A schedule developed at early stages of project planning is called:

Degree of uncertainty that the product will meet its requirements and be fit for its intended use is:

In context of degree of rigor, TSS stands for:

FP-based estimation techniques require problem decomposition based on

___________ is one of the reasons of the project failure.

Which of the following is not a valid reason for measuring software processes, products, and resources?

List at least one advantage of using statistical control techniques in software engineering.

What can be the implications, if the feasibility report generated is not correct?

it can have the following implications:

1 technical

2 financial

3 time frame

4 resources

Does software quality depend only on the source code? Comment on it.

no software quality is umbrella activity that is applied throughout the software


process,

some of the activity are mentioned below:

1 software requirements
2 specify standards for software

3 well defined code

Differentiate between Structured rigor and Casual rigor.

Structured rigor in this case complete process is applied appropriate frame work activites and related tasks
are also applied.

Suppose a project consists of three components i.e. Login-Component, Filter-Component, Transfer-


Component. Calculate the overall projects system complexity from the following data:

Component Structural complexity Data complexity

Login 1 1
Component

Filter-Component 2 1

Transfer- 1 1
Component

Casual rigor in this case only a minimum task set is required. it requires umbrella tasks and reduced
documentation.

A well engineered software should not be

Evolutionary software process models

Which of the following formula is used to calculate the exposure for each risk ?
Evolutionary software process models

Which of the following formula is used to calculate the exposure for each risk ?

__________ is not the management part of software development activities.

An _______________is a user identifiable group of logically related data or control information


maintained within the boundary of the application.

_______ Subgroups are those that the user has the option of using one or none of the subgroups during an
elementary process.

In measuring Software Process Quality by using control charts, if the gap between the defects reported
and defects fixed is increasing, then it means:

Software feasibility is based on which of the following :

In which stage of software development loop, we try to find the solution of the problem on technical
grounds and base our actual implementation on it.

According to Kraul and Steeter, Email is an example of _____ project coordination technique.
Can we ensure 100% risk free software development process, i.e. can we guarantee that during the entire
software development process there will be no occurrence of any risk. Comment with reasons.

software risk is the probability occurance of uncertain events and their potential for
loss within organization technicaly it not possible to ensure 100% risk free software