CADANGAN MEMBINA BANGUNAN PUSAT PERUBATAN YANG TERDIRI DARIPADA ;

1) 1 BLOK 6 TINGKAT PUSAT PERUBATAN & 1 TINGKAT TEMPAT LETAK KENDERAAN BAWAH TANAH
2) PONDOK PENGAWAL , RUMAH PAM AIR & KEBUK SAMPAH

DI ATAS LOT 443, SEKSYEN 43 DAERAH KULIM, BANDAR KULIM, KEDAH DARUL AMAN.

lot 433 = 0.3972 ha

DESIGN RAINFALL

In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 2012)

5 minute rainfall ;
State;
Kedah
Station name kedah peak
Storm duration; t = 5 min
Return period for rainfall; Period = 10 yr
From Appendix 2.B - IDF constant ; = 81.579
From Appendix 2.B - IDF constant ; = 0.2000
From Appendix 2.B - IDF constant ; = 0.4370
From Appendix 2.B - IDF constant ; = 0.7190

Peak rainfall intensity; I = (T/1yr) / (t/1hr + ) 1mm/hr


I = 206.81

Design runoff

* biggest value of I selected for the design purpose

Catchment ground description Bare soil (no cover)

time, t = 5
period = 10
Catchment area; A= = 3972
Runoff coefficient (Table 2.5); C= = 0.7
I = 206.81
Design runoff (rational method); Q=CIA = 0.1597262567

Determine the Drain size using manning

Area m2 0.45 0.45 0.2025


Wetted Perimeter m 0.3 0.3 0.45 1.05
Hydraulic Radius 0.19 0.33
Slope,s 1 300 0.0033333 0.0577350269

Capacity of drain m3/sec 0.45


DIRI DARIPADA ;
ETAK KENDERAAN BAWAH TANAH

KEDAH DARUL AMAN.

MA Second edition 2012)

e rainfall ; 10 minute rainfall ;


dah Kedah
h peak kedah peak
5 min t = 10 min
= 10 yr Period = 10 yr
1.579 = 81.579
.2000 = 0.2000
.4370 = 0.4370
.7190 = 0.7190

I = (T/1yr) / (t/1hr + ) 1mm/hr


mm/hr I = 185.86 mm/hr

minute
years
m2

m3/s
> 0.16 1