Documente Academic
Documente Profesional
Documente Cultură
1 - Transportador de cinta
2 - Longitud de transporte: 5000mm
3 - Potencia de motor: 1.5kw
4 - Ancho de la cinta: 600 mm
4 - Gama de ajuste de Velocidad: 0-3m / s
5 - Material de la correa: correa de PVC
6 - Capacidad de transporte: 0-1000kg / h
7 - Tamao: 5000 850 3500mm (L W H)
8 - Peso: 550kg
El transportador de cinta lleva botellas PET para remover etiquetas
2. Removedor de etiqueta
1. Potencia del motor: 18.5kw+5.5kw(water pump)
2. Velocidad de rotacin: 450rpm
3. Etiqueta eliminacin porcentaje: 95%
4. Manera de usar el agua: Agua reciclada
5. Capacidad: 600kg/h
6.raw material: carbon steel
7:Tamao:50001800 3400mm(LWH)
8. Peso: 3000kg
Motor de etiquetas puede deshacerse de etiquetas, tapas de botellas.
3. Correa para el control y la separacin de botellas
1. Longitud de transporte eficaz:8000mm
2. Potencia del motor: 2.2kw
3. Ancho de la cinta: 800mm
4. Capacidad de transporte: 0-1000kg/h
5.raw material of belt: PVC belt
6. Tamao:8300 900 1000mm(LWH)
7.Peso: 1000kg
Los trabajadores pueden estar de pie por plataforma y elegir botellas color
4. Cinta transportadora
1. Longitud de transporte eficaz: 4500mm
2. Potencia del motor: 1.5kw
3. Ancho de la cinta: 600mm
4. Ajuste de rango de velocidad: 0-3m/s
5.raw material of belt: PVC belt
6. capacidad de transporte: 0-1000kg/h
7.Tamao:46007503000mm(LWH)
8.Peso: 550kg
Cinta transportadora lleva las botellas de PET a la trituradora.
5. Trituradora de SWP800
Remark:
Electric system
Main control part of the adoption is brand-name configuration.
As well as the motor overload protection device.
The whole line uses water 2000-3000kg/h.
The whole line needs a 20-foot container and a 40-foot container.
Part 2:
Machine colour: Supplier's standard colour (any other requirements different from our standard will be
met, with a price surcharge).
Payments terms: by divided payments of 30% T/T down payment and irrevocable 70% T/T at
sight before delivery
Warranty: 12 months
Warranty: One year warranty from date of shipment and sellers responsible for replacing parts free
caused by quality problems but easily wear& tear parts are exceptional, and the extra cost (courier fee or
deliver charges etc.) caused by replacing is for buyers account Electric parts for 12 months, sellers
payable service are all life long available for the product sold.
3.Packing: plastic film
Period of validity of the price above: 45 days since the offer date.
Others
The seller will dispatch two engineers from the seller to the buyer's factory for installation and
commissioning and training, the buyer should be responsible for the room and board and the two-way
air tickets and visa fee ,and the allowance of 45 USD per day for each person.
nstallation / commissioning / acceptance / training Commissioning / Acceptance
The assembly and interfacing of the plant's We will send special one or two persons for
components on site in accordance with the two weeks for each one or two production
scope of our quotation. line(s) to complete the commissioning and
training.
Establishing the supply of the services from
positions to be defined in the installation During this period, any replacement parts
drawing to the consumer components that may have to be obtained will be supplied
free of charge.
Inter-wiring of plant components supplied
by Alianzachina Notification that the plant is ready for
Acceptance will be given by Alianzachina. The
Programming a production program for one Acceptance should be carried out immediately.
of the customer's products. Acceptance should cover a maximum of one
production day (single shift).
Training
Included in this quotation is a 7-day-basic training curse in single shift on site for maintenance
personnel and operators. During this training curse the acceptance will be made.
The mechanical assembly of the plant's components at the installation site according to the scope of the
quotation.
Prerequisite for the installation is the punctual on site furnishing of the following equipment/conditions:
Telephone
Telefax
Toilets/washing facilities
Lockable storage space for plant components and installation material, as well as changing
rooms for the personnel .
It must be possible to carry out all activities on site directly, without hindrance or additional
effort. This means, for instance, that the site is safeguarded against any possibly existing area at risk
from fire.
Should it prove impossible to provide the above mentioned equipment / prerequisites on site at all or
only partially, we request to be informed in good time so that we have a chance of organising the items
still missing. The arising expenditure will be invoiced at cost.
The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient
number.
GENERAL NOTES
The quality of the concrete floor where the plant is to be installed must be to a standard of B25,
with a minimum hole drilling depth of 200 mm. As a rule, special foundations are not required.
Any possibly existing plant or equipment that could obstruct access to the site must be removed.
The customer supplies the raw materials and makes available all auxiliary mediums required for
running the plant as required.
Buildings, foundations, possible required pits and staging (with stairs) for placing machines,
control cabinets and extraction fans.
Fire precautions.
Ventilation on air conditioning of the production shop and the storage tanks.
Plant lighting.
All supply and return lines to the boundaries of the Alianzachina supplied equipment, such as
power connections, exhaust air suctions of the extraction plant from the pressure side of the fan
onwards, dry air for the Alianzachina air drier, and water for cooling purposes.
Hydraulic oil, lubricants, auxiliary and raw materials, such as raw materials, water supplying,
eletric power supplying, ect .
Insurance of the supplied equipment against damage of any kind during the assembly and
commissioning period. In as far as these damages were not caused by supported evidence of
Alianzachina's fault.
Lifting tackle, stacker trucks, and auxiliary personnel for assembly and commissioning, erection
material.