Project : B+G+2+R Jumeirah plots Development, Al Wasl

Consultant : M/s. Nottingham Mechanical & Elecetrical Consulting Engineers


Mep Contractor: ARJ Engineering
Supplier : ACSYS CONTROLS

S/N Consultant comments Reply Remarks


Please find attached cause and effect matrix for CO system.
1 Cause/Effect Matrix to be submitted Comply
Please refer annexure-A

Please find the attached termination drawing and


2 Control Panels Details to be submitted Comply
controller data sheet. Please refer annexure B & C

Detailed shop drawings was submitted by us and the same


3 Detailed drawings must be submitted Comply has been approved. We have enclosed the shop drawings.
Please refer annexure-D
The basement extract fans are interfaced with fire
4 Interface details to be submitted. Comply alarm panel. Please refer the data point list and
schematic (Annexure E &F)

Calibration test to be provided Noted CO sensors are factory calibrated and separate calibration
5 certificates for CO sensors are not available.
The sequence of opertion is not matching with project requiremnts and Please find the attached sequence of
Comply
6 not matching the compliance statement. operation(Annexure G)