Sr. No. &
Rate for Labour
Item Description of Item Unit
2007-08 Rate
Code.
[In Rs.]
1 Excavation for foundation in tidal range up to a depth of 1.50
metre in soft strata (earth, soil of all sorts, sand, slush, silt,
gravel & soft murum) including shoring, strutting and
preparation of bed for foundation as necessary and disposing off
the excavated stuff and necessary incidental dewatering and
backfilling as directed etc. complete.
B.R.- 3 (a) Spec.No. - B.R - 3 (a) / Page No.- 102. Cum 120.00 115.00
2 Excavation for foundation in tidal range up to a depth of 1.50
metre in hard strata including shoring, strutting and preparation of
bed for foundation as necessary and disposing off the excavated
stuff, incidental dewatering if necessary and backfilling as
directed etc. complete.
B.R.- 3
Spec.No. B.R. 3 (b) / Page No.- 102. Cum 330.00 280.00
(b)
3 Removing silt,clay and sand from creek or sea bed upto a depth
of 1.50 metre including disposing off the removed material along
sea shore at location above high tide line etc. complete.
B.R.- 3 (a) Spec.No. B.R. 3 (a) / Page No.- 102. Cum 125.00 115.00
4 Supplying & spreading geofabric filter layer of Geotextile of
Polypropylene multifilament woven to the line, evel and grade
with pore size less than 0.075 mm and permeability greater than
9.0 litre/sqm/sec. confirming specification IS:1969 and ASTM
standard including conveying to the site,joining and stitching with
proper overlap and laying at excavated surface in tidal condition
as directed by Engineer- in- charge etc complete .
c) With Stone Grit 6mm & above brought by Contractor Cum 860.00 50.00
Rd - 19;
Rd - 29; Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192. Cum 340.00 130.00
Rd - 27. [Except weight of stone specified in wording of specification]
7 Supplying and laying in position upto 5 Kg Laterite stones for filter
layer including conveying and spreading as directed by Engineer-
in- charge etc. complete in tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 280.00 130.00
[Except weight of stone specified in wording of specification]
Rd - 27.
8 Supplying & laying trap stones rubble weighing 10 to 25 Kg. for
core layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 380.00 130.00
[Except weight of stone specified in wording of specification]
Rd - 27.
9 Supplying & laying Laterite stones rubble weighing 10 to 20 Kg.
for core layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 300.00 130.00
[Except weight of stone specified in wording of specification]
Rd - 27.
10 Supplying & laying trap stones rubble weighing 35 to 50 Kg. for
armour layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 390.00 140.00
[Except weight of stone specified in wording of specification]
Rd - 27.
11 Supplying & laying Laterite stones rubble weighing 35 to 50 Kg.
for armour layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 325.00 140.00
[Except weight of stone specified in wording of specification]
Rd - 27.
12 Supplying & laying trap stone rubble weighing 50 to 75 Kg. for
armour layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 480.00 150.00
[Except weight of stone specified in wording of specification]
Rd - 27.
13 Supplying & laying trap stone rubbles weighing 75 to 100 Kg. for
armour layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 520.00 170.00
[Except weight of stone specified in wording of specification]
Rd - 27.
14 Supplying & laying Laterite stones rubble weighing 50 to 100 Kg.
for armour layer including conveying with all the leads & lifts and
placing at required places in required line, level, slope & section
as directed etc complete under tidal conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 370.00 170.00
[Except weight of stone specified in wording of specification]
Rd - 27.
15 Providing and laying Trap stones weighing 100 to 200 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 700.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
16 Providing and laying Trap stones weighing 200 to 300 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 750.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
17 Providing and laying Trap stones weighing 300 to 500 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 800.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
18 Providing and laying Trap stones weighing 500 to 750 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 850.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
19 Providing and laying trap stones weighing 750 to 1000 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 1020.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
20 Providing and laying Trap stones weighing 1000 to 1500 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 1150.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
21 Providing and laying Trap stones weighing 1500 to 2000 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 1250.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
22 Providing and laying trap stones weighing 2000 to 3000 Kg. for
appron/ armour layer including quarrying, conveying with all the
leads, lifts, laying in required line, level, slope including necessary
equipments and machinery, such as cranes of adequate capacity
and boom length, as directed etc. complete, in the tidal
conditions.
Rd - 19;
Spec.No.-Rd-19,Page-187; Rd-29,Page-193; Rd-27, Page-192.
Rd - 29; Cum 1450.00 55.00
[Except weight of stone specified in wording of specification]
Rd - 27.
23 Providing & fixing gabions of Meccaferri or equivalent type of
required section including boxes made of mechanically woven
hexagonal shaped wire mesh of type, 10x12 cm. Edges
mechanically selvedged made of heavily (Zinc+ PVC) coated G.I.
wires as per BS: 443, mesh wire 3.00 mm edge wire 3.9 mm
of Meccaferri type or equivalent and filled with 20 to 50 Kg. weight
Trap stones including conveying with all the leads & lifts and
placing at required places in required line, level, slope, section as
directed etc. complete under tidal conditions.