as per record dated D ecem ber 2 0 0 3 w ith a total
popu l ation of 1 , 8 0 5 in dividu al s. I t has on e el em en tary school an d day
care cen ter w herein chil dren are readil y avail abl e of its services. M ost
of the residen ts are g en eral l y poor as their in com e is n ot su fficien t
en ou g h to m eet their dail y n eeds.
pa g e - 2
T he baran g ay cou n cil tog ether w ith the active vol u n teers w ork han d in
han d an d hope to be fu n ded w ith other fu n din g ag en cies.
3 . Project O bjectives
4 . S ectoral O bjectives
IV . P R O J E C T F IN A N C IN G
1 . Fu n ds N eeded : Php 1 , 9 8 4 , 3 0 0 . 6 8
4 . C ou n terpart Fu n din g
1 . C om m u n ity - Php1 6 ,9 2 0 . 0 0 ( in -k in d)
2 . B L G U - Php1 0 0 ,0 0 0 .0 0 ( cash)
Php 3 2 4 , 0 0 0 . 0 0 ( in -k in d)
3 . M L G U - Php1 0 0 ,0 0 0 .0 0 ( cash)
Php 1 1 ,1 2 0 .0 0 ( in -k in d)
pa g e - 3
5 . Fin an cial V iabil ity : I f fu n ded, the com m u n ity an d the
L G U s are very m u ch w il l in g to
provide cou n terparts w hether in the
form of cash or in -k in d to
im pl em en t the project.
V . P R O J E C T B E N E F IT S A N D C O S T S
1 . B en eficiaries
2 . S ocial B en efits
3 . E con om ic B en efits
4 . S ocial C osts : N on e
5 . E con om ic C osts : N on e
V I. P R O J E C T IM P L E M E N T A T IO N
1 . R e s p o n s ib le A g e n c ie s
pa g e - 4
1 .4 C om m u n ity - For the operation an d m ain ten an ce of the
project an d provision of cou n terparts.
P ro j ec t I mp lement at i o n Team (P I T)
T he team is respon sibl e for en su rin g that the pl an n ed dail y activities of
the project are carried ou t efficien tl y. As su ch, it is ex pected to devote
m ost of its tim e in en su rin g that m aterial s, su ppl ies, eq u ipm en t an d
in pu ts are safel y stored an d m ade readil y avail abl e.
pa g e - 5
P ro c u rement Team (P T)
T he team is respon sibl e for the draftin g of procu rem en t pl an an d tak es
charg e of al l activities req u ired to acq u ire al l the su ppl ies, m aterial s,
eq u ipm en t an d l abor from su ppl iers.
Treasu rer
T he B aran g ay T reasu rer is al so the treasu rer of the project. H e/ she shal l
have the cu stody over the fu n ds an d properties of the project an d
en su res that these w il l n ot be m in g l ed w ith those of the B aran g ay
C ou n cil .
Bo o k k eep er
H e/ she shal l tak e charg e of recordin g al l fin an cial tran saction s an d
preparin g fin an cial reports. S eparate book s shal l be m ain tain ed for each
fu n d sou rce. D ocu m en ts to su pport al l fin an cial tran saction shal l be
u n der the cu stody of the book k eeper.
pa g e - 6
T he B L G U w il l provide O an d M fu n ds from the 2 0 % D evel opm en t
Fu n d to m ain tain an d su stain the project.
T he com m u n ity residen ts proposed this project w ith the su pport from
L G U T an g hal ig u e, L G U T al ibon an d K AL AH I -C I D S S : K K B for techn ical an d
com m u n ity devel opm en t assistan ce.
G A L IC A N O G U R R E A M Y R N A A . B A T A L A N
C hairm an Area C oordin ator
Project Preparation T eam AC T T al ibon
D ate: S eptem ber 2 3 , 2 0 0 6 D ate: S eptem ber 2 8 , 2 0 0 6
pa g e - 7