#: _____________
[PROJECT NAME]
Inspection Checklist - Brick/Blockworks
Main Contractor (MC): PIC/Supervisor:
Sub-Contractor: PIC/Supervisor:
Resident Staff (RS): Unit #:
Brick/Block materials: Size & Condition = approved sample? Y ( ) N( ) Mortar mix (cement/sand) ratio = spec i.e. ( : )
RS Re-Verification (3)
RS Re-Verification (3)
Structural element -
MC Rectification (3)
MC Rectification (3)
Infill at brick joints
RS Verification (3)
RS Verification (3)
Bricks / Blocks
Solder course,
& squareness
DPC, exmet
squareness
interlocking
Setting out
Alignment,
Location (1)
frame
Lintel
1 Living, Dining
2 Bedroom 4
3 Bathroom 4
4 Kitchen
5 Staircase
6 Family Hall
7 Master
Bedroom
8 Bathroom 1
9 Bedroom 2
10 Bathroom 2
11 Bedroom 3
12 Bathroom 3
13 Fencing
Checked/Verified by: MC RS MC RS MC RS MC RS
Signature
&
Date
Brickworks Quality KPI = Nos. of location accepted by RS after Re-Verification @ Post-Inst. / Total locations x 100% =
Notes:
(1) Change the location in this checklist according to the product layout. For high-rise project, to attach a copy of the layout.
(2) See below for acceptance tolerance. MC to mark 'a' in respective location only if workmanship is acceptable (NA if not applicable), then inform RS to verify.
Inspection criteria Acceptance tolerance Tools used Diagram
Structural element - alignment & Max. 15mm for encompassing length both verticality & horizontality; Tie / starter bar: see diagram Cross line laser
tie bar
Pre & During
Installation
Setting out 2 setting out lines for each brick wall; Positioning of window & door opening = floor layout Visual
Plumb, horizontal line & Plumb line at all corners; Horizontal line for every course of brick, squareness of room Visual
squareness
Bricks / Blocks Adequately moist. Raise/laid brick <= 1m height at a time Measuring tape
Alignment, squareness Max. 15mm for encompassing length both verticality & horizontality Cross line laser
DPC, exmet See diagram or specified by SO. DPC min. 150mm laps at joints Visual
Post-Installation
Interface with outer frame Gap between aluminium outer frame & brick wall < 15mm, to be filled with 1:3 cement sand Measuring tape
mortar
(3) RS to mark 'a' if acceptable, 'x' if reject (& circle the respective item) or '-' if not check (not for Post-Installation). MC to rectify if any reject & RS to re-verify.
Remarks
ations x 100% =
verify.
Diagram