Sunteți pe pagina 1din 3

Project: PROPOSED 400 ROOMS HOTEL

Brgy. Union, Nabas, Aklan

Package I: GENERAL CONSTRUCTION

Subject : BILL OF MATERIALS


OSM - Highlighted in Yellow

PROPOSAL FORM - (Itemized Bid Breakdown)


General Construction

Gentlemen:

In accordance with your "Invitation to Bid" for the above mentioned project and subject, we propose to supply, deliver and complete all necessary works
called for by the Scope of Work, the Itemized Bid Breakdown, plans, specifications, governing codes and regulations and related bid and contract documents,
at our expense at the following price in Philippine Currency:

PROPOSAL : Itemized Bid Cost for Bid Package I - General Construction of the above project.

Note: All material costs shall include the direct cost of materials, mark-up and VAT.

DESCRIPTION QTY UNIT MATERIAL LABOR TOTAL


COST COST AMOUNT

GENERAL REQUIREMENTS
A. Mobilization / Demobilization lot
B. Bonds and Insurances
1 Performance Bond lot
2 Guarantee Bond lot
4 Surety lot
5 CARI ( By Owner ) lot
6 CGL ( By Owner ) lot
C. Construction Permit / Licences
1 Government Permits / Barangay Permits lot
2 Workers Permit lot
D Temporary Facilties
1 Temporary Water lot
2 Temporary Power lot
3 Workers Accommodation lot
4 Temporary Fence lot
5 Temporary Office
E. Security lot
F Hauling / Waste Disposal lot
G As-Built Plans lot
H TESTING AND COMMISSIONING lot
Others, if any
7.1
7.2
7.3

TOTAL : GENERAL REQUIREMENTS

III FIRE PROTECTION WORKS

II. Automatic Fire Sprinkler Systems


DESCRIPTION QTY UNIT MATERIAL LABOR TOTAL
COST COST AMOUNT
Fire Lines: B.I. pipes, sch.40, ASTM-20,
A. ASTM-53, "Supreme", "Pacific Pipes" brand
1 200mm lm
2 150mm lm
3 75mm lm
4 65mm lm
5 50mm lm
6 40mm lm
7 32mm lm
8 25mm lm
Fittings: elbows, tees, couplings, adaptor,
B. flanges, caps, plugs, reducers,etc
Malleable fittings, weldable and screwed, ASTM-47 lot
Gate Valves: OS & Y, 175 psi, UL/FM
C. approved, "Viking" brand
1 150mm units
2 100mm units
3 75mm units
4 50mm units
Check Valves: Non-slam, 175 psi, UL/FM
D. approved, "Viking" brand
1 150mm units
2 50mm units
Mechanical Grooved Coupling: 175 psi, UL/FM
E. approved, "Victaulic" brand
1 150mm units
F. Fire Hose Valves: 175 psi, UL/FM approved, "Giacomini" brand
1 65mm units

G. Fire Dept. Inlet Conn.: 175 psi, UL/FM approved, "Giacomini" brand
1 2-way,150x65x65x65mm (DSP) units
2 2-way,150x65x65x65mm (WSP) units
Pressure Relief Valve: 175 psi, UL/FM approved, "OCV Model-108"
H. brand
1 150mm units
I. Alarm Check Valve: 175 psi, UL/FM approved, "Viking" brand
1 150mm units
J. Butterfly Valve: 175 psi, UL/FM approved, "Kennedy" brand
1 150mm units
K. Flexible Connector: 175 psi, UL/FM approved, "Tozen" brand
1 150mm units
2 50mm units
L. Float Valve: 175 psi, UL/FM approved, "Z-Tide" brand
1 63mm units
Sprinkler Heads: Quick Response Type, std. temp., UL/FM approved,
M. "Globe/Viking" brand
1 Pendent semi-recessed type units
2 Upright type units
3 Sidewall type units
N. Water Flow Switches: UL/FM approved, "System Sensor" brand
1 100mm units
Supervisory/Tampered Switches: UL/FM approved, "System Sensor"
O. brand units
Inspector Test Valves/Aux. Drain Valves: 175 psi, Glove Valves, UL/FM
P. approved
1 25mm units
Q. Sight Glass: 175 psi, UL/FM approved "Gim" brand
1 25mm units
R. Fire Hose Cabinets: type II, complete w/ UL/FM accessories units
S. Portable Fire Extinguishers: UL/FM approved, "Amerex" brand
1 10lbs. FE-36 units
2 10lbs. Dry Chem. units
T. Other Items:
1 Pipe hangers, supports and sway braces lot
2 Painting works lot
3 Consumable , miscellaneous items lot
4 Excavation, sand bedding and backfilling works lot
5 Testing and adjustments, hydrostatic pressure test lot
DESCRIPTION QTY UNIT MATERIAL LABOR TOTAL
COST COST AMOUNT
VI. FIRE PROTECTION EQUIPMENT: ( OSM - Supply by BVRI, Installation by contractor )
A. Fire Pump: EE driven, vertical turbine, complete w/ controls, UL/FM approved, sets
"Peerless USA" brand
1-unit, cap=500gpm vs. 400 ft tdh, approx. 100hp, 3ph, 60hz, 230V
B. Jockey Pump: EE driven, vertical-in-line, complete w/ controls, "Grundfos" brand sets
1-unit, cap=50gpm vs. 400 ft tdh, approx. 10hp, 1ph, 60hz, 230V
C. Sensing lines: sets
D. Other Items:
1 Start-up & orientation lot
2 Testing & commissioning lot

TOTAL III: FIRE PROTECTION WORKS

We make this proposal with full knowledge of the kind of quantity and quality of the articles and services required, and if said proposal is accepted, we
after receiving notice of acceptance shall enter into a contract with The BDO within ten (10) days with good and sufficient securities for the faithful
performance thereof. We understand that The BDO may accept any item or group of items of any bid, unless we qualify our bid by specific limitations.

We shall complete the specified scope of works of The BDO in accordance with the specifications, and related documents, within the number of days
specified in the Project Time Schedule after award of Contract to us by The BDO. We shall not request for any extension of time other than due to
circumstances of "force majeure".

We understand that time is an essential part of this proposal contract, and that upon failure to complete the project within the stipulated time, we agree to pay
The BDO one-tenth of one percent of Contract Cost for each and every calendar day of delay (Saturdays, Sundays, and legal Holidays included)
as specified in the general conditions, special conditions of the contract and additional provisions on the special conditions of the contract and all other
related documents in the fulfillment of this contract. Said payments shall be made as liquidated damages and not by way penalty, and we further agree
that The BDO may deduct any amount due to us shall become due to us and such sum accruing as liquidated damages as herein stated.

We understood that the Owner reserves the right to reject any and all bids, to waive any defect or informality therein, or to accept such bids as may be
advantageous to the Owner.

We hereby certify that we have prepared and/or checked and reviewed the contract procedures, contract schedules, and prices submitted with this proposal.

SUBMITTED BY:

Company Name (Printed):

Address:

Authorized Representative:

Signature:

Title or Position:

Date:

S-ar putea să vă placă și