Sunteți pe pagina 1din 4

INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

DATE TAG NO..

1. POWER OFF FROM JUNCTION BOX.


2. CLEAN JUNCTION BOX.
3. CLEAN TERMINALS AND EARTH LINKS.
4. CHECK TO ENSURE FIRM TERMINATION ON BLOCKS.
5. CARRY OUT FUNCTIONAL TEST ON THE LOAD CELL CABLES.
6. CHECK FOR POLARITY ON DCV AND MVOLTS IN ALL JUNCTION
BOXES.
INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

7. CARRY OUT RESISTANCE CHECKS ON ALL THE LOAD CELLS.


8. CHECK FOR PHYSICAL DAMAGE ON ALL THE LOAD CELLS.
9. CHECK FOR WATER INGRESS IN ALL THE JUNCTION BOXES.
10. CHECK CONDITION OF SUSPENSION RODS & TENSION RODS.
11. CHECK FIRMNESS OF BOLTS/NUTS ON THE PLATFORM.
12. CHECK PRINTER AND EFFECT FUNCTIONAL TEST.
13. CHECK FUNCTIONALITY OF SECTIONALIZATION
CARD/HOUSING.
14. QUARTERLY FLUSHING OF THE BRIDGE EFFECTED?
15. STATE DATE OF LAST FLUSHING EXERCISE. DATE
.
INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

16. WHEN NEXT IS FLUSHING DUE DATE


17. CHECK BRIDGE FOR FUNCTIONAL TEST AFTER PM/PDM
18. STATE CONDITION OF THE BRIDGE:
AS FOUND .....


AS LEFT



INST/F/P-01/04

Notore Chemical Industries Rev. No.:1


Instrument Plc
Rev. Date:16/08/2016
Title :CHECKLIST OF
Page: 1 of 1
PM/PDM FOR WEIGH
BRIDGE SCALES 1 & 2

PERFORMING OFFICER.
SIGN/DATE

WORKSHOP SUPERVISORS
COMMENT.

SIGN/DATE..

S-ar putea să vă placă și