Sunteți pe pagina 1din 4

MANAGEMENT STRUCTURE

DIRECTOR
(En. Rafizam)

ADMIN & FINANCE


(Ms .Randy)

GURKHA SERVICES MANAGER


(Major (Rtd) K.Subramaniam)

MANAGER MANAGER
(OPERATIONS) (TRAINING & QA)
Mr. Johan Abdullah Mr. Othman Nayan

Note: The CVs of the above executives are attached herewith.

1
APPROACH

Our company adopts the concept of balanced security in the provision of security
services. Such an approach involves the following phases of activities.

PHASE ONE THREAT / RISK ASSESMENT

The objectives of conducting a threat / risk assessment are:

a. To identify targets that need protection.


b. To determine the targets level of exposure to risk.
c. To determine the deficiency gap in the existing protective measures.

Threat / Risk assessments are based on targets criticality, vulnerability and the
probability of a crime taking place.

PHASE TWO DEFINITION OF CONTROL MEASURES

The objectives of defining control measures are to:

a. Ensure that appropriate ratio of balance security components are established


b. Ensure that appropriate protective measures are identified.
c. Ensure that appropriate resources are identified to realize the protective
measures.

PHASE THREE IMPLEMENTATION OF CONTROL MEASURES

The objectives of implementation of control measures are to:

a. To reduce / minimize the organizations exposure to risk.


b. To ensure that operations are carried out with minimum disruption.
c. To ensure that a deterrent security posture is enforced.

2
COSTINGS

Our costing, are base on the following factors:

a. Risk assessment cost.


b. Development of control measures.
c. Procurement of necessary manpower, tools and equipment.
d. Administrative costs.
e. Operational costs.
f. Training costs.
g. Auditing costs.

QUOTATION

Basing on your manpower configuration the following quote for Gurkha Guards Services
is forwarded for your kind attention.

Types of Services Unit Rate (RM)

1 x Unarmed Gurkha Per hour 12.00


Guard

1 x Unarmed Female Per Hour 9.00


Guard (local)

Daily Service Twenty Four (24) Hours


Coverage Period

Manpower Day shift- 6 x Gurkha Guards .


Configuration Day shift 1 x Female Guard
based on clients Night shift 3 x Gurkha Guards
requirement.

3
Total Costing 22 days x 6 gds x RM12 x 12 hrs
(Monthly) = RM
22 days x 1 fem gd x RM9 x 12 hrs
= RM
08 days x 3 gds x 2 shift x RM12 x 12
hrs = RM
Plus 5 % Service tax
RM
Total
RM

Payment Terms Within Fourteen (14) days From Date


of Invoice

S-ar putea să vă placă și